Sample analysis apparatus, sample analysis method, and computer readable storage medium

By introducing control modules and drive modules into the sample analysis equipment, combined with cylinder management of fixture components, the problem of out-of-control of fixture components during immediate stop failure is solved, and the safe clamping of test tubes and the equipment reliability is improved.

CN119064609APending Publication Date: 2024-12-03SHENZHEN DYMIND BIOTECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310652090.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the event of an immediate stop level failure of the existing sample analysis equipment, in order to protect the control valve, all control valves will be closed immediately, resulting in the loss of control of the fixture assembly, and the clamped test tube may fall, reducing equipment reliability and increasing maintenance costs.

Method used

A sample analysis device is designed, including a control module, a driving module and a fixture component. The control module generates an instant stop command. The drive module receives the command and stops the timing operation. The fixture component maintains the operating state when receiving the command, and passes through the first and second The second control valve manages the gas volume of the cylinder to ensure that the clamping member remains clamped when the clamping member fails and prevents the test tube from falling off.

Benefits of technology

It effectively reduces the cost of test tube dropping and repairing caused by failures, and improves the reliability and service life of sample analysis equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064609A_ABST
    Figure CN119064609A_ABST
Patent Text Reader

Abstract

The invention discloses sample analysis equipment, a sample analysis method and a computer readable storage medium. The sample analysis equipment comprises a control module, a driving module and a clamp assembly, the control module is used for generating an immediate stop instruction in response to immediate processing measures of the sample analysis equipment; the driving module is used for receiving the immediate stop instruction and stopping time sequence operation of the sample analysis equipment according to the immediate stop instruction; the clamp assembly is used for clamping the test tube and moving the test tube to a preset position, so that the sample analysis equipment is used for testing a to-be-tested sample of the test tube. When the driving module receives the immediate stop instruction, the driving module can stop time sequence operation of the sample analysis equipment according to the immediate stop instruction, and the operation state of the clamp assembly is kept, so that the possibility that a test tube falls off due to equipment failure when the clamp assembly clamps the test tube is reduced, the maintenance cost of the sample analysis equipment is reduced, and the service life of the sample analysis equipment is prolonged. And the reliability of sample analysis equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of sample analysis, and in particular to a sample analysis device, a sample analysis method, and a computer-readable storage medium. Background Art

[0002] Sample analysis equipment is usually used to perform statistical analysis on cells in blood samples with the help of various reagents to observe changes in blood components. Sample analysis equipment is usually equipped with a fault handling process so that when a device fails, it can handle the failure accordingly according to the degree of the failure, thereby reducing the loss of sample analysis equipment.

[0003] However, when an existing sample analysis device encounters a stop-level failure, in order not to affect the life of the control valve, the immediate processing measures performed are to close all the control valves, causing the clamp assembly to lose control during operation. The test tube clamped by the clamp assembly may be loosened and fall into the equipment, causing damage to other components and reducing the reliability of the sample analysis equipment. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides a sample analysis device, a sample analysis method and a computer-readable storage medium.

[0005] To solve the above problems, the present application provides a first technical solution: a sample analysis device is provided, comprising a control module, a drive module and a clamp assembly; the control module is used to generate an immediate stop instruction in response to the immediate processing measures of the sample analysis device; the drive module is connected to the control module, and is used to receive the immediate stop instruction, and stop the timing operation of the sample analysis device according to the immediate stop instruction; the clamp assembly is connected to the drive module, and is used to clamp the test tube and move the test tube to a preset position, so that the sample analysis device tests the sample to be tested in the test tube; wherein, when the drive module receives the immediate stop instruction, it maintains the operating state of the clamp assembly.

[0006] Optionally, the sample analysis device includes at least a first control valve and a second control valve, the first control valve is used to control the operating state of the clamp assembly, and the control component of the second control valve is different from the control component of the first control valve; when the driving module receives the immediate stop instruction, the second control valve is closed and the first control valve is kept powered on.

[0007] Optionally, the clamp assembly includes a cylinder and a clamping member, the cylinder is connected to the first control valve and the clamping member respectively, the clamping member is used to clamp the test tube in a first state, and the clamping member is also used to release the test tube in a second state, and the driving module is used to adjust the gas volume of the cylinder through the first control valve so that the clamping member is in the first state or the second state.

