Cable path marking device and marking method
By installing the path marking mechanism on the cable path detector and using the loading barrel and telescopic spring to achieve single operation, the problems of low efficiency and poor accuracy of cable path marking in the prior art are solved, and the accuracy and working efficiency of marking are improved .
Patent Information
- Application Number
- CN202411321964.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-03
AI Technical Summary
The existing cable path marking technology is inefficient, has high labor costs and poor accuracy, especially inaccurate marking in curved parts, resulting in cable damage and power outages.
Design a cable path marking device, including a cable path detector and a path marking mechanism, by installing a path marking mechanism on the receiver, using a charging barrel and a telescopic spring to achieve single operation, reduce labor costs, improve work efficiency, and pass through magnets Connected and transparent material loading barrels improve marking accuracy.
It realizes single-person operation, reduces labor costs, improves work efficiency and marking accuracy, reduces errors in cable path marking, and improves work quality.
Smart Images

Figure CN119065010A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cable path detection marking, and in particular to a cable path marking device and a marking method. Background Art
[0002] With the development of social economy, more and more people choose to live in cities. The rapid increase of urban population has led to changes in the internal electricity demand. At the same time, the power industry is also in a booming development. In cities, compared with the laying method of overhead power lines, direct burial and direct burial through pipes are common methods of laying urban cables. This method can improve the cleanliness of the city and make the city look brand new. However, with the passage of time, construction in the city, natural disasters such as wind, frost, rain and snow will damage or even lose the cable path signs installed in the city, making it impossible to know the direction of the cable path. In the process of cable fault finding and urban construction excavation, cables with unknown cable path directions often cause damage to the outer protective layer of the cable or even dig up the cable to cause power outages, which has a great impact on corporate production and people's lives and causes huge economic losses. How to quickly and effectively mark the discovered cable paths has become an important issue.
[0003] At present, the damaged cable paths in the city are mainly detected by cable path detectors. The principle of the cable path detector is to use a detection coil to sense the electromagnetic field caused by the alternating current loaded on the cable to be tested. When performing path detection, a signal generator (transmitter) is used to transmit an audio signal to the cable, and a host (receiver) is used to receive it. At present, cable path detectors are also used at the cable path detection site. When in use, one operator holds a receiver, and another operator carries a bucket in one hand and a shovel in the other hand, following behind the previous operator, and uses the shovel to shovel out markers to mark the path. This operation method requires two or even three people to cooperate, which increases labor costs and low work efficiency. At the same time, since the manual marking is performed behind the receiver operator, this will cause certain errors, and the marked path is not accurate enough, especially in the curved part, the accuracy is even lower.
[0004] A utility model patent with patent application number 202023197582.7 was retrieved from the existing patents, which proposes a flashing cable path marking device, including a base, a frustum-shaped indicator cone is provided on the base, the bottom of the indicator cone is integrally fixedly connected to the upper surface of the base, a solar panel is provided on the top of the indicator cone, a circuit board electrically connected to the solar panel is provided in the indicator cone, a flash light electrically connected to the circuit board is provided on the indicator cone, and an indicator arrow is provided on the outer wall of the indicator cone. The device temporarily marks the cable path at the construction site, and combined with the flashing light effect, the marking effect is more obvious at night, and it has a better warning effect. It does not solve the problems of low efficiency, high labor cost and accurate marking in the cable path marking process. Summary of the invention
[0005] In order to overcome the above-mentioned problems, the purpose of the present invention is to provide a cable path marking device and a marking method. The cable path marking device adds a path marking mechanism on the basis of a traditional cable path detector. The device connects the path marking mechanism with a receiver. A loading bucket is provided under the path marking mechanism. Single-person operation can be achieved during the operation. The opening and closing of the loading bucket is controlled according to the displayed path on the receiver to achieve path marking, reduce labor costs, and improve work efficiency. The marking method clarifies the steps of using the device to mark the cable path, facilitates the work of the operators, and improves work efficiency and work quality.
