Movable door-shaped frame for displacement installation of large steel beam
By designing a movable door frame, using pulleys and rotary handles to improve the convenience and stability of steel beam displacement, the problem of traditional door frames being inconvenient to move on the roof frame beam and being unable to cross the installation node is solved, and the problem of traditional door frames being unable to move on the roof frame beam is realized. More efficient steel beam displacement assistiveness.
Patent Information
- Application Number
- CN202411377236.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-12-03
AI Technical Summary
During the steel beam displacement process, traditional door frames move on the roof frame beam due to limited space, inconvenient operation, and cannot effectively cross the installation node, which affects the auxiliary and efficiency of the steel beam displacement.
A movable door frame is designed, through a combined structure of load-bearing seat, mounting frame and base, the pulley is used to improve movement convenience, and the connecting rod and fixing frame are driven by the rotary handle and screw to perform limit fixation, combined with removable The supporting column and beam structure realizes flexible adjustment of the door frame and the ability to span the installation node.
It improves the stability and movement convenience of the door frame on the roof frame beam, solves the problem that traditional door frames cannot move effectively and cross the installation node, and enhances the auxiliary and efficiency of the steel beam shift work.
Smart Images

Figure CN119062125A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel beam displacement, in particular to a movable door frame used for displacement installation of large steel beams. Background Art
[0002] Building steel beams are an important part of steel structure buildings. They are mainly used to support and tension buildings, carry and transfer loads. In the case of building design changes, maintenance and renovation, or construction needs, the steel beams need to be moved; In the process of shifting the steel beam, a large tower crane or a large truck crane is usually used to lift the steel beam, and then a portal frame is set up on the roof frame beam, and a hoist hook is set up on the portal frame. The hoist hook cooperates with the portal frame to support the steel beam and complete the shifting of the steel beam; However, in actual use, since the portal frames are all installed on the roof frame beams, when moving the portal frames, they usually need to be disassembled or other auxiliary tools need to be used to complete the movement of the portal frames. However, due to the limited operating space on the roof frame beams, it is inconvenient to move the portal frames. Therefore, we propose a movable portal frame for the displacement installation of large steel beams. Summary of the invention
[0003] The object of the present invention is to provide a movable portal frame for the displacement installation of large steel beams to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a movable portal frame for the displacement installation of large steel beams, comprising a load-bearing frame arranged on one side of a building column, the building column being provided with a plurality of them, the tops of the building columns being fixedly connected with roof frame beams, and the tops of the roof frame beams being provided with a plurality of installation nodes, the load-bearing frame being located on one side of the roof frame beam, the top of the load-bearing frame being butted with a support column A, the top of the support column A being fixedly connected with a cross beam A, the bottom of an end of the cross beam A away from the support column A being fixedly connected with a support column B, the end of the cross beam A close to the support column B being butted with a cross beam B, the cross beam A and the cross beam B being connected by a connecting frame, the bottom of an end of the cross beam B away from the cross beam A being fixedly connected with a support column C, the tops of both ends of the cross beam A and the cross beam B being provided with a plurality of butt holes, and the bottoms of the support columns B and the support columns C being fixedly connected with a load-bearing seat; A connecting hole is provided on one side of the bottom of both ends of the load-bearing seat, and a mounting frame is fixedly connected to the bottom of both ends of the load-bearing seat, and a base is fixedly connected between the bottoms of the mounting frames. The load-bearing seat, the mounting frame and the base are cooperatively sleeved on the roof frame beam, and a plurality of fixedly connected pulleys are installed on one side of the load-bearing seat, the mounting frame and the base close to the roof frame beam through a bracket.
[0005] Preferably, both ends of the load-bearing seat are fixedly connected to a support frame on one side close to the connecting hole, and the support frames are rotatably connected to the sides opposite to each other with screw rods, and the screw rods are threadedly connected to fixing frames, and the bottom of the fixing frame passes through the connecting hole and is slidably connected to the connecting hole. The side of the fixing frame close to the roof frame beam is fixedly connected to a limiting plate through a frame body that passes through the mounting frame, and the limiting plate is located on one side of the pulley at the corresponding position.
