Tower grounding device corrosion risk assessment method, device, equipment and medium
The corrosion risk assessment of grounding devices is simplified through hierarchical analysis method and fuzzy evaluation method, solving the problem of time-consuming existing evaluation methods, and improving the evaluation efficiency and grid safety.
Patent Information
- Application Number
- CN202411150964.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-12-03
AI Technical Summary
The existing corrosion evaluation methods for grounding devices have a large amount of workload and time-consuming, especially in the evaluation of the grounding devices of towers in mountainous areas, there are problems of large labor and material consumption.
The hierarchical analysis method is used to determine the weight vector of risk factors, and fuzzy evaluation is performed based on the membership function and hierarchical weights, and the corrosion risk assessment level and final assessment results are calculated to simplify the evaluation process.
It effectively reduces the evaluation workload and time-consuming, improves the evaluation efficiency, prevents electrical accidents, and improves the safe operation of transmission lines and the efficiency of power grid management.
Smart Images

Figure CN119067445A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present disclosure relate to the technical field of corrosion assessment, and in particular to a method, device, equipment and medium for assessing the corrosion risk of a tower grounding device. Background Art
[0002] The grounding device of the transmission line tower is an important part of the transmission line. It is the general term for the grounding body and the grounding down conductor. Its function is to conduct lightning current into the ground to maintain a certain lightning resistance level of the line, ensure that the lightning current is reliably discharged into the earth, protect the insulation of the line equipment, reduce the lightning trip rate of the line, improve the operation reliability and avoid personal injury caused by step voltage. Therefore, the reliability and safety performance of the grounding device are highly valued by the electrical engineering community. However, the grounding device is always buried in a harsh soil environment and is easily corroded, and the corrosion of the grounding device is affected by many factors. Corrosion will cause the grounding conductor to dissolve, the properties of the metal material will be destroyed, and the conductor cross-section that is too small cannot withstand the high amplitude lightning current and fault current, which will bury the hidden danger of the safe current carrying of the grounding conductor. In severe cases, it may even cause the conductor to break, causing the grounding device to fail. Therefore, it is very important to evaluate the corrosion state of the grounding device in the grounding network.
[0003] Existing grounding device corrosion assessment: The first method is usually achieved through underground excavation. However, excavation is only carried out when an electrical accident occurs. If the tower grounding device is located in a mountainous area, this method is not only labor-intensive and material-intensive, but also limited by the on-site environment. The second method is to conduct a large number of tests on the grounding resistance of the grounding device, which is cumbersome. Summary of the invention
[0004] The embodiments of the present disclosure provide a method, device, equipment and medium for evaluating the corrosion risk of a tower grounding device, which solve the problems of large workload and long time consumption in existing methods for evaluating the corrosion risk of grounding devices.
[0005] In a first aspect, a method for assessing the corrosion risk of a tower grounding device is provided, comprising:
[0006] Acquire a risk set of a pole tower grounding device, the risk set including at least one risk factor, and for each of the risk factors, when the risk factor includes at least two risk indicators, determine a first weight vector of each risk indicator in the risk factor using a hierarchical analysis method;
[0007] For each of the risk indicators in the risk factors, a fuzzy evaluation result of the risk indicator is determined according to a membership function corresponding to the risk indicator and a grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device;
[0008] Determining the assessment level of the risk factor according to the fuzzy assessment results of each of the risk indicators and the first weight vector;
[0009] The corrosion risk assessment result of the tower grounding device is determined according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor; the second weight vector is determined by the hierarchical analysis method.
[0010] In a second aspect, a tower grounding device corrosion risk assessment device is provided, comprising:
[0011] A first weight vector determination module is used to obtain a risk set of a tower grounding device, wherein the risk set includes at least one risk factor, and for each of the risk factors, when the risk factor includes at least two risk indicators, a first weight vector of each risk indicator in the risk factor is determined by using a hierarchy analysis method;
[0012] A fuzzy evaluation result determination module is used to determine the fuzzy evaluation result of the risk indicator for each of the risk indicators in the risk factors according to the membership function corresponding to the risk indicator and the grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device;
[0013] An evaluation level determination module, used to determine the evaluation level of the risk factor according to the fuzzy evaluation results of each risk indicator and the first weight vector;
[0014] The corrosion risk assessment result determination module is used to determine the corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor; the second weight vector is determined by the hierarchical analysis method.