[0006] The technical solution adopted by the present invention is: a cable path marking device, including a cable path detector and a path marking mechanism, the cable path detector includes a transmitter and a receiver, the transmitter is clamped at the end of the cable that needs to be path marked, the path marking mechanism is connected to the receiver, the path marking mechanism includes a hand-held rod, a fixed buckle, a charging barrel, an operating handle, a telescopic spring, an operating connecting rod, and a marking material, the fixed buckle is integrally formed with the hand-held rod and is located in the middle position on the left side of the hand-held rod, the charging barrel is welded to the left side of the hand-held rod and is located at the bottom position, a handle connecting seat, a spring mounting hole, and a connecting rod mounting hole are provided on the right side of the hand-held rod, the operating handle is rotatably connected to the handle connecting seat, the operating handle is in a 7-shaped structure, and a first connecting hole and a second connecting hole are opened at its lower end, one end of the telescopic spring is connected in the first connecting hole, and the other end is connected in the spring mounting hole, one end of the operating connecting rod is connected in the second connecting hole, and the other end is connected to the bottom of the charging barrel, and the marking material is placed in the charging barrel.
[0007] As a preferred technical solution of the present invention, the operating connecting rod includes a first connecting rod, a connecting buckle, and a second connecting rod. The connecting buckle is rotatably connected in the connecting rod mounting hole, one end of the first connecting rod is fixedly connected in the second connecting hole, and the other end is fixedly connected to the upper end of the connecting buckle, one end of the second connecting rod is fixedly connected to the lower end of the connecting buckle, and the other end is fixedly connected to the bottom surface of the loading barrel.
[0008] As a preferred technical solution of the present invention, the connecting buckle is a triangular opening structure.
[0009] As a preferred technical solution of the present invention, a hand-held handle is designed at the upper end of the hand-held rod, and the hand-held handle is a semicircular opening structure, and its diameter is larger than the diameter of the display screen connecting rod of the receiver.
[0010] As a preferred technical solution of the present invention, the fixed buckle includes a buckle connecting rod and a buckle. The length of the buckle connecting rod is greater than the diameter of the loading barrel. The front end of the buckle is an open structure. The shape of the buckle is adapted to the shape of the connecting rod of the receiver. Magnets are installed on both sides of the opening, and the magnets on both sides attract each other.
[0011] As a preferred technical solution of the present invention, the upper end of the charging barrel is a cylindrical structure, the lower end is a truncated cone structure, and the bottom surface of the lower end is an open structure. The upper end of the charging barrel is rotatably connected to a barrel cover, and the lower end is rotatably connected to a discharge cover. Magnets are installed on the lower end of the barrel cover and the upper end surface of the charging barrel, and magnets are installed on the upper end of the discharge cover and the lower end surface of the charging barrel, and the magnets attract each other.
[0012] As a preferred technical solution of the present invention, the charging barrel is made of a transparent material, and a marking line is arranged on the outside of the charging barrel.
[0013] As a preferred technical solution of the present invention, the marking material is lime, graphite powder, talcum powder, barite, fluorite, and ochre.
[0014] As a preferred technical solution of the present invention, the path marking mechanism is made of plastic and steel pipe materials with relatively high hardness.
[0015] A method for marking a cable path using a cable path marking device, the steps of which are as follows:
[0016] S01: Clamp the transmitter of the cable path detector to one end of the cable whose cable path needs to be marked;
[0017] S02: Connect the fixing buckle on the path marking mechanism to the middle position of the cable path detector receiver, so that the display screen connecting rod is placed into the handheld handle;
[0018] S03: Add the marking material into the loading barrel;
[0019] S04: Turn on the receiver and mark along the path displayed on the receiver to complete the marking of the entire cable path;
[0020] S05: Install identification plates or identification stakes at corresponding positions according to the marked path.
[0021] Beneficial effects of the present invention:
[0022] 1. A cable path marking device of the present invention comprises a cable path detector and a path marking mechanism. The cable path detector comprises a transmitter and a receiver. The path marking mechanism comprises a hand-held rod, a fixed buckle, a loading bucket, an operating handle, a telescopic spring, an operating connecting rod, and a marking material. The device installs a path marking mechanism on its receiver based on the traditional use of a cable path detector, and places the path marking mechanism behind the receiver. After the receiver receives the information of the cable path, the operating handle of the path marking mechanism behind it is operated, and the operating handle drives the operating connecting rod to move, and the marking material in the loading bucket is immediately sprinkled to realize path marking. The device greatly reduces labor costs and greatly improves work efficiency compared to the traditional method of one person shoveling out marking materials behind another person and sprinkling them. At the same time, the path marking mechanism is connected to the rear of the receiver to ensure accurate marking of the cable path and work quality.
