Centralized shared energy storage frequency modulation optimization configuration method, device, equipment and medium

By calculating the frequency modulation power requirements of the power grid and configuring the energy storage capacity of the new energy station, the problem of low utilization efficiency of energy storage resources in the new energy system is solved, and the efficient utilization of energy storage resources and the flexibility of the power grid is improved.

CN119070335APending Publication Date: 2024-12-03QINGHAI UNIVERSITY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411177141.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing new energy system, the FM storage power station focuses on backup requirements during the declaration cycle in capacity planning, and fails to consider the changes in the upper and lower mileage during the frequency regulation process, resulting in the efficiency of energy storage resource utilization not being optimal, affecting the overall evaluation. .

Method used

By obtaining the operating data of the new energy station group, calculating the primary frequency modulation power and secondary frequency modulation power required by the power grid, determining the charging and discharging targets of the shared energy storage power station, configuring the energy storage capacity based on these goals, and realizing the basic responsibilities of primary frequency modulation and the second Dual functions of sub-frequency modulation and value-added service.

Benefits of technology

It significantly improves the economic benefits of energy storage resources, optimizes resource allocation, enhances the flexibility and stability of the power grid, and improves the utilization efficiency of energy storage resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070335A_ABST
    Figure CN119070335A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of energy storage, in particular to a centralized shared energy storage frequency modulation optimization configuration method and device, equipment and a medium, and the method comprises the steps: obtaining the operation data of each station of a new energy station group; calculating primary frequency modulation power and secondary frequency modulation power required by the power grid according to the operation data; and calculating a charging and discharging target of the shared energy storage power station according to the primary frequency modulation power and the secondary frequency modulation power, and determining energy storage capacity configuration of the shared energy storage power station according to the charging and discharging target. Therefore, the problems of low utilization efficiency of energy storage resources and the like in related technologies are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy storage technology, and in particular to a centralized shared energy storage frequency modulation optimization configuration method, device, equipment and medium. Background Art

[0002] As a high-quality frequency regulation resource with fast response and adjustable parameters, energy storage can provide frequency support to the power grid in low-inertia power systems by injecting a large amount of active power in a short period of time.

[0003] Building a shared energy storage system that serves multiple new energy sites is not only a smart integration of resources, but also a significant improvement in economic benefits. This model maximizes the scale effect by bringing together the regulation needs and power generation potential of multiple sites, thereby effectively reducing marginal costs and expanding economic profit margins. In addition, it goes beyond the boundaries of traditional frequency regulation methods, not only assisting hydropower, thermal power and other controllable energy sources in precise frequency regulation, but also actively exploring frequency regulation energy storage power station solutions tailored for new energy high penetration systems.

[0004] However, the capacity planning of the frequency-regulating energy storage power stations currently configured for new energy systems often focuses on the backup demand within the application period, and lacks detailed consideration of the specific mileage changes during the frequency regulation process. This limitation may lead to the failure to achieve optimal utilization efficiency of energy storage resources, thereby affecting its overall evaluation. Summary of the invention

[0005] The present application provides a centralized shared energy storage frequency modulation optimization configuration method, device, equipment and medium to solve the problem of low utilization efficiency of energy storage resources in related technologies.

[0006] The first aspect of the present application provides a centralized shared energy storage frequency regulation optimization configuration method, comprising the following steps: acquiring operating data of each station in a new energy station group; calculating the primary frequency regulation power and the secondary frequency regulation power required by the power grid based on the operating data; calculating the charging and discharging targets of the shared energy storage power station based on the primary frequency regulation power and the secondary frequency regulation power, and determining the energy storage capacity configuration of the shared energy storage power station based on the charging and discharging targets.

[0007] Optionally, the operating data includes output data and system frequency data of each station on at least one typical day.

[0008] Optionally, the calculation formula of the primary frequency modulation power is:

[0009]

[0010] Among them, P is the actual output of the station, P0 is the initial value of the station active power, K G is the unit adjustment coefficient, f is the current frequency, fu is the upper limit of the primary frequency modulation dead zone, f d It is the lower limit of the primary frequency modulation dead zone;

[0011] The calculation formula of the secondary frequency modulation power is:

[0012]

[0013] Among them, P secd is the power shortage of secondary frequency modulation, K L is the load adjustment factor, f u2 is the upper limit of the maximum frequency adjustment for a single frequency modulation, f d2 It is the lower limit of the maximum frequency adjustment for a single frequency modulation.