[0006] Preferably, a slidably connected connecting frame is sleeved at the joint between the crossbeam A and the crossbeam B, and positioning holes corresponding to the number of docking holes on the crossbeam A and the crossbeam B on the same side are opened at both ends of the connecting frame, and the positioning holes are aligned with the positions of the corresponding docking holes.
[0007] Preferably, a connecting rod is fixedly connected between the screw rods, a rotating handle is fixedly connected to the connecting rod, and a plurality of evenly distributed tooth blocks are fixedly connected to the outer wall of the rotating handle.
[0008] Preferably, two fixedly connected limit frames are installed on the inner top wall of the load-bearing seat on one side close to the connecting rod, and a clamping plate is rotatably connected between the limit frames, and the bottom of the clamping plate is located between the tooth blocks on the rotating handle.
[0009] Preferably, the limiting frames are provided with receiving grooves on the opposite sides thereof, the rotating shafts on both sides of the card plate are located in the receiving grooves on the same side thereof, and a torsion spring B is fixedly connected between the inner wall of the receiving groove and the rotating shaft of the card plate, and a limiting plate is fixedly connected between the bottoms of the limiting frames.
[0010] Preferably, a mounting groove is provided on one side of the support frame close to the screw rod on the same side, the shaft rod of the screw rod is located in the mounting groove on the same side, and a torsion spring A is fixedly connected between the shaft rod of the screw rod and the inner wall of the mounting groove.
[0011] Preferably, the positioning holes are threadedly connected with bolts for fixing the cross beam A, the cross beam B and the connecting frame, and the bolts in the positioning holes pass through the docking holes at corresponding positions therewith.
[0012] Preferably, a reinforcement frame is fixedly connected between the load-bearing frame and the support column A, and the reinforcement frame is fixedly connected to the load-bearing frame and the support column A through a plurality of bolts, and a support seat is fixedly connected to the bottom of the load-bearing frame.
[0013] Preferably, a hoist hook is provided on the cross beam A through a bracket, a roller is installed on the bracket on the hoist hook, and the hoist hook is slidably installed on the cross beam A through the bracket and the roller.
[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention wraps the roof frame beam through the load-bearing seat, the mounting frame and the base to improve the stability of the portal frame. At the same time, the load-bearing seat, the mounting frame and the base are supported by the pulleys on the load-bearing seat, the mounting frame and the base. The rolling property of the pulley can improve the convenience of the portal frame when moving on the roof frame beam. After the portal frame is moved, the connecting rod and the screw rod are driven to rotate by the turning handle. At this time, during the rotation of the screw rod, the fixing frame on the same side can be driven to move, so that the limiting piece fits on the pulley on the mounting frame. At this time, the pulley can be limited and fixed to complete the fixing work of the portal frame, which effectively improves the auxiliary function of the device during the movement. 2. In the process of shifting the steel beam of the present invention, if the portal frame is blocked by the installation node when moving on the roof frame beam, a support column C and a cross beam B are set up on the roof frame beam on the other side of the installation node, and the cross beam B is quickly connected to the cross beam A through the connecting frame, and then the support column B is removed. At this time, the electric hoist can be moved along the cross beam B to the cross beam A, and then the support column B is installed at the bottom of the cross beam B. At this time, a new portal frame can be formed by the support column B, the cross beam B and the support column C, and the hoist hook is moved to the next installation node to perform the steel beam shifting work, thereby avoiding the problem that the traditional portal frame cannot cross the installation node on the roof frame beam during use, and effectively improving the auxiliary function of the device for the steel beam shifting work; 3. When the steel beam is displaced at the edge of the roof frame beam, the present invention can fix the load-bearing frame and the support column A through the connecting frame. At this time, the support column A and