[0015] According to a third aspect, an electronic device is provided, the electronic device comprising:
[0016] one or more processors;
[0017] A storage device for storing one or more programs;
[0018] When the one or more programs are executed by the one or more processors, the one or more processors implement the corrosion risk assessment method for the tower grounding device described in the first aspect above.
[0019] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the program is executed by a processor, the method for assessing the corrosion risk of a tower grounding device described in the first aspect of the embodiment of the present disclosure is implemented.
[0020] In a fifth aspect, a computer program product is provided, the computer program product comprising a computer program, and when the computer program is executed by a processor, the method for assessing the corrosion risk of a tower grounding device described in the first aspect is implemented.
[0021] The disclosed embodiments provide a method, device, equipment and medium for evaluating the corrosion risk of a pole tower grounding device, including: obtaining a risk set of the pole tower grounding device, the risk set including at least one risk factor, for each of the risk factors, when the risk factor includes at least two risk indicators, using a hierarchical analysis method to determine a first weight vector of each risk indicator in the risk factor; for each of the risk indicators in the risk factors, determining a fuzzy evaluation result of the risk indicator according to a membership function corresponding to the risk indicator and a grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the pole tower grounding device; determining an evaluation grade of the risk factor according to the fuzzy evaluation result of each risk indicator and the first weight vector; determining a corrosion risk evaluation result of the pole tower grounding device according to the evaluation grade of each risk factor and a second weight vector corresponding to each risk factor; the second weight vector is determined by the hierarchical analysis method. The technical solution uses the hierarchical analysis method to determine the first weight vector of each risk indicator in the risk factors, and calculates the fuzzy evaluation results of each risk indicator, determines the evaluation level of each risk factor according to the first weight vector and the fuzzy evaluation results, and determines the corrosion risk evaluation results according to the evaluation level of each risk factor and the second weight vector, so as to solve the problems of large workload and long time consumption of the existing evaluation methods for the corrosion risk of grounding devices, prevent the occurrence of electrical accidents, and have important engineering significance for improving the safe operation efficiency of transmission lines and the management of power grid enterprises.
[0022] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present disclosure, nor is it intended to limit the scope of the embodiments of the present disclosure. Other features of the embodiments of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0024] Figure 1 It is a flow chart of a method for evaluating the corrosion risk of a tower grounding device provided in the first embodiment of the present disclosure;
[0025] Figure 2 is a schematic diagram of a risk set provided by Embodiment 1 of the present disclosure;
[0026] Figure 3 It is a process schematic diagram of a method for assessing the corrosion risk of a tower grounding device provided in the first embodiment of the present disclosure;
[0027] Figure 4 It is a structural schematic diagram of a tower grounding device corrosion risk assessment device provided in the second embodiment of the present disclosure;
[0028] Figure 5 It is a structural diagram of an electronic device provided in Embodiment 3 of the present disclosure. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the solutions of the embodiments of the present disclosure, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only embodiments of a part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the embodiments in the embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the embodiments of the present disclosure.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the embodiments of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products, or devices.
[0031] Embodiment 1
[0032] Figure 1 This is a flow chart of a method for evaluating the corrosion risk of a pole tower grounding device provided in the first embodiment of the present disclosure. This embodiment is applicable to the situation where the corrosion risk of a pole tower grounding device is to be evaluated. The method can be executed by a device for evaluating the corrosion risk of a pole tower grounding device. The device for evaluating the corrosion risk of a pole tower grounding device can be implemented in the form of hardware and / or software. The device for evaluating the corrosion risk of a pole tower grounding device can be configured in an electronic device. Electronic devices include but are not limited to computers, terminals, servers and other devices with data processing capabilities. Figure 1As shown, the method includes:
[0033] S110, obtaining a risk set of a tower grounding device, the risk set including at least one risk factor, and for each risk factor, when the risk factor includes at least two risk indicators, using a hierarchical analysis method to determine a first weight vector of each risk indicator in the risk factor.
