Quality and quality double-control water resource simulation and regulation method

The integration of water storage power technology with green power generation and transfer reservoirs optimizes water resource allocation and use, addressing terrain constraints and energy inefficiencies, and enhances water management efficiency and ecological stability.

CN119067515APending Publication Date: 2024-12-03GUIZHOU WATER CONSERVANCY RES INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411100072.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing water resource management systems face challenges in efficiently allocating and utilizing water resources due to terrain constraints and excessive energy consumption in water diversion, particularly in water-scarce areas, and the inefficiency of storing excess electricity for hydropower generation.

Method used

A water resource simulation and regulation method that integrates water storage power technology with green power generation, utilizing transfer and reserve reservoirs to store and redistribute water resources during low-peak electricity consumption or surplus periods, prioritizing water allocation based on value and importance, and simulating spatiotemporal curves to optimize water use.

Benefits of technology

This method enhances water resource management by reducing water shortages, optimizing water use, and addressing ecological and environmental impacts through efficient water redistribution and storage, while minimizing energy consumption and flood control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067515A_ABST
    Figure CN119067515A_ABST
Patent Text Reader

Abstract

The invention relates to the field of water resource regulation and control, in particular to a quantity and quality double-control water resource simulation and regulation and control method, which comprises the following steps of: refining a region into a plurality of grids, counting the distribution and action conditions of water resource sources in the region, and evaluating and marking values and importance degrees of different action water resources; acquiring time-space curves of water resource transfer, consumption and supplement of each grid in the area, and simulating a grid water resource change trend based on a data empirical model in previous years; building a transit reservoir for storing electric energy by water, wherein the transit reservoir is used for transferring water resources in the electricity utilization low-peak period or the green power generation surplus period; reserve reservoirs are arranged in the grids, the transfer reservoirs are communicated with the reserve reservoirs through water supply channels, the reserve maintenance time of the reserve reservoirs is calculated based on the change trend of water resources of the grids, and the reserve reservoirs are supplemented by the transfer reservoirs. By adopting the technical scheme of the invention, water resources can be regulated and controlled by combining with a water storage electric energy technology in a power utilization low-peak period or a green power generation surplus period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of water resource regulation, and in particular to a water resource simulation and regulation method for dual-control of quantity and quality. Background Art

[0002] The water resources system is a complex system that is jointly affected by natural and human factors, including surface water, groundwater, rainfall, evapotranspiration and other components. With the development of the economy and society and the growth of population, the demand for water resources is increasing, and at the same time, problems such as water shortage and water pollution are becoming increasingly prominent. In order to rationally allocate and efficiently utilize water resources and achieve sustainable utilization of water resources, it is necessary to use advanced technical means to simulate and analyze water resources. The core of water resources simulation is to establish mathematical models to describe the physical processes and behavioral characteristics of water resources systems through mathematical equations and algorithms. These models can include distributed hydrological models, water resources allocation models, water quality models, etc., which are used to simulate the circulation process, allocation schemes and water quality changes of water resources, so as to predict water resources in the region and plan regulation policies. Water resources regulation uses spatial analysis technologies such as geographic information systems to scientifically plan water resources. By analyzing the distribution, demand, supply and other conditions of water resources, a reasonable water resources utilization plan is formulated to achieve the rational allocation and efficient utilization of water resources.

[0003] In the prior art, for example, patent publication number CN117852977A discloses a water resource simulation and regulation method with dual quantity and quality control, which simulates and regulates the use and consumption calculation of various water resources in the region, and transfers water resources through water diversion and lifting projects. However, water resource transfer is often constrained by terrain. Some water-scarce areas are unable to establish water diversion projects, which leads to water shortages. Overcoming the terrain problem of transporting water resources through mechanical drive also leads to excessive energy consumption.

