Urban rail transit train operation control method and system
Through the acceleration sequence search algorithm based on train route map and vehicle parameters, the poor generality and deviation problems of complex simulation models in the existing technology are solved, and the high-efficiency energy consumption management and accurate control strategies of urban rail transit trains are realized, and the operation is improved accuracy and adaptability.
Patent Information
- Application Number
- CN202411098833.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-12-06
AI Technical Summary
The existing urban rail transit train control strategy relies on complex simulated vehicle models, has poor versatility and is prone to deviations, making it difficult to achieve effective energy consumption reduction in the optimal control strategy under punctual constraints.
By traversing all acceleration groups based on the train circuit diagram and vehicle parameters, the acceleration sequence search algorithm is used to traverse all acceleration groups, calculate the train running status under each preset time step, and judge and output an effective sequence that meets the normal operation requirements as the initial control strategy, relying on Basic vehicle parameters and circuit diagrams, without the need to build complex vehicle models.
It improves the accuracy and adaptability of the train operation control strategy, reduces energy consumption, enhances the universality and efficiency of the control strategy, and reduces the deviation of the actual operation from the expected speed curve.
Smart Images

Figure CN119078926A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of urban rail transit train operation control, and in particular to an urban rail transit train operation control method and system. Background Art
[0002] Urban rail transit has become an important trunk transportation in modern metropolises with its advantages of convenience, speed, safety, comfort and high efficiency. It not only solves the transportation problem of society, but also drives the development of the economy along the line. At the same time, the public's expectations for rail transit safety, comfort, punctuality and greenness are constantly increasing. The energy consumption of urban rail transit is an important component of train operating costs, and the traction energy consumption of trains accounts for the main part of the operating energy consumption. Through reasonable train control strategies, the traction energy consumption can be effectively reduced, thereby reducing operating costs.
[0003] Usually, subway trains have four operating conditions during section operation: traction, cruising, coasting and braking. Since a single section of a subway line is short and the line conditions are simple, the switching of operating conditions is not very frequent. Usually, traction starts from a station, and the section is mainly cruise and coasting. If necessary, secondary traction is performed, and braking is performed when entering the station. According to the Pontryagin maximum principle, the combination of "traction-cruising-coiling-braking" operating conditions can form the optimal speed curve. Therefore, in practical problems, in order to obtain the optimal control strategy for subway trains under the constraint of punctuality, the reasonable combination of operating conditions and the optimal operating condition conversion point have become the main purpose of solving this problem.
[0004] In the existing technology, most of them rely on establishing a simulated vehicle model and deriving the optimal energy-saving control strategy by iteratively searching the distance-speed curve. When the actual train operation deviates from the expected speed curve of the simulation, if it continues to run according to the pre-calculated speed curve, it will cause a deviation in the running time and consume more energy to track the original speed curve.
[0005] The Chinese patent "A method for energy-saving operation of urban rail transit trains", publication number: CN 111267913A, publication date: June 12, 2020, specifically discloses that an offline ATO interval simulation operation is performed according to the actual line environment of the train operation, and the target adjustment speed is iteratively searched to obtain the distance-speed curves of each operating level with different operating times. According to the distance-speed curves of each operating level planned offline, multiple time adjustment points storing operation data are set on the train operation interval. The train runs online in the operation interval. When passing through the time adjustment point, the target adjustment speed of the train is adjusted online according to the operation data in the time adjustment point and the distance-speed curves of each operating level planned offline, so that the train can alternately run in an idling mode without applying power or resistance and a recovery mode with applying power or resistance. However, this technical solution still relies on the establishment of a simulation vehicle model, and the control is complex and prone to deviations. Summary of the invention
[0006] The present application aims at the problem that the output of train control strategy in the prior art depends on the construction of complex simulation vehicle models, which is poor in universality and prone to deviation. The present application provides a method and system for controlling the operation of urban rail transit trains. The method can obtain the initialization speed and initialization position of the train after leaving the station with maximum traction based on the train route map and train parameters. For different initial control strategies, the acceleration group is obtained according to the traction size after leaving the station with maximum traction. Then, the acceleration sequence search algorithm is used to traverse all acceleration groups to obtain the train operation state corresponding to each preset time step under each acceleration, which includes at least the train position and the train speed. It is judged whether the current train operation state meets the normal operation requirements, and the initial control strategy corresponding to the acceleration that meets the normal operation constraints is output as a valid sequence. Then, the valid sequence is stored, sorted according to different actual operation requirements, and the valid sequence that best meets the actual operation requirements is used as the train operation control strategy. The acceleration sequence search algorithm only relies on basic vehicle parameters and train route maps, does not need to build a complex train model, has stronger universality, and improves planning adaptability and efficiency while ensuring the accuracy of the train planning strategy.
