Water pump optimization scheduling method based on high-dimensional multi-objective optimization
Optimizing pump scheduling through high-dimensional multi-objective optimization method, solving the limitations of the water pump scheduling optimization scheme in the existing technology, improving the control of the water leakage and water quality compliance rate in the pipeline network, realizing the water pump operation strategy and the water tank level setting value Improve the rationality.
Patent Information
- Application Number
- CN202411179942.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing water pump scheduling optimization scheme has the limitations of single-target optimization, and it is impossible to effectively control the background water leakage and pipe network water quality compliance rate, and lacks reasonable water pump operation strategies and water tank level amplitude setting values.
Adoption of water pump optimization scheduling method based on high-dimensional multi-objective optimization, collect real-time data, call optimization scheduling models, build constraints and objective functions, and use distributed scheduling algorithm to generate water pump operation strategies, optimize water pump opening and closing control and water tank liquid level setting. Set value.
The limitations of the water pump scheduling optimization plan are eliminated, the rationality of the water pump operation strategy and the water tank level setting value are improved, and the control and management of the pipe network leakage and water quality compliance rate are enhanced.
Smart Images

Figure CN119062558A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water pump water supply, and in particular to a water pump optimization scheduling method based on high-dimensional multi-objective optimization. Background Art
[0002] Water pumps play an important role in the water supply system, but their operation is often accompanied by high energy consumption and high costs. According to research, more than half of the energy consumed during the operation of pump station projects in my country is wasted, resulting in high costs for the operating benefits of pump stations. In terms of the power consumption of water pump units nationwide, the power consumption of water pump units accounts for about 20% of the total power consumption in the country. Therefore, reducing the power consumption of water pumps and optimizing water pump scheduling are the keys to energy conservation and consumption reduction in the water supply industry.
[0003] In practical applications, pump units are the core process equipment in the entire water supply industry. The traditional operation mode is to adjust the combination and operation cycle of the pump unit by manual experience. The pump often operates in the non-efficient area and its operation efficiency is low. The use of advanced pump scheduling optimization methods not only improves the overall operation efficiency of the pump unit and reduces power consumption, but also reduces the maintenance cost caused by frequent starting and closing of the pump, and prolongs the service life of the equipment; at the same time, there are leakage points in the background water loss of the water supply network that cannot be detected by existing technical means and measures. These leakage points are usually small and scattered. The background water loss is greatly affected by the pressure of the pipe network. Therefore, the management of the pipe network pressure through the pump scheduling optimization method plays an important role in controlling the background loss; in addition, in the water supply network, there will be a regulating pool or a clean water tank according to the actual water distribution and water use conditions. The liquid level of the water tank is usually operated at full water level, and there is a problem of long water age during the low peak period of water use. Through the optimized scheduling of the pump unit, the liquid level amplitude of the distributed water tank in the water supply area can be adjusted according to the water demand, the water age time can be optimized to the greatest extent, and the water quality compliance rate of the pipe network can be improved. Therefore, the existing water pump optimization scheduling scheme has the following problems:
[0004] (1) The single-objective optimization problem that only considers power consumption has limitations. (2) The lack of a reasonable pump operation strategy makes it impossible to effectively control the background water loss of the pipeline network. (3) The lack of a reasonable water tank level amplitude setting value makes it impossible to effectively manage the water quality compliance rate of the pipeline network.
[0005] Therefore, how to eliminate the limitations of the water pump scheduling optimization scheme in the water supply system, improve the rationality of the water pump operation strategy and the water tank level amplitude setting value, and enhance the control and management of the background water loss of the pipeline network and the water quality compliance rate of the pipeline network is a technical problem that needs to be solved urgently. Summary of the invention
[0006] In order to solve the above-mentioned problems in the prior art, the present invention aims to solve the above-mentioned problems existing in the prior art.
[0007] The present invention provides a water pump optimization scheduling method based on high-dimensional multi-objective optimization, the method comprising:
[0008] In each water pump optimization cycle of the water pump optimization scheduling task, the optimization-related data stored in the real-time database are collected; wherein the optimization-related data include the water pump pressure of the target pump group, the water pump on / off status, the water tank liquid level of the water tank corresponding to the target pump group, and the required water flow;
[0009] Calling a water pump optimization scheduling model, extracting objective function elements, decision variable elements and constraint parameters in the water pump optimization scheduling model;
[0010] Based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint conditions of the water pump optimization scheduling task are constructed;
[0011] According to the required water flow, taking the decision variable elements and the objective function elements as the scheduling basis, an objective function of the water pump optimization scheduling task is established;
[0012] A distributed scheduling algorithm is adopted, with the constraints as restrictions and minimizing the objective function as the goal, to solve the water pump optimization scheduling model, generate a water pump operation strategy, and execute the scheduling control of the target pump group in each water pump optimization cycle.