[0008] Optionally, the clamp assembly also includes an air pressure source, which is connected to the cylinder and is used to provide pressure to the cylinder, wherein the cylinder includes a cylinder body and a piston, and the piston is arranged inside the cylinder body and divides the cylinder body into a first cavity and a second cavity; when the drive module receives the immediate stop instruction, the first control valve is energized, and the air pressure source is used to provide pressure to the first cavity to push the piston to move and keep the clamping member in the first state; or, the first control valve is de-energized, and the air pressure source is used to provide pressure to the second cavity to push the piston to move and keep the clamping member in the second state.

[0009] Optionally, the air pressure source is a positive pressure source, and when the first control valve is powered on, the gas volume of the first cavity is greater than the gas volume of the second cavity; when the first control valve is powered off, the gas volume of the first cavity is less than the gas volume of the second cavity.

[0010] Optionally, the control module is used to obtain a treatment measure for the current fault in response to a fault of the sample analysis device, and the control module is also used to generate the immediate stop instruction in response to the treatment measure being an immediate treatment measure.

[0011] Optionally, the sample analysis device also includes a scheduling component, which is connected to the clamp assembly, and is used to drive the clamp assembly to move so that the clamp assembly moves to the preset position; the driving module is used to maintain the operating state of the clamp assembly when receiving the immediate stop instruction, and reset the clamp assembly to the initial position through the scheduling component.

[0012] To solve the above problems, the present application provides a second technical solution: providing a sample analysis method, comprising: in response to a failure of a sample analysis device, obtaining a processing measure for the current failure; in response to the processing measure being an immediate processing measure, generating an immediate stop instruction; stopping the timing operation of the sample analysis device according to the immediate stop instruction, and maintaining the operating state of the clamp assembly.

[0013] Optionally, the sample analysis device includes at least a first control valve and a second control valve, the first control valve is used to control the operating state of the clamp assembly, the control component of the second control valve is different from the control component of the first control valve, and the clamp assembly includes a cylinder and an air pressure source; stopping the timing operation of the sample analysis device according to the immediate stop instruction and maintaining the operating state of the clamp assembly includes: obtaining the operating state of the clamp assembly when a fault occurs; in response to the operating state indicating that the first control valve is in an energized state, closing the second control valve and keeping the first control valve energized so that the air pressure source provides pressure to the first cavity of the cylinder; or, in response to the operating state indicating that the first control valve is in an de-energized state, closing the second control valve and keeping the first control valve de-energized so that the air pressure source provides pressure to the second cavity of the cylinder.

[0014] To solve the above problem, the present application provides a third technical solution: providing a computer-readable storage medium storing program instructions, wherein the program instructions are executed to implement the sample analysis method as described above.

[0015] The present application provides a sample analysis device, a sample analysis method and a computer-readable storage medium, wherein the sample analysis device includes a control module, a drive module and a clamp assembly; the control module is used to generate an immediate stop instruction in response to the immediate processing measures of the sample analysis device; the drive module is connected to the control module, and is used to receive the immediate stop instruction, and stop the timing operation of the sample analysis device according to the immediate stop instruction; the clamp assembly is connected to the drive module, and is used to clamp the test tube and move the test tube to a preset position, so that the sample analysis device tests the sample to be tested in the test tube. When the drive module of the present application receives the immediate stop instruction, it will stop the timing operation of the sample analysis device according to the immediate stop instruction, and maintain the operating state of the clamp assembly, thereby reducing the possibility of the test tube falling due to equipment failure when the clamp assembly is clamping the test tube, reducing the maintenance cost of the sample analysis device, and improving the reliability of the sample analysis device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0017] Figure 1 It is a structural schematic diagram of an embodiment of a sample analysis device provided by the present application;

[0018] Figure 2is a structural schematic diagram of the clamp assembly provided by the present application in a first state;

[0019] Figure 3 is a structural schematic diagram of the clamp assembly provided by the present application in the second state;

[0020] Figure 4 It is a flow chart of an embodiment of the sample analysis method provided by the present application;

[0021] Figure 5 is a flow chart of another embodiment of the sample analysis method provided by the present application;

[0022] Figure 6 It is a structural schematic diagram of an embodiment of a computer-readable storage medium provided by the present application. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0024] It should be noted that if the embodiments of the present application involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0025] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0026] See also Figure 1 , Figure 1 Schematic diagram of the structure of an embodiment of the sample analysis device provided by the present application. Figure 1As shown, the embodiment of the present application first proposes a sample analysis device, which is applied to the field of sample analysis. For example, the sample analysis device can be used to classify and count blood cells in a blood sample, or the sample analysis device can be used to analyze the components of blood to obtain analysis data related to the blood components.

