Cold-state and hot-state boiler starting linkage method for circulating fluidized bed boiler
Through the cold and hot furnace starting method of the circulating fluidized bed boiler, the problems of burner burning, burning out, and coking of the burner are solved, and the success rate of the furnace start-up and the punctuality of the steam supply time are improved, ensuring the production order of salt ore ore smooth progress.
Patent Information
- Application Number
- CN202411171822.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-03
AI Technical Summary
During the cold and hot boiler, the burner is prone to accidents such as burning red, burning, coking, and extinguishing of fires, resulting in a low success rate of start-up and inappropriate steam supply time, which affects the production order of salt ore.
The cold and hot-state furnace starting method of circulating fluidized bed boiler is adopted, including cold-state furnace starting, press-fire shutdown and press-fire furnace starting operation steps. By adjusting the air volume, coal feeding volume and oil pressure, the bed mild smoke is controlled. The gas oxygen content ensures the stable operation of the burner and avoids the burner from burning red and coking.
The boiler start-up success rate has been improved to 98%, the start-up time has been shortened to 3.5-4 hours, ensuring that the steam supply time is on time, reducing production delays and costs, and enhancing the safe operation of the system.
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of boilers, and in particular to a method for linking cold-state and hot-state startup of a circulating fluidized bed boiler. Background Art
[0002] Salt mine processing workshops generally use four CG-75 / 3.82-M circulating fluidized bed boilers, three of which are in operation and one is in standby. Due to the production process characteristics of the salt making device, there are periodic tank cleaning and shutdown and boiler failures, and the boiler needs to be switched. In the past, the burner was often burned red or burned during the ignition and start-up process of the boiler, and the start-up success rate was only about 60%. Each ignition and start-up takes 6 to 10 hours, and the fuel consumption is 0.8t / h, which means the average fuel consumption is about 5 tons / time.
[0003] However, when the boiler auxiliary equipment, production end, etc. fail, or the system suddenly loses power, there are operations such as starting and stopping the furnace by suppressing the fire and restarting the furnace. In the past, the success rate of starting the furnace by raising the fire after suppressing the fire was only about 50%. If the furnace fails to start by raising the fire, it is necessary to start the ignition oil pump and restart the ignition, which will delay the production order by about 3 hours and consume about 3 tons of oil per time, resulting in increased production costs. If the furnace is not properly controlled during startup, coking accidents are likely to occur. If coking occurs, it will take about two days to clean the coke and reinstall the boiler bottom material, which is labor-intensive and time-consuming and delays production, seriously affecting the normal production order of the salt mine. Summary of the invention
[0004] In order to solve or partially solve the problems existing in the related technology, the present application provides a method for the linkage of cold and hot start-up of a circulating fluidized bed boiler, which solves the occurrence of accidents such as termination of start-up due to burner burning red, burning out, coking, fire extinguishing, etc. caused by the linkage of cold and hot start-up of the circulating fluidized bed boiler, so that the steam supply time is punctual and flexible, and the production order of the entire mine can be carried out smoothly.
[0005] The present application provides a method for cold-state and hot-state startup linkage of a circulating fluidized bed boiler, including cold-state startup operation, pressure-fire shutdown operation, and pressure-fire startup operation;
[0006] The steps for cold start operation are:
[0007] S11: Cold fluidization test is passed, and the fluidization air volume, air chamber pressure and primary fan current are recorded;
[0008] S12: Open the ignition air damper to 80%, close the nozzle air to 30-40%, and close the coal spreading air;
[0009] S13: Adjust the oil pressure and start the first oil burner. After the first oil burner burns stably, start the second oil burner.
[0010] S14: Turn off the return air, and use a coal feeder to evenly feed coal into the furnace at a rate of one third of the normal operation;
[0011] S15: Stop feeding coal, the bed material temperature stops rising and tends to decline, and after the oxygen content of flue gas rises, coal is added to the furnace and then to the circulating ash system;
[0012] S16: Check the bed temperature rising rate and flue gas oxygen content, start the coal spreading air, and appropriately adjust the primary air volume, induced draft volume and coal supply. When the bed temperature returns to 850°C, cut off the oil burner. After cutting off the oil burner, adjust the air volume and coal supply appropriately according to the combustion situation, keep the bed temperature rising slowly, and the bed temperature should not exceed 920°C before being put into operation.
