Construction method for optimizing grouting reinforcement and lifting of independent foundation building

By adopting a combined design of corners, sides and internal grouting points on an independent basis, the problem of uneven settlement caused by load differences is solved, and the optimization of grouting and reinforcement of the building is achieved, ensuring the stability and safety of the structure sex.

CN119061951APending Publication Date: 2024-12-03BEIJING HENGXIANG HONGYE FOUND REINFORCEMENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411453789.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Differences in loads under independent foundations lead to uneven settlement, affecting the overall safety and use of building structures. An optimized grouting reinforcement and lifting method is needed to solve this problem.

Method used

Using a combination design of corners, edges and internal grouting points, the grouting path is classified and the reinforcement depth and inclination angle is determined to achieve uniform grouting and reinforcement formation, ensuring uniform lifting of each independent foundation.

Benefits of technology

It effectively reduces the number of grouting holes, avoids foundation lifting and biasing, improves the reinforcement effect, ensures that the settlement of the building meets the design requirements, and improves the stability and safety of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061951A_ABST
    Figure CN119061951A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for optimizing grouting reinforcement and lifting of an independent foundation building, which not only avoids an original foundation beam, but also reduces the number of grouting hole sites in the building through three types of grouting hole sites of corner grouting points, edge grouting points and internal grouting points, does not delay the use of a site, and reduces the influence on the internal environment. Through classification of the stand columns and arrangement of a grouting path, effective grouting under optimized grouting hole sites is guaranteed, and formation of a reinforcing body is guaranteed; each stand column is grouted in two directions, so that the independent foundation can be effectively prevented from being lifted to be inclined, and the influence on the connection between the stand column and the independent foundation is avoided; and through the arrangement of the reinforcing depth and the inclination angle, the grouting path is clear, it is guaranteed that the reinforcing body is located under the center of the stand column, and then the lifting effect is guaranteed and improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of independent foundation reinforcement and lifting, and in particular to a construction method for optimizing grouting reinforcement and lifting of an independent foundation building. Background Art

[0002] As people's requirements for living environment increase, supporting facilities in the community are receiving more and more attention. Supporting facilities are usually low-rise buildings and are built with a frame structure. Independent foundations are often used under the frame structure. Independent foundations are usually used to support a single column, so the load difference between each foundation is large, resulting in different settlement amounts for each foundation. This settlement difference can cause uneven deformation of the superstructure, such as wall cracks, which affects the overall safety and normal use of the building. Therefore, it is necessary and urgent to treat the foundation of the building. Therefore, how to optimize, target and conveniently implement grouting reinforcement and lifting of the independent foundation requires special research and design. Summary of the invention

[0003] The invention provides a construction method for optimizing grouting reinforcement and lifting of an independent foundation building, which is used to solve technical problems such as optimized grouting point design, grouting path design and reinforcement body formation under an independent foundation.

[0004] To achieve the above object, the present invention adopts the following technical solution:

[0005] A construction method for optimizing grouting reinforcement and lifting of an independent foundation building, the specific steps are as follows:

[0006] Step 1: Classify the independent foundations of the frame structure according to the positions of the columns, wherein the independent foundations set under the corner columns are defined as corner column foundations, the independent foundations set under the peripheral columns are defined as side column foundations, and the independent foundations set under the internal columns enclosed by the corner columns and side columns are defined as internal column foundations;

[0007] Step 2: Set corner grouting points on the outside of the corner column foundation. The corner grouting points are located on both sides of the frame structure and are set corresponding to the center line of the corner column. Set a side grouting point on the outside of the side column foundation. The side grouting point is set corresponding to the center line of the side column. Set internal grouting points inside the frame structure. The internal grouting points are set at the intersection of the center lines of four independent foundations. There are four independent foundations between the adjacent internal grouting points in the horizontal and vertical directions.

[0008] Step 3: The setting position of the corner grouting point is obtained according to the side length of the corner column foundation, the position of the side grouting point is obtained according to the side length of the side column foundation, and the position of the internal grouting point is obtained according to the length of the diagonal of the independent foundation around the internal grouting point;

[0009] Step 4: Determine the grouting reinforcement depth under each independent foundation according to the size of the independent foundation, and determine the inclination angle of each grouting hole according to the reinforcement depth;

[0010] Step 5: During grouting, the reinforcement body under the corner column foundation is grouted through the corner grouting points on both sides by combining the corner grouting path; the reinforcement body under the side column foundation is grouted through the edge grouting point on one side and the adjacent internal grouting point by combining the edge grouting path and the internal grouting path respectively; for the reinforcement body under the inner column foundation, the two adjacent internal grouting points are grouted by combining the internal grouting path;

[0011] Step 6: During grouting, the two grouting paths of each independent foundation are grouted simultaneously, and the building is lifted evenly until the settlement of the building meets the design requirements, thereby completing the construction of optimized grouting reinforcement and lifting of the independent foundation building.

