Gigabit-level electrochemical energy storage station and station power utilization system
By adopting dual power switching devices, three-divided fission transformers and combined grounding transformers in GW-level grid-side energy storage power stations, the problems of high investment costs and low power supply reliability are solved, and more efficient equipment utilization and safe power grid are achieved. run.
Patent Information
- Application Number
- CN202411374738.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-03
AI Technical Summary
The construction of GW-level energy storage power stations on the grid side faces problems such as high investment costs, low power supply reliability and low equipment utilization. Especially due to the large number of stations and the large impact of ambient temperature on the performance of electrochemical batteries, the battery is The risk of vicious accidents such as fires increases.
The use of dual power switching devices, three-divided fission transformers, isolation transformers and grounded transformers and step-up station transformers are used to replace the original four station transformers through three-divided fission transformers, and the isolation transformers are added, and the station transformers and ground transformers are combined. Improve equipment utilization and power supply reliability.
It reduces the project cost, improves the reliability of power supply and the efficiency of equipment, reduces the power consumption rate of the station, and ensures the safe and reliable operation of GW-level energy storage power stations.
Smart Images

Figure CN119070467A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of electrochemical energy storage, and in particular is applicable to a gigawatt-level electrochemical energy storage station and a station power system. Background Art
[0002] Hotspots for the development of renewable energy such as photovoltaics and wind power have planned large-scale renewable energy bases at the sending end of UHV DC projects. The capacity of grid-side energy storage power stations is mostly 10MW / 20MWh to 100MW / 200MWh. Although some experience has been accumulated in the design of these energy storage power stations, due to the rapid development of energy storage technology and the lack of industry standards and design standards, the construction of Gigawatt-level (500MW / 1GWh) grid-side energy storage power stations still faces many difficulties. Gigawatt-level energy storage power stations can be defined as: centralized or distributed electrochemical energy storage capacity that can be uniformly dispatched by the power grid in the same regional power grid reaches the Gigawatt level. Therefore, there is an urgent need for large-capacity Gigawatt-level (500MW / 1GWh) energy storage power stations, which is also an inevitable choice for technology iteration. At present, some experience has been accumulated in the design of energy storage power stations, but due to the rapid development of energy storage technology and the lack of industry standards and design standards, the construction of Gigawatt-level (500MW / 1GWh) grid-side energy storage power stations still faces many difficulties.
[0003] In the prior art, the station power system of the electrochemical energy storage station includes 4 38.5 / 0.4kV 3500kVA station transformers, 2 38.5 / 0.4kV 800kVA station transformers, 1 10 / 0.4kV 800kVA station transformer, and 4 38.5kV1250kVA grounding transformers. Figure 1 As shown. The 35kVⅠ, Ⅱ, Ⅲ, and Ⅳ busbars are stepped down to 0.4kV by four 38.5 / 0.4kVA3500kVA station transformers, and then connected through bus tie switches to the station AC panel of the energy storage station for power supply; the 35kVⅠ, Ⅱ, Ⅲ, and Ⅳ busbars also need to be grounded at the neutral point through four 38.5kV 1250kVA grounding transformers; the 35kVⅡ and Ⅳ busbars also need to be powered by two 38.5kV 800kVA station transformers and one 10kV800kVA station transformer for the boost area AC panel of the energy storage station.
[0004] Gigawatt-class energy storage stations are huge in scale. Once there is a problem with the station power system, it will directly or indirectly affect the safe and reliable operation of the batteries in the energy storage power station. In serious cases, it may even cause serious accidents such as battery fires. The severity of the consequences will be several times more than that of megawatt / 100 megawatt-class energy storage stations. Therefore, there are extremely high requirements for the reliability of power supply. There are two possible site structures for gigawatt-class energy storage stations: centralized and distributed. However, whether it is centralized or distributed, the site occupies a huge area, and the station load is relatively dispersed throughout the site. Its layout and control are multi-level and decentralized, and microgrid technology is required; the ambient temperature has a great impact on the performance of the battery, so the power load of the energy storage station mainly comes from the cooling load during the charging and discharging process of the energy storage battery. When the scale of the energy storage station reaches the gigawatt level, its station power load will also reach the megawatt level. The electrochemical battery pack itself is a power source. The station power system needs to be organically integrated with the chemical battery pack system, wind, light and other new energy sources to reduce the plant power consumption rate.
