Sleeve type steel-wood composite floor system and mounting method thereof
Through the combined design of sleeve-type shear joints and bolts, the problem of limited application of existing steel and wood composite floors in large span structures is solved, which improves the strength and stability of the nodes, simplifies the installation process, and improves the improvement of the installation process. Construction efficiency and environmental performance.
Patent Information
- Application Number
- CN202411247526.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-03
AI Technical Summary
The application of existing steel-wood combined floors in large spans, large cantilever structures and other key stress-bearing components is limited. Due to the low strength of the wood and the small elastic modulus, it is difficult to fully exert the mechanical properties of steel and wood.
The steel beam is fixedly connected to the wooden cover by using sleeve-type shearing connectors. By setting multiple sets of shearing connectors and bolts on the wooden cover, the gap between the sleeve and the connecting hole is filled with epoxy resin to enhance the The shear resistance and stiffness of the node.
Improve the strength, stiffness and stability of the steel-wood combination nodes, enhance the safety performance of the overall floor, simplify the installation process, improve construction efficiency, and replaceable bolts, making full use of the mechanical properties of wooden cover plates and steel beams , improves environmental performance.
Smart Images

Figure CN119062042A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building engineering, and particularly relates to a sleeve-type steel-wood composite floor and an installation method thereof. Background Art
[0002] In the context of the transformation and upgrading of the construction industry towards green, low-carbon and new industrialization, prefabricated buildings such as steel-wood composite structures have been favored in actual projects and have been widely used in public buildings such as commercial plazas, schools, and office buildings. Engineered wood has gradually been used in multi-story prefabricated buildings due to its good earthquake resistance, excellent thermal insulation performance, and high degree of industrialized construction, and has good development prospects.
[0003] The steel-wood composite floor formed by connecting engineered wood to steel beams through bonding or metal shear members can give full play to the tensile properties of steel and the compressive properties of wood. At the same time, the structure at the node also limits the relative slip between the steel beam and the wood floor. However, due to the physical properties of wood with low strength and small elastic modulus, the application of steel-wood composite floor is limited in some large-span, large cantilever structures and other key load-bearing components. Summary of the invention
[0004] In order to solve the above problems, the technical solution adopted by the present invention is:
[0005] A sleeve-type steel-wood composite floor comprises: a steel beam and a wooden cover plate arranged on the upper part of the steel beam, wherein the wooden cover plate and the steel beam are fixedly connected by a shear-resistant connector, and the shear-resistant connector comprises a sleeve penetrating the wooden cover plate, and a fixing member arranged inside the sleeve and connecting the steel beam and the wooden cover plate.
[0006] Furthermore, the steel beam is H-shaped.
[0007] Furthermore, a plurality of groups of the shear connectors are evenly arranged along the length direction of the wooden cover board, and each group of the shear connectors is provided with at least two shear connectors, which are located on both sides symmetrically of the same flange of the steel beam.
[0008] Furthermore, the spacing S between each group of two shear connectors is ≥4d, and the end distance e1 of the shear connector from the wooden cover board in the width direction is ≥7d, where d is the diameter of the sleeve.
[0009] Furthermore, the spacing r between each group of shear connectors is ≥5d, and the edge distance e2 between the shear connector and the wooden cover board in the length direction is ≥4d, where d is the diameter of the sleeve.
[0010] Furthermore, a penetrating connection hole is provided on the wooden cover plate, the outer diameter of the sleeve is smaller than the hole diameter of the connection hole, the sleeve is located inside the connection hole, and epoxy resin is provided between the sleeve and the connection hole.
[0011] Furthermore, the fixing member is a bolt, which passes through the steel beam and the sleeve and extends to the outside. A nut is connected to the bolt and located on the upper part of the wooden cover plate, and a gasket is provided between the nut and the wooden cover plate.
[0012] Furthermore, the strength grade and elastic modulus of the sleeve are higher than those of the bolt.
[0013] Furthermore, the wooden cover board is formed by gluing three layers of SPF.
[0014] A method for installing a sleeve-type steel-wood composite floor comprises the following steps:
[0015] S1. Pre-drill holes at the corresponding positions of the wooden cover and steel beam in the factory according to the required diameter;
[0016] S2. Install the fixings on the steel beam through the pre-drilled holes and fix them with sleeves;
[0017] S3, injecting epoxy resin between the connection hole and the sleeve in the wooden cover, and fixing the fixing part with a gasket and a nut;
[0018] S4. After the epoxy resin solidifies, the node installation is completed.
