Concrete crack full-automatic manufacturing and crack repairing monitoring system and method

By designing a fully automatic manufacturing and monitoring system, the rapid and accurate problems of concrete crack detection and repair are solved, and the precise crack production and high-integrated monitoring of the repair process are achieved, ensuring the long-term stability and safety of the concrete structure.

CN119077933APending Publication Date: 2024-12-06JIANGSU UNIV OF SCI & TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411445764.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Concrete materials are prone to small cracks during service, and the existing technology is difficult to detect the development of cracks quickly and accurately, resulting in delays in repair timing and lack of high-integration intelligent equipment for crack production, monitoring and repair.

Method used

A fully automatic manufacturing and monitoring system for concrete cracks is designed, including a curing box, an automated control system, a transmission system, a binding system and a laser positioning and detection system to realize automatic repair of cracks and full life cycle monitoring, through a laser positioning and detection system Accurately locate cracks and coordinate the automated control system to achieve real-time monitoring of crack production, maintenance and repair processes.

Benefits of technology

It realizes precise fabrication of cracks and highly integrated testing of repair processes, ensuring the effectiveness of crack self-repair technology and long-term stability and safety of structure, and providing full life cycle monitoring feedback from crack generation to closure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077933A_ABST
    Figure CN119077933A_ABST
Patent Text Reader

Abstract

The invention discloses a concrete crack full-automatic manufacturing and crack repairing monitoring system and method.The concrete crack full-automatic manufacturing and crack repairing monitoring system comprises a curing box, an automatic control system, a crack manufacturing system, transmission systems and a binding system, the transmission systems are arranged on the two sides of the binding system correspondingly, and the curing box is arranged on the other side of one transmission system; an automatic operating system and a crack manufacturing system are arranged above the transmission system, and the crack manufacturing system comprises a laser positioning and detecting system and a crack simulating device. According to the invention, high-integration integrated test and test analysis of crack making, test piece maintenance and repair, repair process control, and accurate determination of repair degree can be realized, all systems of the instrument cooperate with each other, and the instrument is highly intelligent and controllable; the full-life-cycle real-time monitoring feedback of the concrete structure from crack development to the self-repairing process to crack sealing can be achieved, the high-precision camera device and the laser positioning and sensing device are matched, data feedback is timely and accurate, the measurement result is accurate and reliable, and the long-term stability and safety of the structure are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a concrete crack manufacturing and monitoring system and method, and in particular to a concrete crack full-automatic manufacturing and crack repair monitoring system and method. Background Art

[0002] Cement-based materials are one of the indispensable building materials for civil engineering. However, concrete materials have inherent defects such as low tensile strength, high brittleness, and easy cracking. During the service life of concrete, tiny cracks are inevitably generated due to drying shrinkage, temperature stress and the influence of the surrounding environment. However, in actual engineering, it is difficult to detect microscopic damage quickly and accurately. Due to the periodicity of manual inspection, the development of cracks may deteriorate rapidly between two inspections, resulting in delays in repair. Traditional crack repair often relies on external materials or grouting repairs. These methods have problems such as long construction period, complex construction, and difficult to maintain long-lasting repair effects.

[0003] In recent years, some intelligent concrete crack monitoring technologies have emerged, such as embedded sensors and fiber optic sensing technologies, but these technologies are often limited to monitoring, lacking highly integrated intelligent equipment and testing methods from crack production to specimen transmission testing, and then to real-time monitoring of crack repair progress. At the same time, the existing concrete self-repair technology lacks supporting precise quantitative testing and research equipment for repair effects. Therefore, further optimizing the test methods and system devices for integrated production, maintenance and monitoring has become a key direction for current research and application. Summary of the invention

[0004] Purpose of the invention: The purpose of the present invention is to propose a fully automatic concrete crack manufacturing and crack repair monitoring system and method, which realizes the automated repair of cracks and full life cycle monitoring.

