Method for manufacturing rectifying tower kettle

By using a combined tooling of frame body, telescopic rotating arm and positioning device in the manufacturing of distillation tower kettle, the problems of low positioning accuracy and poor production efficiency in the prior art are solved, and a high accuracy and high efficiency pipe port is achieved Positioning and welding.

CN119075343APending Publication Date: 2024-12-06HUBEI ZHUANGZHI PETROCHEM EQUIP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411135029.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the existing distillation tower kettle manufacturing methods, the positioning accuracy is low and the production efficiency is poor. Especially when the number of pipe ports is large, it is difficult to ensure positioning accuracy and measurement accuracy.

Method used

The positioning tool including a frame, a telescopic rotary arm and a positioning device is adopted. By adjusting the length and angle of the telescopic rotary arm, the positioning position of the pipe opening is accurately marked, and the accuracy of the positioning device is ensured by using a level and an angle meter to improve production efficiency.

Benefits of technology

The positioning accuracy and production efficiency of the pipe ports of the distillation tower kettle is significantly improved, the accumulated error is reduced, and the accurate position marking and welding quality of each pipe port is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119075343A_ABST
    Figure CN119075343A_ABST
Patent Text Reader

Abstract

According to the rectifying tower manufacturing method, the rectifying tower manufactured through the method comprises a jacket cylinder, an inner cylinder and an internal steel pipe, a positioning tool used in the manufacturing method comprises a frame body, a telescopic rotating arm and a positioning device, the frame body is used for being fixedly connected with the cylinder, the telescopic rotating arm is rotationally matched with the frame body, and the positioning device can be positioned by adjusting the length and the rotating angle of the telescopic rotating arm. The relative position of the positioning tool and the barrel can be accurately adjusted, so that positioning marks are marked on the barrel through the positioning device, and the positioning reference of each pipe orifice is a frame body. According to the design, the frame body can be adopted as the positioning reference of all the pipe openings, accumulated errors of the multiple pipe openings are eliminated, it can be ensured that the frame body is kept in the horizontal state through the gradienter, and when the frame body is kept in the horizontal state, the center positioning rod is located on the center shaft of the barrel by adjusting the length of all the telescopic connecting arms.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for manufacturing a chemical container, in particular to a method for manufacturing a distillation tower kettle. Background Art

[0002] A distillation tower is a tower-type vapor-liquid contact device for distillation. Its principle is to achieve separation through partial vaporization and condensation, utilizing the relative volatility differences between different components. The reaction vessel of the distillation tower is the distillation tower kettle. In order to achieve the generation and separation of multiple reactants, the structure of the distillation tower kettle is divided into multiple internal and external reaction chambers. At the same time, each reaction chamber is also provided with a nozzle for inputting different raw materials or outputting different products. There are certain relative position requirements between these nozzles. The current method of manufacturing a distillation tower kettle is usually to manually locate the relative position of each nozzle and weld them.

[0003] Although this method for manufacturing the distillation tower kettle can complete the positioning and fixing of each pipe opening, it still has the following defects: 1. The method of manually locating the relative positions of each nozzle will lead to cumulative errors, and the positioning accuracy cannot be guaranteed when the number of nozzles is large.

[0004] 2. Positioning the pipe mouth requires selecting two parameters, angle and distance, at the same time. The manual measurement steps are cumbersome, resulting in poor production efficiency.

[0005] The information disclosed in this background technology section is only intended to increase the understanding of the overall background of the application, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to ordinary technicians in this field. Summary of the invention

[0006] The purpose of the present invention is to overcome the problems of low positioning accuracy and poor production efficiency in the prior art, and to provide a method for manufacturing a distillation tower kettle with high positioning accuracy and high production efficiency.

[0007] To achieve the above objectives, the technical solution of the present invention is: A method for manufacturing a distillation tower kettle, wherein the distillation tower kettle manufactured by the manufacturing method comprises the following structure: The distillation tower kettle comprises a jacketed cylinder and an inner cylinder; The jacket cylinder is a barrel-shaped structure, the jacket cylinder is sleeved on the lower part of the inner cylinder, and the open end of the jacket cylinder is sealed and connected to the outer wall of the inner cylinder through an arc segment; The top, bottom and sides of the jacket cylinder and the inner cylinder are provided with a plurality of pipe openings 4 with flanges; The manufacturing method is based on the following positioning tooling: The positioning tooling comprises a frame, a telescopic rotating arm and a positioning device; The middle part of the frame is connected to one end of the telescopic rotating arm, the telescopic rotating arm is rotatably matched with the frame, the other end of the telescopic rotating arm is fixedly connected to the positioning device, the frame is used to be fixedly connected to the tank body, and the positioning device is used to mark a positioning mark on the tank body; The manufacturing method comprises the following steps: S1, welding the cylinder, preparing the jacket cylinder and the inner cylinder respectively, placing the prepared jacket cylinder vertically, and then placing the inner cylinder coaxially in the jacket cylinder, and when the inner cylinder is in place, welding the jacket cylinder and the inner cylinder into one; S2, pipe opening positioning, install the positioning tooling to the top of the inner cylinder, adjust the length of the telescopic rotating arm and rotate the telescopic rotating arm angle, so that the positioning device is sequentially marked at the positioning positions of each pipe opening 4 set at the top of the jacket cylinder and the inner cylinder, when the positioning of each pipe opening at the top is completed, remove the positioning tooling, lift the cylinder by the lifting device, and then install the positioning tooling to the bottom of the jacket cylinder, adjust the length of the telescopic rotating arm and rotate the telescopic rotating arm angle, so that the positioning device is sequentially marked at the positioning positions of each pipe opening set at the bottom of the jacket cylinder, when the positioning of each pipe opening 4 at the bottom is completed, remove the positioning tooling, and lower the cylinder by the lifting device; S3, welding the pipe openings, placing the pipe openings 4 arranged on the top of the jacket cylinder and the inner cylinder in the positioning positions in sequence, and welding them. After the welding of the pipe openings on the top is completed, the cylinder is hoisted by the hoisting device, and then the pipe openings arranged on the bottom of the jacket cylinder are placed in the positioning positions in sequence, and welding is performed; S4, inspection, close all pipe openings on the distillation tower kettle, inject water into the distillation tower kettle until the water pressure in the distillation tower kettle reaches 0.3MPa, maintain for 30 minutes, monitor whether the various parts of the distillation tower kettle are deformed or leaking. If no deformation or leakage occurs, the distillation tower kettle is manufactured. If deformation occurs, perform sheet metal repair on the part and weld a reinforcement plate. If leakage occurs, perform repair welding on the part. After completing the repair welding or sheet metal repair, re-inspect.