[0007] To achieve the above technical objectives, the present application provides a technical solution, which is a method for controlling the operation of an urban rail transit train, comprising the following steps: S1: obtaining an initialization speed and an initialization position according to a train route map and train parameters according to maximum traction; S2: obtaining an acceleration group corresponding to an initial control strategy based on an initial control strategy; S3: calculating the train operation state at each preset time step based on the initialization speed, initialization position and acceleration group based on an acceleration sequence search algorithm and normal operation constraint traversal, and outputting a valid sequence corresponding to the train operation state; S4: sorting the valid sequences according to actual operation requirements, and outputting a valid sequence that best meets the actual operation requirements as a train operation control strategy.
[0008] Furthermore, the train running state at each preset time step is calculated based on the acceleration sequence search algorithm and the normal operation constraint traversal according to the initialization speed, the initialization position and the acceleration group, and the valid sequence corresponding to the train running state is output, including: obtaining the train running state corresponding to the preset time step at each acceleration according to the initialization speed, the initialization position and the acceleration group; constructing the time constraint of the acceleration sequence search algorithm with the train running time; constructing the speed constraint of the acceleration sequence search algorithm with the train maximum running speed curve; and obtaining the train running state that meets the constraint conditions as a valid sequence based on the time constraint and the speed constraint.
[0009] Furthermore, the speed constraint of the acceleration sequence search algorithm constructed using the train maximum operating speed curve includes: generating the train maximum operating speed curve based on the train maximum acceleration performance, traction response time and acceleration change rate.
[0010] Furthermore, obtaining the acceleration group corresponding to the initial control strategy based on the initial control strategy includes: setting the initial control strategy according to passenger flow to obtain the acceleration group corresponding to the initial control strategy.
[0011] Furthermore, the train running state that satisfies the constraint conditions based on the time constraint and the speed constraint is taken as a valid sequence, including: calculating the remaining running time of the remaining interval distance at the maximum speed of the train according to the train position in the train running state, judging whether the train running time is met by the preset time step and the remaining running time, if not, taking it as an invalid sequence; judging whether the maximum running speed curve of the train is met according to the train speed in the train running state, if not, taking it as an invalid sequence; taking the initial control strategy corresponding to the train running state that satisfies both the train running time and the maximum running speed curve of the train as a valid sequence.
[0012] Furthermore, the said sorting the effective sequences according to the actual operation requirements and outputting the effective sequence that best meets the actual operation requirements as the train operation control strategy includes: corresponding to the actual operation requirements, integrating the effective sequences to obtain the control sequence corresponding to the actual operation requirements; sorting the control sequences according to energy consumption; and taking the control sequence with the lowest energy consumption as the train operation control strategy; The effective sequence switching position in the control sequence is used as the operating condition conversion point; the train operation control strategy and the operating condition conversion point are generated into a corresponding configuration parameter file; when the train is running, the configuration parameter file is called according to the actual operation requirements to execute the train operation control.
[0013] Furthermore, it also includes: S5: when the train runs to the operating condition conversion point, the actual remaining running time is calculated according to the real-time running position of the train, and it is determined whether the actual remaining running time meets the actual running requirements. If so, the operation continues with the current train operation control strategy; if not, S6 is executed; S6: according to the operating level corresponding to the current train operation control strategy, the train operation control strategies corresponding to the remaining operating levels are called, and the corresponding remaining running time is calculated, and the train operation is controlled with the train operation control strategy whose remaining running time meets the actual running requirements.