the support column B are in a high and low column state and are erected on the roof frame beam. At this time, the steel beam displacement work at the edge of the roof frame beam can be carried out. After the steel beam displacement work at the edge of the roof frame beam is completed, the connecting frame is removed, and then the portal frame is moved to move the support column A to the roof frame beam, and a new load-bearing seat is erected at the bottom thereof. At this time, the portal frame is formed by the support column A, the cross beam A and the support column B, and the steel beams at other positions of the roof frame beam are continuously displaced, which further improves the auxiliary function of the device for the steel beam displacement work at the edge of the roof frame beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the first step of the construction structure of the present invention; Figure 3 This is a schematic diagram of the construction structure of the second step of the present invention; Figure 4 This is a schematic diagram of the construction structure of the third step of the present invention; Figure 5 This is a schematic diagram of the construction structure of the fourth step of the present invention; Figure 6This is a schematic diagram of the construction structure of the fifth step of the present invention; Figure 7 This is a schematic diagram of the construction structure of the sixth step of the present invention; Figure 8 It is a schematic diagram of the structure of the load-bearing seat and its connecting parts of the present invention; Fig. 9 It is a schematic diagram of the cross-sectional structure of the load-bearing seat of the present invention; Fig.10 It is a schematic diagram of the cross-sectional structure of the support frame of the present invention; Fig.11 This is a schematic diagram of the structure of the turning handle of the present invention; Fig.12 It is a schematic diagram of the cross-sectional structure of the limiting frame of the present invention; Fig.13 This is a schematic diagram of the structure of the crossbeam A and the crossbeam B of the present invention; Fig.14 It is a schematic diagram of the structure of the connecting frame of the present invention.
[0016] In the figure: 1. building column; 11. roof frame beam; 12. installation node; 2. load-bearing frame; 21. reinforcement frame; 22. support column A; 3. beam A; 31. support column B; 32. hoist hook; 4. beam B; 41. support column C; 42. docking hole; 5. load-bearing seat; 51. connecting hole; 52. mounting frame; 53. base; 54. pulley; 6. support frame; 601. mounting groove; 602. screw rod; 603. torsion spring A; 61. fixing frame; 62. limiting plate; 63. connecting rod; 64. turning handle; 65. tooth block; 7. limiting frame; 71. card plate; 72. storage groove; 73. torsion spring B; 74. limiting plate; 8. connecting frame; 81. positioning hole. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] See also Figure 1-14 The present invention provides a technical solution: a movable portal frame for the displacement installation of large steel beams, including a building column 1, a plurality of building columns 1, and roof frame beams 11 are fixedly connected between the tops of the building columns 1, and a plurality of installation nodes 12 are provided at the tops of the roof frame beams 11.
[0019] Furthermore, the building columns 1 and the roof frame beams 11 together form a roof support structure, and the steel beams can be installed through the installation nodes 12.
[0020] Combined with Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 As shown, a load-bearing frame 2 is arranged on one side of the building column 1 at one end of the roof frame beam 11, and a support column A22 is butt-jointed at the top of the load-bearing frame 2, and a reinforcement frame 21 is fixedly connected between the load-bearing frame 2 and the support column A22, and the reinforcement frame 21 is fixedly butt-jointed with the load-bearing frame 2 and the support column A22 by a plurality of bolts, and a support seat is fixedly connected at the bottom of the load-bearing frame 2, and a cross beam A3 is fixedly connected to the top of the support column A22, and a support column B31 is fixedly connected to the bottom of the end of the cross beam A3 away from the support column A22, and a hoist hook 32 is slidably connected to the cross beam A3, and reinforcement plates are fixedly connected between the bottoms of both ends of the cross beam A3 and the support columns A22 and B31, and the load-bearing frame 2, the support column A22, the cross beam A3 and the support column B31 are all I-beam structures, which have good load-bearing capacity and are easy to butt-joint.