[0008] The distillation tower still also includes an internal steel pipe, which is arranged in the inner cylinder, the bottom end of the internal steel pipe passes through the bottom of the inner cylinder and is sealedly connected to the inner cylinder, the top of the internal steel pipe is sealedly connected to one end of the elbow, the other end of the elbow passes through the side wall of the inner cylinder and is sealedly connected to the inner cylinder, and the inner cavity of the internal steel pipe is connected to the inner cavity of the jacket cylinder through the elbow; The inner cylinder comprises a lower cylinder and an upper cylinder; The S1 comprises the following steps: Prepare the jacket cylinder, lower cylinder, upper cylinder and internal steel pipe respectively. Place the prepared jacket cylinder vertically, and then place the lower cylinder coaxially in the jacket cylinder. When the inner cylinder is in place, weld the jacket cylinder and the lower cylinder together, place the inner steel pipe coaxially in the inner cylinder. When the inner steel pipe is in place, weld the inner steel pipe and the inner cylinder together, open a mounting hole for the elbow on the side wall of the inner cylinder, and then weld both ends of the elbow to the top of the inner steel pipe and the mounting holes on the inner cylinder respectively, and then seal and weld the upper cylinder to the lower cylinder.

[0009] The pipe orifice also includes an inner cylinder drain port, which is arranged at the bottom of the jacket cylinder, and one side of the inner cylinder drain port passes through the jacket cylinder and the bottom of the inner cylinder and is connected to the inner cylinder to form an integrated structure; The S2 further comprises the following steps: Mark the opening position of the inner cylinder drain port at the bottom of the jacket cylinder and the lower cylinder by the positioning tool, and then use the hole-opening tool to open the mounting hole of the inner cylinder drain port. After the mounting hole of the inner cylinder drain port is opened, place the lower cylinder coaxially in the jacket cylinder, adjust the positions of the jacket cylinder and the lower cylinder so that the mounting hole on the jacket cylinder is located directly above the mounting hole on the lower cylinder, and then weld the jacket cylinder and the lower cylinder into one.

[0010] The frame includes a central positioning rod, a middle bearing, a plurality of telescopic connecting arms and a plurality of positioning clips, the middle bearing is sleeved on the central positioning rod, the middle bearing is rotationally matched with the central positioning rod, one end of the plurality of telescopic connecting arms is fixedly connected to the side wall of the middle bearing along the circumferential direction, and the other end of the plurality of telescopic connecting arms is fixedly provided with a positioning clip, the positioning device 3 is rotationally matched with the central positioning rod, the bottom of the central positioning rod is matched with the rotation center of the tank body, the positioning clip is limitedly matched with the outer wall of the tank body, and each of the telescopic connecting arms is provided with a scale; The S2 further comprises the following steps: When installing the positioning tooling, each positioning clip is set on the outer wall of the cylinder, and the length of each telescopic connecting arm is adjusted to make the length of all telescopic connecting arms equal. At this time, the central positioning rod is located on the central axis of the cylinder.

[0011] A level is provided on the telescopic connecting arm; The S2 further comprises the following steps: When installing the positioning tooling, use a level to adjust the position of the frame to keep the frame in a horizontal state.

[0012] The frame also includes an angle meter, which is an annular structure, and an angle scale is provided on the top end face of the angle meter. The angle meter is provided on the middle bearing, and the center of the angle meter coincides with the center of the middle bearing. The bottom of the angle meter is fixedly connected to the top of the middle bearing, and a scale is provided on the telescopic rotating arm; The S2 further comprises the following steps: Adjust the length of the telescopic rotating arm, and use the scale on the telescopic rotating arm to make the distance between the positioning device and the center of the cylinder meet the requirements of the drawing. Rotate the telescopic rotating arm and use the angle meter to make the rotation angle of the positioning device meet the requirements of the drawing. When the distance between the positioning device and the center of the cylinder and the rotation angle meet the requirements of the drawing, use the positioning device to mark the positioning positions of each pipe opening set on the top of the jacket cylinder and the inner cylinder.