[0005] The existing energy storage station power supply system has the following shortcomings: 1. The large number of transformers used in the station and the high purchase price result in a high investment in station electricity for the Gigawatt energy storage station.
[0006] 2. The ambient temperature has a great impact on the performance of the electrochemical cells used in the Gigawatt-level electrochemical energy storage station. The station power load mainly comes from the cooling load of the electrochemical cell charging and discharging process. The station uses a large number of transformers, the equipment utilization rate is not high, and the station power grid loss rate is high.
[0007] 3. The power supply of the energy storage station is taken from the 330kV main transformer. Once the main transformer is under maintenance or fails, there will be AC power failure, and only a small number of important loads can be powered by battery packs, and the power supply reliability is not high. Summary of the invention
[0008] The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art and provide a station power system for a gigawatt-level electrochemical energy storage station.
[0009] The purpose of the present invention is to be achieved by adopting the following technical scheme: a station power system suitable for a gigawatt-level energy storage station, including a dual power switching device, a three-split transformer, an isolation transformer, a grounded transformer and a step-up transformer for a station, and an AC panel. The step-up transformer of the electrochemical energy storage unit of the two-section bus adopts a three-split transformer, one of which is connected to the energy storage converter and the lithium iron phosphate battery pack, and the other low-voltage side winding is cross-connected to the bus of the AC panel through the isolation transformer and the dual power switching device, and they are hot standby to each other. The two sections of the bus of different main transformers are connected to the two sections of the 380V bus through two grounded transformers and step-up transformers for a station, and the external 10kV line is connected to the 0-section bus of the 380V through a standby transformer. The dual power switching device is directly connected to the AC load, and the dual power switching device is connected to the DC load through the converter.
[0010] Furthermore, both busbars are 35kV, and the three-split transformer is 38.5 / 0.69 / 0.69kV 3500 / 1750 / 1750kVA, of which the main winding transformer uses 38.5kV and the low-voltage side winding is 0.69kV.
[0011] Furthermore, the dual power switching device is directly connected to the AC load, and the dual power switching device is connected to the DC load via the converter.
[0012] Furthermore, the grounding transformer and booster station is 38.5 / 0.4 kV, the isolation transformer is 0.69 / 0.38 kV, and the standby transformer is 10 / 0.4 kV.
[0013] Furthermore, the output ends of the four isolation transformers are cross-connected with the dual power switching devices in pairs, and the output ends of the dual power switching devices are connected to the busbar of the 0.38kV AC panel, serving as hot standby for each other.
[0014] Furthermore, the 38.5kV main winding transformer is connected to the 35kV I, II, III, and IV busbars through a 35kV cable. Furthermore, the transformer input terminals of the two grounded transformer-cum-boosting stations are connected to two sections of 35kV busbars of different main transformers.
[0015] Furthermore, both sections of the 380V busbar are connected to the AC load and are connected to the DC load via the converter.
[0016] Furthermore, the 380V bus sections 0, 1 and 2 are connected via a bus tie switch.
[0017] At the same time, an energy storage station is provided, which adopts the station power system of the above-mentioned gigawatt-level energy storage station.
[0018] Furthermore, the energy storage station is a 500MW / 1000MWh energy storage station or a shared energy storage station.
[0019] Compared with the prior art, the present invention has the following beneficial effects: the original four 38.5 / 0.4kVA 3500kVA station transformers are eliminated, the step-up transformer of the electrochemical energy storage unit adopts a three-split transformer, and an isolation transformer is added. The cost of the isolation transformer is much less than the original station transformer, saving the engineering cost. The 380V side of the isolation transformers of different 35kV bus sections is cross-connected through a dual power switching device to ensure the reliability of power supply; two 38.5 / 0.4kV 800kVA station transformers and two 38.5kV 1250kVA grounding transformers are combined into two grounding transformers and station transformers, which improves the utilization efficiency of station transformers and reduces the station power consumption rate. The two 38.5 / 0.4kV grounding transformers and station transformers connected from different 35kV bus sections are connected to the 380V0, 1, and 2 busbars of a station standby transformer connected from an external power source through a bus tie switch to improve the reliability of power supply.