[0021] Furthermore, the support column A22, the cross beam A3 and the support column B31 together form a portal frame body. When the steel beam at the edge of the roof frame beam 11 is displaced and installed, the load-bearing frame 2 is first set up on one side of the building column 1, and then the reinforcement frame 21 is attached to the top of the load-bearing frame 2 and the bottom of the support column A22, and then the reinforcement frame 21 is fixed by multiple bolts. At this time, the bottom of the support column A22 is supported by the load-bearing frame 2, and it forms a high-low frame structure with the support column B31. At this time, the steel beam can be lifted by the hoist hook 32, and the displacement and installation work is completed. After the displacement and installation of the steel beam at the edge of the roof frame beam 11 is completed, the reinforcement frame 21 is removed, and the portal frame is moved to move the support column A22 to the top of the roof frame beam 11, and then the load-bearing seat 5 is installed at the bottom of the support column A22, and then preparations can be made for the next steel beam displacement and installation work.
[0022] Combined with Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Fig.13 As shown, one end of the beam A3 close to the support column B31 is butted with the beam B4, and the bottom of the end of the beam B4 away from the beam A3 is fixedly connected with the support column C41, and the adjacent ends of the beams A3 and B4 are both provided with a plurality of butt holes 42.
[0023] Further, when the portal frame moves along the roof frame beam 11, when encountering the installation node 12, the load-bearing seat 5 is erected on the other side of the installation node 12, and then the support column C41 and the cross beam B4 are installed on the load-bearing seat 5, and then the cross beam B4 is connected with one end of the cross beam A3 and fixed with the connecting frame 8, and then the support column B31 is removed. At this time, the support column A22, the cross beam A3, the cross beam B4 and the support column C41 cooperate to form a large portal frame. At this time, the portal frame crosses the installation node 12, and then the hoist hook 32 is moved and moved from the cross beam A3 to the cross beam B4. At this time, the hoist hook 32 can cross the installation node 12, and then the support column B31 is reinstalled, and the support column A22 is removed. At this time, a new portal frame is formed by the support column B31, the cross beam B4 and the support column C41, and the steel beam can continue to be shifted and installed through the hoist hook 32.
[0024] Combined with Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 and Fig.11 As shown, the bottom ends of the support column B31 and the support column C41 are fixedly connected with a load-bearing seat 5, and a connecting hole 51 is opened on one side of the bottom of both ends of the load-bearing seat 5. The bottoms of both ends of the load-bearing seat 5 are fixedly connected with a mounting frame 52, and a base 53 is fixedly connected between the bottoms of the mounting frames 52. The load-bearing seat 5, the mounting frame 52 and the base 53 are cooperatively sleeved on the roof frame beam 11. The load-bearing seat 5, the mounting frame 52 and the base 53 are installed with a plurality of fixedly connected pulleys 54 through brackets on one side of the roof frame beam 11. The load-bearing seat 5, the mounting frame 52 and the base 53 are all I-beam structures, which have good load-bearing capacity and are easy to dock. Fixed steel plates are provided at both ends of the base 53. When installing the base 53, the staff can directly install and fix it with the mounting frame 52 on the roof frame beam 11 through the extension capacity of the fixed steel plate; The two ends of the load-bearing seat 5 are fixedly connected to the side close to the connecting hole 51 with a support frame 6, and the opposite sides of the support frame 6 are rotatably connected with a screw rod 602, and the screw rod 602 is threadedly connected with a fixing frame 61, and the bottom of the fixing frame 61 passes through the connecting hole 51 and is slidably connected with the connecting hole 51. The side of the fixing frame 61 close to the roof frame beam 11 is fixedly connected with a limit plate 62 through a frame body that penetrates the mounting frame 52, and the limit plate 62 is located on one side of the pulley 54 at the corresponding position, and a connecting rod 63 is fixedly connected between the screw rods 602, and a rotating handle 64 is fixedly connected to the connecting rod 63. The outer wall of the rotating handle 64 is fixedly connected with a number of evenly distributed tooth blocks 65. When the rotating handle 64 is rotated, the tooth blocks 65 on the rotating handle 64 will engage with the card plate 71 cooperates to lock the handle 64 in the reverse direction to prevent the connecting rod 63 from rotating in the reverse direction by itself, causing the pulley 54 to lose the limit. A mounting groove 601 is provided on the side of the support frame 6 close to the screw rod 602 on the same side. The shaft rods of the screw rod 602 are all located in the mounting groove 601 on the same side. A torsion spring A603 is fixedly connected between the shaft rod of the screw rod 602 and the inner wall of the mounting groove 601. During the rotation of the screw rod 602, the shaft rod at one end thereof cooperates with the inner wall of the mounting groove 601 to tighten the torsion spring A603. When the limit on the screw rod 602 disappears, the torsion spring A603 will rebound and drive the screw rod 602 to rotate in the reverse direction, thereby driving the limiting plate 62 away from the pulley 54 and releasing the limiting work of the pulley 54.