[0019] Beneficial effects of the present invention:
[0020] The sleeve-type steel-wood composite floor and the installation method thereof provided by the present invention combine the wood cover plate and the steel beam, and the structural design thereof is reasonable, thereby improving the strength, rigidity and stability of the steel-wood composite node and improving the safety performance of the overall floor; the assembly is convenient, the construction efficiency is improved, and the construction period is shortened; the bolts are replaceable, and the mechanical properties of the wood cover plate and the steel beam are fully utilized; the engineering wood is light and high-strength, has stable mechanical properties, is green and low-carbon, and improves the environmental protection performance of the composite floor. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0022] Figure 2 It is a schematic diagram of the cross-sectional structure of a node of the present invention;
[0023] Figure 3 It is the AA cross-sectional view of the present invention;
[0024] Figure 4 It is the BB cross-sectional view of the present invention;
[0025] Figure 5 It is a structural diagram of a sleeve-type steel-wood composite floor without fixings installed;
[0026] Among them, 1. gasket; 2. nut; 3. fixing part; 4. epoxy resin; 5. sleeve; 6. connecting hole; 7. wooden cover plate; 8. steel beam. DETAILED DESCRIPTION
[0027] The present invention provides a sleeve-type steel-wood composite floor and an installation method thereof. The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings to make it easier to understand and grasp.
[0028] Example 1
[0029] refer to Figure 1-5 A sleeve-type steel-wood composite floor comprises: a steel beam 8 and a wooden cover plate 7 arranged on the upper part of the steel beam 8, the wooden cover plate 7 and the steel beam 8 are fixedly connected by a shear-resistant connector, and the shear-resistant connector comprises a sleeve 5 passing through the wooden cover plate 7, and a fixing part 3 arranged inside the sleeve 5 to connect the steel beam 8 and the wooden cover plate 7.
[0030] In this embodiment, the steel beam 8 is H-shaped, and the wooden cover plate 7 is installed on the top of the steel beam 8 to fully utilize the physical and mechanical properties of wood's compression resistance and steel's tension resistance.
[0031] In this embodiment, multiple groups of shear connectors are evenly arranged along the length direction of the wooden cover 7, each group of shear connectors has at least two shear connectors, and are located on both sides symmetrically of the same flange of the steel beam 8, so that the force is more uniform and the connection is more stable.
[0032] In this embodiment, the spacing S between each group of two shear connectors is ≥4d, and the end distance e1 of the shear connector from the wooden cover board 7 in the width direction is ≥7d, where d is the diameter of the sleeve.
[0033] In this embodiment, the spacing r between each group of shear connectors is ≥5d, and the edge distance e2 between the shear connector and the wooden cover board 7 in the length direction is ≥4d, where d is the diameter of the sleeve.
[0034] In this embodiment, a penetrating connection hole 6 is provided on the wooden cover plate 7, the outer diameter of the sleeve 5 is smaller than the hole diameter of the connection hole 6, the sleeve 5 is located inside the connection hole 6, and epoxy resin 4 is provided between the sleeve 5 and the connection hole 6. The epoxy resin 4 fills the reserved gap between the sleeve 5 and the connection hole 6 to improve the composite efficiency of the steel-wood composite node.
[0035] Preferably, the epoxy resin 4 has a thickness of 2-3 mm and is made of MT-500 anchor glue material, which has good shear resistance.
[0036] In this embodiment, the fixing part 3 is a bolt, which passes through the steel beam 8 and the sleeve 5 and extends to the outside. A nut 2 is connected to the bolt and located on the upper part of the wooden cover plate 7. A gasket 1 is provided between the nut 2 and the wooden cover plate 7. The bolt passes through the wooden cover plate 7, which strengthens the joint force and deformation coordination of the steel beam 8 and the wooden cover plate 7 and the integrity of the component, provides the main shear bearing capacity, and limits the relative slippage between steel and wood; at the same time, the sleeve 5 is installed outside the bolt to increase the shear resistance and bending stiffness of the floor; the bolt is fastened to the upper side of the wooden cover plate 7 through the gasket 1 and the nut 2, which prevents the component from vertically disengaging and resists the out-of-plane impact force generated by accidental loads.
[0037] Preferably, the gasket 1 is square; the steel beam 8 is made of Q345 hot-rolled HM steel with a cross-sectional size of 200mm*150mm*7mm*10mm; the fixing part 3 is made of 4.8-grade M12*140 full-thread bolt, and the sleeve 5 is made of 8.8-grade M12*16*105 cylindrical nut.