[0020] In summary, the present invention provides a station power system for a gigawatt-level electrochemical energy storage station, using the secondary winding of the three-split transformer of the electrochemical energy storage module as the station transformer, achieving the following technical effects: canceling the original four station transformers and adding an isolation transformer, the cost of the isolation transformer is much lower than the original station transformer, saving engineering costs, and the 380V sides of the isolation transformers of different 35kV bus sections are cross-connected through a dual power switching device to ensure the reliability of power supply; the station transformer and the grounding transformer are combined into a grounding transformer and station transformer, improving the use efficiency of the station transformer and reducing the station power consumption rate.
[0021] Furthermore, the grounding transformer and station transformer is connected to a station transformer connected to the power supply outside the station through a bus tie switch to improve power supply reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Schematic diagram of the station power system structure of the electrochemical energy storage station in the prior art as the background technology of the present invention Figure 2 2 is a schematic diagram showing the structure of a gigawatt-class energy storage station power system using an electrochemical energy storage unit according to the present invention. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0025] This application analyzes the load in the booster station area of the Gigawatt-level energy storage power station on the grid side: the station power load in the booster station area mainly includes the main transformer air-cooling load, distribution device operation load, lighting load, HVAC load, communication power load, maintenance power load, water pump load, etc., which are basically consistent with the load types of conventional substations.
[0026] 1) Distribution device operating load: The distribution device operating load is responsible for supplying power to the switchgear operating structure and providing the energy required for opening and closing. It belongs to the regular and intermittent load. In order to calculate the maximum load required for the switchgear operation, the maximum number of circuit breakers that can be operated simultaneously is considered under extreme conditions. 330kV adopts 3 / 2 wiring. Considering a 330kV busbar failure, and the main transformer incoming line circuit breaker connected to the busbar refuses to operate, the intermediate circuit breaker of the main transformer 330kV incoming line needs to be tripped, and the 330kV main transformer incoming line circuit breaker on the opposite side of the main transformer also needs to be tripped. A total of 8 330kV circuit breakers need to be operated, and the operating load of a single circuit breaker is 8kW. The maximum motor load of the 330kV I bus PT intelligent control cabinet is 15kW, and the total load required is 79kW.
[0027] 2) Lighting load: Due to the booster station area of the energy storage station, indoor lamps are generally not all turned on at the same time. When calculating the total amount of power consumption of the entire station, the lighting that works at the same time is considered, and the total lighting load is multiplied by a certain correction factor.
[0028] 3) HVAC load: HVAC load mainly refers to the power supply for air conditioners and fans in the station to adjust the indoor temperature and ensure air circulation. In unattended operation, this load is mainly to ensure the normal operation of secondary equipment. It belongs to the regular and continuous load. The electric heater load in each building is 16kW.
[0029] 4) Other loads, including heating load of power distribution device, maintenance power supply, communication power supply, UPS power supply, charger, AC distribution panel, inverter, rainwater pump, etc. The heating power supply of power distribution device is responsible for supplying power to the heating device of terminal box and control cabinet. When the temperature is too low, the heating device in terminal box and control cabinet is powered, and the temperature in terminal box and control cabinet is maintained when the temperature is too low to ensure the normal operation of secondary equipment. It is a regular and continuous load. It is necessary to heat 9 330kV circuit breaker control cabinets, and the heating power of each circuit breaker control cabinet is 10W. There are 2 bus intelligent component cabinets, and the single bus intelligent component cabinet is 5kW. The total required load is 100kW. The maintenance power supply is responsible for supplying power to maintenance equipment such as welding machines during equipment maintenance. It is an infrequent and short-term load and is not included in the total power load statistics of the whole station. Communication power supply, UPS power supply, charger, inverter, etc. belong to the load demand of communication and secondary specialties, which is a regular and continuous load of 25kW.
[0030] Regional load analysis of Gigawatt-level energy storage power stations on the grid side: The load of the energy storage area mainly includes the load of the battery compartment air conditioning and liquid cooling equipment, the load of the PSC and the boost transformer compartment. The size of this load mainly depends on the type of battery, cooling method and quantity.