[0023] 2. The present invention provides a cable path marking device, wherein the fixed buckle comprises a buckle connecting rod and a buckle, wherein the length of the buckle connecting rod is greater than the diameter of a charging barrel, and the design of such size can ensure that the charging barrel is exactly between a receiver and a hand-held rod of a path marking mechanism, and the path marking is accurately achieved by sprinkling marking material from the charging barrel. The front end of the buckle is an open structure, and the shape of the buckle is matched with the shape of a connecting rod of the receiver, so that it is convenient to connect to the middle position of the receiver. Magnets are installed on both sides of the opening, and the magnets on both sides attract each other. The design of the magnet makes the connection process simple and convenient, which is convenient for direct connection on site and improves work efficiency.
[0024] 3. The present invention provides a cable path marking device, wherein the upper end of the loading barrel is a cylindrical structure, the lower end is a truncated cone structure, and the bottom surface of the lower end is an open structure. This structural design facilitates the proper amount of spilling of marking materials without wasting marking materials. The loading barrel is made of transparent material, and a marking line is provided on the outside of the loading barrel. The design of the loading barrel and the marking line made of transparent material facilitates timely observation of the amount of marking material in the barrel during operation, and timely replenishment, thereby improving work efficiency.
[0025] 4. The present invention provides a cable path marking device, wherein a hand-held handle is designed at the upper end of the hand-held rod, and the hand-held handle is a semicircular opening structure, and its diameter is larger than the diameter of the display screen connecting rod of the receiver. This structural design facilitates the placement of the receiver display screen connecting rod into the hand-held handle. The operator holds the receiver connecting rod while holding the hand-held handle, and operates the operating handle to achieve path marking, so that one person can mark the cable path with one hand, thereby greatly reducing labor costs.
[0026] 5. The present invention provides a method for marking a path using a cable path marking device. The marking method clarifies the steps of using the device to mark the cable path, which facilitates the work of operators and improves work efficiency and work quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A three-dimensional structural schematic diagram of a path marking mechanism of a cable path marking device proposed by the present invention installed on a receiver;
[0028] Figure 2 A schematic diagram of the overall three-dimensional structure of a path marking mechanism of a cable path marking device proposed by the present invention;
[0029] Figure 3 A schematic diagram of the upper structure of a path marking mechanism of a cable path marking device proposed by the present invention;
[0030] Figure 4 A schematic diagram of the lower end structure of a path marking mechanism of a cable path marking device proposed by the present invention;
[0031] Figure 5 A schematic diagram of the structure of a handheld handle of a path marking mechanism of a cable path marking device proposed by the present invention;
[0032] Figure 6 This is a schematic diagram of the installation position structure of the connection port of a path marking mechanism of a cable path marking device proposed by the present invention.
[0033] Description of Reference Numerals
[0034] 1-receiver, 11-display screen connecting rod, 2-handling rod, 21-handle connecting seat, 22-spring mounting hole, 23-connecting rod mounting hole, 24-handling handle, 3-fixing buckle, 31-buckle connecting rod, 32-buckle, 4-charging barrel, 41-discharging cover, 5-operating handle, 51-first connecting hole, 52-second connecting hole, 6-telescopic spring, 7-operating connecting rod, 71-first connecting rod, 72-connecting buckle, 73-second connecting rod. DETAILED DESCRIPTION
[0035] The specific implementation of the present invention is described below in conjunction with the accompanying drawings and embodiments:
[0036] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which the present invention can be implemented. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0037] At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" cited in this specification are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments to their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.