[0005] Technical solution: The present invention includes a maintenance box, an automated control system, a crack creating system, a transmission system, and a binding system. Transmission systems are provided on both sides of the binding system. A maintenance box is provided on the other side of one of the transmission systems. An automated operating system and a crack creating system are provided above the transmission system. The crack creating system includes a laser positioning and detection system and a crack simulation device.

[0006] The curing box includes a main box body and a sub-box body. A monitoring camera device is provided in the middle of the main box body and a laser sensing device is provided at the bottom. An intelligent suction and drainage device is provided on the sub-box body. The water level of the curing box is adjusted in real time through the intelligent suction and drainage device to cure the test piece.

[0007] The surface of the transmission belt of the transmission system is provided with an automatic induction telescopic fixture for fixing the test piece.

[0008] The automatic sensing telescopic fixture includes a groove, both sides of the groove extend out of the transmission belt and are carried on the surface of the transmission belt, a connecting rod is passed through the bottom of the groove, a bump is fixed on the top of the connecting rod, a spring is sleeved on the rod part of the connecting rod that penetrates into the lower part of the groove, a bracket is covered on the outside of the spring, both ends of the bracket are fixed to the two sides of the groove, and pressure sensors are provided on the surfaces of the grooves on both sides of the connecting rod.

[0009] A support column is arranged at the bottom of the transmission system, the upper end of the support column is fixedly connected to a transmission shaft, one end of the transmission shaft is fixedly connected to a transmission wheel, and the outer surface of the transmission wheel is transmission-connected to a transmission belt for conveying the test piece.

[0010] The binding system includes a binding strap storage bin, a strap feeding roller and a tension control device, wherein the tension control device is connected to the binding strap storage bin, and the strap feeding roller is arranged on the surface of the binding system for conveying test pieces.

[0011] The tension control device can automatically adjust the tightness of the strapping belt according to the size of the test piece, ensuring that the pressure applied by the strapping belt on the surface of the test piece is uniform.

[0012] The crack simulation device integrates a loading system, a control module, and a crack generation module. The loading system can apply controllable stress in different directions, the control module is used to adjust the applied load in real time, and the crack generation module is used to accurately locate the generation of cracks.

[0013] The laser positioning and detection system is capable of setting the initial crack width.

[0014] A method for fully automatic manufacturing of concrete cracks and crack repair monitoring, comprising the following steps:

[0015] S1. Place the test piece on the transmission system. The automatic sensing telescopic fixture of the transmission system extends to fix the test piece and then transmits it to the lashing system.

[0016] S2. After the specimen is transferred to the binding system, the tension control device wraps around the specimen and binds it, and the belt feeding roller transmits the specimen to the transmission system on the other side;

[0017] S3, the specimen is transmitted to the transmission system on the other side, the automatic sensing telescopic fixture is extended to fix the specimen, the laser positioning and detection system performs laser positioning and crack distance measurement on the specimen, the crack simulation device applies load to the specimen to create cracks, and the automatic control system transfers the cracked specimen to the curing box;

[0018] S4. After the specimen is delivered to the preset location, the specimen is subjected to long-term curing in the curing box, and the water level of the curing box is adjusted in real time through the intelligent suction and drainage device to control the curing time and curing cycle;

[0019] S5. After the specimen is cured, the intelligent water suction and drainage device guides water to the auxiliary curing box, and at the same time controls the laser positioning and detection system to emit a laser beam, starts the laser sensing device at the bottom of the box, and transmits the results to the display through the monitoring camera device.

[0020] Beneficial effects: The present invention has the following advantages:

[0021] (1) The present invention can realize highly integrated integrated test and test analysis of crack production, specimen maintenance and repair, repair process control, and accurate determination of the degree of repair. The various systems of the instrument cooperate with each other and are highly intelligent and controllable, providing equipment and measurement method support for the development of concrete crack self-repair technology;

[0022] (2) The present invention can realize real-time monitoring and feedback of the entire life cycle of concrete structures from crack development to self-repair process and then to crack closure. With the help of high-precision camera devices, laser positioning and sensing devices, data feedback is timely and accurate, and the measurement results are accurate and reliable, thus ensuring the long-term stability and safety of the structure.

