Leveling sight line control system, method and equipment
Through the data acquisition and processing of the level measurement line of sight control system, the problem of low efficiency and accuracy of line of sight control in the prior art is solved, high-precision line of sight height and length control is achieved, and the efficiency and accuracy of level measurement are improved.
Patent Information
- Application Number
- CN202411129498.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-03
AI Technical Summary
The efficiency and accuracy of line-of-view control in existing level measurement technologies are low, especially in areas with undulating terrain and complex routes, resulting in multiple adjustments to the station, affecting efficiency and cost.
Provide a level measurement line of sight control system, including a data acquisition module and a line of sight control module, to achieve accurate line of sight height and length control by acquiring and processing the spatial coordinates of the level, front level and rear level ruler, and eliminate visual estimation and step estimation. Error, improve control accuracy and efficiency.
It realizes high-precision control of level measurement line of sight, reduces the number of adjustments of the station, improves work efficiency and control accuracy, and reduces work costs.
Smart Images

Figure CN119063698A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering measurement, and in particular to a leveling measurement sight line control system, method and equipment. Background Art
[0002] Leveling is the main method of elevation measurement due to its high accuracy and good reliability. The sight line height and sight line length of leveling are important factors affecting leveling.
[0003] At present, the method of controlling the line of sight height is visual estimation. Due to the large error, areas with undulating terrain can easily lead to the inability to observe the front and rear lines normally or the minimum line of sight height exceeding the limit. In order to ensure that the line of sight height can meet the observation requirements, the survey station needs to adjust the instrument height multiple times or command the foresight point level to adjust the position, which greatly affects the leveling efficiency and work quality.
[0004] At present, the line of sight length control method uses the step measurement method in low-level leveling. In leveling routes with twists and turns and large undulations, the step measurement error is large, resulting in parameters such as the front and rear line of sight length and the front and rear sight distance difference exceeding the limit. In high-level leveling, the line of sight length control uses the tape measurement method. The tape measurement has high precision and accurate results, but the work efficiency is low, a large number of people are involved, and the work cost is high.
[0005] Therefore, there is an urgent need to provide a leveling measurement line of sight control system, method and equipment to improve the control efficiency and control accuracy of the leveling measurement line of sight. Summary of the invention
[0006] In view of this, it is necessary to provide a leveling measurement line of sight control system, method and equipment to solve the technical problems of low leveling measurement line of sight control efficiency and control accuracy existing in the prior art.
[0007] On the one hand, in order to solve the above technical problems, the present invention provides a leveling measurement sight line control system, the system comprising: A data acquisition module, fixed to the top of the level, the front leveling ruler and the rear leveling ruler, for acquiring the first spatial coordinates of the level, the second spatial coordinates of the front leveling ruler and the third spatial coordinates of the rear leveling ruler; A data processing module, used for performing coordinate conversion on the first space coordinate, the second space coordinate and the third space coordinate respectively, to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling ruler, and the rear plane coordinate and the third elevation value of the rear leveling ruler; A sight line control module is used to control the leveling measurement sight line based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates and the third elevation value.
[0008] In a possible implementation, the data acquisition module includes a positioning antenna unit, a positioning unit, a development board unit, a network transmission unit, and a power supply unit; The positioning antenna unit is used to receive navigation satellite signals, and filter and gain the navigation satellite signals to obtain gain satellite signals; The positioning unit is used to receive the gain satellite signal, determine the original space observation value based on the gain satellite signal, access the CORS system through Ntrip, obtain the virtual reference station observation value broadcast by the CORS system, perform differential processing on the virtual reference station observation value and the original space observation value, and obtain the first space coordinate, the second space coordinate and the third space coordinate; The network transmission unit is used to transmit the first space coordinate, the second space coordinate and the third space coordinate to the data processing module; The development board unit is used to integrate and drive the antenna unit, the positioning unit and the network transmission unit; The power supply unit supplies power to the positioning antenna unit, the positioning unit, the development board unit, and the network transmission unit respectively.
[0009] In a possible implementation, the sight line control module includes a sight line height control submodule and a sight line length control submodule; The sight line height control submodule is used to control the sight line height of the leveling measurement sight line based on the first elevation value, the second elevation value and the third elevation value; The sight line length control submodule is used to control the sight line length of the leveling measurement sight line based on the first plane coordinates, the front plane coordinates and the back plane coordinates.