[0034] In this embodiment, the pole tower grounding device may be an important component of the transmission line. The pole tower grounding device may include a grounding body and a grounding down conductor. Its main function is to conduct lightning current into the ground, protect the insulation of line equipment, reduce the line lightning trip rate, and improve the reliability of operation. A risk set of the pole tower grounding device may be obtained, wherein the risk set may be a set of factors that have a corrosion risk to the pole tower grounding device. The risk set may include at least one risk factor. For each risk factor, the risk factor may include a risk indicator. The risk indicator may be an indicator that can be quantitatively measured in the risk factor. It should be noted that the risk factor may not include a risk indicator.
[0035] Exemplarily, risk factors may include: soil corrosion, cathodic protection, coating protection and / or stray current interference; for the risk factor of soil corrosion, risk indicators such as soil resistivity, hydrogen ion concentration index (pH value), water content and / or salt content may be included; for the risk factor of coating protection, risk indicators such as coating peeling rate and coating blistering rate may be included.
[0036] It can be known that when the risk factor includes at least two risk indicators, the first weight vector of each risk indicator in the risk factor can be determined by using the analytic hierarchy process. The analytic hierarchy process (AHP) can be a multi-criteria decision analysis method, which decomposes complex problems into multiple components by establishing a hierarchical model, and forms a multi-level analysis structure model according to the mutual correlation and affiliation between the factors. It needs to be explained that when the traditional AHP determines the weight, the judgment matrix is constructed by comparing the factors in pairs, and its level is 1-9. Compared with the traditional analytic hierarchy process, the analytic hierarchy process used in this embodiment changes the 9 magnitudes of the judgment matrix to 3 magnitudes, and it is more convenient to construct the judgment matrix, which reduces the influence of the expert's subjective consciousness on the evaluation results, and the calculation results do not need consistency verification, which improves the accuracy and has better applicability. The first weight vector can be the weight vector of each risk indicator in the risk set.
[0037] Figure 2 A schematic diagram of a risk set provided for this embodiment, such as Figure 2As shown, the risk set may include: soil corrosion A, cathodic protection B, coating protection C and stray current interference D, wherein soil corrosion A may include soil resistivity A1, pH value A2, water content A3 and salt content A4, and coating protection C may include coating peeling rate C1 and coating blistering rate C2.
[0038] S120. For each risk indicator in the risk factors, a fuzzy evaluation result of the risk indicator is determined according to a membership function corresponding to the risk indicator and a grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device.
[0039] In this embodiment, when the risk factors include at least two risk indicators, for each risk indicator in the risk factors, the fuzzy evaluation result of the risk indicator can be determined according to the membership function corresponding to the risk indicator and the level weight corresponding to the risk indicator, wherein the membership function can be used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device, and the commonly used membership functions include triangular distribution function, trapezoidal distribution function and normal distribution function. Exemplarily, the membership can be obtained by the triangular distribution function, and its mean square error can be 0.27, which can be expressed as:
[0040]
[0041] Through R1, it can be determined that in the triangular distribution membership function with a mean square error of 0.27, the fuzziness of the influence degree of each influencing factor in each level is shown in Table 1:
[0042] Table 1 The fuzziness of the influence degree of each influencing factor
[0043]
[0044] By normalizing R1, we can get the membership function, which can be expressed as:
[0045]
[0046] Following the above description, after obtaining the membership function, the level weight corresponding to the risk indicator can be determined by the membership function. It includes 5 levels, which can be expressed as: Q N (N=I, II, III, IV, V), where the five level weights can be specifically described as:
[0047]
[0048] Among them, the level weight Q N It can be used to express the fuzziness of the degree of influence of each influencing factor at each level.
[0049] In this embodiment, the level weight of the risk indicator can be determined according to a preset level classification standard, wherein the preset level classification standard can be a pre-set classification level standard. Table 2 is a preset level classification standard provided in this embodiment, as shown in Table 2:
[0050] Table 2 Preset level classification standards
[0051]
[0052] Among them, the preset level classification standards shown include risk factors, risk indicators and classification levels; risk factors include at least one of the following: soil corrosion, cathodic protection, coating protection stray current interference; risk indicators of soil corrosion include at least one of the following: soil resistivity, pH value, water content, salt content; risk indicators of coating protection include at least one of the following: coating peeling rate, coating blistering rate.
