Electric power iron tower
Through modular design and buffer structure, the problem of traditional power towers pouring and breaking in typhoons and earthquakes is solved, which improves wind resistance and stability and reduces maintenance costs.
Patent Information
- Application Number
- CN202411438914.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-12-03
AI Technical Summary
Traditional power towers are prone to risk of dumping and fracture in typhoons or earthquakes, and existing reinforcement measures are limited in effect and are costly to maintain.
A modular electric tower is designed to increase the contact area and stability of the tower body through the removable connection between the first tower body and the second tower body, combined with the support seat, buffer arm, spring and adjustment rod, and use buffering. The structure counteracts wind and vibration, reducing resonance risks.
It improves the wind resistance and stability of the electric tower, reduces maintenance costs, enhances the overall structural connection strength of the tower body, and avoids the risks of overturning and fracture.
Smart Images

Figure CN119062176A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power towers, and in particular to an electric power tower. Background Art
[0002] Common iron towers, due to their high height, will cause immeasurable consequences in terms of personnel and economy if an iron tower collapses when typhoons are frequent, winds are strong, or earthquakes occur. Traditional iron towers are reinforced with traction ropes, but the traction ropes are prone to fatigue after long-term use, resulting in a decrease in the protective effect of the iron tower. This greatly threatens the safety of the iron tower when typhoons are frequent, winds are strong, or earthquakes occur.
[0003] A common anti-topple measure is to install dampers inside the power tower to improve its earthquake resistance, but the effect is limited. In addition, when the power tower encounters extreme weather, the middle part of the tower is subjected to the greatest torque, and the risk of fracture in the middle part of the tower increases dramatically. Summary of the invention
[0004] The object of the present invention is to provide a power iron tower, which can solve the problems raised by the above-mentioned background technology in view of the shortcomings of the prior art.
[0005] The technical solution of the present invention is achieved in this way:
[0006] The present invention provides an electric iron tower, comprising a first tower body and a second tower body, wherein the first tower body and the second tower body are detachably connected, a fixing seat is provided at the connection between the first tower body and the second tower body, a supporting seat located between the first tower body and the second tower body is provided on the fixing seat, and a plurality of second buffer arms are installed on the supporting seat; a mounting seat is also included, and the free ends of the plurality of second buffer arms are all hinged to the mounting seat; and a plurality of first buffer arms respectively connected to the second tower body are installed on the mounting seat.
[0007] In some technical solutions of the present invention, a mounting cylinder is installed on the support seat, the mounting seat is slidably arranged on the outer side wall of the mounting cylinder, and a first spring connected to the mounting seat is provided on the outer side wall of the mounting cylinder.
[0008] In some technical solutions of the present invention, an adjusting rod is slidably provided in the installation tube, a plurality of guide grooves are opened on the outer wall of the installation tube along its axial direction, a slider connected to the adjusting rod is slidably provided in the guide groove, and the slider is connected to the installation seat.
[0009] In some technical solutions of the present invention, a second spring is sleeved on the outer side wall of the mounting tube, one end of the second spring is connected to the mounting seat, and the other end of the second spring is connected to the support seat.
[0010] In some technical schemes of the present invention, a locking ring is installed in the middle part of the second tower body, a plurality of limit holes are opened on the inner wall of the locking ring, a limit rod is slidably provided in the limit hole, a limit spring connected to the inner wall of the limit hole is sleeved on the limit rod, and a part of the limit rod is located in the locking ring; an adjustment block connected to the adjustment rod is slidably provided in the installation cylinder, a first inclined surface is opened on the outer wall of the adjustment block, and a second inclined surface matching the first inclined surface is provided on the free end of the limit rod.
[0011] In some technical solutions of the present invention, a plurality of traction rods connected to the second tower body are provided on the free end of the adjusting block.
[0012] In some technical solutions of the present invention, a stabilizing rod abutting against the adjusting rod is slidably provided in the installation cylinder, and the free end of the stabilizing rod is penetrated in the foundation.