[0010] In a possible implementation, the sight height control submodule includes a front and rear sight point height difference control unit and a measuring station height control unit; The front and rear sight point height difference control unit is used to obtain the maximum allowable height difference of the front and rear sight points, and determine the real-time height difference of the front and rear sight points based on the second elevation value and the third elevation value, and when the maximum allowable height difference of the front and rear sight points is less than or equal to the real-time height difference, determine the height adjustment value of the front leveling rod based on the maximum allowable height difference of the front and rear sight points and the real-time height difference; The survey station height control unit is used to determine the height adjustment value of the level based on the maximum allowable height difference between the front and rear sight points and the first height value.
[0011] In a possible implementation, the maximum height difference allowed by the front and rear sight points is h 容 for: h 容 = L 0 h 0 2× h G When the absolute value of the real-time height difference between the front and rear sight points is greater than or equal to the allowable height difference between the front and rear sight points, the height adjustment value △h of the front sight point 前 for: △ h 前 = h 实 h 容 h 实 =H 后 - H 前 Where; L 0 is the length of the level rod; h 0 is the lowest sight height; h G is the elevation measurement accuracy of the data acquisition module; h 前 , h 实 is an absolute value; H 后 is the third elevation value; H 前 is the second elevation value; the unit is meter.
[0012] In a possible implementation, when the third elevation value H 后 Greater than or equal to the second elevation value H 前 When the control range of the leveling measurement sight height is H 控 for: H 后 -L 0 +h 0 +2×h G <H 控 <H 前 When the third elevation value H 后 Less than the second elevation value H 前When the control range of the leveling measurement sight height is H 控 for: H 前 -L 0 +h 0 +2×h G <H 控 <H 后 The elevation adjustment value of the leveling level △ h 站 for: △h 站 =H 站 -H 控 In the formula, H 后 is the third elevation value; H 前 is the second elevation value; H 站 is the first elevation value; h 容 The maximum allowable height difference between the front and rear sight points; L 0 is the length of the level rod; h 0 is the lowest sight height; h G is the height measurement accuracy of the data acquisition module; h 站 The elevation adjustment value of the level is recorded in absolute value; the unit is meter.
[0013] In a possible implementation, the sight length control submodule includes a sight length parameter determination unit and a sight length control unit; The sight line length parameter determination unit is used to obtain the level requirements of the level measurement, and determine the limit values of the front sight line length, the rear sight line length, and the front and rear sight distance difference based on the level requirements; the level requirements include the front sight line length requirements, the rear sight line length requirements, and the front and rear sight distance difference requirements; The sight line length control unit is used to determine the front sight line length, the rear sight line length and the front and rear sight distance difference based on the first plane coordinates, the front plane coordinates and the rear plane coordinates, and control the front sight line length, the rear sight line length and the front and rear sight distance difference to meet the limit values of the front sight line length, the rear sight line length and the front and rear sight distance difference.
[0014] In a possible implementation, the system also includes monitoring modules corresponding to the level, the front leveling rod, and the rear leveling rod, respectively, and the monitoring module is used to obtain and synchronize the line of sight control value after the leveling measurement is controlled, the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates and the third elevation value.
[0015] On the other hand, the present invention also provides a leveling measurement sight line control method, the method comprising: Obtaining the first spatial coordinate of the level, the second spatial coordinate of the front leveling rod, and the third spatial coordinate of the rear leveling rod; Performing coordinate transformation on the first space coordinate, the second space coordinate and the third space coordinate respectively to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling ruler, and the rear plane coordinate and the third elevation value of the rear leveling ruler; The leveling line of sight is controlled based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the back plane coordinates and the third elevation value.
[0016] On the other hand, the present invention further provides a measuring device, including a positioning measuring instrument and a line of sight control system, wherein the line of sight control system is a leveling measurement line of sight control system as described in any one of the possible implementations described above.