[0031] (1) Battery type. Currently, the main technical route for domestic energy storage power stations is lithium iron phosphate batteries. Therefore, mature and reliable lithium iron phosphate batteries are preferred for gigawatt-level energy storage stations. (2) The optimal temperature range, operating temperature range and tolerable temperature range of lithium iron phosphate batteries are 10-35°C, -20-45°C and -40-60°C respectively. The electrochemical properties of lithium ions are best in the temperature range of 10-35°C. Lithium iron phosphate batteries should be operated in this temperature range as much as possible. Lithium-ion batteries have a small life decay within -20-45°C and can still work normally. However, when the temperature is within -20-40°C, the electrolyte may solidify, hindering the flow of lithium ions, resulting in increased impedance and a significant decrease in battery capacity. When the temperature exceeds 60°C, the chemical properties of lithium ions begin to become increasingly unstable, and the rate of harmful chemical reactions inside the battery is high, which may damage the battery and cause accidents in serious cases. In order to keep the operating temperature of the lithium iron phosphate battery within a safe range, air cooling or liquid cooling is required to cool the cabin. In cold seasons and regions, air conditioning, coils or electric heating are required to heat and insulate the battery cabin.
[0032] According to the AC load of the booster station area of the gigawatt energy storage station and the AC load of the energy storage area of the gigawatt energy storage station, the AC power load of the booster station area is about 800kVA. Considering a certain margin, the 35kV 1000kVA station transformer is selected. The AC power load of the energy storage area is 3765kVA. Considering a certain margin, the 35kV 4000kVA is selected.
[0033] According to the relevant electrochemical energy storage power station design specifications, the Gigawatt-class energy storage power station is composed of 8 station transformers, of which 4 are 35kV grounding transformers and station transformers, with a capacity of 800kVA, respectively taken from the 35kV I and II sections of the main transformers of different booster stations. Another 4 35kV station transformers, with a capacity of 4000kVA, are respectively taken from the 35kV I and II sections of the main transformers of different booster stations. In addition, a 35kV or 10kV external power supply is introduced from outside the 35kV station as a backup power supply. The power supply of the Gigawatt-class energy storage power station on the grid side adopts two power supply methods: (1) using the ring power supply method and setting knife switches in the middle of the ring network for open-loop operation, and (2) using radial power supply, each configuration electrical equipment site is equipped with a dedicated distribution box, and the power supply line of the distribution box is one for operation and one for backup.
[0034] For the high reliability of Gigawatt-level energy storage power stations, large area and large station load application scenarios, since the AC load of Gigawatt-level energy storage power stations is mainly the cooling load of the battery cabin, the number of battery cabins is as many as more than 400, and they are under the same environmental conditions and have the same input load, the upper radiation and lower ring power supply solutions of the energy storage power station are excluded. The application scenario of Gigawatt-level energy storage power station occupies a large area, and the station AC load reaches 4000kVA. Although the ring network saves the length of the cable, in order to ensure the sensitivity of the circuit breaker when the end of the ring power supply network is short-circuited, the cable cross-section needs to be increased, and the cable laying construction is extremely inconvenient. Therefore, the upper ring network and lower radiation power supply method are not suitable. The application scenario of Gigawatt-level energy storage power station occupies a large area, and the number of battery cabins is as many as more than 400. If a double-layer radiation-small room is set up with a dedicated distribution screen solution, the number of AC circuits in the small room used only in the energy storage area is preliminarily estimated to reach more than 800. Even if it is calculated according to 24 circuits of the fixed distribution screen, only the energy storage area needs 34 AC distribution screens. At the same time, since all cables are connected from the relay room to the battery compartment, there are many large-section cables and long small-section cables. From an overall perspective, the number of kilometers of power cables in the entire station increases; at the same time, the distribution panel is located indoors, which will occupy the space of the relay room and increase the area of the relay room, so the double-layer radiation-small room is set up with a dedicated distribution panel. On the basis of double-layer load-on-site dedicated distribution boxes, this application proposes that AC prefabricated cabins are dispersedly arranged in different areas of the energy storage station, and the power consumption of the distribution device can be drawn from the AC prefabricated cabin; as an example, a 500MW / 1000MWh energy storage station is composed of 400 sets of 2.56MWh battery cabins + 2.5MW PCS cabins, which can be divided into 4 areas according to 100MW / 1000WMh, and 4 AC cabins are set up respectively. Each AC cabin takes one line of backup AC power from the station's sections I and II. Each AC cabin is equipped with 10 AC panels, and 2 lines of power are supplied to the battery cabin, PCS, and converter cabin respectively. Due to the use of radial power supply, the power supply reliability is high. By setting up AC cabins in different areas, the cable section and length from the AC cabin to the battery cabin can be reduced while ensuring sensitivity. At the same time, the AC screen is placed in the cabin. Although the investment in the early stage of the project is large, the cost is more favorable during the whole life cycle due to the improvement of the working environment of the AC screen.