[0014] Optionally, the coordination of the primary frequency modulation and the secondary frequency modulation satisfies the following constraints:

[0015]

[0016]

[0017]

[0018]

[0019]

[0020]

[0021]

[0022] in, The power of energy storage replacing the station in the frequency regulation obligation during the t period of a typical day j, The power of wind power with energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j. The power of photovoltaic energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j, is the primary frequency regulation demand generated by the frequency of the energy storage wind power m at the station during the t period of a typical day j, M is the primary frequency regulation demand generated by the frequency of the photovoltaic station n during the t period of a typical day j, j,t,m Whether the energy storage wind power m needs to undertake a frequency regulation obligation during the t period of a typical day j, M j,t,n is whether photovoltaic n needs to bear the obligation of primary frequency regulation during the t period of typical day j; ε is the maximum power ratio coefficient of primary frequency regulation, is the frequency regulation coefficient of wind farm m, is the frequency regulation coefficient of photovoltaic station n, is the installed capacity of wind power m, is the installed capacity of photovoltaic power station n.

[0023] Optionally, if a reverse action of the primary frequency modulation occurs within an adjustment period of the secondary frequency modulation, the secondary frequency modulation is locked.

[0024] Optionally, the constraints of the secondary frequency modulation include:

[0025]

[0026]

[0027] u j,3d+1 =u j,3d+2 =u j,3d+3

[0028]

[0029] Among them, u j,t is a Boolean variable indicating whether to respond to the grid frequency regulation command during the t period of a typical day j, α is the secondary frequency regulation response rate; N t is the number of periods in a typical day; The signal value of energy storage response to secondary frequency modulation in period t of typical day j or the capacity reported a day ago; The secondary frequency modulation power in period t on a typical day j; is the first secondary frequency modulation instruction every 3d minutes, and d is the secondary frequency modulation instruction cycle.

[0030] Optionally, the objective function of the charge and discharge target is:

[0031] minf=C1+C2+C3-B1-B2

[0032]

[0033] Among them, C1 is the annualized investment and operation and maintenance cost of lithium battery energy storage, I is the discount rate, T is the service life of energy storage, and c p is the unit power investment price of energy storage, c e is the unit capacity investment price of energy storage, P max is the rated power of energy storage, E max is the maximum capacity of energy storage, θ is the operation and maintenance cost coefficient;

[0034] C2 is the cost of energy storage to purchase and sell electricity from the grid during the idle period of frequency regulation to maintain the balance of electricity, N d is the number of time periods of a typical day, W j is the number of days in a year for a typical day j, π t is the time-of-use electricity price during period t, is the power purchased and sold by the energy storage during period t on a typical day j

[0035] C3 is the frequency deviation penalty for the energy storage system frequency regulation. is the system frequency deviation after adjustment during period t on a typical day j, p r is the penalty price for system frequency deviation;

[0036] B1 is the capacity price of energy storage responding to secondary frequency regulation, and B2 is the mileage price of energy storage responding to secondary frequency regulation; c sc is the unit price of frequency modulation capacity, c sp is the FM mileage price, D j,t is the frequency modulation mileage during period t on a typical day j.

[0037] The second aspect of the present application provides a centralized shared energy storage frequency regulation optimization configuration device, including: an acquisition module, used to obtain the operating data of each station in a new energy station group; a calculation module, used to calculate the primary frequency regulation power and the secondary frequency regulation power required by the power grid according to the operating data; a determination module, used to calculate the charging and discharging targets of the shared energy storage power station according to the primary frequency regulation power and the secondary frequency regulation power, and determine the energy storage capacity configuration of the shared energy storage power station according to the charging and discharging targets.

[0038] The third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the centralized shared energy storage frequency optimization configuration method as described in the above embodiment.

[0039] The fourth aspect of the present application provides a computer-readable storage medium having a computer program stored thereon, which is executed by a processor to implement the centralized shared energy storage frequency optimization configuration method as described in the above embodiment.

[0040] Therefore, this application includes the following beneficial effects:

[0041] The embodiment of the present application determines the power requirements of primary and secondary frequency regulation of different regulation scales through the regulation coefficients of new energy stations and load sides, and then determines the charging and discharging targets and energy storage capacity configuration of the shared energy storage power station, realizes the dual functions of primary frequency regulation basic duties and secondary frequency regulation value-added services, significantly improves the economic benefits of energy storage, optimizes resource allocation and enhances grid flexibility. Thus, technical problems such as low utilization efficiency of energy storage resources in related technologies are solved.