[0004] Water storage power is a storage technology used to solve the problem that excess electricity can only be released but not stored and utilized. It converts electricity into water transportation, allowing the water body to store gravitational potential energy, and then releases the water body to generate electricity through hydropower. With the transformation of energy structure, green power generation accounts for an increasingly high proportion, and hydropower occupies an important position in green power generation. Its power generation is affected by precipitation, and its peak power generation coincides with the flood season. Based on this, a water resource simulation and regulation method with dual control of quantity and quality is needed that can adapt to the green power generation mode and optimize the water resource regulation effect. Summary of the invention

[0005] To solve the above problems, the present invention provides a water resource simulation and regulation method with dual control of quantity and quality, which regulates water resources by combining it with water storage power technology during low-peak electricity consumption or green power generation surplus period.

[0006] In order to achieve the above object, the technical solution of the present invention is as follows: a water resources simulation and regulation method with dual quantity and quality control, comprising the following steps:

[0007] Step 1: Water resource simulation: Divide the region into multiple grids, count the distribution and role of water resources in the region, mark the water resource growth, reserve and water resource reserves of different roles in the grid, and evaluate and mark the value and importance of water resources of different roles;

[0008] Step 2: Simulation of spatiotemporal curves of water resources: Collect the spatiotemporal curves of water resource transfer, consumption and replenishment in each grid in the region, and simulate the trend of grid water resource changes based on the empirical model of previous years’ data;

[0009] Step 3: Water resource transfer planning: Build a transfer reservoir for water storage and electricity. The transfer reservoir is used to transfer water resources during low-peak electricity consumption or green power generation surplus periods;

[0010] Step 4: Water resource regulation: There are reserve reservoirs in each grid. The transit reservoirs are connected to the reserve reservoirs through water supply channels. The reserve reservoirs are used to supplement water resources with different functions. The reserve maintenance time of the reserve reservoirs is calculated based on the trend of water resource changes in the grid. The transit reservoirs give priority to supplementing the reserve reservoirs with short reserve maintenance time. In the dry season, the reserve reservoirs give priority to supplying water resources with high water resource value and importance.

[0011] The above scheme has the following beneficial effects:

[0012] 1. This plan divides the region into multiple grids to obtain detailed water resource information in the region, so as to understand the water resource situation in each grid and facilitate the subsequent regulation of water resources. The grid will obtain a certain amount of water resources and meet a certain consumption with precipitation and runoff flow. When the grid cannot meet its own consumption, the water resource regulation will improve the water use situation in the grid to solve the problem of water resource shortage. There are many uses for water resources, so it is necessary to clarify the use of water resources and the corresponding value and importance, so as to make the regulation of water resources more valuable rather than ineffective.

[0013] 2. This scheme simulates the time-space curve of water resources to obtain the changing trend of water resources, so as to reserve or call water resources in advance or in time to solve the problem of water shortage. The function of the transfer reservoir is to convert electricity into the gravitational potential energy of the water body for energy storage. The transfer reservoir is usually built on the mountain. The water in the transfer reservoir is accumulated during the low-peak period of electricity consumption or the green power generation surplus period. Due to the high storage position, it is easy to transfer, and the gravitational potential energy can be directly used to generate water resources flow to complete the redistribution of water resources. The green power generation surplus period is often a period of high precipitation, so there is a large amount of surplus energy and water in this period. Through the transfer reservoir, the water resources are allocated to the reserve reservoir in the grid for storage, so that in the subsequent dry season, the water resource shortage problem of the grid can be solved directly from the reserve reservoir without the need for additional long-distance water transfer. Through the simulation of the changing trend of water resources, the water resource problems in each grid can be estimated, so that enough water can be accumulated during the green power generation surplus period to reduce the impact of water resource shortage.

[0014] Compared with the existing technology, the green power generation surplus period often has a large amount of surplus energy and water resources. By utilizing the principle of water storage of electricity, the transit reservoir can complete the work of electricity storage and water resource transfer. By transferring a large amount of water resources for storage during the green power generation surplus period, the reserve reservoir can be used in time to call on water resources when there is a shortage of water resources in the subsequent grid, thereby reducing the impact of water resource shortage.

[0015] Furthermore, the roles of water resources include residential use, shipping, climate regulation, ecological purification, ecological maintenance, cultural tourism, plant irrigation and industrial consumption.