[0035] AC / DC hybrid microgrid is also a type of AC microgrid. Its general structure is that the grid is connected to the AC bus and connected to the DC bus through the main inverter. The AC / DC system combines the advantages of DC microgrid and AC microgrid. Combined with the application scenario of energy storage power station with both AC load and DC load, the station-based AC / DC microgrid solution can be adopted.
[0036] The present invention is further described in detail below in conjunction with the accompanying drawings: See also Figure 1A station power system for a gigawatt-level energy storage station includes a dual power switching device, a three-split transformer, an isolation transformer, a grounding transformer and a step-up station transformer, and an AC panel. The key points of its system architecture are that the step-up transformer of the four electrochemical energy storage units adopts a three-split transformer 38.5 / 0.69 / 0.69kV 3500 / 1750 / 1750kVA, of which the 38.5kV main winding transformer is connected to the 35kVⅠ, Ⅱ, Ⅲ, and Ⅳ busbars through a 35kV cable, one of which is a 0.69kV low-voltage side winding connected to the energy storage converter and the lithium iron phosphate battery pack through a 0.75kV cable, and the other 0.69kV low-voltage side winding is connected to the 0.69 / 0.38kV isolation transformer input through a 0.75kV cable.
[0037] The output ends of the four 0.69 / 0.38kV isolation transformers are cross-connected to the dual power switching devices through 0.6 / 1kV cables. The output ends of the dual power switching devices are connected to the busbars of the 0.38kV AC panel through cables, serving as hot standby for each other.
[0038] The input ends of two 38.5 / 0.4kV grounded transformers and booster stations are connected to two 35kV busbars of different main transformers, and the output ends are connected to two 380V busbars. A 10kV line is connected from outside the station through a 10 / 0.4 kV standby transformer to the 380V busbar 0, and the 380V busbars 0, 1, and 2 are connected through the bus tie switch.
[0039] The scheme described in this application is used in the engineering practice of a 500MW / 1000MWh energy storage power station or shared energy storage power station of a new energy company. The energy storage power station is built on a scale of 500MW / 1000MWh and is connected to the grid at a voltage level of 330kV. It is planned to use a single 330kV line to access the 330kV AC distribution device of a 750kV substation. After the project is connected to the grid for power generation, a single charge can store up to 300,000 kWh of green electricity. By utilizing the "peak shaving and valley filling" adjustment capability of energy storage, it can realize peak-shifting storage and release of green electricity, and promote the realization of "24-hour green electricity supply". It can solve the problem of more than 79 million kWh of abandoned electricity from new energy and reduce the system coal consumption by about 60,000 tons. It will play a positive role in promoting the consumption of new energy in the region, reducing the load pressure of the power grid, and helping to ensure energy supply.
[0040] According to the system planning, a 330kV booster station is required to meet the voltage level of 330kV / 35kV. The total capacity of the main transformer is planned to be 1 240MVA and 1 360MVA in the long term to meet the grid connection requirements of the energy storage power station with an installed capacity of 500MW / 1000MWh. The transformer-line unit connection is completed on the 330kV side in this phase. The 35kV main connection of each main transformer adopts a single busbar double branch connection. Two sections of 35kV busbars need to be built in this phase. The 35kV busbar is planned to have 19 outgoing lines, and each section of 35kV busbar has 3 / 3 outgoing lines in this phase.