[0017] The beneficial effects of the present invention are as follows: the leveling sight line control system provided by the present invention obtains the first spatial coordinates of the level, the second spatial coordinates of the front leveling rod, and the third spatial coordinates of the rear leveling rod through the data acquisition module, and then the data processing module determines the first plane coordinates, the first elevation value, the front plane coordinates and the second elevation value of the front leveling rod, and the rear plane coordinates and the third elevation value of the rear leveling rod based on the first spatial coordinates, the second spatial coordinates, and the third spatial coordinates. The sight line control module can realize the control of the leveling sight line through the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates, and the third elevation value. The control of the leveling sight line is realized based on the accurate first spatial coordinates, the second spatial coordinates, and the third spatial coordinates, eliminating the technical problems of rough visual estimation and large step estimation errors, and improving the control accuracy of the leveling sight line. In addition, there is no need for complex visual estimation and step estimation processes, which improves the control efficiency of the leveling sight line. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a schematic diagram of the structure of an embodiment of leveling measurement; Figure 2 A schematic diagram of the structure of an embodiment of a leveling sight line control system provided by the present invention; Figure 3 A schematic diagram of the structure of an embodiment of the data acquisition module provided by the present invention; Figure 4 A schematic diagram of the structure of an embodiment of the sight line control module provided by the present invention; Figure 5 A schematic diagram of an embodiment of the display content of the monitoring module provided by the present invention; Figure 6 A schematic flow chart of an embodiment of the leveling measurement sight line control method provided by the present invention. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0021] It should be understood that the schematic drawings are not drawn to scale. The flowchart used in the present invention shows the operations implemented according to some embodiments of the present invention. It should be understood that the operations of the flowchart can be implemented out of order, and the steps without logical context can be reversed in order or implemented simultaneously. In addition, those skilled in the art, under the guidance of the content of the present invention, can add one or more other operations to the flowchart, and can also remove one or more operations from the flowchart. Some of the block diagrams shown in the accompanying drawings are functional entities, which do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor systems and / or microcontroller systems.
[0022] Reference to an "embodiment" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiment may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0023] The present invention provides a leveling measurement sight line control system and method, which are described below respectively.
[0024] Before showing the embodiments, the leveling measurement is introduced first. Figure 1 As shown, the leveling measurement is realized by three devices: the level 11 , the front level rod 12 located at the front side of the level 11 , and the rear level rod 13 located at the rear side of the level 11 .
[0025] The measuring principle is: a level 11 is placed between two points on the ground, and the front level rod 12 and the rear level rod 13 erected at the two points are observed, and the height difference between the two points is calculated according to the readings on the rods.
[0026] To avoid errors in the readings of the front level rod 12 and the rear level rod 13 due to unevenness, Figure 1 As shown, a ruler pad 15 can also be provided below the front level ruler 12 and the rear level ruler 13 .
[0027] Figure 1 A schematic diagram of the structure of an embodiment of the leveling sight line control system provided by the present invention is shown in FIG. Figure 1 As shown, the leveling measurement sight line control system 1 includes a data acquisition module 100, a data processing module 200 and a sight line control module 300; The data acquisition module 100 is fixed to the top of the level 11, the front leveling rod 12 and the rear leveling rod 13, and is used to obtain the first spatial coordinate of the level 11, the second spatial coordinate of the front leveling rod 12 and the third spatial coordinate of the rear leveling rod 13; The data processing module 200 is used to perform coordinate conversion on the first space coordinate, the second space coordinate and the third space coordinate respectively, to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling rod, and the rear plane coordinate and the third elevation value of the rear leveling rod; The sight line control module 300 is used to control the leveling measurement sight line based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the back plane coordinates and the third elevation value.
[0028] Among them, the first spatial coordinate, the second spatial coordinate and the third spatial coordinate are coordinates in the geodetic coordinate system, which is a coordinate system established with the reference ellipsoid as the reference surface in geodetic measurement. The position of the ground point is represented by geodetic longitude, geodetic latitude and geodetic height. That is, the first spatial coordinate, the second spatial coordinate and the third spatial coordinate are composed of geodetic longitude, geodetic latitude and geodetic height.
[0029] It should be understood that the first elevation value, the second elevation value and the third elevation value are the geodetic heights in the first spatial coordinates, the second spatial coordinates and the third spatial coordinates.
[0030] The front plane coordinates and the back plane coordinates refer to the constructed two-dimensional grid coordinate system, and the coordinate conversion in the data processing module 200 is specifically: using the Gauss projection forward calculation formula to convert the geodetic coordinates into the two-dimensional grid coordinates.