[0014] Furthermore, S6 also includes: when the actual remaining running time is greater than the actual running demand, the train operation control strategy corresponding to the higher operating level is called in sequence according to the operating level corresponding to the current train operation control strategy to calculate the corresponding remaining running time, until the remaining running time meets the actual running demand, and the corresponding train operation control strategy is output to control the train operation; when the actual remaining running time is less than the actual running demand, the train operation control strategy corresponding to the lower operating level is called in sequence according to the operating level corresponding to the current train operation control strategy to calculate the corresponding remaining running time, until the remaining running time meets the actual running demand, and the corresponding train operation control strategy is output to control the train operation.
[0015] Furthermore, the train parameters include at least the maximum speed of the train, the acceleration performance of the train, the length of the carriage and the load capacity.
[0016] A technical solution provided by the present application is an urban rail transit train operation control system, which is used to implement the method as described above, including: a data acquisition module, used to collect train route maps and train parameters; a traversal analysis module, used to traverse all valid sequences under the initial control strategy according to an acceleration sequence search algorithm; and an operation control module, used to control the train traction state according to the acceleration value in the valid sequence.
[0017] The beneficial effects of the present application are as follows: based on the train route map and train parameters, the initialization speed and initialization position of the train after leaving the station at maximum traction can be obtained. For different initial control strategies, that is, the traction size after leaving the station at maximum traction is obtained, and then all acceleration groups are traversed by the acceleration sequence search algorithm to obtain the train operation state corresponding to each preset time step under each acceleration, which includes at least the train position and the train speed, and to judge whether the current train operation state meets the normal operation requirements, and to output the initial control strategy corresponding to the acceleration that meets the normal operation constraints as a valid sequence, and then to store the valid sequence, sort it according to different actual operation requirements, and use the valid sequence that best meets the actual operation requirements as the train operation control strategy. The use of the acceleration sequence search algorithm only relies on basic vehicle parameters and train route maps, and there is no need to build a complex train model. It has stronger versatility and improves planning adaptability and efficiency while ensuring the accuracy of the train planning strategy. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a flow chart of the urban rail transit train operation control method of this application.
[0019] Figure 2 This is a schematic diagram of the discrete interval of the urban rail transit train operation control method of this application.
[0020] Figure 3 This is a flow chart of the acceleration sequence search algorithm of the urban rail transit train operation control method of this application.
[0021] Figure 4 Schematic diagram of train simulation speed under traditional control method.
[0022] Figure 5 This is a schematic diagram of the simulated train speed under the urban rail transit train operation control method of this application.
[0023] Figure 6 This is a schematic diagram of the operation levels under the urban rail transit train operation control method of this application. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solutions and advantages of the present application more clear, the present application is further described in detail below in conjunction with the drawings and examples. It should be understood that the specific implementation method described here is only an optimal embodiment of the present application, which is only used to explain the present application and does not limit the scope of protection of the present application. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0025] like Figure 1As shown, as the first embodiment of the present application, the urban rail transit train operation control method includes the following steps: S1: Get the initialization speed and initialization position according to the maximum traction based on the train route map and train parameters; S2: obtaining an acceleration group corresponding to the initial control strategy based on the initial control strategy; S3: Calculate the train running state at each preset time step based on the acceleration sequence search algorithm and the normal operation constraint traversal according to the initialization speed, initialization position and acceleration group, and output the valid sequence corresponding to the train running state; S4: Sort the valid sequences according to the actual operation requirements, and output the valid sequence that best meets the actual operation requirements as the train operation control strategy.
[0026] In this embodiment, the initialization speed and initialization position of the train after leaving the station with maximum traction can be obtained based on the train route map and train parameters. For different initial control strategies, that is, the traction size after leaving the station with maximum traction, an acceleration group is obtained, and then all acceleration groups are traversed by the acceleration sequence search algorithm to obtain the train operation state corresponding to each preset time step under each acceleration, which includes at least the train position and the train speed, and to determine whether the current train operation state meets the normal operation requirements, and the initial control strategy corresponding to the acceleration that meets the normal operation constraints is output as a valid sequence, and then the valid sequence is stored and sorted according to different actual operation requirements, and the valid sequence that best meets the actual operation requirements is used as the train operation control strategy. The use of the acceleration sequence search algorithm only relies on basic vehicle parameters and train route maps, and there is no need to build a complex train model. It has stronger versatility and improves planning adaptability and efficiency while ensuring the accuracy of the train planning strategy.
