Clinical project form management method and system
By generating unique coding and recording editing history for clinical project target forms, the complexity and difficulty of tracing project target forms in clinical trials are solved, and efficient form management and traceability are achieved.
Patent Information
- Application Number
- CN202310627380.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-30
- Publication Date
- 2024-12-03
AI Technical Summary
During clinical trials, the existing technology failed to effectively manage and trace project target forms, resulting in complex process management and difficult to trace.
By generating a unique code for each online application project target form, and monitoring and recording each edit in real time, the full process management and traceability of the project target form can be achieved.
It improves the efficiency of applying for project target forms, ensures that each form has a unique identification and generation time, facilitates traceability and search and editing users, and realizes the safe and controllable and full-process management of project target forms.
Smart Images

Figure CN119067088A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information technology, and in particular to a clinical project form management method and system. Background Art
[0002] During the clinical trial process, processes such as drug management classification, distribution methods, drug receipt confirmation, inventory replenishment methods, drug distribution rules, drug packaging, drug destruction, and drug sample retention all need to be recorded using clinical quality control forms so that when unpredictable situations occur, the problem can be traced back to the source, so that changes or corrections can be made, or experience can be learned.
[0003] However, at present, there is no effective process management for each project goal form, and the project goal form is often modified and replaced, which increases the complexity of process management. Therefore, a clinical project form management method is proposed. Summary of the invention
[0004] This manual provides a clinical project form management method and system, which adds a unique code and generation time to each project target form applied for online, can trace every change, and realize the full process management of each project target form.
[0005] In a first aspect, this specification provides a clinical project form management method, comprising the following steps:
[0006] Get the user's project form request information;
[0007] Determining a requested project form template based on the project form request information;
[0008] Automatically generate a project target form by combining a clinical project database, the project form template, and the project form request information, and generate a unique code corresponding to the project target form;
[0009] The unique code is bound to the project target form and sent to a user-specified channel.
[0010] Optionally, the method of obtaining the user's project form request information includes receiving the project form request information input by the user, and / or receiving the project form request information checked by the user.
[0011] Optionally, determining the requested project form template based on the project form request information comprises the following steps:
[0012] Determine the type of the project form request information;
[0013] A corresponding project form template is matched based on the type of the project form request information.
[0014] Optionally, after matching the corresponding project form template based on the type of the project form request information, the method further includes:
[0015] The project form template is edited online based on the project form request information, and the online personalized editing includes deletion, addition, modification, and replacement.
[0016] Optionally, the step of binding the unique code to the project target form and sending the form to a user-specified channel comprises the following steps:
[0017] Obtaining the generation time of the project target form;
[0018] Adding the generation time and the unique code to the setting area of the project target form, and updating the project target form;
[0019] The updated project target form generates a snapshot, saves it, and sends it to the user's designated channel.
[0020] Optionally, the step of generating a snapshot of the updated project target form and saving it, and sending it to a user-specified channel, comprises the following steps:
[0021] Generate a snapshot of the updated project target form and save it;
[0022] Comparing the generation time with a preset time interval to determine the preset time interval corresponding to the generation time;
[0023] Determining a user-specified channel based on a preset time interval corresponding to the generation time;
[0024] The updated project target form is sent through the user specified channel.
[0025] Optionally, determining the user-specified channel based on a preset time interval corresponding to the generation time includes the following steps:
[0026] Obtain a mapping relationship between the preset time interval and the user-specified channel; the preset time interval includes working hours and non-working hours; the user-specified channel includes email and mini-program; the mapping relationship includes: when the generation time belongs to the working hours, sending the project target form via email; when the generation time belongs to the non-working hours, sending the project target form via the mini-program.
[0027] Optionally, after the unique code is bound to the project target form and sent to the user-specified channel, the following steps are included:
[0028] Real-time monitoring of the project target form uploaded by the user after the Nth (N=1) edit;
[0029] Generate a second target code based on the first target code and the encrypted information of the uploading user; the first target code includes the unique code of the uploaded edited project target form;
[0030] The second target code is bound to the project target form and sent to a user-specified channel.