[0013] Optionally, the constraint parameters include the lowest liquid level and the highest liquid level of the water tank corresponding to each water pump in the target pump group; based on the constraint parameters and the water pump pressure, the water pump on / off state, and the water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including:
[0014] Based on the minimum liquid level and maximum liquid level of the water tank corresponding to each water pump in the target pump group and the water tank level of the water tank corresponding to the target pump group in the optimization associated data, the first constraint condition and the second constraint condition of the water pump optimization scheduling task are constructed;
[0015] The expression of the first constraint condition is:
[0016]
[0017] In the formula, represents the minimum liquid level of water tank i, represents the maximum liquid level in tank i, represents the liquid level of water tank i at time t;
[0018] The expression of the second constraint condition is:
[0019]
[0020] In the formula, represents the final liquid level of tank i, represents the initial liquid level of water tank i, and T represents the time of the water pump optimization cycle.
[0021] Optionally, the constraint parameters include the minimum time interval between the start and close of each water pump in the target pump group; based on the constraint parameters and the water pump pressure, water pump on and off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps for constructing the water pump optimization scheduling task specifically include:
[0022] Based on the minimum time interval between the start and stop of each water pump in the target pump group and the start and stop status of the water pump in the optimization associated data, the third constraint condition of the water pump optimization scheduling task is constructed;
[0023] The expression of the third constraint condition is:
[0024]
[0025] Where NTi represents the time intervals divided by the running time of pump i. Indicates the minimum time interval allowed for the running time of pump i.
[0026] Optionally, the constraint parameters include the minimum service pressure of different nodes in the water supply network; based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including:
[0027] Based on the minimum service pressure of different nodes in the water supply network and the pump pressure in the optimization association data, the fourth constraint condition of the water pump optimization scheduling task is constructed;
[0028] Wherein, the expression of the fourth constraint condition is:
[0029]
[0030] Where Pti represents the node pressure of the pump corresponding to node i at time t, Represents the minimum service pressure of node i.
[0031] Optionally, the objective function elements include operating cost accounting rules and maintenance cost accounting rules; according to the required water flow, taking the decision variable elements and the objective function elements as the scheduling basis, the objective function steps of the water pump optimization scheduling task are established, specifically including:
[0032] According to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost;
[0033] Based on the operation cost and maintenance cost of each water pump optimization cycle, the objective function of the water pump optimization scheduling task in each water pump optimization cycle is determined.
[0034] Optionally, the required water flow includes the water flow demand values of the water supply network at different time periods in each water pump optimization cycle, and the decision variable elements include the minimum and maximum water tank control liquid levels during peak electricity prices, and the minimum and maximum water tank control liquid levels during off-peak electricity prices.
[0035] Optionally, according to the required water flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost, specifically including:
[0036] Generate a pump operation strategy based on the change of decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables;
[0037] According to the water pump operation strategy and the electricity prices at different time periods in each water pump optimization cycle, a total electricity price based on changes in decision control variables is generated, and the total electricity price is used as the operation cost of each water pump optimization cycle.
[0038] Optionally, according to the required water flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost, specifically including:
[0039] Generate a pump operation strategy based on the change of decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables;
[0040] According to the water pump operation strategy, the number of times the water pump is started and closed is calculated, and the number of times the water pump is started and closed is used as the maintenance cost of each water pump optimization cycle.
[0041] Optionally, based on the operating cost and maintenance cost of each water pump optimization cycle, the objective function of the water pump optimization scheduling task in each water pump optimization cycle is determined, specifically including: taking the product of the maintenance cost of each water pump optimization cycle and the single water pump start-up and shutdown cost conversion coefficient and the sum of the operating cost of each water pump optimization cycle as the objective function of the water pump optimization scheduling task in each water pump optimization cycle.