[0027] Specifically, in actual operation, steps S1, S2, and S3 are offline calculations, that is, before the train runs, the initialization speed and initialization position are calculated according to the maximum traction based on the train parameters and the train route map, and the acceleration group corresponding to the initial control strategy is obtained based on the initial control strategy. According to the acceleration sequence search algorithm, the second speed and second position after a preset time are calculated according to the initialization position and the acceleration group, and the second speed and second position of the acceleration group are traversed based on the normal operation constraints. The valid sequence that meets the normal operation constraints is output and pre-stored in the on-board software. During the operation of the train, the corresponding valid sequence is called according to the actual operation requirements.
[0028] The acceleration group corresponding to the initial control strategy obtained based on the initial control strategy includes: An initial control strategy is set according to the passenger flow, and an acceleration group corresponding to the initial control strategy is obtained.
[0029] There are corresponding requirements for the running time of the train under different passenger flow conditions. Therefore, the train running time requirements are obtained according to the train passenger flow. Based on the train running time requirements, all control strategies that meet the train running time requirements are used as the initial train control strategies, that is, different initial control strategies correspond to the train running time requirements under different passenger flows. For example, the first initial control strategy is that the train continues to run according to the maximum traction, and the second initial control strategy is that the traction continues to run according to the shortest train running time. In this way, the subsequent initial control strategies corresponding to different train running times are obtained. In order to avoid occasional requirements, such as running at the lowest speed in special circumstances, the initial control strategy corresponding to the lowest running speed of the train can also be set according to the train parameters. In other cases, the initial control strategy can also be to obtain whether the current track allows traction based on the line data. When traction is allowed, the maximum allowable acceleration is calculated based on the current speed, acceleration, traction motor characteristics and comfort requirements. When traction is not allowed, the acceleration is limited to 0.
[0030] The train parameters at least include the maximum speed of the train, the acceleration performance of the train, the length of the carriage and the load capacity. According to the train line map, the line data of the current train can be obtained, and the line data at least includes the starting point of the speed limit section, the end point of the speed limit section, the speed limit value, the starting point of the slope, the end point of the slope and the slope value.
[0031] Since there are different driving terrain sections during the train's travel, such as some sections where the train goes uphill and some sections where the train goes downhill, in different driving terrain sections of the train, in order to ensure the stable operation of the train, different traction forces should be output to adapt to different slopes. Similarly, in the speed limit section of the train, it is necessary to ensure that the train does not exceed the speed limit, and the traction force also needs to be adaptively adjusted at this time. Therefore, the control interval is divided according to the starting point of the speed limit section, the end point of the speed limit section, the speed limit value, the starting point of the slope, the end point of the slope and the slope value, and the starting point of the speed limit section, the end point of the speed limit section, the end point of the slope and the starting point of the slope are used as the initialization position of the control interval. It can be understood that. The end point of the speed limit section and the end point of the slope represent that the train leaves the speed limit section or the terrain of the corresponding slope, and the traction force also needs to be adjusted at this time. Therefore, according to the initialization speed, initialization position and acceleration group, based on the acceleration sequence search algorithm and the normal operation constraint traversal, the train running state under each preset time step is calculated, and the valid sequence corresponding to the train running state is output, including: According to the initialization speed, initialization position and acceleration group, the train running state corresponding to the preset time step under each acceleration is obtained; The time constraint of the acceleration sequence search algorithm is constructed based on the train running time; The speed constraint of the acceleration sequence search algorithm is constructed based on the train's maximum operating speed curve; Based on the time constraint and speed constraint, the train running status that meets the constraint conditions is obtained as a valid sequence.
[0032] The train running time can be obtained based on the interval running time issued by the ATS timetable, or it can be calculated based on passenger flow. The speed constraints of the acceleration sequence search algorithm constructed based on the train maximum running speed curve include: The train maximum operating speed curve is generated based on the train's maximum acceleration performance, traction response time and acceleration change rate.