[0042] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0044] Figure 1 A flowchart of a centralized shared energy storage frequency optimization configuration method provided according to an embodiment of the present application;

[0045] Figure 2 A schematic diagram of the phase division of the frequency regulation response of the power system provided according to an embodiment of the present application;

[0046] Figure 3 A schematic diagram of the droop characteristics and adjustment range of a primary frequency modulation according to an embodiment of the present application;

[0047] Figure 4 A schematic diagram of the adjustment and coordination principle of primary and secondary frequency modulation according to an embodiment of the present application;

[0048] Figure 5 A flowchart of a centralized shared energy storage frequency optimization configuration method provided according to an embodiment of the present application;

[0049] Figure 6 A schematic diagram of a shared energy storage participating in frequency regulation operation mode provided according to an embodiment of the present application;

[0050] Figure 7 This is an example diagram of a centralized shared energy storage frequency optimization configuration device according to an embodiment of the present application;

[0051] Figure 8 Schematic diagram of the structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0052] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0053] The following describes the centralized shared energy storage frequency regulation optimization configuration method, device, equipment and medium of the embodiment of the present application with reference to the accompanying drawings. In response to the problem of high economic cost of energy storage operation mentioned in the above background technology, the present application provides a centralized shared energy storage frequency regulation optimization configuration method. In this method, the power requirements of primary and secondary frequency regulation of different adjustment scales are determined by the adjustment coefficients of the new energy station and the load side, and then the charging and discharging targets and energy storage capacity configuration of the shared energy storage power station are determined, so as to realize the dual functions of the basic responsibility of primary frequency regulation and the value-added service of secondary frequency regulation, significantly improve the economic benefits of energy storage, optimize resource allocation and enhance the flexibility of the power grid. As a result, the problems of low utilization efficiency of energy storage resources in related technologies are solved.

[0054] Specifically, Figure 1 A flow chart of a centralized shared energy storage frequency optimization configuration method provided in an embodiment of the present application.

[0055] like Figure 1 As shown, the centralized shared energy storage frequency regulation optimization configuration method includes the following steps:

[0056] In step S101, the operation data of each station in the new energy station group is obtained;

[0057] Among them, the new energy station group can be a collection of multiple new energy power stations, and the operating data can include the output data and system frequency data of each station on at least one typical day.

[0058] It is understandable that the embodiments of the present application can timely discover potential problems or anomalies by real-time monitoring and acquiring the operating data of each station, thereby facilitating the subsequent optimization configuration of energy storage capacity.

[0059] In step S102, the primary frequency regulation power and the secondary frequency regulation power required by the power grid are calculated according to the operation data.

[0060] Among them, the primary frequency regulation power can be the active output size that the generator needs to adjust to meet the frequency stability demand of the power grid, and the secondary frequency regulation power can be the active output size adjusted by adjusting the active output of the generator or the power demand of the load.

[0061] It can be understood that the embodiment of the present application calculates the primary and secondary frequency regulation powers required by the power grid through operating data, thereby achieving accurate prediction and rapid response to changes in power grid frequency, optimizing resource allocation, improving stability and economic benefits, and enhancing the resilience and intelligence level of the power grid.

[0062] Specifically, Figure 2As shown, the maximum limit of primary frequency regulation is 10% of the station installed capacity, and the frequency regulation dead zone is ±0.033Hz. The part beyond this range is deemed to require secondary frequency regulation. The secondary frequency regulation coefficient is determined by combining the system load and the energy storage adjustment coefficient. The primary and secondary frequency regulation ranges are scientifically divided to ensure the stability of the grid frequency and optimize the system operation efficiency.

[0063] In the embodiment of the present application, the calculation formula of the primary frequency modulation power is:

[0064]

[0065] Among them, P is the actual output of the station, P0 is the initial value of the station active power, K G is the unit adjustment coefficient, f is the current frequency, f u is the upper limit of the primary frequency modulation dead zone, f d It is the lower limit of the primary frequency modulation dead zone;

[0066] The calculation formula of secondary frequency modulation power is:

[0067]

[0068] Among them, P secd is the power shortage of secondary frequency modulation, K L is the load adjustment factor, f u2 is the upper limit of the maximum frequency adjustment for a single frequency modulation, f d2 It is the lower limit of the maximum frequency adjustment for a single frequency modulation.