[0038] Embodiment 1
[0039] A cable path marking device disclosed in the present invention comprises a cable path detector and a path marking mechanism, wherein the cable path detector comprises a transmitter and a receiver 1, wherein the transmitter is clamped at the end of a cable to be path marked, and the path marking mechanism is connected to the receiver 1, and is characterized in that the path marking mechanism comprises a hand-held rod 2, a fixed buckle 3, a charging bucket 4, an operating handle 5, a telescopic spring 6, an operating connecting rod 7, and a marking material, wherein the fixed buckle 3 is integrally formed with the hand-held rod 2 and is located in the middle position on the left side of the hand-held rod 2, and the charging bucket 4 is welded to the hand-held rod 2 The left side position is located at the bottom end, and a handle connecting seat 21, a spring mounting hole 22, and a connecting rod mounting hole 23 are provided on the right side of the hand-held rod 2. The operating handle 5 is rotatably connected to the handle connecting seat 21. The operating handle 5 is in a 7-shaped structure, and a first connecting hole 51 and a second connecting hole 52 are provided at the lower end thereof. One end of the telescopic spring 6 is connected to the first connecting hole 51, and the other end is connected to the spring mounting hole 22. One end of the operating connecting rod 7 is connected to the second connecting hole 52, and the other end is connected to the bottom of the charging barrel 4. The marking material is placed in the charging barrel 4.
[0040] like Figure 1 As shown, when the cable path marking device is used to actually perform cable path marking work, the transmitter of the cable path detector needs to be connected to the end position of the cable to be marked, which can be the connection terminal of the substation cable, the connection terminal of the cable in the ring network cabinet, the input and output terminal of the user end, etc.
[0041] The cable path detector is based on the different directions of the sensor induction coil. The detection methods are divided into the sound peak method and the sound valley method, as well as the pulse magnetic field direction method and the pulse magnetic field amplitude method. These methods determine the path of the cable through multi-point connection based on the relationship between magnetic field strength and position. The cable path detector also uses the principle of electromagnetic wave reflection to track the wire through an external induction clamp. The transmitter can send magnetic induction signals through the built-in antenna, or directly connect to the wire for conduction to increase the tracking distance and reduce the coupling of the signal with other wires. Inductive coupling does not need to be directly connected to the wire to track the wire. The receiver tracks the wire based on the peak signal or the null signal.
[0042] At present, the method used in the field of path marking is mainly to clamp the clamping end of the transmitter in the corresponding position, so that the transmitter transmits an audio current signal of a specific frequency to the cable or applies a high-voltage pulse signal to the cable. These signals generate a magnetic field around the cable. The receiver receives these magnetic fields through an induction coil and converts them into sound signals or other visual signals that are easy for people to recognize, thereby detecting the path of the cable. At present, the transmitter can apply signals through three methods: induction, direct and clamp, and transmit the signals to the underground metal pipe. The receiver receives and feeds back the signals, including the location, direction, burial depth and current measurement of the cable. In this embodiment, the clamp method is mainly used to apply the signal to the cable, and an external induction clamp is also equipped to improve the flexibility and scope of application of the detection.
[0043] In actual use, after installing the transmitter, use the receiver to detect the cable path and mark it, such as Figure 1 As shown, the path marking mechanism is connected to the receiver connecting rod through the fixing buckle 3. Since the fixing buckle 3 and the loading bucket 4 are at the same side position of the hand-held rod 2, the marking material in the loading bucket 4 falls down during use to realize path marking. Since the distance between the receiver 2 and the loading bucket 4 is short, it can improve the accuracy of the path marking process and avoid the errors caused by the traditional method of using a shovel to shovel out the marking material for marking.
[0044] During the path marking process, the operating handle 5 is rotatably connected to the handle connecting seat 21. After holding the handle rod 2, the operating handle 5 is squeezed, and the operating connecting rod 7 connected to the second connecting hole 52 at the lower end of the operating handle 5 moves upward, so that the discharge cover 41 at the bottom of the loading bucket 4 connected to the other end of the operating connecting rod 7 is opened, and the marking material in the loading bucket 4 is spilled to realize the marking of the cable path. The overall structure of the path marking mechanism is simple, which is convenient for on-site staff to use and improves work efficiency.
[0045] At the same time, in the actual path marking process, when the operator has worked for a period of time or the marking material in the loading bucket 4 is about to be used up, the telescopic spring 6, one end of which is connected to the first connecting hole 51 of the operating handle 5 and the other end of which is connected to the spring mounting hole 22, will be subjected to an upward pulling force when the operating handle 5 moves upward. When the pulling force applied by the operator on the operating handle 5 disappears, the telescopic spring 6 will restore to its initial state under the action of the elastic force, and the telescopic spring 6 will provide a downward pulling force. At this time, the operating handle 5 connected to one end of the telescopic spring 6 moves downward, and the operating connecting rod 7 moves downward at the same time. The discharge cover 41 of the loading bucket 4 connected to the other end of the operating connecting rod 7 is closed, the marking material will not spill out, and the cable path marking process is paused.