[0033] The jerk rate, or the rate of change of acceleration, is a physical quantity that describes how acceleration changes over time. The maximum allowable value of the jerk rate can be determined based on railway industry standards and passenger comfort studies. In other cases, the maximum allowable value of the jerk rate can also be calculated based on the train load and track flatness. In this case, the change in acceleration is: Where a(t) is the acceleration at time t, j max is the maximum jerk rate, a max is the maximum acceleration, t response is the traction response time. When 0≤t≤t resp onse, that is, time t is in the traction response time t resp Onse, the acceleration a(t) increases linearly from 0, with an increase rate of j max ; When t>t resp onse, that is, after time t exceeds the traction response time, the acceleration a(t) reaches the maximum value a max And remain unchanged. Integrating the acceleration, we get the change of velocity over time: When the acceleration reaches a max After that, the train will continue to accelerate at the maximum acceleration until it reaches the maximum speed v max . The speed remains constant during the uniform speed phase.
[0034] During the operation of the train, due to the low speed limit when leaving the station and too many working mode switches when entering the station, it will cause inaccurate stopping. Figure 2As shown, the interval between the two stations is discretized into three different stages: exit traction-section operation-entry braking. In the entry and exit stages, fixed braking and maximum traction are used for operation, and no control strategy adjustment is performed. Normal exit and stop are performed, and the optimal control strategy is implemented in the section. Based on the starting point, end point, and speed limit value of the speed limit section in the line data, the speed limit section and speed limit value of the train in the section are obtained. According to the speed limit section and the speed change over time, the maximum speed operation curve of the train in the entire section is obtained. It can be understood that the maximum allowable value of the jerk rate is obtained through passenger comfort, train load, and track flatness, that is, track slope, which can represent the maximum allowable situation under different slopes.
[0035] like Figure 3 As shown, the train running states satisfying the constraints based on the time constraint and the speed constraint are obtained as valid sequences including: According to the train position in the train running state, the remaining running time of the remaining section distance is calculated at the maximum speed of the train, and the preset time step and the remaining running time are used to determine whether the train running time is met. If not, it is regarded as an invalid sequence; The train speed in the train running state is judged whether it meets the train maximum running speed curve. If not, it is regarded as an invalid sequence; the initial control strategy corresponding to the train running state that satisfies both the train running time and the train maximum running speed curve is regarded as a valid sequence.
[0036] By judging whether the speed of the train after the preset time step exceeds the maximum speed of the position in the train's maximum speed curve, it is determined whether the initial control strategy corresponding to the train's running state will cause the train to run overspeed. If the initial control strategy causes the train to run overspeed, it means that the normal operation of the train cannot be ensured, and it is screened out as an invalid sequence. At the same time, the shortest time for the train to run in the subsequent section is calculated by the distance between the train's position after the preset time step and the end of the section and the maximum speed of the train in the subsequent section. The sum of the remaining running time and the preset time step is the shortest running time controlled by the current initial control strategy. If the shortest running time is greater than the train running time at this time, it is screened out as an invalid sequence. Therefore, the acceleration sequence search algorithm is used to search for step lengths and accelerations, and different initial control strategies that meet the requirements under different time steps are obtained.
[0037] As the second embodiment of the present application, however, frequently adjusting the train traction and braking control according to the terrain will reduce the comfort of the train. At the same time, frequent traction adjustment and braking control adjustment may destroy the stable operation state of the train, resulting in increased energy consumption. Therefore, the train operation state includes at least the train position, train speed and train energy consumption. At this time, the effective sequence is sorted according to the actual operation requirements, and the effective sequence that best meets the actual operation requirements is output as the train operation control strategy, including: Corresponding to the actual operation requirements, the effective sequences are integrated to obtain the control sequence corresponding to the actual operation requirements; Sort the control sequence by energy consumption; The control sequence with the lowest energy consumption is used as the train operation control strategy; The effective sequence switching position in the control sequence is taken as the working condition conversion point; Generate corresponding configuration parameter files for train operation control strategies and operating condition conversion points; When the train is running, the configuration parameter file is called according to the actual operation requirements to execute train operation control.