[0041] The energy storage adopts lithium iron phosphate battery energy storage system, which consists of 150 3.45MW / 6.7MWh container energy storage systems. The distributed prefabricated cabins are installed outdoors on the planned site. The energy storage system uses four 38.5kV / 0.69kV / 0.69kV split transformers as the basic access unit. The 38.5kV side of the split transformer is collected through the 35kV collector line and connected to the 35kV low-voltage side bus of the 330kV energy storage booster station to realize the integration of the energy storage system and grid connection. One low-voltage 0.69kV side winding of the split transformer is connected to the energy storage converter and the lithium iron phosphate battery pack, and the other low-voltage 0.69kV side winding is cross-connected to the busbar of the AC panel through a 0.69 / 0.38kV isolation transformer and a dual power supply switching device, which are hot standby for each other. The two sections of the busbars of different main transformers are connected to the two sections of the 380V busbars through two 38.5 / 0.4kV grounded transformers and booster station transformers, and the external 10kV line is connected to the 0 section busbar of the 380V through a 10 / 0.4 kV standby transformer. Furthermore, the input ends of the two grounded transformers and booster station transformers are connected to the two sections of 35kV busbars of different main transformers. The two sections of the 380V busbars are connected to the AC loads, and the DC loads are connected through the converter, and the 0, 1 and 2 sections of the 380V busbars are connected through the bus tie switch.
[0042] Through the system of the present invention, 8 38.5kV / 0.4kV station transformers are replaced with 4 38.5kV / 0.69kV / 0.69kV split transformers, which reduces line loss and saves about 1.2 million yuan in engineering cost. By adopting a cross-connected power supply method, the power supply reliability of the super-large energy storage power station is also improved.
[0043] The above contents are only for explaining the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A station power system suitable for a gigawatt-level energy storage station, characterized in that: It includes a dual power switching device, a three-split transformer, an isolation transformer, a grounding transformer and a booster station transformer, and an AC panel. The boost transformer of the electrochemical energy storage unit with two bus sections adopts a three-split transformer, one of which has a low-voltage side winding connected to the energy storage inverter and the lithium iron phosphate battery pack, and the other low-voltage side winding is cross-connected to the bus of the AC panel through an isolation transformer and a dual power switching device, and they serve as hot standby for each other. The two bus sections of different main transformers are connected to the two 380V bus sections through two grounding transformers and booster station transformers, and the external 10kV line is connected to the 380V 0-section bus through a standby transformer. The dual power switching device is directly connected to the AC load, and the dual power switching device is connected to the DC load through an inverter.
2. The station power system suitable for a gigawatt-class energy storage station according to claim 1, characterized in that: Both busbars are 35kV, and the three-split transformer is 38.5 / 0.69 / 0.69kV 3500 / 1750 / 1750kVA, of which the main winding transformer uses 38.5kV and the low-voltage side winding is 0.69kV.
3. The station power system suitable for a gigawatt-class energy storage station according to claim 2, characterized in that: The 38.5kV main winding transformer is connected to the 35kV I, II, III and IV busbars through a 35kV cable.
4. The station power system suitable for a gigawatt-class energy storage station according to claim 1, characterized in that: The grounding transformer and booster station has a transformer of 38.5 / 0.4 kV, the isolation transformer has a transformer of 0.69 / 0.38 kV, and the standby transformer has a transformer of 10 / 0.4 kV.
5. The station power system suitable for a gigawatt-class energy storage station according to claim 1, characterized in that: The output ends of the four isolation transformers are cross-connected with the dual power switching devices in pairs, and the output ends of the dual power switching devices are connected to the busbar of the 0.38kV AC panel, serving as hot standby for each other.
6. The station power system suitable for a gigawatt-class energy storage station according to claim 1, characterized in that: The input terminals of the two grounded transformer-cum-step-up stations are connected to two sections of 35kV busbars of different main transformers.
7. The station power system applicable to a gigawatt-class energy storage station according to claim 1, characterized in that: The two sections of 380V busbars are connected to AC loads and connected to DC loads through converters.
8. The station power system applicable to a gigawatt-class energy storage station according to claim 1, characterized in that: The 380V bus sections 0, 1 and 2 are connected through the bus tie switch.
9. An energy storage station, characterized in that: A station power system using the gigawatt-class energy storage station described in any one of claims 1-8.
10. The energy storage station according to claim 9, characterized in that: It is a 500MW / 1000MWh energy storage power station or a shared energy storage power station.