[0025] Furthermore, the load-bearing seat 5, the mounting frame 52 and the base 53 cooperate to wrap the roof frame beam 11, thereby improving the stability of the portal frame on the roof frame beam 11. When the portal frame needs to be moved, the friction between the load-bearing seat 5, the mounting frame 52 and the base 53 and the roof frame beam 11 is reduced through the cooperation between the pulleys 54. At this time, the portal frame can be conveniently and stably moved along the roof frame beam 11 through the pulleys 54 to adjust the position of the portal frame on the roof frame beam 11. Furthermore, when the portal frame moves, the handle 64 is manually rotated, and the connecting rod 63 and the screw rods 602 at both ends thereof are driven by the handle 64. At this time, the two screw rods 602 respectively drive the fixed frame 61 connected thereto to move toward the pulley 54 until the limiting plate 62 is attached to the pulley 54. The pulley 54 can be limited and fixed by the limiting plate 62. At this time, the fixing work between the portal frame and the roof frame beam 11 can be completed.
[0026] Combined with Fig. 9 , Fig.10 , Fig.11 and Fig.12As shown, two fixedly connected limit frames 7 are installed on the inner top wall of the load-bearing seat 5 near the connecting rod 63, and a clamping plate 71 is rotatably connected between the limit frames 7. The bottom of the clamping plate 71 is located between the tooth blocks 65 on the turning handle 64, and receiving grooves 72 are opened on the opposite sides of the limit frames 7. The rotating shafts on both sides of the clamping plate 71 are located in the receiving grooves 72 on the same side, and a torsion spring B73 is fixedly connected between the inner wall of the receiving groove 72 and the rotating shaft of the clamping plate 71. A limiting plate 74 is fixedly connected between the bottoms of the limit frames 7, and the limiting plate 74 can be used to limit the bottom rotation angle of the clamping plate 71 to prevent the clamping plate 71 from rotating downward at too large an angle, causing it to lose the ability to limit the turning handle 64.
[0027] Furthermore, during the rotation of the handle 64, the tooth block 65 will continuously squeeze the card plate 71, and the card plate 71 will be lifted, so that the tooth block 65 will continuously pass over the card plate 71. During the rotation of the card plate 71, the shafts on both sides of the card plate 71 will drive the torsion spring B73 to tighten. Every time a tooth block 65 passes over the card plate 71, the torsion spring B73 will rebound and drive the card plate 71 to rotate back to its original position. At this time, the card plate 71 and the tooth block 65 can cooperate to limit and fix the connecting rod 63 to prevent the connecting rod 63 from reversing. When the door frame needs to be moved again, the shafts at both ends of the screw rod 602 will drive the torsion spring A603 to tighten during the rotation. At this time, the clamping plate 71 is manually lifted. At this time, the limit of the torsion spring A603 disappears and starts to rebound, driving the screw rod 602 to rotate in the opposite direction. At this time, the screw rod 602 rotating in the opposite direction will drive the fixed frame 61 connected to it to move in the opposite direction, and the limiting plate 62 will also be separated from the pulley 54. At this time, the pulley 54 can rotate again and move the door frame again through the pulley 54.