[0046] The working process of the path marking mechanism as described above is the marking process of the cable path marking device. The entire operation process is simple and convenient, easy to implement, and can reduce labor costs, improve work efficiency, and improve the accuracy of path marking.
[0047] Specifically, Figure 2 , Figure 3 As shown, the operating connecting rod 7 includes a first connecting rod 71, a connecting buckle 72, and a second connecting rod 73. The connecting buckle 72 is rotatably connected in the connecting rod mounting hole 23. One end of the first connecting rod 71 is fixedly connected in the second connecting hole 52, and the other end is fixedly connected to the upper end of the connecting buckle 72. One end of the second connecting rod 73 is fixedly connected to the lower end of the connecting buckle 72, and the other end is fixedly connected to the bottom surface of the charging barrel 4.
[0048] Specifically, Figure 6 As shown, the connecting buckle 72 is a triangular opening structure, and the up and down movement of the remaining two sides is achieved by rotating one side of the triangle.
[0049] In this embodiment, one end of the first connecting rod 71 is connected to the second connecting hole 52, and the other end is connected to the upper end of the connecting buckle 72. Since the connecting buckle 72 is a triangular opening structure, the connecting buckle 72 is rotatably connected in the connecting rod mounting hole 23, and one end of the first connecting rod 71 is connected to the upper end of the triangular opening structure. In this way, when the first connecting rod 71 moves upward or downward, an upward or downward pulling force is provided to the connecting buckle 72, and the connecting buckle 72 rotates in the connecting rod mounting hole 23, causing the second connecting rod 73 connected to the lower end of the triangular opening structure of the connecting buckle 72 to move upward or downward, thereby realizing the opening or closing of the discharge cover 41 of the loading barrel 4 connected to the other end of the second connecting rod 73. The entire implementation process is reliable and effective, simple and convenient, and easy to operate.
[0050] Specifically, Figure 2As shown, the fixing buckle 3 includes a buckle connecting rod 31 and a buckle 32. The length of the buckle connecting rod 31 is greater than the diameter of the charging barrel 4. The front end of the buckle 32 is an open structure. The shape of the buckle 32 is adapted to the shape of the connecting rod of the receiver 2. Magnets are installed on both sides of the opening, and the magnets on both sides attract each other.
[0051] In this embodiment, the length of the snap-on connecting rod 31 is greater than the diameter of the charging barrel 4. The design of this size can ensure that the charging barrel 4 is exactly between the receiver 1 and the hand-held rod 2 of the path marking mechanism. The path marking is accurately achieved by sprinkling the marking material from the charging barrel 4. The marking material in the charging barrel 4 is marked immediately after the receiver 1 detects the cable path signal. The relative position distance is small, and the distance difference during actual use is within 8 cm, ensuring the accuracy of the cable path marking. This function is achieved by limiting the size, which is reliable and effective.
[0052] In this embodiment, if Figure 2 As shown, the front end of the buckle 32 is an open structure, and the shape of the buckle 32 is adapted to the shape of the connecting rod of the receiver 1, so that it is convenient to connect to the middle position of the receiver 1. The shape adaptation can ensure that the buckle 32 is stably connected to the connecting rod of the receiver 1. Magnets are installed on both sides of the opening, and the magnets on both sides attract each other. The opening design facilitates the connection. Magnets are installed on both sides of the opening. The design of the magnets makes the connection process simple and convenient, which is convenient for direct connection on site and improves work efficiency.
