Source-load storage configuration scheme for balanced electrolytic aluminum source network-load storage integrated project park
The nonlinear relationship between electrolytic aluminum load and power is linearized by variable replacement method and large M method, which solves the problem of inaccurate model in the prior art, and improves the accuracy of balanced electrolytic aluminum configuration and system optimization effect.
Patent Information
- Application Number
- CN202411104995.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-12-03
AI Technical Summary
In the prior art, the output of the electrolytic aluminum load and the power consumption model are inaccurate, resulting in errors in the configuration of balanced electrolytic aluminum, reducing the output or increasing the power consumption.
The variable replacement method and the large M method are used to linearize the nonlinear system planning and operation model, including the linearization of the nonlinear model and the linearization of segmented functions, through power balance constraints, new energy generator output constraints, and the number of installed capacity of new energy power stations Lower limit constraints, distribution and connection line constraints and unit output variable relationship constraints form a more accurate relationship between electrolytic aluminum load and power.
Reduce errors, provide more accurate relationship between electrolytic aluminum load and power, and improve the accuracy of system optimization planning.
Smart Images

Figure CN119070275A_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park, belonging to the technical field of balanced aluminum electrolytic technology. Background Art
[0002] In the optimization planning model of the existing power grid, the output of the balanced electrolytic aluminum load and its power consumption are often expressed in a linear model. When the steady current control of the saturated reactor is not considered, the two present a nonlinear relationship, and the use of a linear model will result in a large error. The wrong relationship between the output and consumption function will lead to an erroneous estimate of the configuration of the balanced electrolytic aluminum, thereby reducing the output of the balanced electrolytic aluminum or increasing the power consumption. Summary of the invention
[0003] The purpose of the present invention is to provide a source-load-storage configuration solution for a balanced electrolytic aluminum source-grid-load-storage integrated project park, so as to solve the problem of inaccurate modeling of the output of electrolytic aluminum load and its power consumption in the prior art.
[0004] The source-load-storage configuration plan for the balanced electrolytic aluminum source-grid-load-storage integrated project park includes:
[0005] The constraints of the S1 system planning and operation model include power balance constraints, output constraints of new energy generators, upper and lower limits of installed capacity of new energy power stations, distribution transformers and interconnection line constraints, and unit output variable relationship constraints;
[0006] S2 uses variable substitution method and big M method to linearize the constraints of nonlinear system planning and operation model, including nonlinear model linearization and piecewise function linearization.
[0007] S1 includes, the power balance constraint is:
[0008]
[0009] In the formula, is the total output of the k-th thermal power unit in the industrial park in the s-th scenario during the t-th period, Ω G is the model set of thermal power units, is the grid-connected power of the original photovoltaic power station in the industrial park in the sth scenario during period t, is the grid-connected power of the original wind farm in the industrial park in the sth scenario during period t, is the grid-connected power of the newly built photovoltaic power station in the industrial park in the sth scenario during the t period, is the grid-connected power of the newly built wind farm in the industrial park in the sth scenario during period t, is the load regulation power in the industrial park during period t under the sth scenario, is the power purchase power in the industrial park during period t under the sth scenario, is the electrolytic aluminum load power in the industrial park during period t under the sth scenario.
[0010] S1 includes the output constraints of new energy generator sets:
[0011]
[0012] In the formula, is the minimum output of the newly built new energy station, is the output value of the newly built new energy station, is the output forecast value of the newly built new energy station, is the minimum output value of the original new energy station. is the output value of the original new energy station, Output forecast value of existing new energy stations.
[0013] S1 includes the upper and lower limits of the installed capacity of new energy power stations:
[0014]
[0015] In the formula, The upper limit of the installed capacity of new energy power stations is is the lower limit of installed capacity of new energy power stations, n Z It is the installed capacity of newly built new energy power stations.
[0016] S1 includes the following constraints for distribution transformers and tie lines:
[0017]
[0018] In the formula, is the operating capacity of the distribution transformer in period t, cosφ is the power factor on the industrial park side, is the rated capacity of the new distribution transformer, is the rated transmission power of the interconnection line.
[0019] S1 includes the unit output variable relationship constraint:
[0020]
[0021] In the formula, is the predicted output of the jth renewable energy power generation equipment in the new station, n Z,old is the number of original new energy station generators, is the predicted output of the hth generator set of the original new energy station, is the total output of the k-th thermal power unit in period t, q is the number of units, n G,kis the number of k-th type units, is the total output of the qth unit of the kth type in period t.
[0022] S2 includes the actual output of aluminum from the mth electrolytic cell during period t. for:
[0023]
[0024] In the formula, λ1, λ2, λ3, and λ4 are parameters. is the active power consumed by each electrolyzer, Δt is the time period;
[0025] Command Parameters δ t ∈[1,10], when Δt=1, for:
[0026]
[0027] S2 includes, using 10 continuous variables α1, α2, …, α 10 and 9 0-1 variables β1, β2, …, β9 divide [1, 10] into 9 equal segments. Let γ1, γ2, …, γ 10 Be the points of piecewise linearization, let the function for:
[0028]
[0029] In the formula, α p are continuous variables α1, α2, …, α 10 ,γ p are the points α1,γ2,…,α of the piecewise linearization 10 ;
[0030] The additional constraints are:
[0031]
[0032] In the formula, β b are variables β1, β2,…,β9.