[0023] (3) The present invention organically combines crack production control technology, crack specimen maintenance and testing technology, and repair process monitoring and feedback technology to form an intelligent, integrated all-in-one device, completes the coordinated coupling of multiple complex processes, and becomes an effective aid to concrete self-repair technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0025] Figure 2 It is a schematic diagram of the lashing system of the present invention;

[0026] Figure 3 A top view of the transmission system of the test platform of the present invention;

[0027] Figure 4 It is a side view of the transmission system of the test platform of the present invention;

[0028] Figure 5 This is an appearance diagram of the automatic induction telescopic fixture of the present invention. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with the accompanying drawings.

[0030] like Figure 1As shown, the fully automatic concrete crack manufacturing and crack repair monitoring system of the present invention includes a curing box 1, an automatic control system 2, a crack manufacturing system, a transmission system 5, and a binding system 6. The binding system 6 is provided with a transmission system 5 on both sides, and a curing box 1 is provided on the other side of one of the transmission systems 5. The transmission system 5 is provided with an automatic operation system 2 and a crack manufacturing system. The crack manufacturing system includes a laser positioning and detection system 3 and a crack simulation device 4, which can accurately locate the crack generation position, and apply controllable stress through a loading system to simulate natural cracks. The transmission system transmits the specimen to the binding system 6 for automatic binding and fixing, and the binding system 6 transmits the specimen to the transmission system 5 on the other side for crack manufacturing. The laser positioning and detection system 3 locates the specimen and accurately controls the crack, drives the crack simulation device 4 to manufacture cracks, and the automatic control system 2 moves the specimen with cracks to the curing box 1 for curing, and uses the laser positioning and detection system 3 for repair monitoring.

[0031] The maintenance box 1 has two boxes in total. A monitoring camera device 12 is provided in the middle of the main box, and the monitoring camera device 12 is connected to the display. A laser sensing device 11 is provided at the bottom to achieve intelligent monitoring and repair effects. An intelligent suction and drainage device 13 is provided on the auxiliary box, and the maintenance cycle can be adjusted according to actual maintenance needs.

[0032] The automated control system 2 includes a pulley-type mobile platform, a multi-degree-of-freedom joint system, an end effector, a sensor system, and a control system.

[0033] The transmission system 5 has a support column 51 at the bottom, the upper end of the support column 51 is fixedly connected to a transmission shaft 52, one end of the transmission shaft 52 is fixedly connected to a transmission wheel 53, the outer surface of the transmission wheel 53 is connected to a transmission belt 54, and the surface of the transmission belt 54 is provided with a plurality of automatic sensing telescopic fixtures 55 at intervals, such as Figure 3 to Figure 5 As shown, it is used to fix the test piece.

[0034] like Figure 4 and Figure 5 As shown, the automatic sensing telescopic fixture 55 includes a groove, and the two sides of the groove extend out of the transmission belt 54 and are carried on the surface of the transmission belt 54. A connecting rod is provided through the bottom of the groove, and a convex block is fixed on the top of the connecting rod. A spring is sleeved on the rod member of the connecting rod that penetrates into the lower part of the groove, and a bracket is covered on the outer side of the spring, and the two ends of the bracket are fixed to the two sides of the groove. Pressure sensors are provided on the surface of the groove on both sides of the connecting rod. In the initial state, the spring of the automatic sensing telescopic fixture 55 is in a compressed state, and the automatic sensing telescopic fixture 55 is flush with the transmission belt 54; when the test piece is placed on the surface of the transmission belt 54, the pressure sensor senses the pressure, and the spring is released, driving the convex block on the top of the connecting rod to penetrate the transmission belt 54 upward, thereby fixing the test piece placed between adjacent automatic sensing telescopic fixtures 55.