[0053] In general, based on the traditional use of a cable path detector, this embodiment installs a path marking mechanism on its receiver, and places the path marking mechanism behind the receiver. After the receiver receives the information of the cable path, the operating handle 5 of the path marking mechanism behind it is operated, and the operating handle 5 drives the operating connecting rod 7 to move, and the marking material in the loading bucket 4 is immediately sprinkled to achieve path marking. This device greatly reduces labor costs and greatly improves work efficiency compared to the traditional method of one person shoveling out marking materials behind another person and sprinkling them. At the same time, the path marking mechanism is connected to the rear of the receiver 2 to ensure accurate marking of the cable path and work quality. At the same time, the cable path marking device has a simple structure and is easy to operate and use, which brings great convenience to actual on-site work, helps operators to effectively carry out their work and improve work efficiency.
[0054] Embodiment 2
[0055] Based on the above embodiment 1, the present invention provides embodiment 2:
[0056] Specifically, in this embodiment, Figure 5As shown, a hand-held handle 24 is designed at the upper end of the hand-held rod 2. The hand-held handle 24 is a semicircular opening structure, and its diameter is larger than the diameter of the display screen connecting rod 11 of the receiver 1.
[0057] like Figure 2 , Figure 3 As shown, under the conditions of the technical solution provided in the above-mentioned embodiment 1, a hand-held handle 24 is designed at the upper end of the hand-held rod 2, and the structure of the hand-held handle 24 is designed to be a semicircular opening mechanism. In actual use, the structure of the hand-held handle 24 can be designed according to the specific structure of the receiver display screen connecting rod 11 of the cable path detector used. If the display screen connecting rod 11 is a rectangular structure, the hand-held handle 24 is designed to be a corresponding rectangular opening structure, which can be adjusted according to actual use requirements. The upper part of the hand-held handle 24 needs to be designed as an opening structure to provide a supporting force for the receiver display screen connecting rod 11 of the cable path detector. The purpose is to place the display screen connecting rod 11 of the receiver of the cable path detector into the hand-held handle 24.
[0058] In actual use, the diameter of the hand-held handle 24 is designed to be larger than the diameter of the display screen connecting rod 11 of the receiver 1. The size design is that the diameter of the hand-held handle 24 is slightly larger than the diameter of the display screen connecting rod 11 of the receiver 1, so that the fit between the two is better while ensuring insertion. When a rectangular receiver display screen connecting rod 11 is used, the length and width of the hand-held handle 24 are designed to be slightly larger than the size of the display screen connecting rod 11 to ensure its fit. Adaptive changes are made according to actual usage. While the structure is simple, it is also easy for operators to operate. The cable path detector receiver 2 and the path marking mechanism can be taken with one hand, and single-person one-handed operation is achieved, greatly reducing labor costs.
[0059] In general, the structural design in the second embodiment facilitates placing the receiver display screen connecting rod 11 into the handheld handle 24. The operator holds the receiver connecting rod 11 while holding the handheld handle 24, and operates the operating handle 5 to achieve path marking. The operator holds the operating handle 5 with one hand and also holds the receiver display screen connecting rod 11, and pinches the operating handle 5 to achieve path marking, thereby realizing single-person single-handed operation and greatly reducing labor costs.
[0060] Embodiment 3
[0061] On the basis of the above-mentioned Embodiment 1 and Embodiment 2, in order to make the device more reliable and effective in actual field, Embodiment 3 is provided:
[0062] Specifically, Figure 4As shown, the upper end of the charging barrel 4 is a cylindrical structure, the lower end is a truncated cone structure, and the bottom surface of the lower end is an open structure. The upper end of the charging barrel 4 is rotatably connected to a barrel cover, and the lower end is rotatably connected to a discharge cover 41. Magnets are installed on the lower end of the barrel cover and the upper end surface of the charging barrel 4, and magnets are installed on the upper end of the discharge cover 41 and the lower end surface of the charging barrel 4, and the magnets attract each other.
[0063] In this embodiment, the loading barrel 4 is set to this structure, and the cylindrical structure at the upper end is matched with the truncated cone structure at the lower end. The marking material is placed in the loading barrel 4. When the marking material in the loading barrel 4 falls through the opening structure on the bottom surface of the lower end of the truncated cone structure to mark the cable path, the truncated cone structure can provide a buffering effect, so that the outflow of the marking material is smoother, and it is also convenient for the actual operation of the entire path marking work. The size of the bottom opening of the truncated cone structure can be designed according to the situation of the path that needs to be marked in the actual work. When the marked section is a dark section, when a light-colored marking material is used, if you want the marked path to be clearer, you can choose an opening diameter design of appropriate size. When the marked section is a dark section, when a dark-colored marking material is used, a larger opening diameter needs to be used. The design can be adaptively performed according to the actual situation.