[0016] Beneficial effects: Classifying water resources by their functions can better assess their value and importance.

[0017] Furthermore, the value of water resources is assessed by dividing the generated value by the amount of water resources required, and the importance is assessed by the impact on human activities.

[0018] Beneficial effects: The value of water resources needs to be calculated in combination with the value it generates and the amount of water resources required, so as to balance the value differences caused by different water consumption in different activities. The importance is assessed based on the impact on human activities, with people as the core. Water resource regulation is mainly to reduce the impact on human activities and to generate economic value as a supplement.

[0019] Furthermore, in step three, the spatiotemporal curve of water resource transfer volume of the transit reservoir is collected and counted; and the supply allocation of the reserve reservoir is adjusted based on the water resource transfer volume of the transit reservoir.

[0020] Beneficial effects: The spatiotemporal curve of water resource transfer in the transit reservoir is collected to obtain information on the amount of water resources that can be called upon. The supply allocation of the reserve reservoir is adjusted based on the water resource transfer amount of the transit reservoir to ensure that water resources will not be consumed too quickly and cause serious water shortages.

[0021] Furthermore, in step three, according to the spatiotemporal curve of water resource transfer in the transit reservoir, the proportion of different green power generation types is planned based on climate characteristics, and the trough area of ​​the spatiotemporal curve of water resource transfer in the transit reservoir is filled.

[0022] Beneficial effects: Sole hydropower generation will lead to a significant reduction in the water resources available in the transit reservoir during the low period. Therefore, the time-space curve of the water resource transfer volume of the transit reservoir can be used to judge the low-season climate, and green power generation equipment can be supplemented based on the climate to improve the water resource regulation carrying capacity during the low period.

[0023] Furthermore, in step three, the transfer reservoir is also used to reduce the flood water level.

[0024] Beneficial effects: The transfer reservoir transfers a large amount of water resources during the green power generation surplus period, which often coincides with the flood season. Therefore, it is possible to reduce the impact of floods by transferring part of the flood season river water.

[0025] Furthermore, in step 4, based on the spatiotemporal curve of water resource transfer in the transit reservoir, during the period of surplus water resource transfer, the reserve reservoir will give priority to increasing the proportion of water resources used for climate regulation, ecological purification and ecological maintenance.

[0026] Beneficial effects: The transfer reservoir transfers a large amount of water resources during the green power generation surplus period, which may fill the reserve reservoir. Therefore, increasing the proportion of water resources in the reserve reservoir for climate regulation, ecological purification and ecological maintenance can not only store excess water, but also alleviate ecological pollution and maintain ecological stability.

[0027] Furthermore, in step one, the water resource pollution purification capacity in the region and the pollution emissions in the grid water resources are counted; during the period of surplus water resource transfer, the reserve reservoir allocates the transferred water resources according to the gap in the pollution purification capacity of each grid water resource.

[0028] Beneficial effects: The environment in each grid is different, and the amount of pollution generated is different. During the period of surplus water resource transfer, the amount of water resources transferred is allocated according to the gap in water resource pollution purification capacity of each grid, thereby alleviating the pollution level in heavily polluted areas.

[0029] Furthermore, irrigation water quotas are formulated in the region, and irrigation water is allocated based on the spatiotemporal curve of water resource transfer in the transit reservoir.

[0030] Beneficial effects: The amount of irrigation water varies greatly with the hydrological year, so it is necessary to specify an irrigation water quota, and then combine the spatiotemporal curve of water resource transfer in the transit reservoir to make a reasonable water demand forecast.

[0031] Furthermore, based on the spatiotemporal curve of water resource transfer in the transit reservoir, the irrigation water demand is predicted. When the irrigation water demand in the subsequent low period of the spatiotemporal curve of water resource transfer in the transit reservoir cannot be met, the irrigation water use method is optimized and the loss coefficient is reduced to meet the irrigation water demand in the low period.