[0042] Optionally, a distributed scheduling algorithm is used, with the constraint conditions as restrictions and minimization of the objective function as the goal, to solve the calling water pump optimization scheduling model, generate a water pump optimization scheduling strategy, and execute the scheduling control of the target pump group in each water pump optimization cycle, specifically including:
[0043] A distributed scheduling algorithm is used to solve the optimal scheduling model for calling water pumps with constraints as restrictions and minimizing the objective function as the goal, generating the optimal setting values of the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during off-peak electricity prices;
[0044] Generate an optimal operation strategy for the water pump based on the optimal setting values of the minimum and maximum water tank control liquid levels during the peak electricity price, the minimum and maximum water tank control liquid levels during the off-peak electricity price, and the water flow demand values of the water supply network at different time periods in each water pump optimization cycle;
[0045] The water pump optimal operation strategy and the liquid level optimal setting value are sent to the target pump group as the water pump optimization scheduling strategy, so that the target pump group executes the scheduling control of the water pump optimization scheduling strategy in each water pump optimization cycle.
[0046] The beneficial effects of the present invention are as follows: a method for optimizing the scheduling of water pumps based on high-dimensional multi-objective optimization is proposed, by obtaining the optimization-related data of the water pump optimization scheduling task, calling the water pump optimization scheduling model, constructing the objective function based on the optimization-related data and the objective function elements and decision variable elements in the water pump optimization scheduling model, and then using the constraint conditions constructed by the constraint parameters to solve the calling water pump optimization scheduling model with the goal of minimizing the objective function, generating a water pump operation strategy that takes into account the operating cost and maintenance cost, and sending the water pump operation strategy to the target pump group to realize the on-off control of the water pump in the target pump group and the determination of the water tank liquid level amplitude setting value corresponding to the water pump. In this way, the present application can eliminate the limitations of the water pump scheduling optimization scheme in the water supply system, improve the rationality of the water pump operation strategy and the water tank liquid level amplitude setting value, and enhance the control and management of the background water loss of the pipe network and the water quality compliance rate of the pipe network. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 A flow chart of the water pump optimization scheduling method based on high-dimensional multi-objective optimization provided in this embodiment. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] like Figure 1 As shown, a water pump optimization scheduling method based on high-dimensional multi-objective optimization, the method comprising:
[0050] S1: In each water pump optimization cycle of the water pump optimization scheduling task, the optimization-related data stored in the real-time database are collected; wherein the optimization-related data include the water pump pressure of the target pump group, the water pump on / off status, the water tank liquid level of the water tank corresponding to the target pump group, and the required water flow;
[0051] S2: calling a water pump optimization scheduling model, and extracting objective function elements, decision variable elements and constraint parameters in the water pump optimization scheduling model;
[0052] S3: Based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint conditions of the water pump optimization scheduling task are constructed;
[0053] S4: according to the required water flow, taking the decision variable elements and the objective function elements as the scheduling basis, establishing the objective function of the water pump optimization scheduling task;
[0054] S5: adopting a distributed scheduling algorithm, with the constraints as restrictions and minimizing the objective function as the goal, solving the calling water pump optimization scheduling model, generating a water pump operation strategy, and executing the scheduling control of the target pump group in each water pump optimization cycle.
[0055] It should be noted that the existing water pump optimization scheduling scheme has the following problems: (1) The single-objective optimization problem that only considers power consumption has limitations. (2) The lack of a reasonable water pump operation strategy makes it impossible to effectively control the background water loss of the pipeline network. (3) The lack of a reasonable water tank liquid level amplitude setting value makes it impossible to effectively manage the water quality compliance rate of the pipeline network. In order to solve the above problems, this embodiment obtains the optimization-related data of the water pump optimization scheduling task, calls the water pump optimization scheduling model, constructs the objective function based on the optimization-related data and the objective function elements and decision variable elements in the water pump optimization scheduling model, and then uses the constraint conditions constructed by the constraint parameters to solve the call of the water pump optimization scheduling model with the goal of minimizing the objective function, and generates a water pump operation strategy that considers the operating cost and maintenance cost. By sending the water pump operation strategy to the target pump group, the on-off control of the water pump in the target pump group and the determination of the water tank liquid level amplitude setting value corresponding to the water pump can be realized. In this way, the present application can eliminate the limitations of the water pump scheduling optimization scheme in the water supply system, improve the rationality of the water pump operation strategy and the water tank liquid level amplitude setting value, and enhance the control and management of the background water loss of the pipeline network and the water quality compliance rate of the pipeline network.