[0064] In actual use, the upper end of the loading barrel 4 is rotatably connected to a barrel cover to prevent the marking material from being removed during use, and the lower end is rotatably connected to a discharge cover 41. The discharge cover 41 is opened and closed to enable the marking material to flow out, thereby achieving marking of the cable path.
[0065] Magnets are installed at the lower end of the barrel cover and the upper end surface of the charging barrel 4, and magnets are installed at the upper end of the discharging cover 41 and the lower end surface of the charging barrel 4. The magnets attract each other, and the barrel cover 41 and the discharging cover 41 are closed under the action of the magnetic force of the magnets. The operation is convenient and simple. It should be noted that since the closure of the discharging cover 41 is achieved by the elastic force generated by the elastic deformation of the telescopic spring 6 in Examples 1 and 2, adding magnets may cause the operator to apply more pulling force on the operating handle 5 during operation. This part of the magnets can be installed according to actual needs.
[0066] Specifically, the charging barrel 4 is made of a transparent material, and a marking line is arranged on the outside of the charging barrel 4 .
[0067] In this embodiment, the loading barrel 4 is made of transparent material, and a marking line is set on the outside of the loading barrel 4. The loading barrel 4 and the marking line design of the transparent material facilitate timely observation of the stock of the marking material in the loading barrel 4 during operation, timely replenishment, and improved work efficiency.
[0068] In general, the structural design of the loading barrel 4 of the third embodiment facilitates the appropriate amount of spilling of marking materials without wasting marking materials. The loading barrel 4 and marking line design of transparent materials facilitate timely observation of the amount of marking materials in the barrel during operation. The amount of marking materials can also be estimated according to the length of the marking path, and enough marking materials can be added at one time, avoiding additional addition steps during the work process, thereby further improving work efficiency.
[0069] Embodiment 4
[0070] On the basis of the above-mentioned third embodiment, different marking materials can be selected according to different road sections on site to achieve wide application of the device.
[0071] Specifically, the marking material is lime, graphite powder, talcum powder, barite, fluorite, and ochre.
[0072] Embodiment 5
[0073] On the basis of the above four embodiments, in order to increase the service life of the device and make it convenient for operators to carry, embodiment 5 is provided:
[0074] Specifically, the path marking mechanism is made of plastic and steel pipe materials with relatively high hardness.
[0075] In this embodiment, the plastic and steel pipe materials with higher hardness are lighter in weight than iron materials, are easier to carry, and reduce work intensity.
[0076] The plastic with higher hardness can be nylon, which has high strength, hardness, chemical corrosion resistance and wear resistance, and prolongs the service life.
[0077] Embodiment 6
[0078] This embodiment is an embodiment of the independent claim:
[0079] A method for marking a cable path using a cable path marking device, the steps of which are as follows:
[0080] S01: Clamp the transmitter of the cable path detector to one end of the cable whose cable path needs to be marked;
[0081] It can be clamped in substations, ring network cabinets, user inlet and outlet terminals, etc.
[0082] S02: Connect the fixing buckle 3 on the path marking mechanism to the middle position of the cable path detector receiver, so that the display screen connecting rod 11 is placed in the handheld handle 24;
[0083] This step allows the display screen connecting rod 11 to fit tightly with the handheld handle 24, making it easy to operate.
[0084] S03: Adding marking material into the charging barrel 4;
[0085] Add an appropriate amount of marking material according to the length of the marking path.
[0086] S04: Turn on the receiver 1, mark along the displayed path on the receiver 1, and complete the marking of the entire cable path;
[0087] S05: Install identification plates or identification stakes at corresponding positions according to the marked path.
[0088] In this embodiment, the marking method clarifies the steps of using the device to mark the cable path, which facilitates the work of operators and improves work efficiency and work quality.
[0089] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.
[0090] Many other changes and modifications may be made without departing from the concept and scope of the present invention.It should be understood that the present invention is not limited to the specific embodiments, and the scope of the present invention is defined by the appended claims.