[0013] The side wall of the jacket cylinder or the inner cylinder is provided with a plurality of pipe openings with flanges; A scale is provided on the positioning clip along the vertical direction; The S2 further comprises the following steps: When there is a pipe mouth on the side of the cylinder, rotate the telescopic rotating arm and use the angle meter to make the rotation angle of the positioning device meet the requirements of the drawing. When the rotation angle of the positioning device meets the requirements of the drawing, mark it on the end cover of the cylinder through the positioning device, and then rotate the positioning tool to make any telescopic rotating arm coincide with the mark. At this time, determine the pipe mouth height through the scale on the positioning device. When the pipe mouth height meets the requirements of the drawing, mark it with the marking tool.

[0014] A positioning cone is coaxially arranged at the bottom of the central positioning rod, and a plurality of positioning steps are arranged on the positioning cone in the horizontal direction. Each of the positioning steps is coaxially arranged with the central positioning rod, and the diameter of each positioning step decreases from top to bottom. The positioning cone is used to be inserted into the hole on the distillation tower kettle for positioning.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. In a manufacturing method of a distillation tower kettle of the present invention, the distillation tower kettle includes a jacketed cylinder, an inner cylinder and a plurality of nozzles thereon, and the positioning tool includes a frame, a telescopic rotating arm and a positioning device. The frame is used to be fixedly connected to the cylinder, and the telescopic rotating arm rotates with the frame. By adjusting the length and rotation angle of the telescopic rotating arm, the relative position of the positioning tool and the cylinder can be accurately adjusted, so that the positioning mark is marked on the cylinder through the positioning device, and the positioning reference of each nozzle is the frame. Therefore, this design adopts the frame as the positioning reference of each nozzle, eliminates the cumulative error of multiple nozzles, and effectively improves the positioning accuracy.

[0016] 2. In a method for manufacturing a distillation tower kettle of the present invention, the frame of the positioning tool includes a central positioning rod, a middle bearing, a plurality of telescopic connecting arms and a plurality of positioning clips, and a level is provided on the frame. When installing the positioning tool, each positioning clip is provided on the outer wall of the cylinder, and the position of the frame is adjusted by the level to keep the frame in a horizontal state, and the length of each telescopic connecting arm is adjusted to make the length of all telescopic connecting arms equal, and the central positioning rod is located on the central axis of the cylinder. Therefore, the design can ensure that the frame remains in a horizontal state by using a level, and when the frame remains in a horizontal state, the length of each telescopic connecting arm is adjusted to make the central positioning rod located on the central axis of the cylinder, thereby effectively improving the positioning accuracy.

[0017] 3. In a method for manufacturing a distillation tower kettle of the present invention, a scale is provided on the inner rod of the telescopic rod of the positioning tool, and an angle meter is provided on the frame. The scale and the angle meter can be used to quickly determine the angle and distance of the positioning device with the center positioning rod as the reference. Therefore, the design can quickly determine the angle and distance of the positioning device with the center positioning rod as the reference, effectively improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the distillation tower kettle manufactured by the present invention.

[0019] Figure 2 It is a top view of the distillation tower kettle manufactured by the present invention.

[0020] Figure 3 It is a structural schematic diagram of the positioning tool in the present invention.

[0021] Figure 4 It is a top view of the positioning tool in the present invention.

[0022] In the figure: jacket cylinder 1, inner cylinder 2, lower cylinder 21, upper cylinder 22, internal steel pipe 3, bent pipe 31, pipe mouth 4, inner cylinder drain port 41, frame 5, center positioning rod 51, middle bearing 52, telescopic connecting arm 53, positioning clip 54, angle meter 55, level 56, positioning cone 57, telescopic rotating arm 6, positioning device 7. DETAILED DESCRIPTION

[0023] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0024] See also Figures 1 to 4 , a method for manufacturing a distillation tower kettle, wherein the distillation tower kettle manufactured by the manufacturing method comprises the following structure: The distillation tower kettle comprises a jacketed cylinder 1 and an inner cylinder 2; The jacket cylinder 1 is a barrel-shaped structure, and the jacket cylinder 1 is sleeved on the lower part of the inner cylinder 2. The open end of the jacket cylinder 1 is sealed and connected to the outer wall of the inner cylinder 2 through an arc segment. The top, bottom and sides of the jacket cylinder 1 and the inner cylinder 2 are provided with a plurality of pipe openings 4 with flanges; The manufacturing method is based on the following positioning tooling: The positioning tool comprises a frame 5, a telescopic rotating arm 6 and a positioning device 7; The middle part of the frame 5 is connected to one end of the telescopic rotating arm 6, the telescopic rotating arm 6 is rotatably matched with the frame 5, the other end of the telescopic rotating arm 6 is fixedly connected to the positioning device 7, the frame 5 is used to be fixedly connected to the tank body, and the positioning device 7 is used to mark the positioning mark on the tank body; The manufacturing method comprises the following steps: S1, welding the cylinder, prepare the jacket cylinder 1 and the inner cylinder 2 respectively, place the prepared jacket cylinder 1 vertically, and then place the inner cylinder 2 coaxially in the jacket cylinder 1, and when the inner cylinder 2 is in place, weld the jacket cylinder 1 and the inner cylinder 2 into one; S2, pipe opening positioning, install the positioning tooling to the top of the inner cylinder 2, and by adjusting the length of the telescopic rotating arm 6 and rotating the telescopic rotating arm 6, the positioning device 7 is sequentially marked at the positioning positions of each pipe opening 4 set at the top of the jacket cylinder 1 and the inner cylinder 2. When the positioning of each pipe opening 4 at the top is completed, remove the positioning tooling, lift the cylinder by the lifting device, and then install the positioning tooling to the bottom of the jacket cylinder 1. By adjusting the length of the telescopic rotating arm 6 and rotating the telescopic rotating arm 6, the positioning device 7 is sequentially marked at the positioning positions of each pipe opening 4 set at the bottom of the jacket cylinder 1. When the positioning of each pipe opening 4 at the bottom is completed, remove the positioning tooling and lower the cylinder by the lifting device; S3, welding the pipe openings, placing the pipe openings 4 arranged on the top of the jacket cylinder 1 and the inner cylinder 2 in the positioning positions in sequence, and welding them. After the welding of the pipe openings 4 on the top is completed, the cylinder is hoisted by the hoisting device, and then the pipe openings 4 arranged on the bottom of the jacket cylinder 1 are placed in the positioning positions in sequence, and welding is performed; S4, inspection, close all the pipe openings 4 on the distillation tower kettle, inject water into the distillation tower kettle until the water pressure in the distillation tower kettle reaches 0.3MPa, maintain for 30 minutes, monitor whether the various parts of the distillation tower kettle are deformed or leaking, if no deformation or leakage occurs, the distillation tower kettle is manufactured, if deformation occurs, perform sheet metal repair on the part and weld a reinforcement plate, if leakage occurs, perform repair welding on the part, and after completing the repair welding or sheet metal repair, re-inspect.