[0032] Beneficial effects: Due to the existence of reserve reservoirs, the time point of insufficient irrigation water supply can be alleviated even during the water shortage period. In the implementation of irrigation water, the irrigation water use method affects the water resource consumption. Therefore, it is possible to deploy and optimize the irrigation water use method within the buffer period provided by the reserve reservoir to reduce irrigation water consumption and thus alleviate the problem of insufficient water supply.

[0033] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of an embodiment of a water resources simulation and regulation method for dual quantity and quality control of the present invention; DETAILED DESCRIPTION

[0035] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] The following is further described in detail through specific implementation methods:

[0039] As attached Figure 1 As shown: A water resources simulation and regulation method with dual quantity and quality control includes the following steps:

[0040] Step 1: Water resource simulation: Divide the area into multiple grids, and count the distribution and functions of water resources in the area. The sources include precipitation, runoff, groundwater and glacier melting, and the functions include residential use, shipping, climate regulation, ecological purification, ecological maintenance, cultural tourism, plant irrigation and industrial consumption. Mark the water resource growth, reserve and water resource reserves with different functions in the grid, evaluate and mark the value and importance of water resources with different functions, where the value of water resources is evaluated by dividing the generated value by the required amount of water resources, and the importance is evaluated by the impact on human activities.

[0041] By subdividing the region into multiple grids, we can grasp the detailed water resource information in the region, so as to understand the water resource situation in each grid and facilitate the subsequent regulation of water resources. The grid will obtain a certain amount of water resources and meet a certain consumption with precipitation and runoff flow. When the grid cannot meet its own consumption, the water use situation in the grid can be improved by regulating water resources to solve the problem of water shortage. There are many uses for water resources. Classifying water resources by their functions can better evaluate the value and importance of their generation, so as to make the regulation of water resources more valuable rather than ineffective. The value of water resources needs to be calculated in combination with the value it generates and the amount of water resources required, so as to balance the value differences brought about by different water consumption in different activities. For example, the value generated by shipping is large, but the water consumption is also huge, so the value generated is not high. The importance is evaluated based on the impact on human activities, with people as the core. For example, the importance of meeting the drinking water and necessary water for life of residents is high, the importance of producing necessities for human life is high, and the importance of maintaining cultural tourism is low. Water resource regulation is mainly to reduce the impact on human activities and generate economic value as a supplement.

[0042] In step one, the pollution purification capacity of water resources in the region and the pollution discharge in the grid water resources are counted.

[0043] Pollution emissions are also an important indicator. Wetlands and lakes formed by water resources have a certain ability to purify pollution. Therefore, when conducting water resource statistics, it is necessary to evaluate the pollution emissions and purification levels within the regional grid.

[0044] Step 2: Simulate the spatiotemporal curve of water resources: collect the spatiotemporal curves of water resource transfer, consumption and replenishment for each grid in the region, and simulate the changing trend of grid water resources based on the empirical model of previous years' data.

[0045] By simulating the time-space curve of water resources, we can obtain the changing trend of water resources, so that water resources can be reserved or called in advance or in time to solve the problem of water shortage.

[0046] Step three, water resource transfer planning: construct a transfer reservoir for water storage and electricity. The transfer reservoir is used to transfer water resources during low-peak electricity consumption periods or green power generation surplus periods.

[0047] The function of the transfer reservoir is to convert electricity into the gravitational potential energy of the water body for energy storage. The transfer reservoir is usually built on the mountain. The water in the transfer reservoir is accumulated during the low-peak period of electricity consumption or the period of green power generation surplus. Due to the high storage location, it is easy to transfer and can directly use the gravitational potential energy to generate water resource flow to complete water resource redistribution.

[0048] Step 4: Water resource regulation: There are reserve reservoirs in each grid. The transit reservoirs are connected to the reserve reservoirs through water supply channels. The reserve reservoirs are used to supplement water resources with different functions. The reserve maintenance time of the reserve reservoirs is calculated based on the trend of water resource changes in the grid. The transit reservoirs give priority to supplementing the reserve reservoirs with short reserve maintenance time. In the dry season, the reserve reservoirs give priority to supplying water resources with high water resource value and importance.