[0012] Furthermore, a single independent foundation is arranged under each column of the frame structure, the center of the column coincides with the center of the independent foundation, and the downward extension line of the center of the column is the end of the corner grouting path, the edge grouting path and the internal grouting path.

[0013] Furthermore, the internal grouting points are first arranged between the independent foundations of the corner columns, side columns and inner columns with the largest settlements, and then are arranged in sequence in the horizontal and vertical directions according to the size of the settlements.

[0014] Furthermore, for the position setting in step three, the distance between the X-direction corner grouting point and the edge grouting point and the center of the corner column is L1, L1=(b1 / 2)+c, and the distance between the Y-direction corner grouting point and the edge grouting point and the center of the corner column is L2, L2=(b2 / 2)+c, wherein b1 is the side length of the corresponding independent foundation in the Y direction, and b2 is the side length of the corresponding independent foundation in the X direction; wherein c is a constant, ranging from 0.5m to 1.5m.

[0015] Furthermore, the distance between the internal grouting point and the center of the adjacent column is L3=1 / 2L, where L is the distance between the centers of two adjacent obliquely opposite columns.

[0016] Furthermore, the grouting reinforcement depth h under the foundation is determined, h = b (2.5-0.4lnb), where b = max (b1, b2), b1 and b2 are the side lengths of the independent foundation in the Y direction and the side lengths of the independent foundation in the X direction, respectively.

[0017] Furthermore, the inclination angle θ of the grouting hole, the inclination angle of the corner grouting path and the edge grouting path in the X direction are determined. The inclination angle of the corner grouting path and the edge grouting path in the Y direction For the inclination angle of the internal grouting path Among them, d is the foundation burial depth.

[0018] Furthermore, the diameter of the reinforcement body is greater than the side length of the independent foundation, and the space between the reinforcement bodies under each adjacent independent foundation is the original soil.

[0019] Furthermore, the soil under the independent foundation is soft soil or contains groundwater, and a lifting layer is arranged at the bottom of the reinforcement body. The thickness of the lifting layer is not greater than the reinforcement depth, and adjacent lifting layers are partially or completely connected.

[0020] The beneficial effects of the present invention are embodied in:

[0021] 1) The present invention uses three types of grouting holes, namely, corner grouting points, edge grouting points and internal grouting points, which not only avoids the original foundation beam, but also reduces the number of grouting holes inside the building, does not delay the use of the site, and reduces the impact on the internal environment.

[0022] 2) The present invention facilitates effective grouting at the optimized grouting hole position and the formation of the reinforcement body by classifying the columns and setting the grouting path; and each column is grouted in two directions, which can effectively avoid lifting the independent foundation and affecting the connection between the column and the independent foundation;

[0023] 3) The present invention not only facilitates the grouting path by setting the reinforcement depth and the inclination angle, but also ensures that the reinforcement body is directly below the center of the column, thereby ensuring and improving the lifting effect;

[0024] Other features and advantages of the present invention will be set forth in the following description, and in part will become apparent from the description, or may be understood by practicing the present invention; the main purpose and other advantages of the present invention may be realized and obtained through the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is the distribution diagram of three types of grouting points at independent foundations;.

[0026] Figure 2 It is a schematic diagram of plane grouting for three grouting path construction;

[0027] Figure 3 It is a schematic diagram of the vertical section of the grouting path at the lower corner of the corner column foundation;

[0028] Figure 4 It is a vertical section diagram of the grouting path at the lower edge of the side column foundation;

[0029] Figure 5 It is a schematic diagram of the vertical section of the internal grouting path under the inner column foundation.

[0030] Figure numbers: 1-frame structure, 2-corner column foundation, 3-side column foundation, 4-inner column foundation, 5-corner grouting point, 6-edge grouting point, 7-inner grouting point, 8-corner grouting path, 9-edge grouting path, 10-inner grouting path, 11-reinforcement body. DETAILED DESCRIPTION

[0031] Take a certain community as an example. Its shops have three floors with a frame structure, and an independent foundation is set under the frame structure. The independent foundation has sunk by about 3 centimeters, and the settlement has not reached stability. There is a loess layer ② under the independent foundation. This soil layer is medium to high compressible soil, has collapsibility, and has a large collapsibility coefficient. When the self-weight and overburden load values ​​are large, it is easy to compress and deform, resulting in uneven settlement. The uneven settlement of the building has caused different degrees of cracking in the wall, and there is a trend of further deterioration. In order to ensure safety in later use, the foundation of the shop needs to be reinforced to ensure that uneven settlement will not occur in the later period. The groundwater level is 29-31m underground, so the impact of groundwater on the independent foundation is not considered.