[0025] The distillation tower still further includes an internal steel pipe 3, which is arranged in the inner cylinder 2. The bottom end of the internal steel pipe 3 passes through the bottom of the inner cylinder 2 and is sealedly connected to the inner cylinder 2. The top of the internal steel pipe 3 is sealedly connected to one end of a bend pipe 31. The other end of the bend pipe 31 passes through the side wall of the inner cylinder 2 and is sealedly connected to the inner cylinder 2. The inner cavity of the internal steel pipe 3 is connected to the inner cavity of the jacket cylinder 1 through the bend pipe 31. The inner cylinder 2 includes a lower cylinder 21 and an upper cylinder 22; The S1 comprises the following steps: The jacket cylinder 1, the lower cylinder 21, the upper cylinder 22 and the inner steel pipe 3 are prepared respectively. Place the prepared jacket cylinder 1 vertically, and then place the lower cylinder 21 coaxially in the jacket cylinder 1. When the inner cylinder 2 is in place, weld the jacket cylinder 1 and the lower cylinder 21 as a whole. Place the internal steel pipe 3 coaxially in the inner cylinder 2. When the internal steel pipe 3 is in place, weld the internal steel pipe 3 and the inner cylinder 2 as a whole. Open a mounting hole for the elbow 31 on the side wall of the inner cylinder 2, and then weld both ends of the elbow 31 to the top of the internal steel pipe 3 and the mounting holes on the inner cylinder 2 respectively, and then seal and weld the upper cylinder 22 to the lower cylinder 21.

[0026] The pipe port 4 also includes an inner cylinder drain port 41, which is arranged at the bottom of the jacket cylinder 1. One side of the inner cylinder drain port 41 passes through the bottom of the jacket cylinder 1 and the inner cylinder 2 and is connected to the inner cylinder 2 as an integral structure. The S2 further comprises the following steps: Mark the opening position of the inner cylinder drain port 41 at the bottom of the jacket cylinder 1 and the lower cylinder 21 by means of a positioning tool, and then use a hole-opening tool to open the mounting hole of the inner cylinder drain port 41. When the mounting hole of the inner cylinder drain port 41 is opened, place the lower cylinder 21 coaxially in the jacket cylinder 1, and adjust the positions of the jacket cylinder 1 and the lower cylinder 21 so that the mounting hole on the jacket cylinder 1 is located directly above the mounting hole on the lower cylinder 21. At this time, the jacket cylinder 1 and the lower cylinder 21 are welded together.

[0027] The frame 5 includes a central positioning rod 51, a middle bearing 52, a plurality of telescopic connecting arms 53 and a plurality of positioning clips 54. The middle bearing 52 is sleeved on the central positioning rod 51, and the middle bearing 52 is rotatably matched with the central positioning rod 51. One end of the plurality of telescopic connecting arms 53 is fixedly connected to the side wall of the middle bearing 52 along the circumferential direction, and the other end of the plurality of telescopic connecting arms 53 is fixedly provided with a positioning clip 54. The positioning device 3 is rotatably matched with the central positioning rod 51, and the bottom of the central positioning rod 51 is matched with the rotation center of the tank body. The positioning clip 54 is limitedly matched with the outer wall of the tank body, and each of the telescopic connecting arms 53 is provided with a scale. The S2 further comprises the following steps: When installing the positioning tool, each positioning clip 54 is set on the outer wall of the cylinder, and the length of each telescopic connecting arm 53 is adjusted to make the length of all telescopic connecting arms 53 equal. At this time, the central positioning rod 51 is located on the central axis of the cylinder.

[0028] The telescopic connecting arm 53 is provided with a level meter 56; The S2 further comprises the following steps: When installing the positioning tool, the position of the frame 5 is adjusted by the level 56 to keep the frame 5 in a horizontal state.