[0031] It should be noted that: in order to realize data transmission between the data acquisition module 100 and the data processing module 200, the embodiment of the present invention can also set up a wireless network between the data acquisition module 100 and the data processing module 200, and send the first spatial coordinate, the second spatial coordinate and the third spatial coordinate from the acquisition module 100 to the data processing module 200 based on the wireless network.
[0032] Compared with the prior art, the leveling sight line control system 1 provided by the embodiment of the present invention obtains the first spatial coordinates of the level, the second spatial coordinates of the front leveling rod, and the third spatial coordinates of the rear leveling rod through the data acquisition module 100, and then the data processing module 200 determines the first elevation value of the level, the front plane coordinates and the second elevation value of the front leveling rod, and the rear plane coordinates and the third elevation value of the rear leveling rod based on the first spatial coordinates, the second spatial coordinates, and the third spatial coordinates. The sight line control module 300 can realize the control of the leveling sight line through the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates, and the third elevation value. The control of the sight line of the leveling measurement is based on the accurate first spatial coordinates, the second spatial coordinates, and the third spatial coordinates as the data basis, eliminating the technical problems of rough visual estimation and large step estimation errors, and improving the control accuracy of the leveling sight line. In addition, there is no need for complex visual estimation and step estimation processes, which improves the control efficiency of the leveling sight line.
[0033] In order to improve the accuracy of the first space coordinate, the second space coordinate and the third space coordinate, so as to further improve the control accuracy of the leveling measurement line of sight, in some embodiments of the present invention, Figure 3 As shown, the data acquisition module 100 includes a positioning antenna unit 110, a positioning unit 120, a network transmission unit 130, a development board unit 140, and a power supply unit 150; The positioning antenna unit 110 is used to receive navigation satellite signals, filter and gain the navigation satellite signals, and obtain gain satellite signals; The positioning unit 120 is used to receive the gain satellite signal, determine the original space observation value based on the gain satellite signal, and access the satellite navigation and positioning CORS system through the Ntrip method, obtain the virtual reference station observation value broadcast by the CORS system and the original space observation value for differential processing, and obtain the first space coordinate, the second space coordinate and the third space coordinate; The network transmission unit 130 is used to realize data transmission between the positioning unit 120 and the data processing module 200, and adopts TCP mode communication technology to send high-precision differential positioning coordinates, namely the first space coordinates, the second space coordinates and the third space coordinates to the data processing module 200.
[0034] The network transmission can be any one of Qianxun CORS, Mobile CORS, etc.
[0035] The development board unit 140 is used to integrate and drive the positioning antenna unit 110 , the positioning unit 120 , the network transmission unit 130 and the power supply unit 150 .
[0036] The power supply unit 150 is respectively connected to the positioning antenna 110 , the network transmission unit 130 , the positioning unit 120 , and the development board unit 140 , and is used to supply power to the positioning antenna 110 , the network transmission unit 130 , the positioning unit 120 , and the development board unit 140 .
[0037] The embodiment of the present invention determines the spatial coordinates by receiving the navigation satellite signal, thereby improving the accuracy of the spatial coordinates. Furthermore, the embodiment of the present invention not only determines multiple spatial coordinates based on a single gain satellite signal, but also obtains virtual reference station observation values, performs differential processing on the virtual reference station observation values and the original spatial observation values, and obtains more accurate first spatial coordinates, second spatial coordinates, and third spatial coordinates, thereby further improving the accuracy of the first spatial coordinates, the second spatial coordinates, and the third spatial coordinates.
[0038] Specifically, the parameters of the positioning antenna 110 are: receiving BDS B1 / B2 / B3, GPS L1 / L2 / L5, GLONASS G1 / G2, GALILEO E1 / E2 / E5a / E5b / E6, the gain is less than 4.5dBi, the polarization mode is right-hand circular polarization (RHCP), and the phase center error is no more than ±2mm.