[0013] The steps of the fire-stop operation are:
[0014] S21: Switch each automatic control system to manual control;
[0015] S22: Stop the belt coal feeder, stop slag discharge, stop the secondary fan, primary fan, return fan, and induced draft fan in sequence, close their regulating dampers immediately, and open the induced draft fan damper by 20% to maintain natural ventilation;
[0016] S23: Close the main steam valve, open the drain valve and superheater header drain valve, open the air exhaust valve according to the boiler pressure, maintain the normal water level of the steam drum, and open the economizer recirculation valve when stopping water supply.
[0017] The steps of the pressure fire furnace start operation are:
[0018] S31: When the bed material temperature is between 600°C and 650°C, the coal spreading air is turned off, and the left and right return air dampers are closed;
[0019] S32: Add coal into the circulating ash system;
[0020] S33: Turn on the coal-spreading air, properly adjust the primary air volume, induced air volume and coal supply, keep the bed temperature rising slowly, and the bed temperature should not exceed 920℃ before the boiler is put into steam operation;
[0021] S34: When the bed material temperature is above 700℃, open the coal spreading air and the left and right return material air dampers to operate synchronously to increase the temperature, so as to reduce the fire accidents caused by the return material operation.
[0022] Optionally, in some schemes, in S12, the total air volume is lower than the critical fluidizing air volume, and the induced draft volume is adjusted to maintain the negative pressure in the furnace within the range of 50-80Pa.
[0023] Optionally, in some schemes, in S14, the smoke temperature in the water-cooled air chamber is less than 650°C, the ignition oil pressure is adjusted between 1.2 and 1.8 MPa, the bed material temperature rise rate is controlled at 150°C / h, and when the bed temperature reaches ≧450°C, the return air is turned off.
[0024] Optionally, in some schemes, in the S15, when the bed temperature reaches 580-600℃, the coal feeding is stopped, the total air volume is increased to the critical fluidizing air volume, the induced draft volume is adjusted, and the negative pressure in the furnace is maintained within the range of 50-80Pa; the bed material temperature rise and the flue gas oxygen content are observed. If the bed material temperature rise stops and there is a downward trend, and the flue gas oxygen content increases, then three coal feeders can be enabled at the same time to feed coal into the furnace at 70% of the coal feeding amount during daily operation. When the bed temperature rises to 800℃, the ignition oil pressure can be reduced. When the bed temperature reaches 850℃, the single-side circulating ash system can be put into use. When the bed temperature drops and then rises back to 850℃, the other side circulating ash system can be put into use.
[0025] Optionally, in some schemes, in S22, when the temperature of the material layer rises to about 980°C, the belt coal feeder is stopped, the slag discharge is stopped, and when the bed temperature drops by 5 to 10°C, the oxygen content gradually rises to 0.5-1%, and the secondary fan, primary fan, return fan, and induced draft fan are stopped in turn.
[0026] Optionally, in some schemes, in S32, the induced draft fan is started to adjust the furnace negative pressure, the coal feeder is started to feed coal into the furnace at 20% of the coal feed during normal operation, the primary fan is started to adjust to the minimum critical fluidizing air volume, the furnace negative pressure is adjusted to remain in the range of -50-80Pa, and coal is fed into the furnace at 70% of the coal feed during daily operation. When the bed temperature reaches 850°C, the single-side circulating ash system can be put into operation, and when the bed temperature drops and then rises back to 850°C, the other-side circulating ash system can be put into operation.
[0027] The technical solution provided by this application may have the following beneficial effects:
[0028] The application solves the problems of burner red, burnout, coking, fire extinguishing, etc. caused by cold and hot start-up linkage of circulating fluidized bed boiler, which leads to the termination of start-up, so that the steam supply time is punctual and flexible, and the production order of the whole mine can be carried out smoothly;
[0029] The startup time of the boiler in this application is shortened from the original 6-10 hours to the current 3.5-4 hours, shortening the startup time by 3-6 hours / time, and the success rate of boiler linkage startup is 98%;
[0030] The furnace start-up linkage operation method applied in this application provides a reliable guarantee for the safe operation of the subsequent system.
[0031] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. DETAILED DESCRIPTION
[0032] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0033] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0034] In response to the above problems, an embodiment of the present application provides a method for the linkage of cold and hot start-up of a circulating fluidized bed boiler, which solves the problem of termination of startup due to burner burning red, burning out, coking, fire extinguishing, etc. caused by the linkage of cold and hot start-up of the circulating fluidized bed boiler, so that the steam supply time is punctual and flexible, and the production order of the entire mine can be carried out smoothly.