[0033] S2 includes, The corresponding piecewise function is:
[0034]
[0035] In the formula, is a 0-1 integer variable, indicating whether the electrolyzer series i is in the normal operation stage in the t period under the s-th scenario. When the variable is 1, it means it is in the relevant stage, and when it is 0, it means it is not in the normal operation stage; is the power of the ith electrolyzer series, is the rated power of the ith electrolyzer series.
[0036] S2 includes, The linearized form is:
[0037]
[0038] In the formula, y1, y2, y3 are 0-1 integer variables, and M is a very large number.
[0039] Compared with the prior art, the present invention has the following beneficial effects: Based on the existing research results, the present invention derives the nonlinear relationship between electrolytic aluminum output and power when steady current control is not considered, and linearizes it, thereby reducing the error and facilitating its application in the system's optimization planning model. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a system architecture diagram of the industrial park to be planned according to the present invention. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] The source-load-storage configuration plan for the balanced electrolytic aluminum source-grid-load-storage integrated project park includes:
[0043] The constraints of the S1 system planning and operation model include power balance constraints, output constraints of new energy generators, upper and lower limits of installed capacity of new energy power stations, distribution transformers and interconnection line constraints, and unit output variable relationship constraints;
[0044] S2 uses variable substitution method and big M method to linearize the constraints of nonlinear system planning and operation model, including nonlinear model linearization and piecewise function linearization.
[0045] S1 includes, the power balance constraint is:
[0046]
[0047] In the formula, is the total output of the k-th thermal power unit in the industrial park in the s-th scenario during the t-th period, Ω G is the model set of thermal power units, is the grid-connected power of the original photovoltaic power station in the industrial park in the sth scenario during period t, is the grid-connected power of the original wind farm in the industrial park in the sth scenario during period t, is the grid-connected power of the newly built photovoltaic power station in the industrial park in the sth scenario during the t period, is the grid-connected power of the newly built wind farm in the industrial park in the sth scenario during period t, is the load regulation power in the industrial park during period t under the sth scenario, is the power purchase power in the industrial park during period t under the sth scenario, is the electrolytic aluminum load power in the industrial park during period t under the sth scenario.
[0048] S1 includes the output constraints of new energy generator sets:
[0049]
[0050] In the formula, is the minimum output of the newly built new energy station, is the output value of the newly built new energy station, is the output forecast value of the newly built new energy station, is the minimum output value of the original new energy station. is the output value of the original new energy station, Output forecast value of existing new energy stations.
[0051] S1 includes the upper and lower limits of the installed capacity of new energy power stations:
[0052]
[0053] In the formula, The upper limit of the installed capacity of new energy power stations is is the lower limit of installed capacity of new energy power stations, n Z It is the installed capacity of newly built new energy power stations.
[0054] S1 includes the following constraints for distribution transformers and tie lines:
[0055]
[0056] In the formula, is the operating capacity of the distribution transformer in period t, cosφ is the power factor on the industrial park side, is the rated capacity of the new distribution transformer, is the rated transmission power of the interconnection line.
[0057] S1 includes the unit output variable relationship constraint:
[0058]
[0059] In the formula, is the predicted output of the jth renewable energy power generation equipment in the new station, n Z,old is the number of original new energy station generators, is the predicted output of the hth generator set of the original new energy station, is the total output of the k-th thermal power unit in period t, q is the number of units, n G,k is the number of k-th type units, is the total output of the qth unit of the kth type in period t.
[0060] S2 includes the actual output of aluminum from the mth electrolytic cell during period t. for:
[0061]
[0062] In the formula, λ1, λ2, λ3, and λ4 are parameters. is the active power consumed by each electrolyzer, Δt is the time period;
[0063] Command Parameters δ t ∈[1,10], when Δt=1, for:
[0064]
[0065] S2 includes, using 10 continuous variables α1, α2, …, α 10 and 9 0-1 variables β1, β2, …, β9 divide [1, 10] into 9 equal segments. Let γ1, γ2, …, γ 10 Be the points of piecewise linearization, let the function for:
[0066]
[0067] In the formula, α p are continuous variables α1, α2, …, α 10 ,γ p are the points γ1,γ2,…,γ of the piecewise linearization 10 ;
[0068] The additional constraints are:
[0069]
[0070] In the formula, β b are variables β1, β2,…,β9.
[0071] S2 includes, The corresponding piecewise function is:
[0072]
[0073] In the formula, is a 0-1 integer variable, indicating whether the electrolyzer series i is in the normal operation stage in the t period under the s-th scenario. When the variable is 1, it means it is in the relevant stage, and when it is 0, it means it is not in the normal operation stage; is the power of the ith electrolyzer series, is the rated power of the ith electrolyzer series.
[0074] S2 includes, The linearized form is:
[0075]
[0076] In the formula, y1, y2, y3 are 0-1 integer variables, and M is a very large number.