[0035] like Figure 2 As shown, the binding system 6 includes a binding strap storage bin 61, a strap feeding roller 62 and a tension control device 63, wherein the tension control device 63 is connected to the binding strap storage bin 61, and the strap feeding roller 62 is arranged on the surface of the binding system 6. The tension control device 63 can automatically adjust the tightness of the binding strap according to the size of the specimen to ensure that the pressure applied by the binding strap on the surface of the specimen is uniform.

[0036] The initial crack width needs to be set in the laser positioning and detection system 3. The laser positioning and detection system 3 is moved to the specified position by manipulating the pulley 31. The laser transmitter of the laser positioning and detection system 3 is moved to the crack manufacturing area by controlling the telescopic device to achieve accurate positioning of the crack of the specimen. The laser positioning and detection system 3 integrates a laser resonant cavity, a beam adjuster, a power control unit, and a transmission interface. Through advanced photoelectric conversion technology and a precise thermal management system, it ensures that the output of the laser beam has high coherence and beam quality, and can be dynamically adjusted for different physical parameters to adapt to the precise control of cracks.

[0037] The crack simulation device 4 integrates a loading system, a control module, and a crack generation module. The loading system can apply controllable stress in different directions, the control module is used to adjust the applied load in real time, and the crack generation module is used to accurately locate the generation of cracks.

[0038] The present invention can realize high integration of precise production of concrete cracks, crack maintenance and repair, and real-time monitoring of the repair status. The various systems work together to provide reliable data support for the full life cycle repair of existing cracked concrete structures, clarify the development, repair, and closure of cracks, and ensure the long-term stability and safety of concrete structures.

[0039] The method for fully automatic manufacturing and crack repair monitoring of concrete cracks of the present invention comprises the following steps:

[0040] S1, operate the transmission system 5, place the test piece on the transmission belt 54, and the automatic sensing telescopic fixture 55 is extended to fix the test piece and then transmit it to the binding system 6;

[0041] S2. After the test piece is transferred to the binding system 6, the sensing device detects the size, shape and weight of the test piece; the tension control device 63 wraps around the test piece and adjusts the tightness of the binding belt according to the size of the test piece; the sealing device automatically adjusts the sealing temperature and pressure according to the material of the binding belt to ensure that the binding belt is firmly sealed; the strapping device is used to automatically cut off the excess strapping belt after the binding is completed, and the strapping roller 62 transmits the test piece to the transmission system 5 on the other side;

[0042] S3, the specimen is transmitted to the transmission system 5, the automatic sensing telescopic fixture 55 is extended to fix the specimen, the laser positioning and detection system 3 performs laser positioning and crack distance measurement on the specimen, the crack simulation device 4 applies load to the specimen to create cracks, and the automatic control system 2 transfers the cracked specimen to the curing box 1;

[0043] S4, after the specimen is delivered to the preset position, the specimen is subjected to long-term curing in the curing box 1, and the water level of the curing box 1 is adjusted in real time by the intelligent suction and drainage device 13 to control the curing time and curing cycle;

[0044] S5. After the specimen is cured, the intelligent water suction and drainage device 13 guides water to the auxiliary curing box, and at the same time controls the laser positioning and detection system 3 to emit a laser beam, starts the laser sensing device 11 at the bottom of the box, and transmits the result to the display through the monitoring camera device 12.

[0045] Example 1

[0046] 1) Prepare Φ100mm high 100mm cylindrical specimens. The specimens are set into two groups, 3 in each group, namely A1 and A2. A1 is the specimen without adding self-healing agent, and A2 is the specimen with adding self-healing agent replacing 4% of fine aggregate content.

[0047] 2) Start the transmission system 5, put the test piece into the transmission system 5, the automatic sensing telescopic fixture 55 is extended to fix the test piece, and then the test piece is transmitted to the binding system 6.