[0029] The frame 5 further includes an angle gauge 55, which is an annular structure. An angle scale is provided on the top end surface of the angle gauge 55. The angle gauge 55 is provided on the middle bearing 52. The center of the angle gauge 55 coincides with the center of the middle bearing 12. The bottom of the angle gauge 55 is fixedly connected to the top of the middle bearing 12. A scale is provided on the telescopic rotating arm 6. The S2 further comprises the following steps: Adjust the length of the telescopic rotating arm 6, and use the scale on the telescopic rotating arm 6 to make the distance between the positioning device 7 and the center of the cylinder meet the requirements of the drawing, rotate the telescopic rotating arm 6, and use the angle meter 55 to make the rotation angle of the positioning device 7 meet the requirements of the drawing. When the distance between the positioning device 7 and the center of the cylinder and the rotation angle meet the requirements of the drawing, mark the positioning positions of each pipe mouth 4 set on the top of the jacket cylinder 1 and the inner cylinder 2 through the positioning device 7.

[0030] The side wall of the jacket cylinder 1 or the inner cylinder 2 is provided with a plurality of pipe openings 4 with flanges; The positioning clip 54 is provided with a scale in the vertical direction; The S2 further comprises the following steps: When there is a pipe mouth 4 on the side of the cylinder, rotate the telescopic rotating arm 6, and use the angle meter 55 to make the rotation angle of the positioning device 7 meet the requirements of the drawing. When the rotation angle of the positioning device 7 meets the requirements of the drawing, mark the end cover of the cylinder through the positioning device 7, and then rotate the positioning tool to make any telescopic rotating arm 6 coincide with the mark. At this time, the height of the pipe mouth 4 is determined by the scale on the positioning device 7. When the height of the pipe mouth 4 meets the requirements of the drawing, mark it with a scribing tool.

[0031] A positioning cone 57 is coaxially arranged at the bottom of the center positioning rod 51, and a plurality of positioning steps are arranged on the positioning cone 57 in the horizontal direction. Each of the positioning steps is coaxially arranged with the center positioning rod 51, and the diameter of each positioning step decreases from top to bottom. The positioning cone 57 is used to be inserted into the hole on the distillation tower kettle for positioning.

[0032] Embodiment 1: See also Figures 1 to 4 , a method for manufacturing a distillation tower kettle, wherein the distillation tower kettle manufactured by the manufacturing method comprises the following structure: The distillation tower kettle comprises a jacketed cylinder 1 and an inner cylinder 2; The jacket cylinder 1 is a barrel-shaped structure, and the jacket cylinder 1 is sleeved on the lower part of the inner cylinder 2. The open end of the jacket cylinder 1 is sealed and connected to the outer wall of the inner cylinder 2 through an arc segment. The top, bottom and sides of the jacket cylinder 1 and the inner cylinder 2 are provided with a plurality of pipe openings 4 with flanges; The manufacturing method is based on the following positioning tooling: The positioning tool comprises a frame 5, a telescopic rotating arm 6 and a positioning device 7; The middle part of the frame 5 is connected to one end of the telescopic rotating arm 6, the telescopic rotating arm 6 is rotatably matched with the frame 5, the other end of the telescopic rotating arm 6 is fixedly connected to the positioning device 7, the frame 5 is used to be fixedly connected to the tank body, and the positioning device 7 is used to mark the positioning mark on the tank body; The manufacturing method comprises the following steps: S1, welding the cylinder, prepare the jacket cylinder 1 and the inner cylinder 2 respectively, place the prepared jacket cylinder 1 vertically, and then place the inner cylinder 2 coaxially in the jacket cylinder 1, and when the inner cylinder 2 is in place, weld the jacket cylinder 1 and the inner cylinder 2 into one; S2, pipe opening positioning, install the positioning tooling to the top of the inner cylinder 2, and by adjusting the length of the telescopic rotating arm 6 and rotating the telescopic rotating arm 6, the positioning device 7 is sequentially marked at the positioning positions of each pipe opening 4 set at the top of the jacket cylinder 1 and the inner cylinder 2. When the positioning of each pipe opening 4 at the top is completed, remove the positioning tooling, lift the cylinder by the lifting device, and then install the positioning tooling to the bottom of the jacket cylinder 1. By adjusting the length of the telescopic rotating arm 6 and rotating the telescopic rotating arm 6, the positioning device 7 is sequentially marked at the positioning positions of each pipe opening 4 set at the bottom of the jacket cylinder 1. When the positioning of each pipe opening 4 at the bottom is completed, remove the positioning tooling and lower the cylinder by the lifting device; S3, welding the pipe openings, placing the pipe openings 4 arranged on the top of the jacket cylinder 1 and the inner cylinder 2 in the positioning positions in sequence, and welding them. After the welding of the pipe openings 4 on the top is completed, the cylinder is hoisted by the hoisting device, and then the pipe openings 4 arranged on the bottom of the jacket cylinder 1 are placed in the positioning positions in sequence, and welding is performed; S4, inspection, close all the pipe openings 4 on the distillation tower kettle, inject water into the distillation tower kettle until the water pressure in the distillation tower kettle reaches 0.3MPa, maintain for 30 minutes, monitor whether the various parts of the distillation tower kettle are deformed or leaking, if no deformation or leakage occurs, the distillation tower kettle is manufactured, if deformation occurs, perform sheet metal repair on the part and weld a reinforcement plate, if leakage occurs, perform repair welding on the part, and after completing the repair welding or sheet metal repair, re-inspect.