[0069] Specifically, Figure 3 As shown, the primary frequency modulation has the following droop characteristics:

[0070]

[0071] Among them, P is the actual output of the station, P0 is the initial value of the station active power, K G is the unit adjustment coefficient, f is the current frequency, f u is the upper limit of the primary frequency modulation dead zone, f d It is the lower limit of the primary frequency modulation dead zone;

[0072] K G The relationship between the installed capacity and the adjustment rate is as follows:

[0073]

[0074] Among them, σ is the unit adjustment rate, S is the installed capacity;

[0075] like Figure 4 As shown in the figure, the calculation formula of the secondary frequency modulation power is:

[0076]

[0077] Among them, P secd is the power shortage of secondary frequency modulation, K L is the load adjustment factor, f u2 is the upper limit of the maximum frequency adjustment for a single frequency modulation, f d2 It is the lower limit of the maximum frequency adjustment for a single frequency modulation;

[0078] f u2 、f d2 The calculation method is:

[0079]

[0080]

[0081] Among them, P pri It is the maximum adjustment range of a frequency modulation.

[0082] In the embodiment of the present application, the coordination of the primary frequency modulation and the secondary frequency modulation satisfies the following constraints:

[0083]

[0084]

[0085]

[0086]

[0087]

[0088]

[0089]

[0090] in, The power of energy storage replacing the station in the frequency regulation obligation during the t period of a typical day j, The power of wind power with energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j. The power of photovoltaic energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j, is the primary frequency regulation demand generated by the frequency of the energy storage wind power m at the station during the t period of a typical day j, M is the primary frequency regulation demand generated by the frequency of the photovoltaic station n during the t period of a typical day j, j,t,m Whether the energy storage wind power m needs to undertake a frequency regulation obligation during the t period of a typical day j, M j,t,n is whether photovoltaic n needs to bear the obligation of primary frequency regulation during the t period of typical day j; ε is the maximum power ratio coefficient of primary frequency regulation, is the frequency regulation coefficient of wind farm m, is the frequency regulation coefficient of photovoltaic station n, is the installed capacity of wind power m, is the installed capacity of photovoltaic power station n.

[0091] In the embodiment of the present application, if a reverse action of the primary frequency modulation occurs within the adjustment period of the secondary frequency modulation, the secondary frequency modulation is locked.

[0092] It can be understood that when a conflict occurs between primary frequency regulation and secondary frequency regulation, the embodiment of the present application adopts the principle of primary frequency regulation priority to lock the secondary frequency regulation demand, so as to ensure rapid and stable recovery of the grid frequency, optimize resource utilization, and reduce risks.

[0093] In the embodiment of the present application, the constraints of the secondary frequency modulation include:

[0094]

[0095]

[0096] u j,3d+1 =u j,3d+2 =u j,3d+3

[0097]

[0098] Among them, u j,t is a Boolean variable indicating whether to respond to the grid frequency regulation command during the t period of a typical day j, α is the secondary frequency regulation response rate; N t is the number of periods in a typical day; The signal value of energy storage response to secondary frequency modulation in period t of typical day j or the capacity reported a day ago; The secondary frequency modulation power in period t on a typical day j; is the first secondary frequency modulation instruction every 3d minutes, and d is the secondary frequency modulation instruction cycle.

[0099] Specifically, in order to reflect the different characteristics of primary frequency modulation and secondary frequency modulation and simplify the calculation to a certain extent, the adjustment period of secondary frequency modulation is set to 3 minutes, and when the reverse action of primary frequency modulation occurs within the secondary frequency modulation period, the secondary frequency modulation is locked. The secondary frequency modulation power within one day is subject to the following constraints:

[0100]

[0101]

[0102] u j,3d+1 =u j,3d+2 =u j,3d+3

[0103] Among them, u j,t is a Boolean variable indicating whether to respond to the grid frequency regulation command during the t period of a typical day j; The signal value of energy storage response to secondary frequency modulation in period t of typical day j or the capacity reported a day ago; The secondary frequency modulation power in period t on a typical day j; is the first secondary frequency modulation instruction within every 3d minutes, and d is the secondary frequency modulation instruction cycle;

[0104] Since the power grid requires that the availability of energy storage to respond to secondary frequency regulation reaches a certain number of times within a day, that is:

[0105]

[0106] Among them, α is the secondary frequency modulation response rate, N t is the number of periods in a typical day.