[0027] The sample analysis device of this embodiment includes a control module 20, a drive module 10 and a clamp assembly 30. The control module 20 is used to generate an immediate stop instruction in response to the immediate processing measures of the sample analysis device. The drive module 10 is connected to the control module 20, and is used to receive the immediate stop instruction and stop the timing operation of the sample analysis device according to the immediate stop instruction. The clamp assembly 30 is connected to the drive module 10, and is used to clamp the test tube and move the test tube to a preset position so that the sample analysis device can test the sample to be tested in the test tube.

[0028] Specifically, the clamp assembly 30 may include a clamp (not shown) and a lifting mechanism, the lifting mechanism is used to move in the direction of gravity, so that the clamp is located at different heights and the test tube is removed from the test tube rack or placed on the test tube rack, and the clamp is used to clamp the test tube. The clamp may be a clamping claw, and the driving module 10 may adjust the clamping force of the clamp by adjusting the degree of opening and closing of the clamp, so that the clamp clamps the test tube or releases the test tube.

[0029] In some possible embodiments, the sample analysis device includes an injection assembly, the injection assembly is used to obtain the test tube and move the test tube to a first preset position, the clamp assembly 30 is used to move the test tube at the first preset position to a second preset position, so that the sample analysis device performs a pretreatment operation on the test tube at the second preset position; and / or, the sample analysis device includes a sampling assembly and a detection assembly, the sampling assembly is used to obtain the sample to be tested in the test tube, so that the detection assembly detects the sample to be tested and obtains the detection result, and the clamp assembly 30 is used to move the pretreated test tube at the second preset position to the sampling assembly, so that the sampling needle of the sampling assembly draws the sample to be tested from the test tube.

[0030] Among them, the control module 20 is used to perform instruction analysis and instruction generation according to data calculation and processing, and the driving module 10 is used to drive and control various components, motors, etc. of the sample analysis device according to the instructions delivered by the control module 20. The control module 20 generates corresponding immediate processing measures in response to the sample analysis device having an immediate stop failure. The failure may include a hardware failure, a software failure, or an algorithm failure. According to different types of failures, the control module 20 determines the failure state of the sample analyzer through different ways. For example, when the failure is an algorithm failure such as a sampling needle blocking, the control module 20 obtains the test results of the sample to be tested, and determines whether the detection structure is abnormal according to the preset operation logic, so as to determine that the sample analysis device has a needle blocking failure when the test result is abnormal and generate immediate processing measures.

[0031] When the driving module 10 receives the immediate stop instruction, the operating state of the clamp assembly 30 is maintained, wherein the operating state may be the state in which the clamp assembly 30 clamps the test tube, for example, the operating state may include a first state and a second state, the clamp assembly 30 clamps the test tube in the first state, and releases the test tube in the second state. The driving module 10 maintaining the operating state of the clamp assembly 30 may include: before the failure occurs, the clamp assembly 30 clamps the test tube, and the driving module 10 maintains the clamping state of the clamp assembly 30 according to the received immediate stop instruction, so that the clamp assembly 30 continues to clamp the test tube to prevent the test tube from falling and causing the test tube to break, the sample to be tested to leak, etc. when the immediate stop instruction is executed; or, before the failure occurs, the clamp assembly 30 does not clamp the test tube, that is, the clamp assembly 30 is in a released state, and the driving module 10 maintains the released state of the clamp assembly 30 according to the received immediate stop instruction to close the control valve of the clamp assembly 30 and reduce the working loss of the control valve.

[0032] In the embodiment of the present application, when the driving module 10 of the sample analysis device receives the immediate stop command sent by the control module 20, it will stop the timing operation of the sample analysis device according to the immediate stop command and maintain the operating state of the clamp assembly 30, thereby reducing the possibility of the test tube falling due to equipment failure when the clamp assembly 30 is clamping the test tube, reducing the maintenance cost of the sample analysis device, and improving the reliability of the sample analysis device.

[0033] Optionally, the sample analysis device includes at least a first control valve 310 and a second control valve (not shown), the first control valve 310 is used to control the operating state of the clamp assembly 30, and the control component of the second control valve is different from the control component of the first control valve 310; when the driving module 10 receives an immediate stop command, it closes the second control valve and keeps the first control valve 310 powered on.

[0034] Specifically, the driving module 10 is connected to the first control valve 310 and the second control valve respectively, and the driving module 10 is used to control the opening and closing of the first control valve 310 and the second control valve, so that the sample analysis device performs sample detection and obtains the detection results according to a preset timing; the driving module 10 is also used to close the control valve on the running timing according to an immediate stop instruction when a failure occurs in the sample analysis device, so as to prevent the timing from continuing to run and causing the failure to spread to other parts, thereby improving the service life of the sample analysis device.