[0033] The distillation tower still further includes an internal steel pipe 3, which is arranged in the inner cylinder 2. The bottom end of the internal steel pipe 3 passes through the bottom of the inner cylinder 2 and is sealedly connected to the inner cylinder 2. The top of the internal steel pipe 3 is sealedly connected to one end of a bend pipe 31. The other end of the bend pipe 31 passes through the side wall of the inner cylinder 2 and is sealedly connected to the inner cylinder 2. The inner cavity of the internal steel pipe 3 is connected to the inner cavity of the jacket cylinder 1 through the bend pipe 31. The inner cylinder 2 includes a lower cylinder 21 and an upper cylinder 22; The S1 comprises the following steps: The jacket cylinder 1, the lower cylinder 21, the upper cylinder 22 and the inner steel pipe 3 are prepared respectively. Place the prepared jacket cylinder 1 vertically, and then place the lower cylinder 21 coaxially in the jacket cylinder 1. When the inner cylinder 2 is in place, weld the jacket cylinder 1 and the lower cylinder 21 as a whole. Place the internal steel pipe 3 coaxially in the inner cylinder 2. When the internal steel pipe 3 is in place, weld the internal steel pipe 3 and the inner cylinder 2 as a whole. Open a mounting hole for the elbow 31 on the side wall of the inner cylinder 2, and then weld both ends of the elbow 31 to the top of the internal steel pipe 3 and the mounting holes on the inner cylinder 2 respectively, and then seal and weld the upper cylinder 22 to the lower cylinder 21.

[0034] The pipe port 4 also includes an inner cylinder drain port 41, which is arranged at the bottom of the jacket cylinder 1. One side of the inner cylinder drain port 41 passes through the bottom of the jacket cylinder 1 and the inner cylinder 2 and is connected to the inner cylinder 2 as an integral structure. The S2 further comprises the following steps: Mark the opening position of the inner cylinder drain port 41 at the bottom of the jacket cylinder 1 and the lower cylinder 21 by means of a positioning tool, and then use a hole-opening tool to open the mounting hole of the inner cylinder drain port 41. When the mounting hole of the inner cylinder drain port 41 is opened, place the lower cylinder 21 coaxially in the jacket cylinder 1, and adjust the positions of the jacket cylinder 1 and the lower cylinder 21 so that the mounting hole on the jacket cylinder 1 is located directly above the mounting hole on the lower cylinder 21. At this time, the jacket cylinder 1 and the lower cylinder 21 are welded together.

[0035] Embodiment 2: The frame 5 includes a central positioning rod 51, a middle bearing 52, a plurality of telescopic connecting arms 53 and a plurality of positioning clips 54. The middle bearing 52 is sleeved on the central positioning rod 51, and the middle bearing 52 is rotatably matched with the central positioning rod 51. One end of the plurality of telescopic connecting arms 53 is fixedly connected to the side wall of the middle bearing 52 along the circumferential direction, and the other end of the plurality of telescopic connecting arms 53 is fixedly provided with a positioning clip 54. The positioning device 3 is rotatably matched with the central positioning rod 51, and the bottom of the central positioning rod 51 is matched with the rotation center of the tank body. The positioning clip 54 is limitedly matched with the outer wall of the tank body, and each of the telescopic connecting arms 53 is provided with a scale. The S2 further comprises the following steps: When installing the positioning tool, each positioning clip 54 is set on the outer wall of the cylinder, and the length of each telescopic connecting arm 53 is adjusted to make the length of all telescopic connecting arms 53 equal. At this time, the central positioning rod 51 is located on the central axis of the cylinder.

[0036] The telescopic connecting arm 53 is provided with a level meter 56; The S2 further comprises the following steps: When installing the positioning tool, the position of the frame 5 is adjusted by the level 56 to keep the frame 5 in a horizontal state.

[0037] The frame 5 further includes an angle gauge 55, which is an annular structure. An angle scale is provided on the top end surface of the angle gauge 55. The angle gauge 55 is provided on the middle bearing 52. The center of the angle gauge 55 coincides with the center of the middle bearing 12. The bottom of the angle gauge 55 is fixedly connected to the top of the middle bearing 12. A scale is provided on the telescopic rotating arm 6. The S2 further comprises the following steps: Adjust the length of the telescopic rotating arm 6, and use the scale on the telescopic rotating arm 6 to make the distance between the positioning device 7 and the center of the cylinder meet the requirements of the drawing, rotate the telescopic rotating arm 6, and use the angle meter 55 to make the rotation angle of the positioning device 7 meet the requirements of the drawing. When the distance between the positioning device 7 and the center of the cylinder and the rotation angle meet the requirements of the drawing, mark the positioning positions of each pipe mouth 4 set on the top of the jacket cylinder 1 and the inner cylinder 2 through the positioning device 7.

[0038] Embodiment 3: The side wall of the jacket cylinder 1 or the inner cylinder 2 is provided with a plurality of pipe openings 4 with flanges; The positioning clip 54 is provided with a scale in the vertical direction; The S2 further comprises the following steps: When there is a pipe mouth 4 on the side of the cylinder, rotate the telescopic rotating arm 6, and use the angle meter 55 to make the rotation angle of the positioning device 7 meet the requirements of the drawing. When the rotation angle of the positioning device 7 meets the requirements of the drawing, mark the end cover of the cylinder through the positioning device 7, and then rotate the positioning tool to make any telescopic rotating arm 6 coincide with the mark. At this time, the height of the pipe mouth 4 is determined by the scale on the positioning device 7. When the height of the pipe mouth 4 meets the requirements of the drawing, mark it with a scribing tool.