[0035] The cold-state and hot-state startup linkage method of the circulating fluidized bed boiler comprises cold-state startup operation, fire-reducing shutdown operation, and fire-reducing startup operation.
[0036] The steps for cold start operation are:
[0037] S11: Cold fluidization test is passed, and the fluidization air volume, air chamber pressure and primary fan current are recorded.
[0038] S12: Open the ignition air damper to 80%, close the nozzle air to 30-40%, and close the coal spreading air;
[0039] The total primary air volume is lower than the critical fluidizing air volume. Adjust the induced draft volume to keep the furnace negative pressure within the range of 50-80Pa.
[0040] S13: Adjust the oil pressure and put the first oil burner into operation. After the first oil burner burns stably, put the second oil burner into operation.
[0041] S14: Turn off the return air, and use a coal feeder to evenly feed coal into the furnace at a rate of one third of the normal operation;
[0042] The smoke temperature in the water-cooled air chamber is less than 650°C. The ignition oil pressure is adjusted between 1.2 and 1.8 MPa to control the bed material temperature rise rate at 150°C / h. When the bed temperature reaches ≧450°C, the return air is closed.
[0043] S15: Stop feeding coal, the bed material temperature stops rising and tends to decline, and after the oxygen content of flue gas rises, coal is added to the furnace and then to the circulating ash system;
[0044] When the bed temperature reaches 580-600℃, stop feeding coal, increase the total air volume to the critical fluidizing air volume, adjust the induced draft volume, and keep the furnace negative pressure within the range of 50-80Pa; observe the bed material temperature rise and the flue gas oxygen content. If the bed material temperature stops and there is a downward trend, and the flue gas oxygen content increases, then three coal feeders can be used at the same time to feed coal into the furnace at 70% of the coal feed during daily operation. When the bed temperature rises to 800℃, the ignition oil pressure can be reduced. When the bed temperature reaches 850℃, the single-side circulating ash system can be put into use. When the bed temperature drops and then rises back to 850℃, the other side circulating ash system can be put into use.
[0045] S16: Check the bed temperature rising rate and flue gas oxygen content, start the coal spreading air, and appropriately adjust the primary air volume, induced draft volume and coal supply. When the bed temperature returns to 850°C, cut off the oil burner. After cutting off the oil burner, adjust the air volume and coal supply appropriately according to the combustion situation, keep the bed temperature rising slowly, and the bed temperature should not exceed 920°C before being put into operation.
[0046] Pay attention to the expansion of the drum, header, etc. during startup, observe the expansion indicator regularly, and keep a record of the displacement; if the bed pressure drops below 6KPa, bed material should be added. When the drum pressure reaches 0.1MPa, close the drum and superheater air valves. When the steam pressure rises to 0.15-0.2MPa, flush the pressure gauge and check with the adjacent pressure gauge to ensure accurate readings; when the drum pressure rises to 0.3MPa, close all drain valves except the superheater drain, and drain water and sewage regularly; open the air exhaust valve appropriately, control the pressure increase rate to 0.05-0.1MPa / min, and the heating rate to 1.5℃ / min, so that the temperature difference between the upper and lower walls of the drum is less than 50℃; when the pressure reaches 1.0MPa, start the continuous discharge, close the superheater drain, and when the pressure reaches 1.0-1.2MPa, backwash the desuperheater.
[0047] The steps of the fire-stop operation are:
[0048] S21: Switch each automatic control system to manual control.
[0049] S22: Stop the belt coal feeder, stop slag discharge, stop the secondary fan, primary fan, return fan, and induced draft fan in sequence, close their regulating dampers immediately, and open the induced draft fan damper by 20% to maintain natural ventilation;
[0050] When the temperature of the material layer rises to about 980℃, stop the belt coal feeder and slag discharge. When the bed temperature drops by 5 to 10℃, the oxygen content gradually rises to 0.5-1%. Stop the secondary fan, primary fan, return fan and induced draft fan in turn.
[0051] S23: Close the main steam valve, open the drain valve and superheater header drain valve, open the air exhaust valve according to the boiler pressure to prevent the safety valve from operating, maintain the normal water level of the steam drum, and open the economizer recirculation valve when stopping water supply.