[0056] In a preferred embodiment, the constraint parameters include the minimum liquid level and the maximum liquid level of the water tank corresponding to each water pump in the target pump group; based on the constraint parameters and the water pump pressure, the water pump on / off state, and the water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including:
[0057] S31: constructing a first constraint condition and a second constraint condition of the water pump optimization scheduling task based on the lowest liquid level and the highest liquid level of the water tank corresponding to each water pump in the target pump group and the water tank liquid level of the water tank corresponding to the target pump group in the optimization association data;
[0058] The expression of the first constraint condition is:
[0059]
[0060] In the formula, represents the minimum liquid level of water tank i, represents the maximum liquid level in tank i, represents the liquid level of water tank i at time t;
[0061] The expression of the second constraint condition is:
[0062]
[0063] In the formula, represents the final liquid level of tank i, represents the initial liquid level of water tank i, and T represents the time of the water pump optimization cycle.
[0064] Furthermore, the constraint parameters include the minimum time interval between the start and stop of each water pump in the target pump group; based on the constraint parameters and the water pump pressure, water pump start and stop status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including:
[0065] S32: constructing a third constraint condition for the water pump optimization scheduling task based on the minimum time interval between the start and stop of each water pump in the target pump group and the water pump start and stop status in the optimization associated data;
[0066] The expression of the third constraint condition is:
[0067]
[0068] Where NTi represents the time intervals divided by the running time of pump i. Indicates the minimum time interval allowed for the running time of pump i.
[0069] Furthermore, the constraint parameters include the minimum service pressure of different nodes in the water supply network; based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including:
[0070] S33: constructing a fourth constraint condition for the water pump optimization scheduling task based on the minimum service pressure of different nodes in the water supply network and the water pump pressure in the optimization association data;
[0071] Wherein, the expression of the fourth constraint condition is:
[0072]
[0073] Where Pti represents the node pressure of the water pump corresponding to node i at time t, and Pmiin represents the minimum service pressure of node i.
[0074] In this embodiment, when considering the liquid level of each water tank corresponding to each water pump, two constraints need to be provided. The first is that the liquid level of the water tank must be within the actual volume range of the water tank, that is, the liquid level of the water tank is between the lowest water level and the highest water level; the second is that in order to make the obtained water pump scheduling scheme sustainable, a constraint is set for the final water level of the water tank, and a non-strict constraint is adopted, that is, the final water level of the water tank is greater than or equal to the initial water level of the water tank, so that the water pump scheduling scheme is more flexible. In addition, considering that the frequent opening and closing of the water pump will cause water hammer, which will damage the stability of the water pump and the water supply network, and even cause water quality problems, such as causing the turbidity of the water to increase. However, it is not enough to reduce the opening and closing of the water pump as much as possible. The opening and closing of the pump with two short time intervals may be more harmful than the opening and closing of the pump with three long time intervals. In order to avoid frequent opening and closing of the water pump, a constraint is made on the minimum time interval between the opening and closing of the water pump, that is, the third constraint. In addition, in order to meet the needs of the entire water supply network, the pressure on the node must meet the minimum service pressure. Different minimum service pressure constraints, i.e., the fourth constraint condition, are set according to the conditions and specific needs of different pipe networks. Therefore, this embodiment sets four constraints to limit the actual situation in the water supply system water pump optimization scheduling control scenario, thereby improving the accuracy and rationality of the water supply system water pump optimization scheduling.
[0075] In a preferred embodiment, the objective function elements include operating cost accounting rules and maintenance cost accounting rules; according to the required water flow, the objective function steps of the water pump optimization scheduling task are established based on the decision variable elements and the objective function elements as the scheduling basis, specifically including:
[0076] S41: according to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost;
[0077] S42: Based on the operation cost and maintenance cost of each water pump optimization cycle, determine the objective function of the water pump optimization scheduling task in each water pump optimization cycle.
[0078] In practical applications, the required water flow includes the water flow demand value of the water supply network at different time periods in each water pump optimization cycle, and the decision variable elements include the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during off-peak electricity prices.
[0079] On this basis, according to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rules and the maintenance cost accounting rules as the dispatch accounting basis, the operation cost and maintenance cost are calculated respectively, specifically including:
[0080] S411: Generate a water pump operation strategy based on the change of decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at low peak electricity prices as decision control variables;
[0081] S412: According to the water pump operation strategy and the electricity prices at different time periods in each water pump optimization cycle, a total electricity price based on changes in decision control variables is generated, and the total electricity price is used as the operation cost of each water pump optimization cycle.