[0038] In this embodiment, the initial control strategy is to allow traction and not allow traction, and the effective sequence is integrated corresponding to the actual operation demand, such as integrating the part of the effective sequence with continuous traction. The actual operation demand corresponds to the train operation time demand, such as setting operation level 1 to operation level 10, operation level 1 corresponds to the shortest train operation time demand, and the operation level 2 starts to increase the train operation time by 5s. The effective sequence is integrated to obtain the control sequence that meets different operation levels, and the control sequence is sorted according to energy consumption, so that the control sequence with the lowest energy consumption under the current operation level can be obtained, and the effective sequence switching position in the control sequence is obtained as the working condition conversion point. In the process of train operation optimization, the working condition conversion point is effectively searched by variable step length to improve the search efficiency and find a better working condition conversion strategy. This not only helps to reduce the energy consumption of train operation and improve the operation efficiency, but also improve the riding comfort of passengers. At the same time, during the operation of the train, the actual operation time and expected operation time of the current operation control strategy can be compared at the working condition conversion point to determine whether the operation control strategy needs to be adjusted, and the corresponding control can be directly called according to the pre-stored configuration parameter file, without the need to temporarily calculate and output the control strategy during the train operation, thereby improving the timeliness of control.
[0039] In this embodiment, the urban rail transit train operation control method further includes: S5: When the train runs to the operating condition conversion point, the actual remaining running time is calculated according to the real-time running position of the train, and it is determined whether the actual remaining running time meets the actual running requirements. If so, the train continues to run with the current train operation control strategy; if not, S6 is executed; S6: According to the operation level corresponding to the current train operation control strategy, the train operation control strategies corresponding to the remaining operation levels are called, and the corresponding remaining operation time is calculated, and the train operation is controlled by the train operation control strategy whose remaining operation time meets the actual operation requirements.
[0040] The train arriving at the station too quickly also belongs to the phenomenon of being late on time, so step S6 also includes: When the actual remaining running time is greater than the actual running demand, the train operation control strategy corresponding to the higher running level is called in turn according to the running level corresponding to the current train operation control strategy to calculate the corresponding remaining running time until the remaining running time meets the actual running demand, and the corresponding train operation control strategy is output to control the train operation; When the actual remaining running time is less than the actual running demand, the train operation control strategies corresponding to the lower running levels are called in sequence according to the running level corresponding to the current train operation control strategy to calculate the corresponding remaining running time until the remaining running time meets the actual running demand, and the corresponding train operation control strategies are output to control the train operation.
[0041] In this embodiment, operation level 1 is the highest operation level, and operation level 10 is the lowest operation level. When the remaining operation levels are divided, the operation level with a shorter operation time is regarded as a higher operation level, and the operation level with a longer operation time is regarded as a lower operation level. The actual remaining operation time is the travel time required for the train to reach the station from the current position according to the current control strategy. The actual operation demand includes the expected remaining operation time, and the expected remaining operation time is the ideal time for the train to reach the station from the current position according to the punctuality demand. When the actual remaining operation time is greater than the actual operation demand, that is, when the actual remaining operation time is more than the expected remaining operation time, it is necessary to increase the subsequent operation speed of the train to reduce the actual remaining operation time, thereby calling the train control strategies corresponding to the higher operation levels in turn. When the remaining operation time of a certain train control strategy has met the expected remaining operation time, the train operation control strategies of the higher operation levels are no longer called. Similarly, when the actual remaining running time is less than the actual running demand, that is, when the actual remaining running time is less than the expected remaining running time, it is necessary to reduce the subsequent running speed of the train to increase the actual remaining running time, thereby calling the train control strategies corresponding to the lower running levels in turn. When the remaining running time of a certain train control strategy has met the expected remaining running time, the train operation control strategy of the lower running level will no longer be called. This improves the efficiency of strategy output while ensuring that the train arrives on time.
[0042] Step S6 also includes: When the train operation control strategy corresponding to the highest operating level still does not meet the actual operation requirements, the train operation is controlled by the train operation control strategy corresponding to the highest operating level.
[0043] When a train is delayed for too long and cannot meet the running demand even if it runs at the highest speed, it will run at the highest speed to shorten the delay as much as possible.