[0052] The steps of the pressure fire furnace start operation are:
[0053] S31: When the bed material temperature is between 600℃ and 650℃, close the coal spreading air and the left and right return air dampers; if the bed material temperature is above 700℃, it is not necessary to close the coal spreading air and the left and right return air dampers, control the drum water level at the middle and lower water level, put the water pump into operation, and put the electrostatic precipitator into electric field operation.
[0054] S32: Add coal into the circulating ash system;
[0055] Start the induced draft fan to adjust the negative pressure in the furnace, start the coal feeder to feed coal into the furnace at 20% of the coal feed during normal operation, start the primary fan and adjust it to the minimum critical fluidizing air volume, adjust the negative pressure in the furnace to remain within the range of -50-80Pa, feed coal into the furnace at 70% of the coal feed during daily operation, when the bed temperature reaches 850℃, the single-side circulating ash system can be put into operation, and when the bed temperature drops and then rises back to 850℃, the other side circulating ash system can be put into operation.
[0056] S33: Check the bed temperature rising rate and flue gas oxygen content, start the coal spreading air, appropriately adjust the primary air volume, induced draft volume and coal supply, and adjust the air volume and coal supply appropriately according to the combustion situation, keep the bed temperature rising slowly, and the bed temperature should not exceed 920℃ before the boiler is put into steam operation.
[0057] S34: When the bed material temperature is above 700℃, open the coal spreading air and the left and right return material air dampers to operate synchronously to increase the temperature, so as to reduce the fire accidents caused by the return material operation.
[0058] Open the isolation gate valve of the coal feeder and after the boiler is ignited, check the ignition of the oil gun frequently and pay attention to the adjustment of the oil gun air volume to achieve reasonable air distribution; check the bed temperature frequently to prevent large deviations on both sides; pay attention to monitoring the flue gas temperature at the furnace outlet, and the deviation of the flue gas temperature on both sides should not exceed 30°C.
[0059] Strictly follow the temperature rise and pressure rise curve, and the temperature difference between the upper and lower walls of the drum shall not exceed 50℃, otherwise the temperature rise and pressure rise speed should be reduced; attention should be paid to the water level of the drum during the pressure rise to prevent fullness or lack of water. During intermittent water filling, the economizer recirculation door should be closed when filling water, and the recirculation door should be opened after stopping water filling; switching the feed water pump should be done slowly; closely monitor the bed temperature, bed pressure and air volume to prevent the bed pressure from being too low and the air distribution plate from overheating and overheating, so as to ensure good fluidization of the bed layer.
[0060] Boiler adjustment:
[0061] (1) Maintain the boiler's evaporation capacity in accordance with the specified load curve;
[0062] (2) Balance water intake and maintain normal water level;
[0063] (3) Ensure the quality of steam;
[0064] (4) Maintain normal bed temperature, bed pressure, steam temperature and steam pressure;
[0065] (5) Control SO2 and NOX emissions within the specified range;
[0066] (6) Ensure the safety and economy of boiler operation.
[0067] The present application solves the problems of the occurrence of accidents such as burner red-hot, burnt-out, coking, fire extinguishing, etc. caused by the cold and hot start-up linkage of the circulating fluidized bed boiler, which terminates the start-up, so that the steam supply time is punctual and flexible, and the production order of the whole mine can be carried out smoothly; the start-up time of the boiler is shortened from the original 6-10h to the current 3.5-4h, and the start-up time is shortened by 3-6 hours / time, and the success rate of boiler linkage start-up is 98%; the start-up linkage operation method provides a reliable guarantee for the safe operation of the subsequent system.