[0013] In some technical solutions of the present invention, the stabilizing rod includes a sliding rod and a sinking rod. The sinking rod is fixed in the foundation. An installation channel is opened in the sliding rod. The sinking rod is installed in the installation channel. A buffer spring abutting against the sinking rod is provided in the installation channel.
[0014] In some technical solutions of the present invention, a third spring is sleeved on the outer wall of the mounting tube, a plurality of through grooves are opened on the outer wall of the mounting tube, connecting blocks connected to the sliding rod are slidably provided in the through grooves, a mounting ring connected to the connecting block is sleeved on the outer wall of the mounting tube, and the third spring is connected to the mounting ring.
[0015] In some technical solutions of the present invention, a locking block is provided at the end of the adjusting rod close to the stabilizing rod, and a locking groove adapted to the locking block is provided at the end of the sliding rod.
[0016] Compared with the prior art, the present invention has at least the following advantages or beneficial effects:
[0017] The first tower body and the second tower body are both modular tower bodies, and the two are detachably connected by bolts to avoid the problem of high maintenance cost after the tower body overturns due to the above-mentioned structural parts being an integral whole. A fixed seat is provided at the connection between the first tower body and the second tower body, and a support seat is provided on the fixed seat between the first tower body and the second tower body, so that the fixed seat is used to connect the first tower body, and the two are connected by bolts; the second tower body and the support seat are connected by bolts, which is convenient for assembly and maintenance; the fixed seat and the support seat are also fixedly connected by bolts to increase the contact area between the first tower body and the second tower body, so that the connection between the two is tighter; it also increases the wind resistance of the overall structure; the adjusting rod located in the mounting tube will make periodic reciprocating motion with the mounting seat, so that the mounting seat is pulled downward by the adjusting rod to move the center of gravity of the iron tower downward, thereby increasing the stability of the tower body, thereby offsetting the force exerted by the wind on the tower body and avoiding resonance of the tower body. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a schematic diagram of the installation structure of the present invention;
[0020] Figure 2 It is a three-dimensional cross-sectional structural schematic diagram of the present invention;
[0021] Figure 3 It is a cross-sectional combined schematic diagram of the present invention;
[0022] Figure 4 for Figure 3 Schematic diagram of the local enlarged structure at point A in the middle.
[0023] Icons: 1. First tower body; 2. Second tower body; 3. Fixed seat; 4. Mounting seat; 5. First buffer arm; 6. Second buffer arm; 7. First spring; 8. Second spring; 9. Third spring; 10. Mounting tube; 11. Locking ring; 12. Traction rod; 13. Adjusting rod; 14. Stabilizing rod; 15. Support seat; 16. Locking block; 17. Locking groove; 141. Sliding rod; 142. Sinking rod; 18. Adjusting block; 19. Limiting rod; 20. Limiting spring. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0025] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Example 1
[0027] Please refer to Figure 1-Figure 4 shown.
[0028] The present invention provides a power iron tower, such as Figure 1 , Figure 2 As shown, it includes a first tower body 1 and a second tower body 2. The structures of the above tower bodies are all steel profiles, which are connected by bolts and welding. The first tower body 1 is the basic tower body, and its height is relatively high, about twice that of the second tower body 2. The second tower body 2 is the tower body in the middle and above of the power tower, and its size is smaller than that of the first tower body. The first tower body 1 and the second tower body 2 are both modular tower bodies, and the two are detachably connected by bolts to avoid the problem that the above-mentioned structural parts are a whole, resulting in a sudden increase in the maintenance cost after the tower body overturns. A fixed seat 3 is provided at the connection between the first tower body 1 and the second tower body 2, and a support seat 15 located between the first tower body 1 and the second tower body 2 is provided on the fixed seat 3. In this way, the fixed seat 3 is used to connect the first tower body 1, and the two are connected by bolts; the second tower body 2 and the support The support seat 15 is connected by bolts, which is convenient for assembly and maintenance; the fixing seat 3 and the support seat 15 are also fixedly connected by bolts, which are used to increase the contact area between the first tower body 1 and the second tower body 2, so that the connection between the two is tighter; it also increases the wind resistance of the overall structure; at least three second buffer arms 6 are installed on the support seat 15 through a clamping seat, and the second buffer arms 6 correspond to the edges of the first tower body 1; it also includes a mounting seat 4, and the free ends of multiple second buffer arms 6 are hinged to the mounting seat 4; at least three first buffer arms 5 respectively connected to the second tower body 2 are installed on the mounting seat 4, and the first buffer arms 5 correspond to the edges of the second tower body 2. In this way, the first buffer arm 5 and the second buffer arm 6 form a triangular structure with the edges of the first tower body 1 and the second tower body 2, which is used to increase the wind resistance of the middle part of the power tower.