[0082] In this embodiment, when determining the operating cost and maintenance cost of the water pump optimization scheduling task, the water demand flow of the water users of the water supply network corresponding to each water pump is first obtained, that is, the water flow demand value of the water supply network at different time periods for each water pump in each water pump optimization cycle (the flow rate can be obtained through historical water flow prediction), and then the water pump operation strategy is generated based on the water demand flow and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables (that is, the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices are used as variables, and according to the water flow demand values at different time periods, the water pump is executed to store water when the liquid level in the water tank drops to the minimum liquid level, and the water pump is stopped to store water when the liquid level in the water tank rises to the maximum liquid level).
[0083] In actual applications, due to the different water demands in different water supply areas, it is necessary to consider both the water storage supply of water users and the water age of the water tank should not be too long. In this embodiment, the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during low-peak electricity prices are set as decision control variables. When the liquid level in the water tank reaches the minimum liquid level, the water pump is turned on to perform water pump storage. When the liquid level in the water tank reaches the maximum liquid level, the water pump is turned off to stop water storage. In this way, the water storage supply and the water age of the water tank are regulated and balanced by setting the maximum liquid level and the minimum liquid level. At the same time, in order to accurately calculate the operating cost of the water pump scheduling operation, this embodiment considers the minimum liquid level and the maximum liquid level of the peak electricity price and the low-peak electricity price respectively, so as to further improve the rationality of the water pump scheduling optimization.
[0084] After that, according to the water pump operation strategy (i.e., the time when the water pump is turned on to perform water storage in each water pump optimization cycle) and the electricity prices in different time periods in each water pump optimization cycle, the total electricity price based on the changes in decision control variables is generated. This total electricity price is the operating cost of the water pump optimization scheduling task in each water pump optimization cycle.
[0085] On this basis, according to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rules and the maintenance cost accounting rules as the dispatch accounting basis, the operation cost and maintenance cost are calculated respectively, specifically including:
[0086] S413: generating a water pump operation strategy based on changes in decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables;
[0087] S414 calculates the number of times the water pump is started and closed according to the water pump operation strategy, and uses the number of times the water pump is started and closed as the maintenance cost of each water pump optimization cycle.
[0088] In a preferred embodiment, based on the operating cost and maintenance cost of each water pump optimization cycle, the objective function of the water pump optimization scheduling task in each water pump optimization cycle is determined, specifically including: taking the product of the maintenance cost of each water pump optimization cycle and the single water pump start-up and shutdown cost conversion coefficient and the sum of the operating cost of each water pump optimization cycle as the objective function of the water pump optimization scheduling task in each water pump optimization cycle.
[0089] In this embodiment, after obtaining the water pump operation strategy based on the change of the decision control variable based on the above method, the number of times each water pump is started and closed in each water pump optimization cycle when executing the water pump operation strategy is calculated, and the number of times the water pump is started and closed is used as the maintenance cost of each water pump optimization cycle. After that, the product of the number of times the water pump is started and closed and the preset single water pump start and close cost conversion coefficient is used as the impact of the maintenance cost in the objective function, and the operating cost is directly considered as the impact of the operating cost in the objective function. Finally, the operating cost and the product of the number of times the water pump is started and closed and the preset single water pump start and close cost conversion coefficient are added to obtain the objective function of the water pump optimization scheduling task in each water pump optimization cycle. It should be noted that the objective function is a function based on the change of the decision control variable, that is, it is different according to the minimum and maximum water tank control liquid levels when the user sets different peak electricity prices and the minimum and maximum water tank control liquid levels when the user sets different peak electricity prices.
[0090] In a preferred embodiment, a distributed scheduling algorithm is adopted, with the constraint conditions as restrictions and the objective of minimizing the objective function, to solve the water pump optimization scheduling model, generate a water pump optimization scheduling strategy, and execute the scheduling control of the target pump group in each water pump optimization cycle, specifically including:
[0091] S51: adopting a distributed scheduling algorithm, taking the constraints as restrictions and minimizing the objective function as the goal, solving the optimal scheduling model for calling the water pump, and generating the optimal setting values of the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during low-peak electricity prices;
[0092] S52: Generate an optimal operation strategy for the water pump based on the minimum and maximum water tank control liquid levels during the peak electricity price, the optimal liquid level setting values of the minimum and maximum water tank control liquid levels during the off-peak electricity price, and the water flow demand values of the water supply network at different time periods in each water pump optimization cycle;
[0093] S53: Sending the water pump optimal operation strategy and the liquid level optimal setting value as the water pump optimization scheduling strategy to the target pump group, so that the target pump group executes the scheduling control of the water pump optimization scheduling strategy in each water pump optimization cycle.