[0031] Optionally, the step of binding the second target code to the project target form and sending the form to a user-specified channel comprises the following steps:
[0032] Real-time monitoring of the project target form uploaded by the user after the Nth (N>1)th editing;
[0033] Returns the request form information for getting the user's project.
[0034] In a second aspect, this specification also provides a clinical project form management system, which is applied to the above-mentioned clinical project form management method, including:
[0035] A form request acquisition module, configured to acquire project form request information of a user;
[0036] a project form template determination module configured to determine a requested project form template based on the project form request information;
[0037] A project target form code generation module, configured to automatically generate a project target form in combination with a clinical project database, the project form template, and the project form request information, and to generate a unique code corresponding to the project target form;
[0038] The sending module is configured to bind the unique code with the project target form and send it to a user-specified channel.
[0039] In summary, the present application includes at least one of the following beneficial technical effects:
[0040] Online application for project target forms can improve application efficiency; the project target form carries a first unique identifier and generation time. After editing and uploading again, the system generates a new target code, i.e., the second target code, based on the first unique identifier and the information of the uploading user. This allows one form and one number to be achieved, making it easy to trace the source, and to find and edit user forms safely and controllably; snapshots generated by the project target form are sorted and saved by generation time. Of course, the unique codes and snapshots can also be listed in a chart and sorted by generation time. This makes it easy to understand the status of the project target form over a period of time and facilitates traceability. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0042] Figure 1 is a flow chart of a clinical project form management method according to an embodiment of the present invention;
[0043] Figure 2 It is one of the project target forms of a clinical project form management method according to an embodiment of the present invention;
[0044] Figure 3 This is the second project target form of a clinical project form management method according to an embodiment of the present invention;
[0045] Figure 4 It is a module block diagram of a clinical project form management system according to an embodiment of the present invention.
[0046] Figure numerals: 1. Form request acquisition module; 2. Project form template determination module; 3. Project target form code generation module; 4. Sending module. DETAILED DESCRIPTION
[0047] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0048] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0049] This manual provides a clinical project form management method. Figure 1 1 is a flow chart of a clinical project form management method according to an embodiment of the present invention, comprising the following steps:
[0050] S101: Obtaining the user's project form request information;
[0051] Optionally, a method of obtaining the user's project form request information includes receiving the project form request information input by the user, and / or receiving the project form request information checked by the user.
[0052] In the specific implementation of this specification, users can select the project form request method according to their own needs and preferences. The project form request information input by the user is more personalized; the project form request information selected by the user is more accurate and can quickly lock the project form.
[0053] S102: Determine the requested project form template based on the project form request information;
[0054] Optionally, step S102 includes the following sub-steps:
[0055] Determine the type of information requested by the project form;
[0056] Match the corresponding project form template based on the type of project form request information.
[0057] In a specific implementation of the present specification, the project form request information is parsed, information that can determine the project form type is obtained therefrom, and the user's needs are determined based on the information that can determine the project form type. A project form template library is pre-set, which includes a mapping relationship between the project form type and the project form template, which can be one-to-one or one-to-many. Therefore, the project form template can be determined by memorizing the type of the project form request information.
[0058] Optionally, after S102, the following steps are also included:
[0059] The project form template is edited online based on the project form request information. The online personalized editing includes deletion, addition, modification and replacement.
[0060] In the specific implementation of the present specification, when the current project form template does not meet the project form request information, the project form template can be edited online when applying for the first time. Of course, in order to ensure the reliability of the project form template, the marking range can be set in advance, and the project form template can be set as an editable area and a non-editable area. The non-editable area includes fixed items of the project form template and cannot be changed. The editable area includes personalized setting items of the project form template, which can be adjusted according to actual needs.
[0061] S103: automatically generating a project target form in combination with the clinical project database, the project form template, and the project form request information, and generating a unique code corresponding to the project target form;
[0062] In a specific implementation of the present specification, corresponding information is obtained from a clinical project database based on the project form request information, and the information is displayed on a project form template, thereby obtaining a project target form that meets the project form request information input by the user.