[0035] Among them, the sample analysis device includes at least a first control valve 310 and a second control valve. The first control valve 310 is a control component of the clamp assembly 30 for controlling the operating state. The driving module 10 adjusts the clamp assembly 30 to be in a clamped state or a released state through the first control valve 310. For example, when the clamp is adjusted by air pressure, the first control valve 310 can be a speed control valve; the second control valve is a control component outside the clamp assembly 30. For example, the second control valve can include a liquid flow valve of a sampling assembly and a detection assembly, etc., so as to add or transport the sample to be tested and the detection reagent to a preset position. The states of the first control valve 310 may include power-on and power-off. When the first control valve 310 is adjusted to the first switch, the circuit of the first control valve 310 is in a power-on state so that the clamp assembly 30 is in a clamping state. Before a fault occurs, when the clamp assembly 30 is in the clamping state, the drive module 10 maintains the position of the first switch unchanged according to the immediate stop instruction; when the first control valve 310 is adjusted to the second switch, the circuit of the first control valve 310 is in a power-off state so that the clamp assembly 30 is in a loose state. Before a fault occurs, when the clamp assembly 30 is in the loose state, the drive module 10 maintains the position of the second switch unchanged according to the immediate stop instruction.

[0036] In the embodiment of the present application, when the driving module 10 of the sample analysis device receives an immediate stop command, it will close the second control valve according to the immediate stop command and keep the first control valve 310 powered on to stop the control valves of other components except the clamp assembly 30, thereby reducing the loss of other components caused by the fault. By keeping the first control valve 310 powered on and the clamp assembly 30 running, the possibility of the test tube falling due to equipment failure when clamping the test tube is reduced, thereby reducing the maintenance cost of the sample analysis device and improving the reliability of the sample analysis device.

[0037] Optionally, see Figure 2-3 , Figure 2 is a schematic structural diagram of the clamp assembly 30 provided by the present application in the first state, Figure 3 is a schematic diagram of the structure of the clamp assembly 30 provided by the present application in the second state. Figure 2As shown, the clamp assembly 30 includes a cylinder 320 and a clamping member, the cylinder 320 is connected to the first control valve 310 and the clamping member respectively, the clamping member is used to clamp the test tube in the first state, and the clamping member is also used to release the test tube in the second state, and the driving module 10 is used to adjust the gas volume of the cylinder 320 through the first control valve 310 so that the clamping member is in the first state or the second state.

[0038] Specifically, the driving module 10 of this embodiment adjusts the pressure of the cylinder 320 through the first control valve 310, so that the piston 323 of the cylinder 320 can push the clamping member to be in the first state or the second state when in different positions; when the clamping member is in the first state, the first control valve 310 is in an energized state and makes the gas volume in the cylinder 320 greater than a preset value, so that the piston 323 connected to the cylinder 320 adjusts the clamping member to a state where it can clamp the test tube; when the clamping member is in the second state, the first control valve 310 is in an off-power state and makes the gas volume in the cylinder 320 less than or equal to a preset value, so that the piston 323 connected to the cylinder 320 adjusts the clamping member to a loosened state.

[0039] In one possible implementation, the first control valve 310 is used to change the degree of gas compression in the cylinder 320 by adjusting the connection method of the cylinder 320, so that when the piston 323 is located at different positions, the clamping member is in the first state or the second state; in other implementations, the first control valve 310 is used to magnetically cooperate with the cylinder 320 to change the formation of the cylinder 320, so that when the piston 323 is located at different positions, the clamping member is in the first state or the second state. At this time, the first control valve 310 can be a solenoid valve.

[0040] In the embodiment of the present application, the sample analysis device adjusts the gas volume of the cylinder 320 through the first control valve 310, so that the clamping member is in a first state of clamping the test tube or a second state of releasing the test tube, which facilitates the driving module 10 to maintain the operating state of the clamp assembly 30 through the first control valve 310, reduces the possibility of the test tube falling due to equipment failure when clamping the test tube, reduces the maintenance cost of the sample analysis device, and improves the reliability of the sample analysis device.

[0041] Optionally, the clamp assembly 30 also includes an air pressure source 340, which is connected to the cylinder 320. The air pressure source 340 is used to provide pressure for the cylinder 320. The cylinder 320 includes a cylinder body and a piston 323. The piston 323 is arranged inside the cylinder body and divides the cylinder body into a first cavity 321 and a second cavity 322, wherein the piston 323 includes a push rod connected to the clamping member, the second cavity 322 is arranged on the side of the cylinder body away from the push rod, and the first cavity 321 is arranged on the side of the cylinder body close to the push rod.