[0094] In this embodiment, after obtaining the objective function of the water pump optimization scheduling task in each water pump optimization cycle, the distributed scheduling algorithm is used to solve the calling water pump optimization scheduling model with the constraint conditions as restrictions and the minimization of the objective function as the goal to obtain the optimal liquid level setting value, and then the optimal liquid level setting value and the water flow demand value of the water supply network at different time periods in each water pump optimization cycle are used to derive and generate the optimal water pump operation strategy. Finally, the optimal water pump operation strategy and the optimal liquid level setting value are sent to the target pump group, so that the target pump group executes the scheduling control of the water pump optimization scheduling strategy in each water pump optimization cycle according to the optimization associated data collected from the real-time database. In this way, on the basis of simultaneously considering the water storage supply of water users and the water age of the water tank should not be too long, the limitations of the water pump scheduling optimization scheme in the water supply system are eliminated, the rationality of the water pump operation strategy and the water tank liquid level amplitude setting value is improved, and the control and management of the background water loss of the pipeline network and the water quality compliance rate of the pipeline network are enhanced.
[0095] In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "center", "top", "bottom", "top", "bottom", "inside", "outside", "inner side", "outer side" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Among them, "inside" refers to an internal or enclosed area or space. "Periphery" refers to the area surrounding a specific component or a specific area.
[0096] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0097] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", and "assemble" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0098] In the description of the embodiments of the present invention, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.
[0099] In the description of the embodiments of the present invention, it is to be understood that "-" and "~" represent a range between two values, and the range includes the endpoints. For example: "AB" represents a range greater than or equal to A and less than or equal to B. "A~B" represents a range greater than or equal to A and less than or equal to B.
[0100] In the description of the embodiments of the present invention, the term "and / or" herein is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.
[0101] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pump optimization scheduling method based on high-dimensional multi-objective optimization, It is characterized in that The method comprises: In each water pump optimization cycle of the water pump optimization scheduling task, the optimization-related data stored in the real-time database are collected; wherein the optimization-related data include the water pump pressure of the target pump group, the water pump on / off status, the water tank liquid level of the water tank corresponding to the target pump group, and the required water flow; Calling a water pump optimization scheduling model, extracting objective function elements, decision variable elements and constraint parameters in the water pump optimization scheduling model; Based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint conditions of the water pump optimization scheduling task are constructed; According to the required water flow, taking the decision variable elements and the objective function elements as the scheduling basis, an objective function of the water pump optimization scheduling task is established; A distributed scheduling algorithm is adopted, with the constraints as restrictions and minimizing the objective function as the goal, to solve the water pump optimization scheduling model, generate a water pump operation strategy, and execute the scheduling control of the target pump group in each water pump optimization cycle.
2. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 1, It is characterized in that The constraint parameters include the minimum liquid level and the maximum liquid level of the water tank corresponding to each water pump in the target pump group; based on the constraint parameters and the water pump pressure, the water pump on / off state, and the water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including: Based on the minimum liquid level and maximum liquid level of the water tank corresponding to each water pump in the target pump group and the water tank level of the water tank corresponding to the target pump group in the optimization associated data, the first constraint condition and the second constraint condition of the water pump optimization scheduling task are constructed; The expression of the first constraint condition is: In the formula, represents the minimum liquid level of water tank i, represents the maximum liquid level in tank i, represents the liquid level of water tank i at time t; The expression of the second constraint condition is: In the formula, represents the final liquid level of tank i, represents the initial liquid level of water tank i, and T represents the time of the water pump optimization cycle.
3. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 1, It is characterized in that The constraint parameters include the minimum time interval between the start and close of each water pump in the target pump group; based on the constraint parameters and the water pump pressure, water pump on and off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including: Based on the minimum time interval between the start and stop of each water pump in the target pump group and the start and stop status of the water pump in the optimization associated data, the third constraint condition of the water pump optimization scheduling task is constructed; Wherein, the expression of the third constraint condition is: Where NT i represents several time intervals divided by the running time of pump i, Indicates the minimum time interval allowed for the running time of pump i.
4. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 1, It is characterized in that The constraint parameters include the minimum service pressure of different nodes in the water supply network; based on the constraint parameters and the water pump pressure, water pump on / off status, and water tank liquid level of the water tank corresponding to the target pump group in the optimization associated data, the constraint condition steps of the water pump optimization scheduling task are constructed, specifically including: Based on the minimum service pressure of different nodes in the water supply network and the pump pressure in the optimization association data, the fourth constraint condition of the water pump optimization scheduling task is constructed; The expression of the fourth constraint condition is: In the formula, represents the node pressure of the water pump corresponding to node i at time t, Represents the minimum service pressure of node i.
5. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 1, It is characterized in that The objective function elements include operating cost accounting rules and maintenance cost accounting rules; according to the required water flow, the objective function steps of the water pump optimization scheduling task are established based on the decision variable elements and the objective function elements as the scheduling basis, specifically including: According to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost; Based on the operation cost and maintenance cost of each water pump optimization cycle, the objective function of the water pump optimization scheduling task in each water pump optimization cycle is determined.
6. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 5, It is characterized in that The required water flow includes the water flow demand value of the water supply network at different time periods in each water pump optimization cycle, and the decision variable elements include the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during off-peak electricity prices.
7. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 6, It is characterized in that According to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost, specifically including: Generate a pump operation strategy based on the change of decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables; According to the water pump operation strategy and the electricity prices at different time periods in each water pump optimization cycle, a total electricity price based on changes in decision control variables is generated, and the total electricity price is used as the operation cost of each water pump optimization cycle.
8. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 6, It is characterized in that According to the water demand flow, taking the decision variable elements as the dispatch control basis, taking the operation cost accounting rule and the maintenance cost accounting rule as the dispatch accounting basis, respectively calculating the operation cost and the maintenance cost, specifically including: Generate a pump operation strategy based on the change of decision control variables according to the water flow demand value of the water supply network at different time periods in each water pump optimization cycle and the minimum and maximum water tank control liquid levels at peak electricity prices and the minimum and maximum water tank control liquid levels at off-peak electricity prices as decision control variables; According to the water pump operation strategy, the number of times the water pump is started and closed is calculated, and the number of times the water pump is started and closed is used as the maintenance cost of each water pump optimization cycle.
9. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 6, It is characterized in that Based on the operating cost and maintenance cost of each water pump optimization cycle, the objective function of the water pump optimization scheduling task in each water pump optimization cycle is determined, specifically including: taking the product of the maintenance cost of each water pump optimization cycle and the single water pump start-up and shutdown cost conversion coefficient and the sum of the operating cost of each water pump optimization cycle as the objective function of the water pump optimization scheduling task in each water pump optimization cycle.
10. The water pump optimization scheduling method based on high-dimensional multi-objective optimization according to claim 1, It is characterized in that A distributed scheduling algorithm is adopted, with the constraint conditions as restrictions and the objective of minimizing the objective function, to solve the water pump optimization scheduling model, generate a water pump optimization scheduling strategy, and execute the scheduling control of the target pump group in each water pump optimization cycle, specifically including: A distributed scheduling algorithm is used to solve the optimal scheduling model for calling water pumps with constraints as restrictions and minimizing the objective function as the goal, generating the optimal setting values of the minimum and maximum water tank control liquid levels during peak electricity prices and the minimum and maximum water tank control liquid levels during off-peak electricity prices; Generate an optimal operation strategy for the water pump based on the optimal setting values of the minimum and maximum water tank control liquid levels during the peak electricity price, the minimum and maximum water tank control liquid levels during the off-peak electricity price, and the water flow demand values of the water supply network at different time periods in each water pump optimization cycle; The water pump optimal operation strategy and the liquid level optimal setting value are sent to the target pump group as the water pump optimization scheduling strategy, so that the target pump group executes the scheduling control of the water pump optimization scheduling strategy in each water pump optimization cycle.
Citation Information
Patent Citations
Multi-target water pump scheduling method based on adaptive angle constraint evolutionary algorithm
CN112182978A
Intelligent collaborative optimization scheduling method for water taking and supplying pump stations of waterworks
CN113536684A
Scheduling method, system and equipment for uniformly reducing operation and maintenance cost of water supply pipe network system
CN116227829A
Operation method and device of water supply network and electronic equipment
CN116432378A
Cited By
Water pump control method and device, electronic equipment and storage medium
CN121676425A