[0039] A positioning cone 57 is coaxially arranged at the bottom of the center positioning rod 51, and a plurality of positioning steps are arranged on the positioning cone 57 in the horizontal direction. Each of the positioning steps is coaxially arranged with the center positioning rod 51, and the diameter of each positioning step decreases from top to bottom. The positioning cone 57 is used to be inserted into the hole on the distillation tower kettle for positioning.

[0040] The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiment. Any equivalent modifications or changes made by ordinary technicians in this field based on the contents disclosed by the present invention should be included in the protection scope recorded in the claims.

Claims

1. A method for manufacturing a distillation tower reactor, Features: The distillation tower kettle manufactured by the manufacturing method comprises the following structure: The distillation tower kettle comprises a jacketed cylinder (1) and an inner cylinder (2); The jacket cylinder (1) is a barrel-shaped structure, the jacket cylinder (1) is sleeved on the lower part of the inner cylinder (2), and the open end of the jacket cylinder (1) is sealedly connected to the outer wall of the inner cylinder (2) through an arc segment; The top, bottom and sides of the jacket cylinder (1) and the inner cylinder (2) are all provided with a plurality of pipe openings (4) with flanges; The manufacturing method is based on the following positioning tooling: The positioning tool comprises a frame (5), a telescopic rotating arm (6) and a positioning device (7); The middle part of the frame (5) is connected to one end of a telescopic rotating arm (6), the telescopic rotating arm (6) and the frame (5) are rotatably matched, the other end of the telescopic rotating arm (6) is fixedly connected to a positioning device (7), the frame (5) is used to be fixedly connected to the tank body, and the positioning device (7) is used to mark a positioning mark on the tank body; The manufacturing method comprises the following steps: S1, welding the cylinder, preparing a jacket cylinder (1) and an inner cylinder (2) respectively, placing the prepared jacket cylinder (1) vertically, and then placing the inner cylinder (2) coaxially inside the jacket cylinder (1), and after the inner cylinder (2) is placed in place, welding the jacket cylinder (1) and the inner cylinder (2) into one piece; S2, positioning the pipe openings, installing the positioning tooling on the top of the inner cylinder (2), adjusting the length of the telescopic rotating arm (6) and rotating the telescopic rotating arm (6) at an angle, so that the positioning device (7) sequentially marks the positioning positions of the pipe openings (4) arranged at the top of the jacket cylinder (1) and the inner cylinder (2), when the positioning of the pipe openings (4) at the top is completed, removing the positioning tooling, lifting the cylinder by a lifting device, and then installing the positioning tooling on the bottom of the jacket cylinder (1), adjusting the length of the telescopic rotating arm (6) and rotating the telescopic rotating arm (6) at an angle, so that the positioning device (7) sequentially marks the positioning positions of the pipe openings (4) arranged at the bottom of the jacket cylinder (1), when the positioning of the pipe openings (4) at the bottom is completed, removing the positioning tooling, and lowering the cylinder by a lifting device; S3, welding the pipe openings, placing the pipe openings (4) arranged at the top of the jacket cylinder (1) and the inner cylinder (2) in the positioning positions in sequence, and welding them. After the welding of the pipe openings (4) at the top is completed, the cylinder is hoisted by a hoisting device, and then the pipe openings (4) arranged at the bottom of the jacket cylinder (1) are placed in the positioning positions in sequence, and welding is performed; S4, inspection, close all the pipe openings (4) on the distillation tower kettle, inject water into the distillation tower kettle until the water pressure in the distillation tower kettle reaches 0.3MPa, maintain for 30 minutes, monitor whether the various parts of the distillation tower kettle are deformed or leaking, if no deformation or leakage occurs, the distillation tower kettle is manufactured, if deformation occurs, perform sheet metal repair on the part and weld a reinforcement plate, if leakage occurs, perform repair welding on the part, after the repair welding or sheet metal repair is completed, re-inspect.

2. A method for manufacturing a distillation tower reactor according to claim 1, Features: The distillation tower still further comprises an internal steel pipe (3), the internal steel pipe (3) being arranged in the inner cylinder (2), the bottom end of the internal steel pipe (3) passing through the bottom of the inner cylinder (2) and being sealedly connected to the inner cylinder (2), the top of the internal steel pipe (3) being sealedly connected to one end of a curved pipe (31), the other end of the curved pipe (31) passing through the side wall of the inner cylinder (2) and being sealedly connected to the inner cylinder (2), the inner cavity of the internal steel pipe (3) being connected to the inner cavity of the jacket cylinder (1) through the curved pipe (31); The inner cylinder (2) comprises a lower cylinder (21) and an upper cylinder (22); The S1 comprises the following steps: The jacket cylinder (1), the lower cylinder (21), the upper cylinder (22) and the inner steel pipe (3) are prepared respectively. The prepared jacket cylinder (1) is placed vertically, and then the lower cylinder (21) is coaxially placed inside the jacket cylinder (1). When the inner cylinder (2) is in place, the jacket cylinder (1) and the lower cylinder (21) are welded together. The inner steel pipe (3) is coaxially placed inside the inner cylinder (2). When the inner steel pipe (3) is in place, the inner steel pipe (3) and the inner cylinder (2) are welded together. A mounting hole for the bent pipe (31) is opened on the side wall of the inner cylinder (2), and then the two ends of the bent pipe (31) are respectively welded to the top of the inner steel pipe (3) and the mounting holes on the inner cylinder (2), and then the upper cylinder (22) is sealed and welded to the lower cylinder (21).