[0107] In step S103, the charge and discharge targets of the shared energy storage power station are calculated according to the primary frequency regulation power and the secondary frequency regulation power, and the energy storage capacity configuration of the shared energy storage power station is determined according to the charge and discharge targets.

[0108] Among them, the shared energy storage power station can be a power station that provides energy storage services for multiple new energy sites or power grid areas. The charging and discharging targets can be set for the shared energy storage power station based on the frequency regulation requirements of the power grid.

[0109] It can be understood that the embodiment of the present application determines the charging and discharging targets and energy storage capacity configuration of the shared energy storage power station by accurately calculating the power requirements of the primary frequency regulation and the secondary frequency regulation, thereby effectively improving the stability of the power grid, enhancing flexibility, and promoting the consumption of new energy and the development of the energy storage industry.

[0110] In the embodiment of the present application, the objective function of the charge and discharge target is:

[0111] minf=C1+C2+C3-B1-B2

[0112]

[0113] Among them, C1 is the annualized investment and operation and maintenance cost of lithium battery energy storage, I is the discount rate, T is the service life of energy storage, and c p is the unit power investment price of energy storage, c e is the unit capacity investment price of energy storage, P max is the rated power of energy storage, E max is the maximum capacity of energy storage, θ is the operation and maintenance cost coefficient;

[0114] C2 is the cost of energy storage to purchase and sell electricity from the grid during the idle period of frequency regulation to maintain the balance of electricity, N d is the number of time periods of a typical day, W j is the number of days in a year for a typical day j, π t is the time-of-use electricity price during period t, is the power purchased and sold by the energy storage during period t on a typical day j;

[0115] C3 is the frequency deviation penalty for the energy storage system frequency regulation. is the system frequency deviation after adjustment during period t on a typical day j, p r is the penalty price for system frequency deviation;

[0116] B1 is the capacity price of energy storage responding to secondary frequency regulation, and B2 is the mileage price of energy storage responding to secondary frequency regulation; c sc is the unit price of frequency modulation capacity, c sp is the FM mileage price, D j,t is the frequency modulation mileage during period t on a typical day j.

[0117] Specifically, based on the operation of j typical days, M wind farms and N photovoltaic power stations are set up, and the annualized total cost of the energy storage power station is minimized to configure the capacity of shared energy storage. The objective function is expressed as follows:

[0118] minf=C1+C2+C3-B1-B2

[0119]

[0120] Among them, C1 is the annualized investment and operation and maintenance cost of lithium battery energy storage, I is the discount rate, T is the service life of energy storage, and c p is the unit power investment price of energy storage, c e is the unit capacity investment price of energy storage, P max is the rated power of energy storage, E max is the maximum capacity of energy storage, θ is the operation and maintenance cost coefficient;

[0121] C2 is the cost of energy storage to purchase and sell electricity from the grid during the idle period of frequency regulation to maintain the balance of electricity, N d is the number of time periods of a typical day, W j is the number of days in a year for a typical day j, π t is the time-of-use electricity price during period t, is the power purchased and sold by the energy storage during period t on a typical day j;

[0122] C3 is the frequency deviation penalty for the energy storage system frequency regulation. The system has certain requirements for the availability of energy storage in response to AGC secondary frequency regulation. Under a specific risk factor and due to the coordination problem between the primary and secondary frequency regulation, the adjusted system frequency will still have a certain deviation. is the system frequency deviation after adjustment during period t on a typical day j, p r is the penalty price for system frequency deviation;

[0123] B1 is the capacity price of energy storage responding to secondary frequency regulation, and B2 is the mileage price of energy storage responding to secondary frequency regulation; c sc is the unit price of frequency modulation capacity, c sp is the FM mileage price, D j,t is the frequency modulation mileage during period t on a typical day j;

[0124] D j,t The calculation formula is:

[0125]

[0126]

[0127]

[0128] in, is the frequency modulated power during period t on a typical day.