[0029] Preferably, the first buffer arm 5 includes a first mounting rod and a second mounting rod, a two-way hydraulic push rod is arranged between the first mounting rod and the second mounting rod, the first mounting rod and the second mounting rod are respectively fixedly connected to the ends of the two pushing ends of the two-way hydraulic push rod, the first mounting rod is connected to the edge of the second tower body 2; the second mounting rod is hinged to the outer side wall of the mounting seat 4; and the first buffer arm 5 has two working states, the first working state is: when the force exerted by the wind on the tower body is small, the two pushing ends of the two-way hydraulic push rod can slide freely in the cylinder body of the two-way hydraulic push rod, and the force exerted by the wind on the tower body is converted into the reciprocating motion of the two pushing ends of the two-way hydraulic push rod, so that the force exerted by the wind on the tower body can be offset, and the tower body can be prevented from shaking due to resonance;
[0030] The second working state is: when the force exerted by the wind on the tower body is relatively large, the two pushing ends of the two-way hydraulic push rod gradually move out of the cylinder body of the two-way hydraulic push rod, exert a reaction force on the tower body, and push the mounting seat 4 to move downward in the vertical direction; and force the effective length of the second buffer arm 6 to gradually decrease, so that the force of the wind on the tower body is converted into compression of the second buffer arm 6, thereby offsetting the force, so that the force exerted by the wind on the tower body can be offset and the resonance of the tower body can be avoided.
[0031] Preferably, the second buffer arm 6 comprises a sliding sleeve and a push rod slidably disposed in the sliding sleeve, and the push rod is provided with a long spring connected to the sliding sleeve.
[0032] In some technical schemes of the present invention, a mounting cylinder 10 is installed on the support seat 15, and the mounting cylinder 10 is welded to the middle part of the support seat 15 by welding. The mounting seat 4 is slidably arranged on the outer wall of the mounting cylinder 10, and the first spring 7 connected to the mounting seat 4 is on the outer wall of the mounting cylinder 10. In this way, when the two pushing ends of the bidirectional hydraulic push rod in the first buffer arm 5 do not produce any action, the force of the wind on the tower body can be transmitted to the mounting seat 4 through the first buffer arm 5. At this time, the mounting seat 4 reciprocates on the outer wall of the mounting cylinder 10, and the second buffer arm 6 also performs reciprocating lifting and lowering motion. In this way, the force exerted by the wind on the tower body can be offset to avoid resonance of the tower body.
[0033] In some technical schemes of the present invention, an adjusting rod 13 is slidably provided in the mounting tube 10, and the adjusting rod 13 is clearance-matched with the inner wall of the mounting tube 10, and concave-convex scratches are provided on the outer wall of the adjusting rod 13 to increase the friction between the two. A plurality of guide grooves are provided on the outer wall of the mounting tube 10 along its axial direction, and a slider connected to the adjusting rod 13 is slidably provided in the guide groove, and the slider is connected to the mounting seat 4. When the mounting seat 4 reciprocates on the outer wall of the mounting tube 10, the adjusting rod 13 located in the mounting tube 10 will perform periodic reciprocating motion with the mounting seat 4. In this way, the adjusting rod 13 is pulled downward by the mounting seat 4 to move the center of gravity of the iron tower downward, thereby increasing the stability of the tower body, thereby offsetting the force exerted by the wind on the tower body and avoiding resonance of the tower body.