[0039] The parameters of the network transmission unit 130 are: standard 6-pin hardware interface, 3V / 1.8VSIM card, USB 2.0 high-speed interface, baud rate (bps) 1200, 2400, 4800, 9600, 19200, 38400; working temperature -35℃~70℃; working humidity 5%~95%; supported frequency bands LTE-TDD is B34 / B38 / B39 / B40 / B41, LTE-FDD is B1 / B3 / B5 / B8; output power LTE-TDD is Class 3 (23dBm+1 / -3dB), LTE-FDD is Class 3 (23dBm+-2dB); network protocols are TCP / UDP / PPP / FTP / HTTP / NITZ / CMUX / NDIS / NT; SMS is TEXT and PDU mode; operating system supports Windows / Linux / Android.
[0040] The parameters of the positioning unit 120 are: the first positioning time cold start is no more than 28s, the hot start is no more than 1s, the data update is 1-10Hz, the capture sensitivity is -146dBm, the recapture sensitivity is -160dBm, the tracking sensitivity is -164dBm, the elevation accuracy is no more than 0.05m+1ppm, and the plane accuracy is no more than 0.0025m+1ppm.
[0041] Among them, satellite navigation positioning CORS refers to the Continuous Operational Reference System, which can be defined as one or several fixed, continuously operating GNSS / GPS reference (or base) stations, which use computer technology, modern communication technology, data communication and Internet (LAN / WAN) and other technologies to form a network that automatically provides different types of GPS / GNSS observations (carrier phase, pseudorange), various correction numbers, status information, and other related GPS / GNSS service items to users of different types, different needs, and different levels in real time. It provides spatial location information services such as dynamic and continuous spatial frameworks for mobile positioning.
[0042] The main parameters of the development board unit 140 are: bus width is 32 bits, FLASH is 64KB, RAM is 20KB, and the operating temperature meets -40°C ~ 85°C.
[0043] The main parameters of the power supply 150 are: output voltage is DC3.7V, input voltage is DC4.2-5V, and battery capacity is 2800mAh.
[0044] Since the accuracy of leveling measurement is affected by the sight line height and the sight line length, wherein the sight line height refers to the elevation relationship between the level, the front leveling rod and the rear leveling rod, and the sight line length refers to the distance relationship between the front leveling rod, the level and the rear leveling rod, therefore, in order to achieve comprehensive control of the sight line of leveling measurement, in some embodiments of the present invention, such as Figure 4 As shown, the sight line control module 300 includes a sight line height control submodule 310 and a sight line length control submodule 320; The sight line height control submodule 310 is used to control the sight line height of the leveling measurement sight line based on the first elevation value, the second elevation value and the third elevation value; The sight line length control submodule 320 is used to control the sight line length of the leveling measurement sight line based on the front plane coordinates and the back plane coordinates.
[0045] The embodiment of the present invention controls the leveling line of sight through two dimensions, namely, line of sight height and line of sight length, thereby improving the comprehensiveness of the control and further improving the control accuracy of the leveling control.
[0046] In a specific embodiment of the present invention, Figure 4 As shown, the sight height control submodule 310 includes a front and rear sight height difference control unit 311 and a station height control unit 312; The front and rear sight height difference control unit 311 is used to obtain the maximum allowable height difference between the front and rear sight points, and determine the real-time height difference between the front and rear sight points based on the second elevation value and the third elevation value, and determine the elevation adjustment value of the front leveling rod when the maximum allowable height difference between the front and rear sight points is less than or equal to the real-time height difference; The station height control unit 312 is used to determine the allowable height difference of the station based on the maximum allowable height difference between the front and rear sight points and the first elevation value, and to determine the elevation adjustment value of the level based on the first elevation value, the second elevation value and the third elevation value of the station.
[0047] Among them, the expression for the maximum allowable height difference between the front and rear sight lines is: h 容 =L 0 -h 0 -2×h G In the formula, h 容 The maximum allowable height difference between the front and rear sight points; L 0 is the length of the level rod; h 0 is the lowest sight height; h G It is the elevation measurement accuracy of the data acquisition module.
[0048] The expression of the real-time height difference between the front and rear sight lines is: h 实 =H 后 - H 前 In the formula, H 后 is the third elevation value; h 实 It is the real-time height difference; H 前 is the second elevation value.