[0129] According to the centralized shared energy storage frequency regulation optimization configuration method proposed in the embodiment of the present application, the power requirements of primary and secondary frequency regulation of different regulation scales are determined by the regulation coefficients of the new energy station and the load side, and then the charging and discharging targets and energy storage capacity configuration of the shared energy storage power station are determined, realizing the dual functions of the primary frequency regulation basic responsibility and the secondary frequency regulation value-added service, significantly improving the economic benefits of energy storage, optimizing resource allocation and enhancing the flexibility of the power grid. Thus, the problem of low utilization efficiency of energy storage resources in related technologies is solved.

[0130] The following will be combined Figure 5 The centralized shared energy storage frequency regulation optimization configuration method is specifically described, wherein the centralized shared energy storage frequency regulation optimization configuration method is applied to the scale assessment of the investment and construction of frequency regulation electrochemical energy storage, such as Figure 6 As shown, the specific contents include the following steps:

[0131] S1. Obtain the output and system frequency data of each station on a typical day, the typical day weight, and the economic and operating parameters of electrochemical energy storage;

[0132] Among them, typical daily data and weights are obtained by clustering the operating data of the station and the power system for one year; the parameters of electrochemical energy storage include the annual operation and maintenance cost coefficient of electrochemical energy storage, the capacity price and power price of energy storage investment, the maximum and minimum limits of SOC, the maximum and minimum charge and discharge rates of energy storage, the charge and discharge efficiency of energy storage, the service life and the cost discount rate.

[0133] S2. Based on the operation data, the required power is determined according to the boundaries and adjustment coefficients of the primary and secondary frequency modulations;

[0134] S3, determine the charging and discharging behavior of the energy storage based on the power of the primary and secondary frequency modulation, and determine the energy storage capacity according to the power of the energy storage operation;

[0135] It should be noted that the energy storage capacity configuration model can simulate the operation of energy storage under the frequency regulation power demand of the system on a typical day, and simulate the SOC of energy storage under the power constraint and operation constraint of energy storage, so as to determine the rated capacity required for electrochemical energy storage;

[0136] When the SOC of the electrochemical energy storage reaches its maximum in a day, the quotient of the remaining power of the battery divided by the SOC is the rated capacity required for energy storage;

[0137] Among them, electrochemical energy storage needs to meet the following constraints in the operation model:

[0138] 0.15E max ≤E j,t ≤0.95E max ,

[0139] Among them, E j,t is the remaining energy of the energy storage in period t of a typical day j;

[0140] During a storage charge and discharge cycle, the SOC of the storage at any time should be maintained within a certain range.

[0141] To ensure that the energy storage operates normally, it is stipulated that the initial power consumption of a day is equal to the power consumption at the end of the day. The energy balance constraint of the energy storage for a day is:

[0142]

[0143] Energy storage rate characteristic constraint: the ratio of the power output of the energy storage system per unit time to its battery capacity, which indicates the ability of the energy storage response system to adjust, that is:

[0144]

[0145] Energy storage SOC time period coupling constraints:

[0146]

[0147] in, is the total charging and discharging power of energy storage, is the energy storage charging power during period t on a typical day j, is the energy storage discharge power in period t of a typical day j, which are non-negative and non-positive numbers respectively, η c is the charging efficiency of energy storage, η dis the discharge efficiency of energy storage.

[0148] Energy storage power replenishment constraints: When energy storage does not need to perform frequency regulation, energy storage can purchase and sell electricity from the grid to maintain its own power balance:

[0149]

[0150]

[0151] in, It is a Boolean variable flag and introduces a real auxiliary variable

[0152] Energy storage power constraints:

[0153]

[0154]

[0155]

[0156]

[0157]

[0158] In summary, the embodiments of the present application use one or more typical daily system frequency data as the basis for judgment, and determine the power requirements of primary and secondary frequency regulation of different regulation scales through the regulation coefficients of new energy stations and the load side. Taking the lowest total cost as the optimization goal, a capacity configuration model is proposed in which multiple new energy stations invest in centralized shared energy storage to assume the obligation of primary frequency regulation and participate in the secondary frequency regulation to benefit under the condition of meeting a certain availability rate. Compared with the model of independently configuring energy storage or only participating in primary frequency regulation, the further participation of energy storage in secondary frequency regulation services can greatly increase the upper limit of energy storage revenue, and the capacity assessment of energy storage is closer to actual demand, which ensures utilization while saving costs, thus having better economic performance.