[0053] For example, the soil resistivity measured on site is 150Ω.m, and compared with the preset grade classification standard table, it is the second grade. Then the grade weight corresponding to the risk indicator of soil resistivity is Q II The fuzzy evaluation result can be determined by the product of the membership function corresponding to the risk index and the grade weight corresponding to the risk index, that is, the fuzzy evaluation result of soil resistivity can be expressed as:
[0054] G A1 =Q Ⅱ R
[0055] S130: Determine the assessment level of the risk factor according to the fuzzy assessment results of each risk indicator and the first weight vector.
[0056] It can be known that after obtaining the fuzzy evaluation results of each risk indicator, the evaluation level of the risk factor can be determined according to the fuzzy evaluation results of each risk and the first weight vector.
[0057] S140. Determine a corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and a second weight vector corresponding to each risk factor; the second weight vector is determined by a hierarchical analysis method.
[0058] Specifically, after obtaining the assessment level of each risk factor, the corrosion risk assessment result of the tower grounding device can be determined by the assessment level of each risk factor and the second weight vector corresponding to each risk factor, wherein the second weight vector can be determined by the hierarchical analysis method.
[0059] Exemplarily, the product of each risk factor assessment level and the second weight vector may be calculated, and the maximum value of the product of each risk factor assessment level and the second weight vector may be selected to determine the corrosion risk assessment result of the tower grounding device according to the maximum value.
[0060] The present embodiment provides a method for assessing the corrosion risk of a pole tower grounding device, comprising: obtaining a risk set of the pole tower grounding device, the risk set comprising at least one risk factor, for each of the risk factors, when the risk factor comprises at least two risk indicators, determining a first weight vector of each risk indicator in the risk factor by using a hierarchical analysis method; for each of the risk indicators in the risk factors, determining a fuzzy assessment result of the risk indicator according to a membership function corresponding to the risk indicator and a grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the pole tower grounding device; determining an assessment grade of the risk factor according to the fuzzy assessment results of each of the risk indicators and the first weight vector; determining a corrosion risk assessment result of the pole tower grounding device according to the assessment grade of each of the risk factors and a second weight vector corresponding to each of the risk factors; the second weight vector is determined by the hierarchical analysis method, so as to solve the problems of large workload and long time consumption of the existing assessment method for the corrosion risk of the grounding device, prevent the occurrence of electrical accidents, and have important engineering significance for improving the safe operation efficiency of the transmission line and the management of the power grid enterprise.
[0061] As an optional implementation manner, the tower grounding device corrosion risk assessment method provided in this embodiment may also include:
[0062] For each risk factor, when the risk factor does not include a risk indicator, the measured value of the risk factor is compared with a preset grade classification standard to determine the assessment grade of the risk factor.
[0063] It should be noted that when the risk factor does not include a risk indicator, the measured value of the risk factor can be compared with a preset grade classification standard to determine the assessment grade of the risk factor.
[0064] For example, for cathodic protection B, the actual measured data is 1.0, which can determine that the risk factor of cathodic protection B is level 2 in the preset level classification standard, and further confirm that the assessment level of cathodic protection B is level 2.
[0065] In one embodiment, the determining the first weight vector of each risk indicator in the risk factor by using the analytic hierarchy process includes:
[0066] a1) determining a comparison matrix of the risk factors; the comparison matrix includes the comparison results of the importance of any two risk indicators;
[0067] In this embodiment, when the risk factors include at least two risk indicators, the comparison matrix of the risk factors can be determined according to the comparison result of the importance of any two risk indicators.
[0068] For example, by comparing the four risk indicators of soil corrosion A: soil resistivity A1, pH value A2, water content A3 and salt content A4, a comparison matrix can be established as follows:
[0069]
[0070] In the comparison matrix, i can represent the comparison matrix M A The row j can represent the comparison matrix M A If risk indicator i is less important than risk indicator j, then a ij =0; if risk indicator i is as important as risk indicator j, then a ij =1; if risk indicator i is more important than risk indicator j, then a ij =2.
[0071] b1) determining the importance ranking index of each risk indicator according to the comparison matrix;
[0072] Specifically, after the comparison matrix is obtained, the importance ranking index of each risk indicator can be determined according to the obtained comparison matrix, wherein the importance ranking index is used to determine the importance or priority of each risk indicator.
[0073] For example, the importance ranking index of risk indicator i can be expressed as:
[0074]
[0075] c1) determining a first weight vector for each risk indicator according to the importance ranking index.