[0038] In this embodiment, the strength grade and elastic modulus of the sleeve 5 are higher than those of the bolt, and the mechanical properties of the sleeve 5 are better than those of the bolt. When the bolt is damaged but the sleeve 5 does not yield, the bolt can be replaced and repaired.
[0039] In this embodiment, the wooden cover board 7 is formed by gluing three layers of SPF.
[0040] Preferably, each layer of the wooden cover board 7 is 35 mm thick and is made of cross-laminated timber prefabricated panels made of sawn timber of North American and European imported hemlock, spruce-pine-fir (SPF), southern pine and spruce, as well as sawn timber of Chinese domestic rubber wood, fir and other species.
[0041] Example 2
[0042] A method for installing a sleeve-type steel-wood composite floor is the method for installing a sleeve-type steel-wood composite floor provided in Example 1, and the installation method comprises the following steps:
[0043] S1. Pre-drill holes at the corresponding positions of the wooden cover and steel beam in the factory according to the required diameter;
[0044] S2. Install the fixings on the steel beam through the pre-drilled holes and fix them with sleeves;
[0045] S3, injecting epoxy resin between the connection hole and the sleeve in the wooden cover, and fixing the fixing part with a gasket and a nut;
[0046] S4. After the epoxy resin solidifies, the node installation is completed.
[0047] The above fully describes the technical solution of the present invention. It should be noted that the specific implementation of the present invention is not limited to the above description. All technical solutions formed by ordinary technicians in the field using equivalent or equivalent transformations in structure, method or function based on the spirit of the present invention fall within the protection scope of the present invention.
Claims
1. A sleeve-type steel-wood composite floor, characterized in that: include: A steel beam and a wooden cover plate arranged on the upper part of the steel beam, wherein the wooden cover plate and the steel beam are fixedly connected via a shear-resistant connector, and the shear-resistant connector includes a sleeve penetrating the wooden cover plate, and a fixing member arranged inside the sleeve and connecting the steel beam and the wooden cover plate.
2. The sleeve-type steel-wood composite floor according to claim 1 is characterized in that: The steel beam is H-shaped.
3. The sleeve-type steel-wood composite floor according to claim 2 is characterized in that: The shear connectors are evenly arranged in multiple groups along the length direction of the wooden cover plate, and each group of the shear connectors is provided with at least two shear connectors, which are located on both sides of the same flange of the steel beam.
4. The sleeve-type steel-wood composite floor according to claim 2 is characterized in that: The spacing S between each group of two shear connectors is ≥4d, and the end distance e1 of the shear connector from the wooden cover board in the width direction is ≥7d, where d is the diameter of the sleeve.
5. The sleeve-type steel-wood composite floor according to claim 2 is characterized in that: The spacing r between each group of shear connectors is ≥5d, and the edge distance e2 between the shear connectors and the wooden cover board in the length direction is ≥4d, where d is the diameter of the sleeve.
6. The sleeve-type steel-wood composite floor according to claim 1 is characterized in that: The wooden cover plate is provided with a penetrating connection hole, the outer diameter of the sleeve is smaller than the hole diameter of the connection hole, the sleeve is located inside the connection hole, and epoxy resin is provided between the sleeve and the connection hole.
7. The sleeve-type steel-wood composite floor according to claim 1 is characterized in that: The fixing member is a bolt, which passes through the steel beam and the sleeve and extends to the outside. A nut is connected to the bolt and located on the upper part of the wooden cover plate, and a gasket is provided between the nut and the wooden cover plate.
8. The sleeve-type steel-wood composite floor according to claim 7 is characterized in that: The strength grade and elastic modulus of the sleeve are higher than those of the bolt.
9. The sleeve-type steel-wood composite floor according to claim 1 is characterized in that: The wooden cover board is made of three layers of SPF glued together.
10. The installation method of the sleeve-type steel-wood composite floor according to any one of claims 1 to 9 is characterized in that: The following steps are involved: S1. Pre-drill holes at the corresponding positions of the wooden cover and steel beam in the factory according to the required diameter; S2. Install the fixings on the steel beam through the pre-drilled holes and fix them with sleeves; S3, injecting epoxy resin between the connection hole and the sleeve in the wooden cover, and fixing the fixing part with a gasket and a nut; S4. After the epoxy resin solidifies, the node installation is completed.