[0028] Combined with Figure 1 , Figure 3 , Figure 5 , Figure 6 and Fig.14 As shown, the crossbeam A3 and the crossbeam B4 are connected by a connecting frame 8, and a slidably connected connecting frame 8 is sleeved at the joint between the crossbeam A3 and the crossbeam B4. The connecting frame 8 will only wrap the upper part of the crossbeam A3 and the crossbeam B4. By wrapping the upper part of the crossbeam A3 and the crossbeam B4 and fixing and limiting them, the stability between the crossbeam A3 and the crossbeam B4 can be improved, and at the same time, the bottom of the crossbeam A3 and the crossbeam B4 is made smooth, so that the hoist hook 32 can move back and forth smoothly between the crossbeam A3 and the crossbeam B4. Both ends of the connecting frame 8 are provided with positioning holes 81 corresponding to the number of the docking holes 42 on the crossbeam A3 and the crossbeam B4 on the same side, and the positioning holes 81 are aligned with the corresponding docking holes 42. Bolts for fixing the crossbeam A3, the crossbeam B4 and the connecting frame 8 are threadedly connected in the positioning holes 81, and the bolts in the positioning holes 81 pass through the docking holes 42 at the corresponding positions.
[0029] Furthermore, when the crossbeam A3 and the crossbeam B4 are docked and installed, the connecting frame 8 is first mounted on the crossbeam A3, and then the crossbeam B4 is inserted on the connecting frame 8. Then, the positioning hole 81 on the connecting frame 8 is aligned with the docking hole 42 on the crossbeam A3 and the crossbeam B4. Then, bolts are passed through the positioning hole 81 and the docking hole 42, and the bolts cooperate with the connecting frame 8 to complete the fixed limiting work between the crossbeam A3 and the crossbeam B4.
[0030] Working principle: The first step is to Figure 2 As shown, first, on the roof surface on one side of the roof frame beam 11, the load-bearing frame 2 is fixed by the support seat, and then the support column A22 is fixed on the load-bearing frame 2 by bolts and the reinforcement frame 21, and then the cross beam A3 is fixed to the support column A22 by bolts, and then the bottom of the cross beam A3 away from the support column A22 is fixed to the support column B31 by bolts, and then the load-bearing seat 5 and the mounting frame 52 are set on the roof frame beam 11, and the base 53 is installed between the bottom of the mounting frame 52, and then Then, the bottom end of the support column B31 is fixed to the top of the load-bearing seat 5 by bolts. At this time, the pulley 54 is fixed and limited by the limit plate 62, so that the load-bearing seat 5, the mounting frame 52 and the base 53 are limited to be fixed. Then, the steel beam displacement work is started. The steel beam is tied with a rope, and then the telescopic end is hung on the hoist hook 32. The steel beam is lifted by the hoist hook 32, and the steel beam is displaced by moving the hoist hook 32. Then, the workers install the steel beam; The second step is to Figure 3 As shown, on the basis of the first step, after the installation of the first steel beam is completed, the load-bearing seat 5, the mounting frame 52 and the base 53 are set up on the roof frame beam 11 on the other side of the next installation node 12. At this time, the connecting frame 8 is put on the end of the beam A3 close to the support column B31, and then the beam B4 is inserted into the connecting frame 8, and then the connecting frame 8 is fixed by bolts, and then the support column C41 is fixed by bolts at the bottom of the end of the beam B4 away from the beam A3, and Fix the support column C41 and the newly constructed load-bearing seat 5, then remove the support column B31 between the beam A3 and the beam B4, then move the hoist hook 32 from the beam A3 to the beam B4, and then use the load-bearing seat 5, the mounting frame 52 and the pulley 54 on the base 53 to push the entire portal frame to move, ensuring that the hoist hook 32 is moved from one side of the mounting node 12 to the other side thereof, and then continue to use the limit plate 62 to limit and fix the pulley 54; The third step is to Figure 4As shown, on the basis of the second step, after the hoist hook 32 is moved, the support column B31 is installed below the end of the beam B4 near the beam A3, and then the bottom end of the support column B31 is fixed to the top of the load-bearing seat 5 previously left on the roof frame beam 11, and then the load-bearing frame 2, support