[0076] Specifically, after obtaining the importance ranking index of each risk indicator, the judgment matrix K can be established according to the importance ranking index. A , where the judgment matrix K A Each element in can be represented as k ij , where i can represent the judgment matrix K A The row j can represent the judgment matrix K A Column, k ij It can be expressed as:
[0077]
[0078] Among them, λ max =max{λ i},λmin =max{λ i},
[0079] Following the above description, after obtaining the judgment matrix, the transfer matrix Z can be established based on the judgment matrix A , where Z A The elements of can be expressed as z ij , z ij It can be expressed as:
[0080] z ij =lgk ij
[0081] In the transfer matrix Z A After that, we can use the transfer matrix Z A Calculate the optimal transfer matrix H A , where H A The elements of h can be expressed as ij ,h ij It can be expressed as:
[0082]
[0083] For example, when i=1, j=2, (Z 1n -Z 2n ) is Z A In the matrix (Z 11 -Z 21 )、(Z 12 -Z 22 )、(Z 13 -Z 23 )、(Z 14 -Z 24 ). After obtaining the optimal transfer matrix H A After that, we can use the optimal transfer matrix H A Determine the quasi-optimal consistent matrix S A , S A The elements in are s ij , as shown below:
[0084]
[0085] Following the above description, after obtaining the quasi-optimal consistent matrix, the eigenvector of the quasi-optimal consistent matrix can be calculated, so that the first weight vectors of the four risk indicators under soil corrosion A can be obtained: soil resistivity A1, pH value A2, water content A3 and salt content A4. For each risk indicator, the corresponding first weight vector can be expressed as P Ai , P Ai It can be expressed as:
[0086]
[0087] Then the first weight vector P A It can be expressed as:
[0088] P A =(P A1 ,P A2 ,P A3 ,P A4 )
[0089] It should be explained that for the risk factor of soil corrosion A, the first weight vector of soil corrosion can be established according to the above steps. At the same time, the comparison matrix of the two risk indicators of coating protection C can also be established according to the above steps, and then the first weight vector of the two risk indicators can be calculated. At the same time, the comparison matrix of the risk factors of soil corrosion A, cathodic protection B of grounding device, coating protection C, and stray current interference D can also be established to calculate the second weight vector of the risk factor.
[0090] In one embodiment, determining the assessment level of the risk factor according to the fuzzy assessment results of each of the risk indicators and the first weight vector includes:
[0091] a2) vertically splicing the fuzzy evaluation results corresponding to each risk indicator to construct an evaluation matrix;
[0092] Specifically, after the fuzzy evaluation results corresponding to the risk indicators are obtained by calculation, the fuzzy evaluation results corresponding to the risk indicators can be vertically spliced to construct an evaluation matrix.
[0093] For example, taking soil corrosion A as an example, the evaluation results corresponding to the four risk indicators in soil corrosion A can be expressed as G A1 , G A2 , G A3 , G A4 , then the evaluation matrix F can be expressed as:
[0094]
[0095] b2) determining a first comprehensive evaluation vector according to the evaluation matrix and the first weight vector;
[0096] Specifically, after obtaining the evaluation matrix, the first comprehensive evaluation vector can be determined according to the obtained evaluation matrix and the first weight vector. Exemplarily, the product of the evaluation matrix and the first weight vector can be determined as the first comprehensive evaluation vector, wherein the first comprehensive evaluation vector can be a vector that evaluates the risk factors according to the risk indicators.
[0097] Exemplarily, the first comprehensive evaluation vector can be expressed as:
[0098] G A =P A F
[0099] Among them, P A It can be the first weight vector, and F can be the evaluation matrix corresponding to the risk indicator.
[0100] c2) comparing the first evaluation value satisfying the first preset condition in the first comprehensive evaluation vector with a preset evaluation level to determine the evaluation level of the risk factor.
[0101] In this embodiment, after obtaining the first comprehensive evaluation vector by calculation, the first evaluation value in the first comprehensive evaluation vector that satisfies the first preset condition can be determined, wherein the first evaluation value can be the value in the first comprehensive evaluation vector that satisfies the first preset condition, and the first preset condition can be a condition for screening the evaluation values in the first comprehensive evaluation vector. Exemplarily, the first preset condition can be selecting the maximum value in the first comprehensive evaluation vector.