[0159] Next, a centralized shared energy storage frequency optimization configuration device proposed according to an embodiment of the present application will be described with reference to the accompanying drawings.

[0160] Figure 7 It is a block diagram of a centralized shared energy storage frequency optimization configuration device according to an embodiment of the present application.

[0161] like Figure 7 As shown, the centralized shared energy storage frequency regulation optimization configuration device 10 includes: an acquisition module 100, a calculation module 200 and a determination module 300.

[0162] Among them, the acquisition module 100 is used to obtain the operating data of each station in the new energy station group; the calculation module 200 is used to calculate the primary frequency modulation power and secondary frequency modulation power required by the power grid according to the operating data; the determination module 300 is used to calculate the charging and discharging targets of the shared energy storage power station according to the primary frequency modulation power and the secondary frequency modulation power, and determine the energy storage capacity configuration of the shared energy storage power station according to the charging and discharging targets.

[0163] It should be noted that the aforementioned explanation of the embodiment of the centralized shared energy storage frequency regulation optimization configuration method is also applicable to the centralized shared energy storage frequency regulation optimization configuration device of this embodiment, and will not be repeated here.

[0164] According to the centralized shared energy storage frequency regulation optimization configuration device proposed in the embodiment of the present application, the power requirements of primary and secondary frequency regulation of different regulation scales are determined through the regulation coefficients of the new energy station and the load side, and then the charging and discharging targets and energy storage capacity configuration of the shared energy storage power station are determined, realizing the dual functions of the primary frequency regulation basic duties and the secondary frequency regulation value-added services, significantly improving the economic benefits of energy storage, optimizing resource allocation and enhancing the flexibility of the power grid. As a result, the problem of low utilization efficiency of energy storage resources in related technologies is solved.

[0165] Figure 8 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:

[0166] A memory 801 , a processor 802 , and a computer program stored in the memory 801 and executable on the processor 802 .

[0167] When the processor 802 executes the program, the centralized shared energy storage frequency regulation optimization configuration method provided in the above embodiment is implemented.

[0168] Furthermore, the electronic device further comprises:

[0169] The communication interface 803 is used for communication between the memory 801 and the processor 802 .

[0170] The memory 801 is used to store computer programs that can be executed on the processor 802 .

[0171] The memory 801 may include a high-speed RAM (Random Access Memory) memory, and may also include a non-volatile memory, such as at least one disk memory.

[0172] If the memory 801, the processor 802 and the communication interface 803 are implemented independently, the communication interface 803, the memory 801 and the processor 802 can be connected to each other through a bus and communicate with each other. The bus can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 8 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0173] Optionally, in a specific implementation, if the memory 801, the processor 802 and the communication interface 803 are integrated on a chip, the memory 801, the processor 802 and the communication interface 803 can communicate with each other through an internal interface.

[0174] The processor 802 may be a CPU (Central Processing Unit), or an ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement the embodiments of the present application.

[0175] An embodiment of the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-mentioned centralized shared energy storage frequency optimization configuration method.

[0176] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms are not necessarily directed to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0177] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0178] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0179] It should be understood that the various parts of the present application can be implemented in hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, the steps or methods can be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array, a field programmable gate array, etc.

[0180] A person of ordinary skill in the art may understand that all or part of the steps carried by the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the above-mentioned program may be stored in a computer-readable storage medium, which, when executed, includes one of the steps of the method embodiment or a combination thereof.

[0181] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A centralized shared energy storage frequency modulation optimization configuration method, characterized in that: The following steps are involved: Obtain the operation data of each station in the new energy station group; Calculate the primary frequency regulation power and the secondary frequency regulation power required by the power grid according to the operation data; The charging and discharging targets of the shared energy storage power station are calculated according to the primary frequency modulation power and the secondary frequency modulation power, and the energy storage capacity configuration of the shared energy storage power station is determined according to the charging and discharging targets.

2. The centralized shared energy storage frequency modulation optimization configuration method according to claim 1 is characterized in that: The operation data includes output data and system frequency data of each station on at least one typical day.

3. The centralized shared energy storage frequency modulation optimization configuration method according to claim 1 is characterized in that: The calculation formula of the primary frequency modulation power is: Among them, P is the actual output of the station, P0 is the initial value of the station active power, K G is the unit adjustment coefficient, f is the current frequency, f u is the upper limit of the primary frequency modulation dead zone, f d It is the lower limit of the primary frequency modulation dead zone; The calculation formula of the secondary frequency modulation power is: Among them, P secd is the power shortage of secondary frequency modulation, K L is the load adjustment factor, f u2 is the upper limit of the maximum frequency adjustment for a single frequency modulation, f d2 It is the lower limit of the maximum frequency adjustment for a single frequency modulation.