column A22, beam A3 and connecting frame 8 are removed in turn. At this time, a new portal frame is formed by the support column B31, beam B4 and support column C41, and the steel beam of the next installation node 12 can be installed by the hoist hook 32; Step 4: According to the attached Figure 5 As shown, on the basis of the third step, after the installation of the previous steel beam is completed, the subsequent steel beams are installed. At this time, the load-bearing seat 5, the mounting frame 52 and the base 53 are set on the roof frame beam 11 on the other side of the subsequent installation node 12, and the pulley 54 is limited and fixed by the limiting piece 62. Then, the dismantled connecting frame 8 is set on the end of the beam B4 close to the support column C41, and the beam A3 is inserted into the connecting frame 8, and the connecting frame 8 is fixed by bolts. At this time, the previously dismantled support column A22 is fixed to the bottom of the end of the beam A3 away from the beam B4, and the bottom of the support column A22 is fixed to the top of the newly built load-bearing seat 5; Step 5: According to the attached Figure 6 As shown, based on the fourth step, the support column C41 between the beam B4 and the beam A3 is removed, and then the hoist hook 32 is moved from the beam B4 to the beam A3, and then the limit of the pulley 54 on the mounting frame 52 at the bottom of the support column B31 and the support column A22 is released, and then the current entire portal frame is moved, and it is ensured that the hoist hook 32 moves to the other side of the next mounting node 12, and then the pulley 54 on the mounting frame 52 is limited and fixed; Step 6: According to the attached Figure 7 As shown, on the basis of the fifth step, the support column C41 and the bottom of the end of the beam A3 away from the support column A22 are fixed by bolts. After the fixing is completed, the support column B31 and the beam B4 are removed in turn. At this time, a new portal frame is formed by the support column C41, the beam A3 and the support column A22, and the hoist hook 32 is moved to the new installation node 12. At this time, the hoist hook 32 can be used to install the steel beam on the new installation node 12. By dismantling and reassembling the support column A22, the beam A3, the support column B31, the beam B4, and the support column C41, the installation of the steel beam on the pigeon roof frame beam 11 can be completed.
[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A movable door frame for displacement installation of large steel beams, characterized in that: The invention comprises a load-bearing frame (2) arranged on one side of a building column (1), the building column (1) being provided with a plurality of them, a roof frame beam (11) being fixedly connected between the tops of the building columns (1), and a plurality of mounting nodes (12) being provided on the tops of the roof frame beams (11), the load-bearing frame (2) being located on one side of the roof frame beam (11), a support column A (22) being butt-jointed to the top of the load-bearing frame (2), a cross beam A (3) being fixedly connected to the top of the support column A (22), and a side of the cross beam A (3) being away from the support column A (22) A support column B (31) is fixedly connected to the bottom of the end; an end of the cross beam A (3) close to the support column B (31) is butt-jointed with a cross beam B (4); the cross beam A (3) and the cross beam B (4) are connected via a connecting frame (8); an end of the cross beam B (4) away from the cross beam A (3) is fixedly connected to a support column C (41); a plurality of butt-jointing holes (42) are provided at the tops of both ends of the cross beam A (3) and the cross beam B (4); and a load-bearing seat (5) is fixedly connected to the bottom ends of the support column B (31) and the support column C (41); A communicating hole (51) is provided on one side of the bottom of both ends of the load-bearing seat (5); a mounting frame (52) is fixedly connected to the bottom of both ends of the load-bearing seat (5); a base (53) is fixedly connected between the bottoms of the mounting frames (52); the load-bearing seat (5), the mounting frame (52) and the base (53) are cooperatively sleeved on the roof frame beam (11); and a plurality of fixedly connected pulleys (54) are installed on one side of the load-bearing seat (5), the mounting frame (52) and the base (53) close to the roof frame beam (11) through brackets.