[0077] The system architecture of the industrial park to be planned in the present invention is as follows Figure 1 As shown, the original wind farm, the original photovoltaic power station, the thermal power units, the photovoltaic power station to be built, and the wind farm to be built are integrated and allocated to the adjustable electrolytic aluminum load and conventional load. At the same time, the external power grid enters the distribution transformer through the interconnection line and also participates in the planning of the industrial park system architecture.
[0078] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features may be replaced by equivalents, and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. The source-load-storage configuration scheme for the balanced electrolytic aluminum source-grid-load-storage integrated project park is characterized by: include: The constraints of the S1 system planning and operation model include power balance constraints, output constraints of new energy generators, upper and lower limits of installed capacity of new energy power stations, distribution transformers and interconnection line constraints, and unit output variable relationship constraints; S2 uses variable substitution method and big M method to linearize the constraints of nonlinear system planning and operation model, including nonlinear model linearization and piecewise function linearization; The big M method involves adding variables to the constraints, adding terms with M as coefficients to the objective function, treating M as an algebraic symbol to participate in the calculation, and solving it using the simplex method.
2. The source-load-storage configuration scheme for a balanced electrolytic aluminum source-grid-load-storage integrated project park according to claim 1 is characterized in that: S1 includes, the power balance constraint is: In the formula, is the total output of the k-th thermal power unit in the industrial park in the s-th scenario during the t-th period, Ω G is the model set of thermal power units, is the grid-connected power of the original photovoltaic power station in the industrial park in the sth scenario during period t, is the grid-connected power of the original wind farm in the industrial park in the sth scenario during period t, is the grid-connected power of the newly built photovoltaic power station in the industrial park in the sth scenario during the t period, is the grid-connected power of the newly built wind farm in the industrial park in the sth scenario during period t, is the load regulation power in the industrial park during period t under the sth scenario, is the power purchase power in the industrial park during period t under the sth scenario, is the electrolytic aluminum load power in the industrial park during period t under the sth scenario.
3. The source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park according to claim 2 is characterized in that: S1 includes the output constraints of new energy generator sets: In the formula, is the minimum output of the newly built new energy station, is the output value of the newly built new energy station, is the output forecast value of the newly built new energy station, is the minimum output value of the original new energy station. is the output value of the original new energy station, Output forecast value of existing new energy stations.
4. The source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park according to claim 3 is characterized in that: S1 includes the upper and lower limits of the installed capacity of new energy power stations: In the formula, The upper limit of the installed capacity of new energy power stations is is the lower limit of installed capacity of new energy power stations, n Z The installed capacity of newly built new energy power stations.
5. The source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park according to claim 4 is characterized in that: S1 includes the following constraints for distribution transformers and tie lines: In the formula, is the operating capacity of the distribution transformer in period t, cosφ is the power factor on the industrial park side, is the rated capacity of the new distribution transformer, is the rated transmission power of the interconnection line.
6. The source-load-storage configuration scheme for a balanced electrolytic aluminum source-grid-load-storage integrated project park according to claim 5 is characterized in that: S1 includes the unit output variable relationship constraint: In the formula, is the predicted output of the jth renewable energy power generation equipment in the new station, n z,old is the number of original new energy station generators, is the predicted output of the hth generator set of the original new energy station, is the total output of the k-th thermal power unit in period t, q is the number of units, n G,k is the number of k-th type units, is the total output of the qth unit of the kth type in period t.
7. The source-load-storage configuration scheme for a balanced electrolytic aluminum source-grid-load-storage integrated project park according to claim 6 is characterized in that: S2 includes the actual output of aluminum from the mth electrolytic cell during period t. for: In the formula, λ1, λ2, λ3, and λ4 are parameters. is the active power consumed by each electrolyzer, Δt is the time period; Command Parameters When Δt=1, for:
8. The source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park according to claim 7 is characterized in that: S2 includes, using 10 continuous variables α1, α2, …, α 10 and 9 0-1 variables β1, β2, …, β9 divide [1, 10] into 9 equal segments. Let γ1, γ2, …, γ 10 Be the points of piecewise linearization, let the function for: In the formula, α p are continuous variables α1, α2, …, α 10 ,γ p are the points γ1,γ2,…,γ of the piecewise linearization 10 ; The additional constraints are: In the formula, β b are variables β1, β2,…,β9.
9. The source-load-storage configuration scheme for a balanced electrolytic aluminum source-grid-load-storage integrated project park according to claim 8 is characterized in that: S2 includes, The corresponding piecewise function is: In the formula, is a 0-1 integer variable, indicating whether the electrolyzer series i is in the normal operation stage in the t period under the s-th scenario. When the variable is 1, it means it is in the relevant stage, and when it is 0, it means it is not in the normal operation stage; is the power of the ith electrolyzer series, is the rated power of the ith electrolyzer series.
10. The source-load-storage configuration scheme for a balanced aluminum electrolytic source-grid-load-storage integrated project park according to claim 9, characterized in that: S2 includes, The linearized form is: In the formula, y1, y2, y3 are 0-1 integer variables, and M is a very large number.