3. A method for manufacturing a distillation tower reactor according to claim 2, Features: The pipe port (4) further comprises an inner cylinder drain port (41), wherein the inner cylinder drain port (41) is arranged at the bottom of the jacket cylinder (1), and one side of the inner cylinder drain port (41) passes through the jacket cylinder (1) and the bottom of the inner cylinder (2) and is connected to the inner cylinder (2) to form an integral structure; The S2 further comprises the following steps: The opening position of the inner cylinder drain opening (41) is marked on the bottom of the jacket cylinder (1) and the lower cylinder (21) by a positioning tool, and then the mounting hole of the inner cylinder drain opening (41) is opened by a hole-opening tool. After the mounting hole of the inner cylinder drain opening (41) is opened, the lower cylinder (21) is coaxially placed in the jacket cylinder (1), and the positions of the jacket cylinder (1) and the lower cylinder (21) are adjusted so that the mounting hole on the jacket cylinder (1) is located directly above the mounting hole on the lower cylinder (21). At this time, the jacket cylinder (1) and the lower cylinder (21) are welded together.

4. A method for manufacturing a distillation tower bottom according to any one of claims 1 to 4, Features: The frame (5) comprises a central positioning rod (51), a middle bearing (52), a plurality of telescopic connecting arms (53) and a plurality of positioning clips (54); the middle bearing (52) is sleeved on the central positioning rod (51); the middle bearing (52) and the central positioning rod (51) are rotationally matched; one end of the plurality of telescopic connecting arms (53) is fixedly connected to the side wall of the middle bearing (52) along the circumferential direction; the other end of the plurality of telescopic connecting arms (53) is fixedly provided with a positioning clip (54); the positioning device 3 and the central positioning rod (51) are rotationally matched; the bottom of the central positioning rod (51) is matched with the rotation center of the tank body; the positioning clip (54) is limitedly matched with the outer wall of the cylinder body; and each of the telescopic connecting arms (53) is provided with a scale; The S2 further comprises the following steps: When installing the positioning fixture, each positioning clip (54) is set on the outer wall of the cylinder, and the length of each telescopic connecting arm (53) is adjusted so that the lengths of all telescopic connecting arms (53) are equal. At this time, the central positioning rod (51) is located on the central axis of the cylinder.

5. A method for manufacturing a distillation tower reactor according to claim 4, Features: The telescopic connecting arm (53) is provided with a level meter (56); The S2 further comprises the following steps: When installing the positioning tool, the position of the frame (5) is adjusted by a level (56) so that the frame (5) remains in a horizontal state.

6. A method for manufacturing a distillation tower bottom according to claim 5, Features: The frame (5) further comprises an angle meter (55), the angle meter (55) being an annular structure, the top end surface of the angle meter (55) being provided with angle scales, the angle meter (55) being provided on the middle bearing (52), the center of the circle of the angle meter (55) being coincident with the center of the circle of the middle bearing 12, the bottom of the angle meter (55) being fixedly connected with the top of the middle bearing 12, and the telescopic rotating arm (6) being provided with a scale; The S2 further comprises the following steps: The length of the telescopic rotating arm (6) is adjusted, and the distance between the positioning device (7) and the center of the cylinder body is made to meet the requirements of the drawing by using the scale on the telescopic rotating arm (6). The telescopic rotating arm (6) is rotated, and the rotation angle of the positioning device (7) is made to meet the requirements of the drawing by using the angle meter (55). When the distance between the positioning device (7) and the center of the cylinder body and the rotation angle meet the requirements of the drawing, the positioning device (7) is used to mark the positioning positions of the various pipe openings (4) arranged at the top of the jacket cylinder (1) and the inner cylinder (2).

7. A method for manufacturing a distillation tower bottom according to claim 6, Features: The side wall of the jacket cylinder (1) or the inner cylinder (2) is provided with a plurality of pipe openings (4) with flanges; A scale is provided on the positioning clip (54) along the vertical direction; The S2 further comprises the following steps: When there is a pipe opening (4) on the side of the cylinder, the telescopic rotating arm (6) is rotated, and the rotation angle of the positioning device (7) is made to meet the requirements of the drawing by using the angle meter (55). When the rotation angle of the positioning device (7) meets the requirements of the drawing, a mark is made on the cylinder end cover by using the positioning device (7), and then the positioning fixture is rotated to make any telescopic rotating arm (6) coincide with the mark. At this time, the height of the pipe opening (4) is determined by using the scale on the positioning device (7). When the height of the pipe opening (4) meets the requirements of the drawing, it is marked by using a marking tool.

8. A method for manufacturing a distillation tower bottom according to claim 7, Features: A positioning cone (57) is coaxially arranged at the bottom of the central positioning rod (51), and a plurality of positioning steps are arranged in the horizontal direction on the positioning cone (57), each of the positioning steps is coaxially arranged with the central positioning rod (51), and the diameter of each of the positioning steps decreases from top to bottom, and the positioning cone (57) is used to be inserted into a hole on the bottom of the distillation tower for positioning.

Citation Information

Patent Citations

  • Trepanning positioning line drawing device and method

    CN104354150A

  • Marking-off device and marking-off method for hole seat on outer side wall of barrel and reinforcement rib on inner side wall of barrel

    CN106914877A

  • Marking tool based on hole positioning

    CN218965386U

  • Marking-off tool

    JP2011240426A