4. The centralized shared energy storage frequency modulation optimization configuration method according to claim 1 is characterized in that: The coordination of primary frequency modulation and secondary frequency modulation satisfies the following constraints: in, The power of energy storage replacing the station in the frequency regulation obligation during the t period of a typical day j, The power of wind power with energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j. The power of photovoltaic energy storage replacing the station to undertake the frequency regulation obligation during the t period of a typical day j, is the primary frequency regulation demand generated by the frequency of the energy storage wind power m at the station during the t period of a typical day j, is the primary frequency regulation demand generated by the frequency of the photovoltaic station n during the t period of a typical day j, M j,t,m Whether the energy storage wind power m needs to undertake a frequency regulation obligation during the t period of a typical day j, M j,t,n is whether PV n needs to undertake the primary frequency regulation obligation during the t period of a typical day j; ε is the maximum power ratio coefficient of the primary frequency regulation, is the frequency regulation coefficient of wind farm m, is the frequency regulation coefficient of photovoltaic station n, is the installed capacity of wind power m, is the installed capacity of photovoltaic power station n.

5. The centralized shared energy storage frequency modulation optimization configuration method according to claim 1 is characterized in that: If the reverse action of the primary frequency modulation occurs during the adjustment period of the secondary frequency modulation, the secondary frequency modulation will be blocked.

6. The centralized shared energy storage frequency modulation optimization configuration method according to claim 5 is characterized in that: The constraints of secondary frequency modulation include: in j,3d+1 =in j,3d+2 =in j,3d+3 Among them, u j,t is a Boolean variable indicating whether to respond to the grid frequency regulation command during the t period of a typical day j, α is the secondary frequency regulation response rate; N t is the number of periods in a typical day; The signal value of energy storage response to secondary frequency modulation in period t of typical day j or the capacity reported a day ago; The secondary frequency modulation power in period t on a typical day j; is the first secondary frequency modulation instruction every 3d minutes, and d is the secondary frequency modulation instruction cycle.

7. The centralized shared energy storage frequency modulation optimization configuration method according to claim 1 is characterized in that: The objective function of the charge and discharge target is: min f=C1+C2+C3-B1-B2 Among them, C1 is the annualized investment and operation and maintenance cost of lithium battery energy storage, I is the discount rate, T is the service life of energy storage, and c p is the unit power investment price of energy storage, c e is the unit capacity investment price of energy storage, P max is the rated power of energy storage, E max is the maximum capacity of energy storage, θ is the operation and maintenance cost coefficient; C2 is the cost of energy storage to purchase and sell electricity from the grid during the idle period of frequency regulation to maintain the balance of electricity, N d is the number of time periods of a typical day, W j is the number of days in a year for a typical day j, π t is the time-of-use electricity price during period t, is the power purchased and sold by the energy storage during period t on a typical day j; C3 is the frequency deviation penalty for the energy storage system frequency regulation. is the system frequency deviation after adjustment during period t on a typical day j, p r is the penalty price for system frequency deviation; B1 is the capacity price of energy storage responding to secondary frequency regulation, and B2 is the mileage price of energy storage responding to secondary frequency regulation; c sc is the unit price of frequency modulation capacity, c sp is the FM mileage price, D j,t is the frequency modulation mileage during period t on a typical day j.

8. A centralized shared energy storage frequency modulation optimization configuration device, characterized in that: include: An acquisition module is used to obtain the operation data of each station in the new energy station group; A calculation module, used for calculating the primary frequency regulation power and the secondary frequency regulation power required by the power grid according to the operation data; A determination module is used to calculate the charging and discharging targets of the shared energy storage power station according to the primary frequency modulation power and the secondary frequency modulation power, and determine the energy storage capacity configuration of the shared energy storage power station according to the charging and discharging targets.

9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the centralized shared energy storage frequency optimization configuration method as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program or instruction stored thereon, characterized in that: When the computer program or instruction is executed, the centralized shared energy storage frequency optimization configuration method described in any one of claims 1-7 is implemented.