[0049] The basic rule for controlling the height difference between the front and rear sight lines is that the real-time height difference between the front and rear sight lines must be less than the maximum allowable height difference between the front and rear sight lines, and only the position of the front sight line can be adjusted, and the rear sight line is strictly prohibited from being changed. Therefore, the height adjustment value of the front sight line (level) △h 前 : △h 前 =h 容 h 实 When △h 前 >0, that is, h 容 >h 实 , the observation is established and there is no need to adjust the foresight point.
[0050] When △h 前 ≤0, that is, h 容 ≤h 实 , the observation is not valid and the front sight point needs to be adjusted.
[0051] The adjustment direction of the front sight point is to reduce the relative height difference between the front and rear sight points. The height difference is △h. 前 , until △h 前 If the absolute value is greater than zero, the foresight point height is adjusted to the correct position.
[0052] Since the sight height of the level instrument (station) must be above the lowest sight height of the high sight point and below the ruler top height of the low sight point, in order to ensure that the leveling measurement is observable. 后 ≥H 前 When the control range of the level gauge's sight height is 控 for: H 后 -L 0 +h 0 +2×h G <H 控 <H前 When H 后 <H 前 When the control range of sight height is H 控 for: H 前 -L 0 +h 0 +2×h G <H 控 <H 后 The sight height H determined by the above two formulas 控 The first elevation value of the scope and level guides the elevation at which the level instrument is set up; that is: △h 站 =H 控 -H 站 In the formula, H 站 is the first elevation value.
[0053] In summary, when the third elevation value is greater than or equal to the second elevation value, the elevation adjustment value of the level is △h 站 scope for: H 后 -L 0 +h 0 +2×h G - H 站 <△h 站 <H 前 - H 站 When the third elevation value is less than the second elevation value, the elevation adjustment value of the level △h 站 scope for: H 前 -L 0 +h 0 +2×h G - H 站 <△h 站 <H 后 - H站 In a specific embodiment of the present invention, Figure 4 As shown, the sight length control submodule 320 includes a sight length parameter determination unit 321 and a sight length control unit 322; The sight line length parameter determination unit 321 is used to obtain the level measurement level requirements, which include the front sight line length requirements, the rear sight line length requirements and the sight distance difference requirements, and determine the front sight line length, the rear sight line length and the front and rear sight distance difference limit values based on the front sight line length requirements, the rear sight line length requirements and the front and rear sight distance difference requirements; The sight line length control unit 322 is used to determine the front sight line length, the rear sight line length and the front and rear sight distance difference based on the first plane coordinates, the front plane coordinates and the rear plane coordinates, and control the front sight line length, the rear sight line length and the front and rear sight distance difference to meet the limit values of the front sight length, the rear sight line length and the front and rear sight distance difference.
[0054] Among them, the front sight length S 前 and backsight length S 后 The calculation formula is: S 后 =
[0055] S 前 =
[0056] In the formula, , They are the X-axis coordinate value and Y-axis coordinate value of the front plane coordinate respectively; , They are the X-axis coordinate value and Y-axis coordinate value of the rear plane coordinate respectively; , are the X-axis coordinate value and Y-axis coordinate value of the first plane coordinate respectively.
[0057] Front and rear sight distance difference△ S for: △ S = S 后 S 前 It should be noted that the national leveling measurement grades are divided into first, second, third and fourth grade leveling measurement. The requirements for the foresight length, rear sight length and sight distance difference corresponding to each grade are different, which can be determined according to the different leveling measurement grades and will not be elaborated here.
[0058] In summary, the conditions for effective horizontal sight control are: the following conditions are met at the same time: (1) The front and rear sight heights must be between the lowest sight height at the high sight point and the top of the low sight point.
[0059] (2) The front and rear sight lengths must be within the maximum sight length required by the grade.
[0060] (3) The difference in front and rear sight distances must be within the maximum front and rear sight distance difference required by the grade.
[0061] It should be noted that the units of the above parameters are all meters.
[0062] Since there is usually a certain distance between the level, front level rod and rear level rod, the traditional method for controlling the line of sight during leveling measurement is: verbal or gesture control at close range, and walkie-talkie or phone call control at long distances. In complex urban environments and noisy measuring sections, hearing and vision errors or misunderstandings often occur, resulting in multiple adjustments to the level rod at the forward sight station, reducing work efficiency.