[0042] Specifically, the air pressure source 340 is used to provide pressure to the cylinder 320. The driving module 10 adjusts the pressure supply mode of the air pressure source 340 through the first control valve 310, so as to push the piston 323 to move and adjust the state of the clamping member through the air pressure change inside the cylinder. Figure 2 As shown, the driving module 10 maintains the first control valve 310 in the powered state, and the air pressure source 340 is used to provide pressure to the first cavity 321. The pressure change of the first cavity 321 causes the piston 323 to move to the side away from the push rod, so that the clamping member is maintained in the first state. In another embodiment, the first control valve 310 maintains the first control valve 310 in the powered state, and the air pressure source 340 is used to provide pressure to the second cavity 322. The pressure change of the second cavity 322 causes the piston 323 to move to the side close to the push rod, so as to push the piston 323 to move and keep the clamping member in the second state.

[0043] The first cavity 321 of the cylinder 320 is provided with a first connection end, the second cavity 322 is provided with a second connection end, and the first control valve 310 is used to change the connection mode between the air pressure source 340 and the cylinder 320 so that the clamping member is in the first state or the second state. Figure 2 As shown, the first control valve 310 is powered on, and the air pressure source 340 is connected to the first connection end. The air pressure source 340 is used to inflate and pressurize the first cavity 321, so that the piston 323 moves to the side away from the push rod under the action of the air pressure. Since the piston 323 is connected to the clamping member through the push rod, the movement of the piston 323 toward the second cavity 322 can clamp the clamping member, so that the clamping member remains in the first state of clamping the test tube; Figure 3 As shown, the first control valve 310 is powered off, and the air pressure source 340 is connected to the second connection end. The air pressure source 340 is used to inflate and pressurize the second cavity 322, so that the piston 323 moves toward the side close to the push rod under the action of air pressure, and the clamp remains in the second released state.

[0044] In the embodiment of the present application, the sample analysis device changes the connection mode between the air pressure source 340 and the cylinder 320 through the first control valve 310, so that the clamping member is in a first state of clamping the test tube or a second state of releasing the test tube, which facilitates the driving module 10 to maintain the operating state of the clamp assembly 30 through the first control valve 310, reduces the possibility of the test tube falling due to equipment failure when clamping the test tube, reduces the maintenance cost of the sample analysis device, and improves the reliability of the sample analysis device.

[0045] Optionally, the air pressure source 340 is a positive pressure source, the first control valve 310 is powered on, and the volume of the first cavity 321 is greater than the volume of the second cavity 322. The first control valve 310 is powered off, and the gas volume of the first cavity 321 is less than the gas volume of the second cavity 322.

[0046] Specifically, the air pressure source 340 is a positive pressure source. In a possible implementation, the pressure of the air pressure source 340 may be in the range of 200 KPa-250 KPa, or the pressure of the air pressure source 340 may be 230 KPa. When the first control valve 310 is powered on, the air pressure source 340 is connected to the first connection end, and the air pressure source 340 inflates and pressurizes the first cavity 321, so that the gas in the first cavity 321 pushes the piston 323 to move toward the second cavity 322 under the action of pressure, the gas volume in the first cavity 321 is greater than the volume of the second cavity 322, and the clamp is in the first state and clamps the test tube; when the first control valve 310 is powered off, the air pressure source 340 is connected to the second connection end, and the air pressure source 340 inflates and pressurizes the second cavity 322, so that the gas in the second cavity 322 pushes the piston 323 to move toward the first cavity 321 under the action of pressure, the gas volume in the first cavity 321 is less than the volume of the second cavity 322, and the clamp is in the second state and is released, so that the test tube moves from the clamping position of the clamp to other temporary storage positions.

[0047] In the embodiment of the present application, the sample analysis device controls the air pressure source 340 to inflate and pressurize the first cavity 321 when the first control valve 310 is powered on, so that the clamping member remains in the first state of clamping the test tube, and controls the air pressure source 340 to inflate and pressurize the second cavity 322 when the first control valve 310 is powered off, so that the clamping member remains in the second state of clamping the test tube. This facilitates the driving module 10 to maintain the operating state of the clamp assembly 30 through the first control valve 310, reduces the possibility of the test tube falling due to equipment failure when clamping the test tube, reduces the maintenance cost of the sample analysis device, and improves the reliability of the sample analysis device.