[0063] S104: Bind the unique code to the project target form and send it to the user-specified channel.
[0064] Optionally, S104 specifically includes the following steps:
[0065] Get the generation time of the project target form;
[0066] Add the generation time and unique code to the setting area of the project target form and update the project target form;
[0067] Generate a snapshot of the updated project target form, save it, and send it to the user's specified channel.
[0068] In a specific implementation manner of this specification, the project target form can be a clinical trial quality control form. Of course, it can also be other medical-related forms, which will not be described in detail here. The generation time and unique code are added to the project target form so that they can be traced later. The snapshots generated by the project target form are sorted and saved according to the generation time. Of course, the unique codes and snapshots can also be listed in a chart and sorted according to the generation time. In this way, it is convenient to understand the situation of the project target form within a period of time, and it is convenient to trace the source. Specifically, the unique code and generation time can be added to the footer of the project target form.
[0069] Optionally, a snapshot of the updated project target form is generated and saved, and sent to a user-specified channel, including the following steps:
[0070] Generate a snapshot of the updated project target form and save it;
[0071] Compare the generation time with the preset time interval to determine the preset time interval corresponding to the generation time;
[0072] Determine the user-specified channel based on a preset time interval corresponding to the generation time;
[0073] Send the updated project goal form through the user-specified channel.
[0074] Optionally, determining the user-specified channel based on a preset time interval corresponding to the generation time includes the following steps:
[0075] Get the mapping relationship between the preset time interval and the user-specified channel; the preset time interval includes working hours and non-working hours; the user-specified channel includes email and mini program; the mapping relationship includes: when the generation time belongs to working hours, the project target form is sent via email; when the generation time belongs to non-working hours, the project target form is sent via mini program.
[0076] In the specific implementation of this specification, working hours and non-working hours are set according to the user's working habits. During working hours, users can easily receive information through work software, that is, mailboxes, internal work software, DingTalk, etc. During non-working hours, users generally log out of work software and cannot receive information through work software in the first time. Therefore, the designated channel can be set to mini-programs, text messages, etc. Specifically, working hours can be 9:00-17:00 from Monday to Friday, and non-working hours are 17:00-9:00 from Monday to Friday, all day on Saturday, and all day on Sunday.
[0077] Optional, after S104, Figure 2 It is one of the project target forms of a clinical project form management method according to an embodiment of the present invention, and comprises the following steps:
[0078] Real-time monitoring of the project target form uploaded by the user after the Nth (N=1) edit;
[0079] Generate a second target code based on the first target code and the encrypted information of the uploading user; the first target code includes the unique code of the uploaded edited project target form;
[0080] The second target code is bound to the project target form and sent to the user-specified channel.
[0081] Optionally, the second target code is bound to the project target form and sent to the user-specified channel. Figure 3 This is the second project target form of a clinical project form management method according to an embodiment of the present invention, comprising the following steps:
[0082] Real-time monitoring of the project target form uploaded by the user after the Nth (N>1) edit;
[0083] Returns the request form information for getting the user's project.
[0084] In the specific implementation of this specification, when the user uploads the project target form after the first edit, a new target code, i.e., the second target code, is generated by combining the first target code and the information of the uploading user (including the key), so that one form has one number, which is convenient for tracing and finding the editing user. When the user uploads the project target form after the second edit, the project target form is re-applied. That is, it can be ensured that each project target form can be uniquely identified, thereby realizing the management of the entire process of each project target form.
[0085] At the same time, the paper documents corresponding to each signed and approved project target form need to be kept in the document room for traceability.
[0086] In this manual, the project target form is applied for online, which can improve the application efficiency; the project target form has a first unique identifier and generation time. After editing and uploading again, the system generates a new target code based on the first unique identifier and the information of the uploading user, that is, the second target code, so that one form has one number, which is convenient for traceability, and the search and editing of user forms is safe and controllable; the snapshots generated by the project target form are saved and sorted by generation time. Of course, the unique codes and snapshots can also be listed in a chart and sorted by generation time. This makes it convenient to understand the situation of the project target form over a period of time and facilitates traceability.