[0063] In order to solve the above technical problems, in some embodiments of the present invention, Figure 2 As shown, the leveling measurement line of sight control system 1 also includes a monitoring module 400 corresponding to the level 11, the front level rod 12, and the rear level rod 13 respectively. The monitoring module 400 is used to obtain and synchronously display the line of sight control value, the first plane coordinate, the first elevation value, the front plane coordinate, the second elevation value, the rear plane coordinate and the third elevation value of the leveling measurement line of sight after control.
[0064] The embodiment of the present invention respectively sets monitoring modules 400 at the level 11, the front level rod 12, and the rear level rod 13, so as to realize the synchronous display of all data without the need for oral, gesture or other communication methods affected by the environment, thereby further improving the control efficiency and accuracy of the leveling measurement line of sight control.
[0065] In a specific embodiment of the present invention, the monitoring module 400 may be a mobile device such as a mobile phone.
[0066] like Figure 5 As shown, the monitoring module 400 can be distinguished by the displayed IP and port number, on which the position information, elevation information and adjustment value of the line of sight control of the front sight point (front leveling rod), the rear sight point (rear leveling rod) and the measuring station (level) will be displayed.
[0067] Correspondingly, an embodiment of the present invention also provides a line of sight control method for a leveling device, such as Figure 6 As shown, the sight line control method of the leveling device includes: S601, obtaining a first spatial coordinate of the level, a second spatial coordinate of the front leveling rod, and a third spatial coordinate of the rear leveling rod; S602, respectively performing coordinate conversion on the first space coordinate, the second space coordinate and the third space coordinate to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling rod, and the rear plane coordinate and the third elevation value of the rear leveling rod; S603, controlling the leveling measurement sight line based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the back plane coordinates and the third elevation value.
[0068] The specific implementation process and principle of the line of sight control method of the leveling device provided in the above embodiment can be found in the corresponding content in the above leveling measurement line of sight control system embodiment, which will not be repeated here.
[0069] Those skilled in the art will appreciate that all or part of the processes of the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the computer program can be stored in a computer-readable storage medium, wherein the computer-readable storage medium is a disk, an optical disk, a read-only storage memory, or a random access memory, etc.
[0070] An embodiment of the present invention further provides a measuring device, including a positioning measuring instrument and a sight line control system, wherein the sight line control system is a leveling sight line control system in any one of the above embodiments.
[0071] The above is a detailed introduction to a leveling measurement sight line control system, method and equipment provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for technical personnel in this field, according to the idea of the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. Leveling sight control system, It is characterized in that include: A data acquisition module, fixed to the top of the level, the front leveling ruler and the rear leveling ruler, for acquiring the first spatial coordinates of the level, the second spatial coordinates of the front leveling ruler and the third spatial coordinates of the rear leveling ruler; A data processing module, used for performing coordinate conversion on the first space coordinate, the second space coordinate and the third space coordinate respectively, to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling ruler, and the rear plane coordinate and the third elevation value of the rear leveling ruler; A sight line control module is used to control the leveling measurement sight line based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates and the third elevation value.
2. The leveling sight line control system according to claim 1, It is characterized in that The data acquisition module includes a positioning antenna unit, a positioning unit, a development board unit, a network transmission unit and a power supply unit; The positioning antenna unit is used to receive navigation satellite signals, and filter and gain the navigation satellite signals to obtain gain satellite signals; The positioning unit is used to receive the gain satellite signal, determine the original space observation value based on the gain satellite signal, access the CORS system through Ntrip, obtain the virtual reference station observation value broadcast by the CORS system, perform differential processing on the virtual reference station observation value and the original space observation value, and obtain the first space coordinate, the second space coordinate and the third space coordinate; The network transmission unit is used to transmit the first space coordinate, the second space coordinate and the third space coordinate to the data processing module; The development board unit is used to integrate and drive the antenna unit, the positioning unit and the network transmission unit; The power supply unit supplies power to the positioning antenna unit, the positioning unit, the development board unit, and the network transmission unit respectively.
3. The leveling sight line control system according to claim 1, It is characterized in that The sight line control module includes a sight line height control submodule and a sight line length control submodule; The sight line height control submodule is used to control the sight line height of the leveling measurement sight line based on the first elevation value, the second elevation value and the third elevation value; The sight line length control submodule is used to control the sight line length of the leveling measurement sight line based on the first plane coordinates, the front plane coordinates and the back plane coordinates.