[0102] Continuing with the above description, after the first evaluation value is determined, the first evaluation value can be compared with the preset evaluation level, and then the evaluation level corresponding to the risk factor can be determined, wherein the evaluation level can include the first evaluation value and the evaluation level; the preset evaluation level can be a pre-set evaluation level, and the preset evaluation level can determine different evaluation levels according to different values.
[0103] Exemplarily, the preset assessment levels may include 5 levels: level 1: very low (numerical range of 0-0.2), level 2: low (numerical range of 0.2-0.4), level 3: medium (numerical range of 0.4-0.6), level 4: high (numerical range of 0.6-0.8), level 5: very high (numerical range of 0.8-1.0). If the first assessment value corresponding to the soil corrosion risk factor is 0.5, it can be determined that the assessment level of the soil corrosion risk factor is medium (0.5).
[0104] In one embodiment, determining the corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor includes:
[0105] A second comprehensive evaluation vector is determined according to the evaluation level of the risk factor and the second weight vector of the risk factor, and a second evaluation value that meets the second preset condition in the second comprehensive evaluation vector is compared with the preset evaluation level to determine the corrosion risk assessment result of the tower grounding device.
[0106] Specifically, after obtaining the evaluation level of each risk factor, the second comprehensive evaluation vector can be determined according to the evaluation level of each risk factor and the second weight vector of the risk factor. The second weight vector can be a weight vector for representing each risk factor calculated by the analytic hierarchy process. The second comprehensive evaluation vector can be a vector for evaluating the corrosion risk of the tower grounding device according to the risk factors.
[0107] Following the above description, after obtaining the second comprehensive evaluation vector, the second evaluation value can be determined according to the second preset condition. The second evaluation value can be a value in the second comprehensive evaluation vector that satisfies the second preset condition. The second preset condition can be a condition for screening the evaluation values in the second comprehensive evaluation vector. Exemplarily, the second preset condition can be selecting the maximum value in the second comprehensive evaluation vector. After the second evaluation value is determined, the second evaluation value can be compared with the preset evaluation level to determine the corrosion risk assessment result of the tower grounding device.
[0108] Figure 3 A schematic diagram of a process of a tower grounding device corrosion risk assessment method provided in this embodiment, such as Figure 3 As shown, the risk set of the tower grounding device can be obtained, a comparison matrix can be established according to the risk set, an importance ranking index can be calculated according to the comparison matrix, a judgment matrix can be established according to the importance ranking index, a transfer matrix can be established according to the judgment matrix, an optimal transfer matrix can be established according to the transfer matrix, a quasi-optimal consistent matrix can be determined according to the optimal transfer matrix, and a first weight vector of the risk indicator and a second weight vector of the risk factor can be calculated according to the quasi-optimal consistent matrix. According to the risk set, a preset evaluation level can be determined, and according to the preset level classification standard, the risk indicator is evaluated based on the first weight vector and the evaluation level to obtain the evaluation level of the risk factor, and the risk factor is evaluated based on the second weight vector and the evaluation level of the risk factor to obtain the grounding device corrosion risk assessment result, which solves the problem of cumbersome test engineering of the evaluation method for the corrosion state of the grounding device in the prior art, and can effectively reduce the failure rate of the grounding device, and achieve the purpose of moving from passive maintenance (replacement) to active electrical accident prevention.
[0109] Embodiment 2
[0110] Figure 4 is a schematic diagram of the structure of a tower grounding device corrosion risk assessment device provided in the second embodiment of the present disclosure; Figure 4 As shown, the device includes: a first weight vector determination module 210, a fuzzy evaluation result determination module 220, an evaluation level determination module 230, and a corrosion risk assessment result determination module 240.
[0111] The first weight vector determination module 210 is used to obtain a risk set of the tower grounding device, wherein the risk set includes at least one risk factor, and for each of the risk factors, when the risk factor includes at least two risk indicators, a first weight vector of each risk indicator in the risk factor is determined by using a hierarchical analysis method;
[0112] A fuzzy evaluation result determination module 220 is used to determine the fuzzy evaluation result of the risk indicator for each of the risk indicators in the risk factors according to the membership function corresponding to the risk indicator and the grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device;
[0113] An evaluation level determination module 230, configured to determine the evaluation level of the risk factor according to the fuzzy evaluation results of each risk indicator and the first weight vector;
[0114] The corrosion risk assessment result determination module 240 is used to determine the corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor; the second weight vector is determined by the hierarchical analysis method.