[0068] Finally, it should be noted that, in this article, relationships such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms include, include or any other variations are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0069] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0070] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A method for cold and hot start-up linkage of a circulating fluidized bed boiler, characterized in that: The cold and hot start-up linkage method of the circulating fluidized bed boiler includes cold start-up operation, pressure-fire shutdown operation, and pressure-fire start-up operation; The steps for cold start operation are: S11: Cold fluidization test is passed, and the fluidization air volume, air chamber pressure and primary fan current are recorded; S12: Open the ignition air damper to 80%, close the nozzle air to 30-40%, and close the coal spreading air; S13: Adjust the oil pressure and start the first oil burner. After the first oil burner burns stably, start the second oil burner. S14: Turn off the return air, and use a coal feeder to evenly feed coal into the furnace at a rate of one third of the normal operation; S15: Stop feeding coal, the bed material temperature stops rising and tends to decline, and after the flue gas oxygen content rises, coal is added to the furnace and then to the circulating ash system; S16: Check the bed temperature rising rate and flue gas oxygen content, start the coal spreading air, and properly adjust the primary air volume, induced air volume and coal supply. When the bed temperature rises back to 850°C, cut off the oil burner. After cutting off the oil burner, adjust the air volume and coal supply appropriately according to the combustion situation, keep the bed temperature rising slowly, and the bed temperature should not exceed 920°C before being put into operation. The steps of the fire-stop operation are: S21: Switch each automatic control system to manual control; S22: Stop the belt coal feeder, stop slag discharge, stop the secondary fan, primary fan, return fan, and induced draft fan in sequence, close their regulating dampers immediately, and open the induced draft fan damper by 20% to maintain natural ventilation; S23: Close the main steam valve, open the drain valve and superheater header drain valve, open the air exhaust valve according to the boiler pressure, maintain the normal water level of the steam drum, and open the economizer recirculation valve when stopping water supply; The steps of the pressure fire furnace start operation are: S31: When the bed material temperature is between 600°C and 650°C, the coal spreading air is turned off, and the left and right return air dampers are closed; S32: Add coal into the circulating ash system; S33: Turn on the coal-spreading air, properly adjust the primary air volume, induced air volume and coal supply, keep the bed temperature rising slowly, and the bed temperature should not exceed 920℃ before the boiler is put into steam operation; S34: When the bed material temperature is above 700℃, open the coal spreading air and the left and right return material air dampers to operate synchronously to increase the temperature, so as to reduce the fire accidents caused by the return material operation.
2. The method for cold and hot start-up linkage of a circulating fluidized bed boiler according to claim 1, characterized in that: In the above-mentioned S12, the total air volume is lower than the critical fluidizing air volume, and the induced draft volume is adjusted to maintain the negative pressure in the furnace within the range of 50--80Pa.
3. The method for cold and hot start-up linkage of a circulating fluidized bed boiler according to claim 1 or 2, characterized in that: In the S14, the smoke temperature of the water-cooled air chamber is less than 650°C, and the ignition oil pressure is adjusted between 1.2 and 1.8 MPa to control the bed material temperature rise rate at 150°C / h. When the bed temperature reaches ≧450°C, the return air is turned off.
4. The method for cold and hot start-up linkage of a circulating fluidized bed boiler according to claim 3, characterized in that: In the above S15, when the bed temperature reaches 580-600°C, the coal feeding is stopped, the total air volume is increased to the critical fluidizing air volume, the induced draft volume is adjusted, and the negative pressure in the furnace is maintained within the range of 50-80Pa; the bed material temperature rise and the flue gas oxygen content are observed. If the bed material temperature rise stops and has a downward trend, and the flue gas oxygen content increases, then three coal feeders can be enabled at the same time to feed coal into the furnace at 70% of the coal feeding amount during daily operation. When the bed temperature rises to 800°C, the ignition oil pressure can be reduced. When the bed temperature reaches 850°C, the single-side circulating ash system can be put into use. When the bed temperature drops and then rises back to 850°C, the other-side circulating ash system can be put into use.
5. The method for cold and hot start-up linkage of a circulating fluidized bed boiler according to claim 4, characterized in that: In the S22, when the material layer temperature rises to about 980°C, the belt coal feeder is stopped, the slag discharge is stopped, and when the bed temperature drops by 5 to 10°C, the oxygen content gradually rises to 0.5-1%, and the secondary fan, primary fan, return fan, and induced draft fan are stopped in sequence.
6. The method for cold and hot start-up linkage of a circulating fluidized bed boiler according to claim 5, characterized in that: In the S32, the induced draft fan is started to adjust the furnace negative pressure, the coal feeder is started to feed coal into the furnace at 20% of the coal feed during normal operation, the primary fan is started to adjust to the minimum critical fluidizing air volume, the furnace negative pressure is adjusted to remain in the range of -50-80Pa, and coal is fed into the furnace at 70% of the coal feed during daily operation. When the bed temperature reaches 850°C, the single-side circulating ash system can be put into operation, and when the bed temperature drops and then rises back to 850°C, the other-side circulating ash system can be put into operation.