[0048] 3) After the test piece is transferred to the preset position of the binding system 6, the sensing device detects the size, shape and weight of the test piece; and automatically adjusts the length and tension of the binding belt according to the detection results; the tension control system automatically adjusts the tightness of the binding belt according to the size of the test piece to ensure that the pressure applied by the binding belt on the surface of the test piece is uniform; the sealing device automatically adjusts the sealing temperature and pressure according to the material of the binding belt to ensure that the binding belt is firmly sealed; the strapping device is used to automatically cut off the excess strapping after strapping is completed, and the strapping roller device transmits the test piece to the test platform transmission system.

[0049] 4) The specimen is transmitted to the transmission system 5, the automatic sensing telescopic fixture 55 is extended to fix the specimen, the laser positioning and detection device 3 performs laser positioning and crack distance measurement on the specimen, the crack simulation device 4 applies a load to the specimen to create a crack with a width of 100 mm, and the automatic control system 2 transfers the cracked specimen to the curing box 1.

[0050] 5) After the specimen is delivered to the preset position, the water level of the curing box is adjusted in real time through the intelligent suction and drainage device 13, and the specimen is cured for 28 days.

[0051] 6) After the specimen is cured for 28 days, the intelligent water suction and drainage device 13 guides water to the auxiliary curing box, controls the laser positioning and detection system 3 to emit a laser beam, starts the laser sensing device 11 at the bottom of the box, and the monitoring camera device 12 transmits the results to the display to compare the repair degree of the cracks detected by A1 and A2.

[0052] 7) By comparing the degree of repair of cracks in the specimens of groups A1 and A2, it can be found that the crack repair rate of the specimens in group A1 is 64%, and the crack repair rate of the specimens in group A2 is as high as 916%.

[0053] Example 2

[0054] 1) Prepare cylindrical specimens with a diameter of 100 mm and a height of 100 mm. The specimens are divided into two groups, each with 3 specimens, namely A1 and A2. A1 is a specimen without adding a self-healing agent, and A2 is a specimen with a self-healing agent that replaces 2% of the fine aggregate content.

[0055] 2) Start the transmission system 5, put the test piece into the transmission system 5, the automatic sensing telescopic fixture 55 is extended to fix the test piece, and then the test piece is transmitted to the intelligent binding system 6.

[0056] 3) After the test piece is transferred to the preset position of the binding system 6, the sensing device detects the size, shape and weight of the test piece; and automatically adjusts the length and tension of the binding belt according to the detection results; the tension control system automatically adjusts the tightness of the binding belt according to the size of the test piece to ensure that the pressure applied by the binding belt on the surface of the test piece is uniform; the sealing device automatically adjusts the sealing temperature and pressure according to the material of the binding belt to ensure that the binding belt is firmly sealed; the strapping device is used to automatically cut off the excess strapping after strapping is completed, and the strapping roller device transmits the test piece to the test platform transmission system.

[0057] 4) The specimen is transmitted to the transmission system 5, the automatic sensing telescopic fixture 55 is extended to fix the specimen, the laser positioning and detection device 3 performs laser positioning and crack distance measurement on the specimen, the crack simulation device 4 applies a load to the specimen to create a crack with a width of 0.80 mm, and the automatic control system 2 transfers the cracked specimen to the curing box 1.

[0058] 5) After the specimen is delivered to the preset position, the water level of the curing box is adjusted in real time through the intelligent suction and drainage device 13, and the specimen is cured for 28 days.

[0059] 6) After the specimen is cured for 28 days, the intelligent water suction and drainage device 13 leads water to the auxiliary curing box, controls the laser positioning and detection system 3 to emit a laser beam, starts the laser sensing device 11 at the bottom of the box, and transmits the results of the monitoring camera device 12 to the display to compare the repair degree of the cracks detected by A1 and A2.