[0115] A second embodiment of the present disclosure provides a tower grounding device corrosion risk assessment device to solve the problem that the existing grounding device corrosion risk assessment method has a large workload and is time-consuming.
[0116] Optionally, the first weight vector determining module 210 is further configured to:
[0117] Determine a comparison matrix of the risk factors; the comparison matrix includes the importance comparison results of any two risk indicators;
[0118] Determine the importance ranking index of each risk indicator according to the comparison matrix;
[0119] A first weight vector of each risk indicator is determined according to the importance ranking index.
[0120] Optionally, the evaluation level determination module 230 is used to:
[0121] Vertically splicing the fuzzy evaluation results corresponding to each risk indicator to construct an evaluation matrix;
[0122] Determine a first comprehensive evaluation vector according to the evaluation matrix and the first weight vector;
[0123] The first evaluation value satisfying the first preset condition in the second comprehensive evaluation vector is compared with a preset evaluation level to determine the evaluation level of the risk factor.
[0124] Optionally, the corrosion risk assessment result determination module 240 is used to:
[0125] A second comprehensive evaluation vector is determined according to the evaluation level of the risk factor and the second weight vector of the risk factor, and a second evaluation value that meets the second preset condition in the second comprehensive evaluation vector is compared with the preset evaluation level to determine the corrosion risk assessment result of the tower grounding device.
[0126] Optionally, the device further comprises:
[0127] The risk factor comparison module is used to compare the measured value of each risk factor with a preset grade classification standard to determine the assessment grade of the risk factor when the risk factor does not include a risk indicator.
[0128] Optionally, the level weight of the risk indicator is determined according to a preset level classification standard, and the preset level classification standard includes risk factors, risk indicators and classification levels;
[0129] The risk factors include at least one of the following: soil corrosion, cathodic protection, coating protection stray current interference;
[0130] The risk index of soil corrosion includes at least one of the following: soil resistivity, pH value, water content, and salt content;
[0131] The risk index of coating protection includes at least one of the following: coating peeling rate and coating blistering rate.
[0132] The tower grounding device corrosion risk assessment device provided in the embodiments of the present disclosure can execute the tower grounding device corrosion risk assessment method provided in any embodiment of the present disclosure, and has the corresponding functional modules and beneficial effects of the execution method.
[0133] Embodiment 3
[0134] Figure 5 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the embodiments of the present disclosure described and / or claimed herein.
[0135] like Figure 5As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0136] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0137] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microprocessor, etc. The processor 11 executes the various methods and processes described above, such as a tower grounding device corrosion risk assessment method.
[0138] In some embodiments, the tower grounding device corrosion risk assessment method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the tower grounding device corrosion risk assessment method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the tower grounding device corrosion risk assessment method in any other appropriate manner (e.g., by means of firmware).
[0139] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0140] The computer programs for implementing the methods of the embodiments of the present disclosure may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0141] In the context of the disclosed embodiments, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device, or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0142] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0143] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0144] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0145] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in the embodiments of the present disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions of the embodiments of the present disclosure can be achieved, and this document does not limit this.
[0146] The above specific implementations do not constitute a limitation on the protection scope of the embodiments of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the embodiments of the present disclosure shall be included in the protection scope of the embodiments of the present disclosure.
[0147] The embodiments of the present disclosure also provide a computer program product, including a computer program and / or instructions, which, when executed by a processor, implements the tower grounding device corrosion risk assessment method provided in any embodiment of the present application.
[0148] In the process of implementation, the computer program product can be written in one or more programming languages or a combination thereof to write computer program codes for performing the operation of the disclosed embodiments, the programming languages including object-oriented programming languages, such as Java, Smalltalk, C++, and also including conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (e.g., using an Internet service provider to connect through the Internet).
[0149] Note that the above are only preferred embodiments of the embodiments of the present disclosure and the technical principles used. Those skilled in the art will understand that the embodiments of the present disclosure are not limited to the specific embodiments herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the embodiments of the present disclosure. Therefore, although the embodiments of the present disclosure are described in more detail through the above embodiments, the embodiments of the present disclosure are not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the embodiments of the present disclosure, and the scope of the embodiments of the present disclosure is determined by the scope of the attached claims.