[0049] The green power generation surplus period is often a period of high rainfall, so there is a large amount of surplus energy and water in this period. Through the transfer reservoir, the water resources are allocated to the reserve reservoir in the grid for storage, so that in the subsequent dry season, the water resource shortage problem of the grid can be solved directly from the reserve reservoir without the need for additional long-distance water transfer. By simulating the changing trend of water resources, it is possible to estimate the water resource problems in each grid, so as to accumulate enough water during the green power generation surplus period and reduce the impact of water resource shortage. During the dry season, by allocating the water in the reserve reservoir, water resources are reasonably allocated to their functions, and the priority of supply is evaluated by value and importance, thereby improving the regulation value of water resources and ensuring that water resources can be used efficiently.

[0050] In step three, the spatiotemporal curve of water resource transfer from the transit reservoir is collected and counted, and the supply allocation of the reserve reservoir is adjusted based on the water resource transfer from the transit reservoir.

[0051] The spatiotemporal curve of water resource transfer volume of the transit reservoir is collected to obtain the information of water resource volume that can be used. The supply allocation of the reserve reservoir is adjusted based on the water resource transfer volume of the transit reservoir to ensure that water resources will not be consumed too quickly and cause serious water shortage.

[0052] In step three, according to the spatiotemporal curve of water resource transfer in the transit reservoir, the proportion of different green power generation types is planned based on climate characteristics, and the trough area of ​​the spatiotemporal curve of water resource transfer in the transit reservoir is filled.

[0053] Solely relying on hydropower generation will lead to a significant reduction in the water resources available in the transit reservoir during the low period. Therefore, the spatiotemporal curve of water resource transfer in the transit reservoir can be used to judge the climate during the low period, and green power generation equipment can be supplemented based on the climate to improve the water resource regulation capacity during the low period.

[0054] In step three, the transfer reservoir is also used to reduce flood water levels.

[0055] The transfer reservoir transfers a large amount of water resources during the green power generation surplus period, which often coincides with the flood season. Therefore, it is possible to reduce the impact of floods by transferring part of the river water during the flood season.

[0056] In step 4, based on the spatiotemporal curve of water resource transfer in transit reservoirs, during periods of surplus water resource transfer, reserve reservoirs give priority to increasing the proportion of water resources used for climate regulation, ecological purification and ecological maintenance. Reserve reservoirs allocate transferred water resources based on the gap in water resource pollution purification capacity in each grid.

[0057] The transfer reservoir transfers a large amount of water resources during the green power generation surplus period, which may fill the reserve reservoir. Therefore, increasing the proportion of water resources in the reserve reservoir for climate regulation, ecological purification and ecological maintenance can not only store excess water, but also alleviate ecological pollution and maintain ecological stability. The environment in each grid is different, and the amount of pollution generated is different. During the period of surplus water resource transfer, the amount of transferred water resources is allocated according to the gap in the water resource pollution purification capacity of each grid, thereby alleviating the pollution level in the heavily polluted areas.

[0058] Formulate irrigation water quotas in the region and allocate irrigation water based on the spatiotemporal curve of water resource transfer in transit reservoirs.

[0059] The amount of irrigation water varies greatly with the hydrological year, so it is necessary to specify an irrigation water quota, and then combine the spatiotemporal curve of water resource transfer in the transit reservoir to make a reasonable water demand forecast.

[0060] Based on the spatiotemporal curve of water resource transfer in the transit reservoir, the irrigation water demand is predicted. When the irrigation water demand in the subsequent low period of the spatiotemporal curve of water resource transfer in the transit reservoir cannot be met, the irrigation water use method is optimized and the loss coefficient is lowered to meet the irrigation water demand in the low period.

[0061] Due to the existence of reserve reservoirs, the shortage of irrigation water can be alleviated even during the water shortage period. In the implementation of irrigation water, the irrigation water use method affects the water resource consumption. Therefore, within the buffer period provided by the reserve reservoir, the optimized irrigation water use method can be deployed to reduce irrigation water consumption, thereby alleviating the problem of insufficient water supply.