4. The leveling sight line control system according to claim 3, It is characterized in that The sight height control submodule includes a front and rear sight point height difference control unit and a measuring station height control unit; The front and rear sight point height difference control unit is used to obtain the maximum allowable height difference of the front and rear sight points, and determine the real-time height difference of the front and rear sight points based on the second elevation value and the third elevation value, and when the maximum allowable height difference of the front and rear sight points is less than or equal to the real-time height difference, determine the height adjustment value of the front leveling rod based on the maximum allowable height difference of the front and rear sight points and the real-time height difference; The survey station height control unit is used to determine the height adjustment value of the level based on the maximum allowable height difference between the front and rear sight points and the first elevation value, the second elevation value and the third elevation value.
5. The leveling sight line control system according to claim 4, It is characterized in that The maximum allowable height difference between the front and rear sight points h 容 for: h 容 = L 0 h 0 2× h G When the absolute value of the real-time height difference between the front and rear sight points is greater than or equal to the allowable height difference between the front and rear sight points, the height adjustment value of the front sight point △h 前 for: △ h 前 = h 实 h 容 h 实 =H 后 - H 前 Where: L 0 is the length of the level rod; h 0 is the minimum sight height; h G is the elevation measurement accuracy of the data acquisition module; h 前 , h 实 is an absolute value; H 后 is the third elevation value; H 前 is the second elevation value; The units are all meters.
6. The leveling sight line control system according to claim 4, It is characterized in that When the third elevation value H 后 Greater than or equal to the second elevation value H 前 When the control range of the leveling measurement sight height is H 控 for: H 后 -L 0 +h 0 +2×h G <H 控 <H 前 When the third elevation value H 后 Less than the second elevation value H 前 When the control range of the leveling measurement sight height is H 控 for: H 前 -L 0 +h 0 +2×h G <H 控 <H 后 The elevation adjustment value of the leveling level △ h 站 for: △h 站 =H 站 -H 控 In the formula, H 后 is the third elevation value; H 前 is the second elevation value; H 站 is the first elevation value; h 容 The maximum allowable height difference between the front and rear sight points; L 0 is the length of the level rod; h 0 is the minimum sight height; h G It is the height measurement accuracy of the data acquisition module; △ h 站 The elevation adjustment value of the level is recorded in absolute value; the unit is meter.
7. The leveling sight line control system according to claim 3, It is characterized in that The sight length control submodule includes a sight length parameter determination unit and a sight length control unit; The sight line length parameter determination unit is used to obtain the level requirements of the level measurement, and determine the limit values of the front sight line length, the rear sight line length, and the front and rear sight distance difference based on the level requirements; the level requirements include the front sight line length requirements, the rear sight line length requirements, and the front and rear sight distance difference requirements; The sight line length control unit is used to determine the front sight line length, the rear sight line length and the front and rear sight distance difference based on the first plane coordinates, the front plane coordinates and the rear plane coordinates, and control the front sight line length, the rear sight line length and the front and rear sight distance difference to meet the limit values of the front sight line length, the rear sight line length and the front and rear sight distance difference.
8. The leveling sight line control system according to claim 1, It is characterized in that The system also includes monitoring modules corresponding to the level, the front leveling rod, and the rear leveling rod respectively, and the monitoring modules are used to obtain and synchronize the line of sight control value after the leveling measurement line of sight is controlled, the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the rear plane coordinates and the third elevation value.
9. A leveling sight line control method, It is characterized in that include: Obtaining the first spatial coordinate of the level, the second spatial coordinate of the front leveling rod, and the third spatial coordinate of the rear leveling rod; Performing coordinate transformation on the first space coordinate, the second space coordinate and the third space coordinate respectively to obtain the first plane coordinate and the first elevation value of the level, the front plane coordinate and the second elevation value of the front leveling ruler, and the rear plane coordinate and the third elevation value of the rear leveling ruler; The leveling line of sight is controlled based on the first plane coordinates, the first elevation value, the front plane coordinates, the second elevation value, the back plane coordinates and the third elevation value.
10. A measuring device, It is characterized in that It comprises a positioning measuring instrument and a sight line control system, wherein the sight line control system is the leveling sight line control system as described in any one of claims 1-8.