[0032] Combination Figures 1 to 5 As shown, the construction method of optimizing grouting reinforcement and lifting of independent foundation buildings is further explained. The specific steps are as follows:

[0033] Step 1: Classify the independent foundations of the frame structure 1 according to the positions of the columns, wherein the independent foundation set under the corner column is defined as the corner column foundation 2, the independent foundation set under the peripheral columns is defined as the side column foundation 3, and the independent foundation set under the internal columns enclosed by the corner column and the side column is defined as the inner column foundation 4;

[0034] Wherein, a single independent foundation is arranged under each column of the frame structure 1, the center of the column coincides with the center of the independent foundation, and the downward extension line of the center of the column is the end of the corner grouting path 8, the edge grouting path 9 and the internal grouting path 10. Step 2, a corner grouting point 5 is arranged outside the corner column foundation 2, and the corner grouting point 5 is located on both sides outside the frame structure 1 and is arranged corresponding to the center line of the corner column; an edge grouting point 6 is arranged outside the side column foundation 3, and the edge grouting point 6 is arranged corresponding to the center line of the side column; an internal grouting point 7 is arranged inside the frame structure 1, and the internal grouting point 7 is arranged at the intersection of the center lines of the four independent foundations, and four independent foundations are spaced between the internal grouting points 7 adjacent in the horizontal and vertical directions; as Figure 1 In the figure, the corner grouting point 5 is marked with K1, the edge grouting point 6 is marked with K2, and the internal grouting point 7 is marked with K3.

[0035] In this embodiment, the internal grouting points 7 are first arranged between the independent foundations of the corner columns, side columns and inner columns with the largest settlement, and then are arranged in sequence in the horizontal and vertical directions according to the settlement size.

[0036] Step three, determine the location of the corner grouting point 5 according to the side length of the corner column foundation 2, determine the location of the side grouting point 6 according to the side length of the side column foundation 3, and determine the location of the internal grouting point 7 according to the length of the diagonal of the independent foundations around the internal grouting point 7.

[0037] For the position setting in step three, the distance between the X-direction corner grouting point 5 and the edge grouting point 6 and the center of the corner column is L1, L1=b1 / 2+c, and the distance between the Y-direction corner grouting point 5 and the edge grouting point 6 and the center of the corner column is L2, L2=b2 / 2+c, where b1 is the side length of the corresponding independent foundation in the Y direction, and b2 is the side length of the corresponding independent foundation in the X direction. In this embodiment, the long direction of the frame structure is the X-axis, and the short direction is the Y-axis. The b1 of the independent foundation is 3m, and b2 is 3m, where c is a constant, which is 0.5m, so L1 is 2m and L2 is 2m.

[0038] The distance between the internal grouting point 7 and the center of the adjacent column is L3=1 / 2L, where L is the distance between the centers of two adjacent obliquely opposite columns. In this embodiment, L is 9.4m, so L3 is 4.7m.

[0039] Step 4: Determine the grouting reinforcement depth under each independent foundation according to the size of the independent foundation, and determine the inclination angle of each grouting hole according to the reinforcement depth.

[0040] Determine the grouting reinforcement depth h under the foundation, h = b (2.5-0.4lnb), where b = max (b1, b2), b1 and b2 are the side lengths of the independent foundation in the Y direction and the side lengths of the independent foundation in the X direction respectively; thus, it can be concluded that h is 3.3m.

[0041] Determine the inclination angle θ of the grouting hole, the inclination angle of the X-direction corner grouting path 8 and the edge grouting path 9 The inclination angle of the corner grouting path 8 and the edge grouting path 9 in the Y direction The inclination angle of the internal grouting path 10 Among them, d is the foundation burial depth, which is 1.2m. Therefore, θ1 is 66°, θ2 is 66°, and θ3 is 44°.

[0042] Step 5. During grouting, the reinforcement body 11 under the corner column foundation 2 is combined through the corner grouting points 5 on both sides by the corner grouting path 8 for grouting, and the reinforcement body 11 under the side column foundation 3 is combined through the edge grouting point 6 on one side and the adjacent internal grouting point 7 by the edge grouting path 9 and the internal grouting path 10 for grouting respectively; for the reinforcement body 11 under the inner column foundation 4, there are two adjacent internal grouting points 7 that are combined by the internal grouting path 10 for grouting.

[0043] In this embodiment, the diameter of the reinforcement body 11 is greater than the side length of the independent foundation, and the original soil is between the reinforcement bodies 11 under each adjacent independent foundation. The soil under the independent foundation is soft soil or contains groundwater, and a lifting layer is set at the bottom of the reinforcement body 11. The thickness of the lifting layer is not greater than the reinforcement depth, and adjacent lifting layers are partially or completely connected.