Claims
1. A method for assessing the corrosion risk of a tower grounding device, characterized in that: include: Acquire a risk set of a pole tower grounding device, the risk set including at least one risk factor, and for each of the risk factors, when the risk factor includes at least two risk indicators, determine a first weight vector of each risk indicator in the risk factor using a hierarchical analysis method; For each of the risk indicators in the risk factors, a fuzzy evaluation result of the risk indicator is determined according to a membership function corresponding to the risk indicator and a grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device; Determining the assessment level of the risk factor according to the fuzzy assessment results of each of the risk indicators and the first weight vector; Determining a corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and a second weight vector corresponding to each risk factor; The second weight vector is determined by a hierarchy analysis method.
2. The method according to claim 1, characterized in that The method of using the analytic hierarchy process to determine the first weight vector of each risk indicator in the risk factor includes: Determine a comparison matrix of the risk factors; the comparison matrix includes the importance comparison results of any two risk indicators; Determine the importance ranking index of each risk indicator according to the comparison matrix; A first weight vector of each risk indicator is determined according to the importance ranking index.
3. The method according to claim 1, characterized in that Determining the assessment level of the risk factor according to the fuzzy assessment results of each of the risk indicators and the first weight vector includes: Vertically splicing the fuzzy evaluation results corresponding to each risk indicator to construct an evaluation matrix; Determine a first comprehensive evaluation vector according to the evaluation matrix and the first weight vector; The first evaluation value satisfying the first preset condition in the first comprehensive evaluation vector is compared with a preset evaluation level to determine the evaluation level of the risk factor.
4. The method according to claim 1, characterized in that: The step of determining the corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor includes: A second comprehensive evaluation vector is determined according to the evaluation level of the risk factor and the second weight vector of the risk factor, and a second evaluation value that meets the second preset condition in the second comprehensive evaluation vector is compared with the preset evaluation level to determine the corrosion risk assessment result of the tower grounding device.
5. The method according to claim 1, characterized in that The method further comprises: For each risk factor, when the risk factor does not include a risk indicator, the measured value of the risk factor is compared with a preset grade classification standard to determine the assessment grade of the risk factor.
6. According to the method of claim 1, the level weight of the risk indicator is determined according to a preset level classification standard; The preset classification standards include risk factors, risk indicators and classification levels; The risk factors include at least one of the following: soil corrosion, cathodic protection, coating protection stray current interference; The risk index of soil corrosion includes at least one of the following: soil resistivity, pH value, water content, and salt content; The risk index of coating protection includes at least one of the following: coating peeling rate and coating blistering rate.
7. A tower grounding device corrosion risk assessment device, characterized in that: include: A first weight vector determination module is used to obtain a risk set of a tower grounding device, wherein the risk set includes at least one risk factor, and for each of the risk factors, when the risk factor includes at least two risk indicators, a first weight vector of each risk indicator in the risk factor is determined by using a hierarchy analysis method; A fuzzy evaluation result determination module is used to determine the fuzzy evaluation result of the risk indicator for each of the risk indicators in the risk factors according to the membership function corresponding to the risk indicator and the grade weight corresponding to the risk indicator; the membership function is used to reflect the fuzziness of the risk indicator to the corrosion rate of the tower grounding device; An evaluation level determination module, used to determine the evaluation level of the risk factor according to the fuzzy evaluation results of each risk indicator and the first weight vector; A corrosion risk assessment result determination module, used to determine the corrosion risk assessment result of the tower grounding device according to the assessment level of each risk factor and the second weight vector corresponding to each risk factor; The second weight vector is determined by a hierarchy analysis method.
8. An electronic device, characterized in that: include: one or more processors; A storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the tower grounding device corrosion risk assessment method as described in any one of claims 1-6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method for assessing the corrosion risk of a tower grounding device as described in any one of claims 1 to 6 is implemented.
10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the computer program implements the tower grounding device corrosion risk assessment method as claimed in any one of claims 1 to 6.
Citation Information
Cited By
Device and method for detecting corrosion state of grounding resistor of power transmission, transformation and distribution equipment
CN120414915A