[0034] In some technical solutions of the present invention, a second spring 8 is sleeved on the outer wall of the mounting tube 10, one end of the second spring 8 is connected to the mounting seat 4, and the other end of the second spring 8 is connected to the support seat 15. The mounting seat 4 is used to have the ability to automatically return to its original position, so that the buffer structure composed of the mounting seat 4, the first buffer arm 5 and the second buffer arm 6 can effectively resist and offset the force exerted by the wind on the tower body, thereby avoiding resonance of the tower body.
[0035] In some technical schemes of the present invention, a locking ring 11 is installed in the middle part of the second tower body 2 through a bracket, which serves the purpose of stabilizing the second tower body 2; at least three limiting holes are opened around the inner wall of the locking ring 11, and a limiting rod 19 is slidably provided in the limiting hole, and a limiting spring 20 connected to the inner wall of the limiting hole is sleeved on the limiting rod 19, and a part of the limiting rod 19 is located in the locking ring 11; an adjusting block 18 connected to the adjusting rod 13 is slidably provided in the installation tube 10, and a first inclined surface is opened on the outer wall of the adjusting block 18, and a second inclined surface matching the first inclined surface is provided on the free end of the limiting rod 19. When the adjusting rod 13 pulls the adjusting block 18 connected to it to move downward in the vertical direction in the mounting tube 10, the first inclined surface on the outer wall of the adjusting block 18 will squeeze the second inclined surface on the limiting rod 19. At this time, the limiting rod 19 will compress the limiting spring 20. The limiting rod 19 is partially located in the locking ring 11 and embedded in the limiting hole, so that the middle part of the second tower body 2 and the top of the first tower body 1 are connected as a whole by using the adjusting rod 13, thereby improving the connection strength between the first tower body 1 and the second tower body 2.
[0036] In some technical solutions of the present invention, a plurality of traction rods 12 connected to the second tower body 2 are provided on the free end of the adjustment block 18. The traction rod 12 is a flexible rod body with a certain telescopic ability, which can connect the middle and upper positions of the second tower body 2 with the top of the first tower body 1 as a whole, thereby improving the connection strength between the first tower body 1 and the second tower body 2. And when the second tower body 2 vibrates, the traction rod 12 can be used to absorb and offset the vibration of the second tower body 2, thereby avoiding the risk of the second tower body 2 breaking due to the offset movement at the high position of the second tower body 2.
[0037] In some technical solutions of the present invention, a stabilizing rod 14 that abuts against the adjusting rod 13 is slidably provided in the installation tube 10, and the free end of the stabilizing rod 14 is penetrated in the foundation. When the adjusting rod 13 moves downward in the vertical direction in the installation tube 10 under the push of the first buffer arm 5 until it abuts against the stabilizing rod 14 slidably provided in the installation tube 10, the adjusting rod 13 can be connected to the stabilizing rod 14 deep in the foundation as a whole, thereby strengthening the connection strength between the first tower body 1 and the second tower body 2 and the connection strength with the foundation, avoiding the second tower body 2 located on the first tower body 1 from offset movement, stabilizing the second tower body 2, and causing the risk of the second tower body 2 breaking.
[0038] In some technical solutions of the present invention, the stabilizing rod 14 includes a sliding rod 141 and a sinking rod 142. The sinking rod 142 is fixed in the foundation. An installation channel is opened in the sliding rod 141. The sinking rod 142 is installed in the installation channel. A buffer spring abutting against the sinking rod 142 is provided in the installation channel.
[0039] In some technical solutions of the present invention, a third spring 9 is sleeved on the outer wall of the installation tube 10, a plurality of through slots are opened on the outer wall of the installation tube 10, and a connection block connected to the slide rod 141 is slidably arranged in each through slot, and a mounting ring connected to the connection block is sleeved on the outer wall of the installation tube 10, and the third spring 9 is connected to the mounting ring. The third spring 9 and the buffer spring in the above structure can effectively absorb and offset the vibration force transmitted by the first buffer arm 5 and transmit it to the ground surface; after the adjustment rod 13 is not pushed by the first buffer arm 5, the stabilizing rod 14 is out of contact with the adjustment rod 13, and the third spring 9 and the buffer spring will push the stabilizing rod 14 to reset, preparing for the next buffer.