[0048] Optionally, the control module 20 is used to obtain a treatment measure for the current fault in response to a fault of the sample analysis device. The control module 20 is also used to generate an immediate stop instruction in response to the treatment measure being an immediate treatment measure.

[0049] Specifically, the control module 20 is connected to several sensor devices of the sample analysis device to continuously obtain the operating status of each component of the sample analysis device, so as to control the timing of the sample analysis device. When the sensor device receives an abnormality, the control module 20 determines the fault information of the sample analysis device according to the abnormal information reported by the sensor device to obtain the processing measures of the fault corresponding to the fault information. The fault information can generally include the fault level, fault type, etc., so that the control module 20 generates specific processing instructions according to the corresponding processing measures, and the driving module 10 can execute the corresponding fault processing measures according to the processing instructions to reduce the impact of the fault of the sample analysis device.

[0050] Among them, when the fault level of the current fault is high and the fault type is more fatal, in order not to affect the life of the sample analysis equipment, the control module 20 needs to execute immediate processing measures when it recognizes that the current fault is an immediate stop fault, and generate an immediate stop instruction based on the immediate processing measures. The immediate stop instruction is used to instruct the drive module 10 to shut down the components in the operating timing of the sample analysis equipment to reduce the possibility of expansion of the fault scope and damage to the components due to continued operation of the components.

[0051] Optionally, the sample analysis device further includes a scheduling component (not shown), which is connected to the fixture component 30 and is used to drive the fixture component 30 to move so that the fixture component 30 moves to a preset position. The driving module 10 is used to maintain the running state of the fixture component 30 when receiving an immediate stop instruction, and reset the fixture component 30 to an initial position through the scheduling component.

[0052] Specifically, the scheduling component includes a lifting mechanism, which is used to drive the clamping member to move up and down in the direction of gravity (first direction); in one embodiment, the scheduling component is also used to drive the clamp assembly 30 to move in the second direction and the third direction through a sliding track, the first direction is respectively perpendicular to the second direction and the third direction, and the second direction is perpendicular to the third direction, and the scheduling component is used to drive the clamp assembly 30 to move in three dimensions; in another embodiment, the scheduling component is also used to drive the clamp assembly 30 to move in the second direction through a sliding track, the first direction is perpendicular to the second direction, when the first direction is the direction of gravity, the second direction can be any direction on the horizontal plane, and the scheduling component is used to drive the clamp assembly 30 to move in two dimensions; according to the scheduling requirements of the clamp assembly 30, the scheduling component can be designed as a two-dimensional motion component or a three-dimensional motion component, which is not specifically limited here.

[0053] In a possible embodiment, in order to reduce the expansion of the fault scope caused by the continued operation of the component, when the current fault is an immediate stop fault, the fault elimination measures performed by the control module 20 usually include component reset. When a fault occurs during the process of the scheduling component driving the clamp component 30 to move, since the clamp component 30 is on the scheduling path, when the driving module 10 performs the fault elimination measures, the reset process of other components may cause the component to interfere with the test tube, resulting in a greater possibility of an accident. Therefore, in this embodiment, the driving module 10 is used to maintain the running state of the clamp component 30 when receiving the immediate stop instruction, and reset the clamp component 30 to the initial position through the scheduling component. The initial position is the position when the clamp component 30 receives the test tube, or the initial position can be the initial position of the clamp component 30 when the analysis sequence of the sample analysis device is closed, so as to reduce the possibility of interference between the clamp component 30 and other components and improve the reliability of the sample analysis device.

[0054] See also Figure 4 , Figure 4 FIG. 1 is a flow chart of an embodiment of the sample analysis method provided by the present application. Figure 4 As shown, the embodiment of the present application also proposes a sample analysis method, which is used to control sample analysis equipment such as a blood analyzer and a blood cell analyzer. The sample analysis method includes the following steps:

[0055] Step S11: in response to a failure of the sample analysis device, obtaining a treatment measure for the current failure.

[0056] Specifically, when a fault occurs in the sample analysis device, a processing measure for the current fault is obtained according to fault information such as the fault level and type, so that corresponding fault processing is performed according to the processing measure to reduce the impact range of the fault.

[0057] Step S12: In response to the processing measure being an immediate processing measure, an immediate stop instruction is generated.

[0058] When the acquired processing measures include immediate processing measures, in order to reduce the loss of the sample analysis device, an immediate stop instruction is generated according to the immediate processing measures.

[0059] Step S13: stopping the sequential operation of the sample analysis device according to the immediate stop instruction, and maintaining the operating state of the clamp assembly 30 .