[0060] 7) By comparing the degree of repair of cracks in the two groups of specimens A1 and A2, it can be found that the crack repair rate of the specimens in group A1 is 72%, and the crack repair rate of the specimens in group A2 is as high as 903%.

Claims

1. A fully automatic concrete crack manufacturing and crack repair monitoring system, It is characterized in that It includes a maintenance box, an automatic control system, a crack creating system, a transmission system, and a binding system. Transmission systems are provided on both sides of the binding system. A maintenance box is provided on the other side of one of the transmission systems. An automatic operating system and a crack creating system are provided above the transmission system. The crack creating system includes a laser positioning and detection system and a crack simulation device.

2. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 1, It is characterized in that The maintenance box comprises a main box body and a sub-box body. A monitoring camera device is arranged in the middle of the main box body and a laser sensing device is arranged at the bottom. An intelligent water suction and drainage device is arranged on the sub-box body.

3. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 1, It is characterized in that The surface of the transmission belt of the transmission system is provided with an automatic induction telescopic fixture.

4. A fully automatic concrete crack manufacturing and crack repair monitoring system according to claim 3, It is characterized in that The automatic sensing telescopic fixture includes a groove, both sides of the groove extend out of the transmission belt and are carried on the surface of the transmission belt, a connecting rod is passed through the bottom of the groove, a bump is fixed on the top of the connecting rod, a spring is sleeved on the rod part of the connecting rod that penetrates into the lower part of the groove, a bracket is covered on the outside of the spring, both ends of the bracket are fixed to the two sides of the groove, and pressure sensors are provided on the surfaces of the grooves on both sides of the connecting rod.

5. A fully automatic concrete crack manufacturing and crack repair monitoring system according to claim 3, It is characterized in that A support column is arranged at the bottom of the transmission system, the upper end of the support column is fixedly connected to a transmission shaft, one end of the transmission shaft is fixedly connected to a transmission wheel, and the outer surface of the transmission wheel is transmission-connected to a transmission belt.

6. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 1, It is characterized in that The binding system comprises a binding strap storage bin, a strap feeding roller and a tension control device, wherein the tension control device is connected to the binding strap storage bin, and the strap feeding roller is arranged on the surface of the binding system.

7. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 6, It is characterized in that The tension control device can automatically adjust the tightness of the strapping belt according to the size of the test piece.

8. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 1, It is characterized in that The crack simulation device integrates a loading system, a control module, and a crack generation module. The loading system can apply controllable stress in different directions, the control module is used to adjust the applied load in real time, and the crack generation module is used to locate the generation of cracks.

9. A concrete crack fully automatic manufacturing and crack repair monitoring system according to claim 1, It is characterized in that The laser positioning and detection system is capable of setting the initial crack width.

10. A monitoring method of the concrete crack full-automatic manufacturing and crack repair monitoring system according to any one of claims 1 to 9, It is characterized in that The following steps are involved: S1. Place the test piece on the transmission system. The automatic sensing telescopic fixture of the transmission system extends to fix the test piece and then transmits it to the lashing system. S2. After the specimen is transferred to the binding system, the tension control device wraps around the specimen and binds it, and the belt feeding roller transmits the specimen to the transmission system on the other side; S3, the specimen is transmitted to the transmission system on the other side, the automatic sensing telescopic fixture is extended to fix the specimen, the laser positioning and detection system performs laser positioning and crack distance measurement on the specimen, the crack simulation device applies load to the specimen to create cracks, and the automatic control system transfers the cracked specimen to the curing box; S4. After the specimen is delivered to the preset location, the specimen is subjected to long-term curing in the curing box, and the water level of the curing box is adjusted in real time through the intelligent suction and drainage device to control the curing time and curing cycle; S5. After the specimen is cured, the intelligent water suction and drainage device guides water to the auxiliary curing box, and at the same time controls the laser positioning and detection system to emit a laser beam, starts the laser sensing device at the bottom of the box, and transmits the results to the display through the monitoring camera device.