[0040] In some technical solutions of the present invention, a locking block 16 is provided at the end of the adjusting rod 13 close to the stabilizing rod 14, and a locking groove 17 adapted to the locking block 16 is provided at the end of the sliding rod 141. After the stabilizing rod 14 and the adjusting rod 13 are abutted, the connection strength between the two is increased to avoid the phenomenon of separation between the two, which causes the stabilizing rod 14 and the adjusting rod 13 to be unable to effectively absorb and offset the vibration force transmitted by the first buffer arm 5 and transmit it to the ground surface.
[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A power tower, characterized in that: The invention comprises a first tower body (1) and a second tower body (2), wherein the first tower body (1) and the second tower body (2) are detachably connected, a fixing seat (3) is provided at the connection between the first tower body (1) and the second tower body (2), a supporting seat (15) located between the first tower body (1) and the second tower body (2) is provided on the fixing seat (3), and a plurality of second buffer arms (6) are installed on the supporting seat (15); the invention also comprises a mounting seat (4), and the free ends of the plurality of second buffer arms (6) are all hinged to the mounting seat (4); and a plurality of first buffer arms (5) respectively connected to the second tower body (2) are installed on the mounting seat (4).
2. The power tower according to claim 1, characterized in that: A mounting tube (10) is mounted on the support seat (15), the mounting seat (4) is slidably arranged on the outer wall of the mounting tube (10), and a first spring (7) connected to the mounting seat (4) is arranged on the outer wall of the mounting tube (10).
3. The power tower according to claim 2, characterized in that: An adjusting rod (13) is slidably disposed in the installation tube (10), a plurality of guide grooves are provided on the outer wall of the installation tube (10) along its axial direction, a sliding block connected to the adjusting rod (13) is slidably disposed in the guiding groove, and the sliding block is connected to the installation seat (4).
4. A power tower according to claim 2 or 3, characterized in that: A second spring (8) is sleeved on the outer wall of the mounting tube (10), one end of the second spring (8) is connected to the mounting seat (4), and the other end of the second spring (8) is connected to the support seat (15).
5. The electric power tower according to claim 3, characterized in that: A locking ring (11) is installed in the middle of the second tower body (2), and a plurality of limiting holes are opened on the inner wall of the locking ring (11), and a limiting rod (19) is slidably arranged in the limiting hole, and a limiting spring (20) connected to the inner wall of the limiting hole is sleeved on the limiting rod (19), and a part of the limiting rod (19) is located in the locking ring (11); an adjusting block (18) connected to the adjusting rod (13) is slidably arranged in the installation cylinder (10), and a first inclined surface is opened on the outer wall of the adjusting block (18), and a second inclined surface matching the first inclined surface is arranged on the free end of the limiting rod (19).
6. The electric power tower according to claim 5, characterized in that: A plurality of traction rods (12) connected to the second tower body (2) are provided on the free end of the adjustment block (18).
7. The electric power tower according to claim 3, characterized in that: A stabilizing rod (14) is slidably disposed in the installation cylinder (10) and abuts against the adjusting rod (13), and a free end of the stabilizing rod (14) is inserted into the foundation.
8. The electric power tower according to claim 7, characterized in that: The stabilizing rod (14) comprises a sliding rod (141) and a sinking rod (142); the sinking rod (142) is fixedly arranged in the foundation; an installation channel is provided in the sliding rod (141); the sinking rod (142) is installed in the installation channel; a buffer spring abutting against the sinking rod (142) is provided in the installation channel.
9. The electric power tower according to claim 7, characterized in that: A third spring (9) is sleeved on the outer wall of the mounting tube (10), a plurality of through grooves are provided on the outer wall of the mounting tube (10), connecting blocks connected to the slide rod (141) are slidably provided in the through grooves, a mounting ring connected to the connecting block is sleeved on the outer wall of the mounting tube (10), and the third spring (9) is connected to the mounting ring.
10. The electric power tower according to claim 8, characterized in that: A locking block (16) is provided at the end of the adjusting rod (13) close to the stabilizing rod (14), and a locking groove (17) adapted to the locking block (16) is provided at the end of the sliding rod (141).