[0060] The timing operation of the sample analysis device is stopped according to the immediate stop instruction, and the operation state of the clamp assembly 30 is maintained. The operation state of the clamp assembly 30 may include the power-on state of the first control valve 310 of the clamp assembly 30. For example, before the failure occurs, the first control valve 310 is in the power-on state, and the first control valve 310 continues to be powered on according to the immediate stop instruction; or, before the failure occurs, the first control valve 310 is in the power-off state, and the first control valve 310 continues to be powered off according to the immediate stop instruction.

[0061] It can be understood that the timing of the sample analysis device includes any node of the injection process, sampling process, sample preparation process and analysis process of the sample analysis device. Stopping the timing operation of the sample analysis device can include stopping the operation of components such as the control valves and motors of the injection component, sampling component and detection component, and maintaining the operating state of the clamp component 30. The clamp component 30 is used to realize the scheduling of the test tube between positions such as the injection component, sampling component and detection component.

[0062] In an embodiment of the present application, when an immediate stop instruction is generated, the timing operation of the sample analysis device will be stopped according to the immediate stop instruction, and the operating state of the clamp assembly 30 will be maintained, thereby reducing the possibility of the test tube falling due to equipment failure when the clamp assembly 30 is clamping the test tube, reducing the maintenance cost of the sample analysis device, and improving the reliability of the sample analysis device.

[0063] Optionally, see Figure 5 , Figure 5 FIG. 1 is a flow chart of another embodiment of the sample analysis method provided by the present application. Figure 5 As shown, the sample analysis device of this embodiment includes at least a first control valve 310 and a second control valve. The first control valve 310 is used to control the operating state of the clamp assembly 30. The control component of the second control valve is different from the control component of the first control valve 310. The clamp assembly 30 includes a cylinder 320 and a gas pressure source 340. Step S13 further includes the following steps:

[0064] Step S21: Acquire the operating status of the clamp assembly 30 when a fault occurs.

[0065] Specifically, the operating state of the clamp assembly 30 when a fault occurs is acquired according to the immediate stop instruction, and the operating state of the clamp assembly 30 can be used to indicate the power-on state of the first control valve 310 .

[0066] Step S22 : in response to the operation status indicating that the first control valve 310 is in the energized state, the second control valve is closed, and the first control valve 310 is kept energized so that the air pressure source 340 provides pressure to the first chamber 321 of the cylinder 320 .

[0067] In response to the operating status indication that the first control valve 310 is in an energized state, that is, before the failure occurs, the first control valve 310 is in an energized state and clamps the test tube, then in response to the immediate stop instruction, the second control valve is closed and the first control valve 310 continues to be energized, so that the air pressure source 340 provides pressure to the first cavity 321 of the cylinder 320 and maintains the pressure of the first cavity 321 at a preset value, and the clamp assembly 30 continues to maintain the state of clamping the test tube.

[0068] Step S23 : in response to the operation status indicating that the first control valve 310 is in the power-off state, the second control valve is closed, and the first control valve 310 is kept power-off, so that the air pressure source 340 provides pressure to the second chamber 322 of the cylinder 320 .

[0069] In response to the operating status indicating that the first control valve 310 is in a power-off state, that is, the clamp assembly 30 did not clamp the test tube before the failure occurred, the second control valve is closed in response to the immediate stop instruction and the first control valve 310 is kept power-off, so that the air pressure source 340 provides pressure to the second cavity 322 of the cylinder 320 and maintains the pressure of the second cavity 322 at a preset value, and the clamp assembly 30 continues to maintain a state of releasing the test tube, reducing the loss of the first control valve 310.

[0070] In an embodiment of the present application, when an immediate stop command is received, the second control valve will be closed according to the immediate stop command, and the first control valve 310 will be kept powered on to stop the control valves of other components except the clamp assembly 30, thereby reducing the loss of other components caused by the fault. By keeping the first control valve 310 powered on and the clamp assembly 30 running, the possibility of the test tube falling due to equipment failure when clamping the test tube is reduced, thereby reducing the maintenance cost of the sample analysis equipment and improving the reliability of the sample analysis equipment.

[0071] See also Figure 6 , Figure 6 Schematic diagram of the structure of an embodiment of the computer-readable storage medium provided by the present application. Figure 6 As shown, the computer-readable storage medium 110 stores program instructions 111 that can implement all the above methods.