Claims
1. A cable path marking device, comprising a cable path detector and a path marking mechanism, wherein the cable path detector comprises a transmitter and a receiver (1), wherein the transmitter is clamped at the end of a cable to be path marked, and the path marking mechanism is connected to the receiver (1), characterized in that: The path marking mechanism comprises a hand-held rod (2), a fixing buckle (3), a charging barrel (4), an operating handle (5), a telescopic spring (6), an operating connecting rod (7), and a marking material. The fixing buckle (3) is integrally formed with the hand-held rod (2) and is located at the middle position on the left side of the hand-held rod (2). The charging barrel (4) is welded to the left side of the hand-held rod (2) and is located at the bottom position. The right side of the hand-held rod (2) is provided with a handle connecting seat (21), a spring mounting hole (22), and a connecting rod mounting hole (23). The operating handle (5) is rotatably connected to the handle connecting seat (21). The operating handle (5) is in a 7-shaped structure, and a first connecting hole (51) and a second connecting hole (52) are provided at the lower end thereof. One end of the telescopic spring (6) is connected to the first connecting hole (51), and the other end is connected to the spring mounting hole (22). One end of the operating connecting rod (7) is connected to the second connecting hole (52), and the other end is connected to the bottom of the charging barrel (4). The marking material is placed in the charging barrel (4).
2. A cable path marking device according to claim 1, characterized in that: The operating connecting rod (7) comprises a first connecting rod (71), a connecting buckle (72), and a second connecting rod (73); the connecting buckle (72) is rotatably connected in the connecting rod mounting hole (23); one end of the first connecting rod (71) is fixedly connected in the second connecting hole (52), and the other end is fixedly connected to the upper end of the connecting buckle (72); one end of the second connecting rod (73) is fixedly connected to the lower end of the connecting buckle (72), and the other end is fixedly connected to the bottom surface of the charging barrel (4).
3. A cable path marking device according to claim 2, characterized in that: The connecting buckle (72) is a triangular opening structure.
4. A cable path marking device according to claim 1, characterized in that: The upper end of the hand-held rod (2) is provided with a hand-held handle (24), and the hand-held handle (24) is a semicircular opening structure, and its diameter is larger than the diameter of the display screen connecting rod (11) of the receiver (1).
5. A cable path marking device according to claim 1, characterized in that: The fixing buckle (3) comprises a buckle connecting rod (31) and a buckle (32). The length of the buckle connecting rod (31) is greater than the diameter of the charging barrel (4). The front end of the buckle (32) is an open structure. The shape of the buckle (32) is compatible with the shape of the connecting rod of the receiver (2). Magnets are installed on both sides of the opening, and the magnets on both sides attract each other.
6. A cable path marking device according to claim 1, characterized in that: The upper end of the charging barrel (4) is a cylindrical structure, the lower end is a truncated cone structure, and the bottom surface of the lower end is an open structure. The upper end of the charging barrel (4) is rotatably connected to a barrel cover, and the lower end is rotatably connected to a discharge cover (41). Magnets are installed on the lower end of the barrel cover and the upper end surface of the charging barrel (4), and magnets are installed on the upper end of the discharge cover (41) and the lower end surface of the charging barrel (4), and the magnets attract each other.
7. A cable path marking device according to claim 1 or 6, characterized in that: The charging barrel (4) is made of a transparent material, and a marking line is arranged on the outside of the charging barrel (4).
8. A cable path marking device according to claim 1, characterized in that: The marking materials are lime, graphite powder, talcum powder, barite, fluorite and ochre.
9. A cable path marking device according to claim 1, characterized in that: The path marking mechanism is made of plastic and steel pipe materials with relatively high hardness.
10. A method for marking a cable path using the cable path marking device according to any one of claims 1 to 9, characterized in that: The steps are as follows: S01: Clamp the transmitter of the cable path detector to one end of the cable whose cable path needs to be marked; S02: Connect the fixing buckle (3) on the path marking mechanism to the middle position of the cable path detector receiver, so that the display screen connecting rod (11) is placed in the handheld handle (24); S03: Adding marking material into the loading barrel (4); S04: Turn on the receiver (1), mark along the displayed path on the receiver (1), and complete the marking of the entire cable path; S05: Install identification plates or identification stakes at corresponding positions according to the marked path.