[0044] In this embodiment, by integrating the effective sequence of continuous traction under continuous step length, the frequent switching of traction is reduced, the stability of train operation is improved, and the user comfort is improved. At the same time, based on the slope value of the train running track and the acceleration of the position point, the traction force value at the position is obtained, so that the ramp is used for acceleration, which reduces the frequent adjustment of traction and braking control during the section operation, improves travel comfort, and effectively reduces train energy consumption.
[0045] As the third embodiment of the present application, a specific embodiment is provided for illustration. Figure 4 , Figure 5 As shown, the train operation between a certain section of subway stations is simulated.
[0046] The calculated control strategy is input into the onboard embedded software in a configured manner. When the train runs to the operating condition conversion point corresponding to the operating level, Figure 6 The calculation control strategy is shown.
[0047] The train runs to point A at operation level 2 according to the dispatching command, and determines whether the remaining running time meets the remaining running time of operation level 2 at this location. If it meets the requirements, the train still runs according to the offline calculation control strategy.
[0048] If the train reaches point B1, the average speed of point A->B1 is higher than the expected speed, and the remaining running time is longer than expected. Therefore, the remaining running time of level 3 to level 10 is compared downwards, and the train is controlled according to the control strategy that meets the remaining running time level. Assuming that the adjusted running level is level 3, and the expected running level and the adjusted running level are both allowed to be traction, the configuration value of the next operating condition switching point of running level 3 is read, and the speed corresponding to the configuration value is run as the target speed. After the train runs to the target speed at the current maximum allowed acceleration, it keeps cruising to the next operating condition switching point to compare the remaining time.
[0049] If the vehicle reaches point B2, the average speed of points A->B2 is lower than the expected speed, and the remaining running time is less than expected. Therefore, the remaining running time of level one is compared upwards, and the vehicle is controlled according to the control strategy that meets the remaining running time level, and the vehicle is run to the next operating condition switching point to compare the remaining time.
[0050] According to this control strategy, the punctuality requirement can be met through real-time adjustment of levels during interval operation. At the same time, since each level is the most energy-saving control strategy, it can save operating energy consumption on the basis of punctuality.
[0051] As a fourth embodiment of the present application, an urban rail transit train operation control system includes: Data acquisition module, used to collect train route map and train parameters; A traversal analysis module is used to traverse the effective sequences under all initial control strategies according to the acceleration sequence search algorithm; The operation control module is used to control the train traction state according to the acceleration value in the valid sequence.
[0052] In this embodiment, the search process does not rely on the simulation vehicle model, but only requires vehicle parameter configuration, which can solve the problem of inaccurate simulation vehicle model and deviation from expectation during actual operation. At the same time, the search efficiency is improved by searching the working condition conversion point with a variable step length. The train traction state is controlled according to the acceleration value and working condition conversion point in the effective sequence, which can effectively integrate the continuous traction section, avoid frequent switching of train traction, and improve the train operation stability and user comfort.
[0053] The specific implementation described above is a preferred implementation of the urban rail transit train operation control method and system of the present application, and is not intended to limit the specific implementation scope of the present application. The scope of the present application includes but is not limited to the specific implementation embodiment. All equivalent changes made in accordance with the shape and structure of the present application are within the protection scope of the present application.
Claims
1. An urban rail transit train operation control method, characterized in that: The steps include: S1: Get the initialization speed and initialization position according to the maximum traction based on the train route map and train parameters; S2: obtaining an acceleration group corresponding to the initial control strategy based on the initial control strategy; S3: Calculate the train running state at each preset time step based on the acceleration sequence search algorithm and the normal operation constraint traversal according to the initialization speed, initialization position and acceleration group, and output the valid sequence corresponding to the train running state; S4: Sort the valid sequences according to the actual operation requirements, and output the valid sequence that best meets the actual operation requirements as the train operation control strategy.