2. The movable portal frame for displacement installation of large steel beams according to claim 1 is characterized in that: Both ends of the load-bearing seat (5) are fixedly connected to a support frame (6) on one side close to the connecting hole (51); the supporting frames (6) are rotatably connected to opposite sides thereof with screw rods (602); the screw rods (602) are threadedly connected to a fixing frame (61); the bottom of the fixing frame (61) passes through the connecting hole (51) and is slidably connected to the connecting hole (51); a side of the fixing frame (61) close to the roof frame beam (11) is fixedly connected to a limiting plate (62) through a frame body penetrating the mounting frame (52); the limiting plate (62) is located on one side of a pulley (54) at a corresponding position thereto.
3. The movable portal frame for displacement installation of large steel beams according to claim 1 is characterized in that: A slidably connected connecting frame (8) is sleeved at the joint of the crossbeam A (3) and the crossbeam B (4), and positioning holes (81) corresponding in number to the butt holes (42) on the crossbeam A (3) and the crossbeam B (4) on the same side are formed at both ends of the connecting frame (8), and the positioning holes (81) are aligned with the positions of the corresponding butt holes (42).
4. The movable portal frame for displacement installation of large steel beams according to claim 2 is characterized in that: A connecting rod (63) is fixedly connected between the screw rods (602), a rotating handle (64) is fixedly connected to the connecting rod (63), and a plurality of evenly distributed tooth blocks (65) are fixedly connected to the outer wall of the rotating handle (64).
5. The movable portal frame for displacement installation of large steel beams according to claim 4 is characterized in that: Two fixedly connected limit frames (7) are installed on the inner top wall of the load-bearing seat (5) on the side close to the connecting rod (63), and a clamping plate (71) is rotatably connected between the limit frames (7), and the bottom of the clamping plate (71) is located between the tooth blocks (65) on the rotating handle (64).
6. The movable portal frame for displacement installation of large steel beams according to claim 5, characterized in that: The limiting frames (7) are provided with receiving grooves (72) on opposite sides thereof, the rotating shafts on both sides of the clamping plate (71) are located in the receiving grooves (72) on the same side thereof, and a torsion spring B (73) is fixedly connected between the inner wall of the receiving groove (72) and the rotating shaft of the clamping plate (71), and a limiting plate (74) is fixedly connected between the bottoms of the limiting frames (7).
7. The movable portal frame for displacement installation of large steel beams according to claim 2, characterized in that: A mounting groove (601) is provided on one side of the support frame (6) close to the screw rod (602) on the same side thereof, the shaft of the screw rod (602) is located in the mounting groove (601) on the same side thereof, and a torsion spring A (603) is fixedly connected between the shaft of the screw rod (602) and the inner wall of the mounting groove (601).
8. The movable portal frame for displacement installation of large steel beams according to claim 3 is characterized in that: Bolts for fixing the cross beam A (3), the cross beam B (4) and the connecting frame (8) are threadedly connected in the positioning holes (81), and the bolts in the positioning holes (81) penetrate into the docking holes (42) at corresponding positions.
9. The movable portal frame for displacement installation of large steel beams according to claim 1, characterized in that: A reinforcement frame (21) is fixedly connected between the load-bearing frame (2) and the support column A (22); the reinforcement frame (21) is fixedly connected to the load-bearing frame (2) and the support column A (22) by means of a plurality of bolts; and a support seat is fixedly connected to the bottom of the load-bearing frame (2).
10. The movable portal frame for displacement installation of large steel beams according to claim 1, characterized in that: A hoist hook (32) is arranged on the crossbeam A (3) via a bracket, a roller is installed on the bracket on the hoist hook (32), and the hoist hook (32) is slidably installed on the crossbeam A (3) through the bracket and the roller.