[0087] The present application also discloses a clinical project form management system, which is applied to the above-mentioned clinical project form management method, including:
[0088] The form request acquisition module 1 is configured to acquire the project form request information of the user;
[0089] A project form template determination module 2, configured to determine a requested project form template based on the project form request information;
[0090] A project target form code generation module 3 is configured to automatically generate a project target form in combination with a clinical project database, a project form template, and project form request information, and to generate a unique code corresponding to the project target form;
[0091] The sending module 4 is configured to bind the unique code with the project target form and send it to the user-specified channel.
[0092] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0093] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A clinical project form management method, characterized in that: The following steps are involved: Get the user's project form request information; Determining a requested project form template based on the project form request information; Automatically generate a project target form by combining a clinical project database, the project form template, and the project form request information, and generate a unique code corresponding to the project target form; The unique code is bound to the project target form and sent to a user-specified channel.
2. The clinical project form management method according to claim 1, characterized in that: The method of obtaining the user's project form request information includes receiving the project form request information input by the user and / or receiving the project form request information selected by the user.
3. The clinical project form management method according to claim 1, characterized in that: The step of determining the requested project form template based on the project form request information comprises the following steps: Determine the type of the project form request information; A corresponding project form template is matched based on the type of the project form request information.
4. The clinical project form management method according to claim 1, characterized in that: After the type of the project form request information is matched with the corresponding project form template, the following steps are included: The project form template is edited online based on the project form request information, and the online personalized editing includes deletion, addition, modification, and replacement.
5. The clinical project form management method according to claim 1, characterized in that: The step of binding the unique code to the project target form and sending the form to a user-specified channel includes the following steps: Obtaining the generation time of the project target form; Adding the generation time and the unique code to the setting area of the project target form, and updating the project target form; The updated project target form generates a snapshot, saves it, and sends it to the user's designated channel.
6. The clinical project form management method according to claim 1, characterized in that: The step of generating a snapshot of the updated project target form and saving it, and sending it to a user-specified channel, includes the following steps: Generate a snapshot of the updated project target form and save it; Comparing the generation time with a preset time interval to determine the preset time interval corresponding to the generation time; Determining a user-specified channel based on a preset time interval corresponding to the generation time; The updated project target form is sent through the user specified channel.
7. The clinical project form management method according to claim 1, characterized in that: The determining of the user-specified channel based on the preset time interval corresponding to the generation time comprises the following steps: Obtain a mapping relationship between the preset time interval and the user-specified channel; the preset time interval includes working hours and non-working hours; the user-specified channel includes email and mini-program; the mapping relationship includes: when the generation time belongs to the working hours, sending the project target form via email; when the generation time belongs to the non-working hours, sending the project target form via the mini-program.
8. The clinical project form management method according to claim 1, characterized in that: After the unique code is bound to the project target form and sent to the user-specified channel, the following steps are included: Real-time monitoring of the project target form uploaded by the user after the Nth (N=1) edit; Generate a second target code based on the first target code and the encrypted information of the uploading user; the first target code includes the unique code of the uploaded edited project target form; The second target code is bound to the project target form and sent to a user-specified channel.
9. The clinical project form management method according to claim 1, characterized in that: The step of binding the second target code to the project target form and sending the form to a user-specified channel comprises the following steps: Real-time monitoring of the project target form uploaded by the user after the Nth (N>1)th editing; Returns the request form information for getting the user's project.
10. A clinical project form management system, applied to the clinical project form management method described in any one of claims 1 to 9, characterized in that: include: A form request acquisition module (1), configured to acquire project form request information of a user; A project form template determination module (2), configured to determine a requested project form template based on the project form request information; A project target form code generation module (3), configured to automatically generate a project target form by combining the clinical project database, the project form template, and the project form request information, and to generate a unique code corresponding to the project target form; The sending module (4) is configured to bind the unique code with the project target form and send it to a user-specified channel.