2. The urban rail transit train operation control method according to claim 1, characterized in that: The train running state under each preset time step is calculated based on the acceleration sequence search algorithm and the normal operation constraint traversal according to the initialization speed, the initialization position and the acceleration group, and the valid sequence of the corresponding train running state is outputted, including: According to the initialization speed, initialization position and acceleration group, the train running state corresponding to the preset time step under each acceleration is obtained; The time constraint of the acceleration sequence search algorithm is constructed based on the train running time; The speed constraint of the acceleration sequence search algorithm is constructed based on the train's maximum operating speed curve; Based on the time constraint and speed constraint, the train running status that meets the constraint conditions is obtained as a valid sequence.
3. The urban rail transit train operation control method according to claim 2, characterized in that: The speed constraint of the acceleration sequence search algorithm constructed by using the maximum running speed curve of the train includes: The train maximum operating speed curve is generated based on the train's maximum acceleration performance, traction response time and acceleration change rate.
4. The urban rail transit train operation control method according to claim 1, characterized in that: The acceleration group corresponding to the initial control strategy obtained based on the initial control strategy includes: An initial control strategy is set according to the passenger flow, and an acceleration group corresponding to the initial control strategy is obtained.
5. The urban rail transit train operation control method according to claim 2, characterized in that: The train running states satisfying the constraint conditions obtained based on the time constraint and the speed constraint as a valid sequence include: According to the train position in the train running state, the remaining running time of the remaining section distance is calculated at the maximum speed of the train, and the preset time step and the remaining running time are used to determine whether the train running time is met. If not, it is regarded as an invalid sequence; The train speed in the train running state is judged whether it meets the train maximum running speed curve. If not, it is regarded as an invalid sequence; the initial control strategy corresponding to the train running state that satisfies both the train running time and the train maximum running speed curve is regarded as a valid sequence.
6. The urban rail transit train operation control method according to claim 1, characterized in that: The process of sorting the effective sequences according to the actual operation requirements and outputting the effective sequence that best meets the actual operation requirements as the train operation control strategy includes: Corresponding to the actual operation requirements, the effective sequences are integrated to obtain the control sequence corresponding to the actual operation requirements; Sort the control sequence by energy consumption; The control sequence with the lowest energy consumption is used as the train operation control strategy; The effective sequence switching position in the control sequence is taken as the working condition conversion point; Generate corresponding configuration parameter files for train operation control strategies and operating condition conversion points; When the train is running, the configuration parameter file is called according to the actual operation requirements to execute train operation control.
7. The urban rail transit train operation control method according to claim 6, characterized in that: Also includes: S5: When the train runs to the operating condition conversion point, the actual remaining running time is calculated according to the real-time running position of the train, and it is determined whether the actual remaining running time meets the actual running requirements. If so, the train continues to run with the current train operation control strategy; if not, S6 is executed; S6: According to the operation level corresponding to the current train operation control strategy, the train operation control strategies corresponding to the remaining operation levels are called, and the corresponding remaining operation time is calculated, and the train operation is controlled by the train operation control strategy whose remaining operation time meets the actual operation requirements.
8. The urban rail transit train operation control method according to claim 6, characterized in that: The S6 further includes: When the actual remaining running time is greater than the actual running demand, the train operation control strategy corresponding to the higher running level is called in turn according to the running level corresponding to the current train operation control strategy to calculate the corresponding remaining running time until the remaining running time meets the actual running demand, and the corresponding train operation control strategy is output to control the train operation; When the actual remaining running time is less than the actual running demand, the train operation control strategies corresponding to the lower running levels are called in sequence according to the running level corresponding to the current train operation control strategy to calculate the corresponding remaining running time until the remaining running time meets the actual running demand, and the corresponding train operation control strategies are output to control the train operation.
9. The urban rail transit train operation control method according to claim 1, characterized in that: The train parameters include at least the maximum speed of the train, the acceleration performance of the train, the length of the carriage and the load capacity.
10. An urban rail transit train operation control system, used to implement the method according to any one of claims 1 to 9, characterized in that: include: Data acquisition module, used to collect train route map and train parameters; A traversal analysis module is used to traverse the effective sequences under all initial control strategies according to the acceleration sequence search algorithm; The operation control module is used to control the train traction state according to the acceleration value in the valid sequence.
Citation Information
Cited By
Train automatic driving speed planning method and device
CN121553215A