[0044] Step 6: During grouting, the two grouting paths of each independent foundation are grouted simultaneously, and the building is lifted evenly until the settlement of the building meets the design requirements, thereby completing the construction of optimized grouting reinforcement and lifting of the independent foundation building.

[0045] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field can think of within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.

Claims

1. A construction method for optimizing grouting reinforcement and lifting of an independent foundation building, characterized in that: The specific steps are as follows: Step 1: Classify the independent foundations of the frame structure (1) according to the positions of the columns, wherein the independent foundations arranged under the corner columns are defined as corner column foundations (2), the independent foundations arranged under the peripheral columns are defined as side column foundations (3), and the independent foundations arranged under the internal columns enclosed by the corner columns and side columns are defined as internal column foundations (4); Step 2: a corner grouting point (5) is arranged outside the corner column foundation (2), the corner grouting point (5) is located on both sides outside the frame structure (1) and is arranged corresponding to the center line of the corner column; a side grouting point (6) is arranged outside the side column foundation (3), wherein the side grouting point (6) is arranged corresponding to the center line of the side column; an internal grouting point (7) is arranged inside the frame structure (1), the internal grouting point (7) is arranged at the intersection of the center lines of four independent foundations, and four independent foundations are spaced between the adjacent internal grouting points (7) in the transverse and longitudinal directions; Step 3: The setting position of the corner grouting point (5) is obtained according to the side length of the corner column foundation (2), the position of the side grouting point (6) is obtained according to the side length of the side column foundation (3), and the position of the internal grouting point (7) is obtained according to the length of the diagonal of the independent foundations around the internal grouting point (7); Step 4: Determine the grouting reinforcement depth under each independent foundation according to the size of the independent foundation, and determine the inclination angle of each grouting hole according to the reinforcement depth; Step 5: During grouting, the reinforcement body (11) under the corner column foundation (2) is grouted through the corner grouting points (5) on both sides by the corner grouting path (8); the reinforcement body (11) under the side column foundation (3) is grouted through the side grouting point (6) on one side and the adjacent internal grouting point (7) by the side grouting path (9) and the internal grouting path (10) respectively; for the reinforcement body (11) under the inner column foundation (4), the two adjacent internal grouting points (7) are combined by the internal grouting path (10) for grouting. Step 6: During grouting, the two grouting paths of each independent foundation are grouted simultaneously, and the building is lifted evenly until the settlement of the building meets the design requirements, thereby completing the construction of optimized grouting reinforcement and lifting of the independent foundation building.

2. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 1, characterized in that: A single independent foundation is arranged under each column of the frame structure (1), the center of the column coincides with the center of the independent foundation, and the downward extension line of the center of the column is the end of the corner grouting path (8), the edge grouting path (9) and the internal grouting path (10).

3. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 1, characterized in that: The internal grouting points (7) are first arranged between the corner columns, side columns and inner column independent foundations with the largest settlement, and then arranged in sequence in the horizontal and vertical directions according to the settlement size.

4. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 1, characterized in that: For the position setting in step 3, the distance between the X-direction corner grouting point (5) and the edge grouting point (6) and the center of the corner column is L1, L1 = (b1 / 2) + c, and the distance between the Y-direction corner grouting point (5) and the edge grouting point (6) and the center of the corner column is L2, L2 = (b2 / 2) + c, where b1 is the side length of the corresponding independent foundation in the Y direction, b2 is the side length of the corresponding independent foundation in the X direction, and c is a constant, ranging from 0.5m to 1.5m.

5. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 4, characterized in that: The distance between the internal grouting point (7) and the center of the adjacent column is L3=1 / 2L, where L is the distance between the centers of two adjacent obliquely opposite columns.

6. A construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 5, characterized in that: Determine the grouting reinforcement depth h under the foundation, h = b (2.5-0.4lnb), where b = max (b1, b2), b1 and b2 are the side lengths of the independent foundation in the Y direction and the side lengths of the independent foundation in the X direction, respectively.

7. A construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 6, characterized in that: Determine the inclination angle θ of the grouting hole, the inclination angle of the X-direction corner grouting path (8) and the edge grouting path (9) The inclination angle of the corner grouting path (8) and the edge grouting path (9) in the Y direction The inclination angle of the internal grouting path (10) Among them, d is the foundation burial depth.

8. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 1, characterized in that: The diameter of the reinforcement body (11) is greater than the side length of the independent foundation, and the space between the reinforcement bodies (11) under each adjacent independent foundation is the original soil body.

9. The construction method for optimizing grouting reinforcement and lifting of an independent foundation building as claimed in claim 1, characterized in that: The soil under the independent foundation is soft soil or contains groundwater. A lifting layer is arranged at the bottom of the reinforcement body (11). The thickness of the lifting layer is not greater than the reinforcement depth, and adjacent lifting layers are partially or completely connected.