[0072] If the integrated units of the functional units in the various embodiments of the present application are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium 110. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer-readable storage medium 110 includes several instructions in a program instruction 111 to enable a computer device (which can be a personal computer, a system server, or a network device, etc.), an electronic device (such as MP3, MP4, etc., or a mobile terminal such as a mobile phone, a tablet computer, a wearable device, or a desktop computer, etc.) or a processor to execute all or part of the steps of the methods of various implementation methods of the present application.

[0073] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-readable storage media 110 (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0074] The present application is described by flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by a computer-readable storage medium 110. These computer-readable storage media 110 can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the program instructions 111 executed by the processor of the computer or other programmable data processing device generate instructions for implementing the process in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0075] The above description is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A sample analysis device, characterized in that: include: a control module for generating an immediate stop instruction in response to an immediate processing measure of the sample analysis device; A driving module, connected to the control module, configured to receive the immediate stop instruction and stop the sequential operation of the sample analysis device according to the immediate stop instruction; A clamp assembly, connected to the driving module, for clamping the test tube and moving the test tube to a preset position so that the sample analysis device can test the sample to be tested in the test tube; Wherein, when receiving the immediate stop instruction, the driving module maintains the running state of the clamp assembly.

2. The sample analysis device according to claim 1, characterized in that: The sample analysis device comprises at least a first control valve and a second control valve, wherein the first control valve is used to control the operating state of the clamp assembly, and the control component of the second control valve is different from the control component of the first control valve; When receiving the immediate stop instruction, the driving module closes the second control valve and keeps the first control valve powered on.

3. The sample analysis device according to claim 2, characterized in that: The clamp assembly includes a cylinder and a clamping member, the cylinder is connected to the first control valve and the clamping member respectively, the clamping member is used to clamp the test tube in a first state, and the clamping member is also used to release the test tube in a second state, and the driving module is used to adjust the gas volume of the cylinder through the first control valve to make the clamping member be in the first state or the second state.

4. The sample analysis device according to claim 2, characterized in that: The clamp assembly further includes an air pressure source, which is connected to the cylinder and is used to provide pressure to the cylinder. The cylinder includes a cylinder body and a piston, and the piston is arranged inside the cylinder body and divides the cylinder body into a first cavity and a second cavity. When the driving module receives the immediate stop instruction, the first control valve is energized, and the air pressure source is used to provide pressure to the first cavity to push the piston to move and keep the clamping member in the first state; alternatively, the first control valve is de-energized, and the air pressure source is used to provide pressure to the second cavity to push the piston to move and keep the clamping member in the second state.

5. The sample analysis device according to claim 4, characterized in that: The air pressure source is a positive pressure source. When the first control valve is powered on, the gas volume of the first cavity is greater than the gas volume of the second cavity. When the first control valve is powered off, the gas volume of the first cavity is less than the gas volume of the second cavity.

6. The sample analysis device according to claim 1, characterized in that: The control module is used for obtaining a treatment measure for the current fault in response to a fault of the sample analysis device. The control module is also used for generating the immediate stop instruction in response to the treatment measure being an immediate treatment measure.

7. The sample analysis device according to claim 1, characterized in that: The sample analysis device also includes a scheduling component, which is connected to the clamp component and is used to drive the clamp component to move so that the clamp component moves to the preset position; the driving module is used to maintain the operating state of the clamp component when receiving the immediate stop instruction, and reset the clamp component to the initial position through the scheduling component.

8. A sample analysis method, characterized in that: include: In response to a failure of the sample analysis device, obtaining a treatment measure for the current failure; In response to the processing measure being an immediate processing measure, generating the immediate stop instruction; The sequential operation of the sample analysis device is stopped according to the immediate stop instruction, and the operation state of the clamp assembly is maintained.

9. The sample analysis method according to claim 8, characterized in that: The sample analysis device comprises at least a first control valve and a second control valve, the first control valve is used to control the operating state of the clamp assembly, the control assembly of the second control valve is different from the control assembly of the first control valve, and the clamp assembly comprises a cylinder and a gas pressure source; The step of stopping the sequential operation of the sample analysis device according to the immediate stop instruction and maintaining the operation state of the fixture assembly includes: Obtaining the operating status of the fixture assembly when a fault occurs; In response to the operation status indicating that the first control valve is in an energized state, closing the second control valve and keeping the first control valve energized so that the air pressure source provides pressure to the first chamber of the cylinder; Alternatively, in response to the operating status indicating that the first control valve is in a power-off state, the second control valve is closed and the first control valve is kept power-off so that the air pressure source provides pressure to the second chamber of the cylinder.

10. A computer-readable storage medium, characterized in that: Program instructions are stored, and the program instructions are executed to implement the sample analysis method according to any one of claims 8 to 9.