[0062] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A water resources simulation and regulation method with dual control of quantity and quality, It is characterized in that The following steps are involved: Step 1: Water resource simulation: Divide the region into multiple grids, count the distribution and role of water resources in the region, mark the water resource growth, reserve and water resource reserves of different roles in the grid, and evaluate and mark the value and importance of water resources of different roles; Step 2: Simulation of spatiotemporal curves of water resources: Collect the spatiotemporal curves of water resource transfer, consumption and replenishment in each grid in the region, and simulate the trend of grid water resource changes based on the empirical model of previous years’ data; Step 3: Water resource transfer planning: Build a transfer reservoir for water storage and electricity. The transfer reservoir is used to transfer water resources during low-peak electricity consumption or green power generation surplus periods; Step 4: Water resource regulation: There are reserve reservoirs in each grid. The transit reservoirs are connected to the reserve reservoirs through water supply channels. The reserve reservoirs are used to supplement water resources with different functions. The reserve maintenance time of the reserve reservoirs is calculated based on the trend of water resource changes in the grid. The transit reservoirs give priority to supplementing the reserve reservoirs with short reserve maintenance time. In the dry season, the reserve reservoirs give priority to supplying water resources with high water resource value and importance.

2. The water resources simulation and regulation method for dual control of quantity and quality according to claim 1, It is characterized in that The functions of water resources include residential use, shipping, climate regulation, ecological purification, ecological maintenance, cultural tourism, plant irrigation and industrial consumption.

3. The water resources simulation and regulation method for dual control of quantity and quality according to claim 2, It is characterized in that The value of water resources is assessed by dividing the generated value by the amount of water resources required, and the importance is assessed based on the impact on human activities.

4. The water resources simulation and regulation method for dual quantity and quality control according to claim 3, It is characterized in that In step three, the spatiotemporal curve of water resource transfer in the transit reservoir is collected and counted; the supply allocation of the reserve reservoir is adjusted based on the water resource transfer in the transit reservoir.

5. The water resources simulation and regulation method for dual control of quantity and quality according to claim 4, It is characterized in that In step three, according to the spatiotemporal curve of water resource transfer in the transit reservoir, the proportion of different green power generation types is planned based on climate characteristics, and the trough area of ​​the spatiotemporal curve of water resource transfer in the transit reservoir is filled.

6. The water resources simulation and regulation method for dual quantity and quality control according to claim 5, It is characterized in that In step three, the transfer reservoir is also used to reduce flood water levels.

7. The water resources simulation and regulation method for dual quantity and quality control according to claim 6, It is characterized in that In step 4, based on the spatiotemporal curve of water resource transfer in the transit reservoir, during the period of surplus water resource transfer, the reserve reservoir will give priority to increasing the proportion of water resources used for climate regulation, ecological purification and ecological maintenance.

8. The water resources simulation and regulation method for dual quantity and quality control according to claim 7, It is characterized in that In step one, the water pollution purification capacity in the region and the pollution emissions in the grid water resources are counted; during the period of surplus water resource transfer, the reserve reservoir allocates the transferred water resources according to the gap in the pollution purification capacity of each grid water resource.

9. The water resources simulation and regulation method for dual quantity and quality control according to claim 8, It is characterized in that Formulate irrigation water quotas in the region and allocate irrigation water based on the spatiotemporal curve of water resource transfer in transit reservoirs.

10. The water resources simulation and regulation method for dual control of quantity and quality according to claim 9, It is characterized in that Based on the spatiotemporal curve of water resource transfer in the transit reservoir, the irrigation water demand is predicted. When the irrigation water demand in the subsequent low period of the spatiotemporal curve of water resource transfer in the transit reservoir cannot be met, the irrigation water use method is optimized and the loss coefficient is reduced to meet the irrigation water demand in the low period.

Citation Information

Patent Citations

  • Quality and quality double-control water resource simulation and regulation method

    CN117852977A