LPG (Liquefied Petroleum Gas) supply system for large gas transport ship and large gas transport ship
By using low-temperature and high-pressure deck fuel tanks and fuel preparation equipment on large gas transport ships, the LPG gas supply system that directly supplies the engine is solved, and the cost reduction and simplification are achieved in the existing technology The effect of the operation.
Patent Information
- Application Number
- CN202411192426.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-06
AI Technical Summary
The existing LPG gas supply system is expensive, the maintenance and management are difficult, and the construction process is complex, which increases the procurement cost and operational complexity of steel.
The low-temperature and high-pressure deck fuel tank and fuel preparation equipment are used to pressurize and heat-raising treatment of LPG through a booster pump and heat exchanger, which is directly supplied to the engine, reducing the system space and maintenance needs.
It reduces the cost and construction period of the LPG fuel enclosure system, simplifies operations, reduces maintenance costs, and improves the maintenance and efficiency of the system.
Smart Images

Figure CN119079093A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of gas supply, and in particular to an LPG gas supply system for a large gas carrier and a large gas carrier. Background Art
[0002] In recent years, the International Maritime Organization (IMO) has increasingly stringent requirements for ship emissions, and the industry is also exploring the use of more clean energy as engine fuel. Compared with traditional compliant fuels, LPG (Liquefied Petroleum Gas) powered main engines will reduce fuel consumption by 10%, sulfur dioxide emissions by 99%, particulate matter emissions by 90%, carbon dioxide emissions by 15%, and nitrogen oxide emissions by 10%. For IMO2030's emission reduction goals, LPG is a good alternative marine fuel. As a marine fuel, LPG can reduce fuel consumption and save costs. In addition, LPG dual-fuel powered ships also have the advantages of flexible dual fuel use and lower price sensitivity.
[0003] The LPG fuel power scheme in the existing technology basically configures a cryogenic fuel tank first, then pressurizes the low-temperature and low-pressure LPG in the cryogenic fuel tank to 18-25barg through a first-stage pump, and then pressurizes the 53barG, 25℃-45℃ LPG fuel through a second-stage booster pump and passes through a heat exchanger to send the 53barG, 25℃-45℃ LPG fuel to the main engine for combustion. Part of the LPG sent to the LPG dual-fuel main engine will be returned to the gas supply system through the RVT and then sent to the LPG main engine for use. There are two ways to protect the low-temperature LPG fuel tank:
[0004] The first method is to equip the ship with a reliquefaction system to maintain the pressure of the fuel tank within the designed pressure range;
[0005] The second type: equipped with low-temperature and high-pressure LPG fuel tanks, usually with a design pressure of 18 barg and a design temperature of -52°C.
[0006] However, the reliquefaction system configured in the first method is very expensive, with high maintenance costs and high requirements for operators; in the second method, the low-temperature and high-pressure LPG fuel tank must first use low-temperature steel plates, increase the design pressure, and cover the surface of the tank with a layer of thermal insulation. The construction process of this type of tank is complex, the construction requirements are high, and the steel procurement cost is high.
[0007] For LPG gas supply system, temperature control through two-stage boosting and multiple heat exchangers will lead to high system cost and large system space. The operation becomes complicated for the operator, and the equipment that needs maintenance increases a lot, making the system operation and management more difficult. Summary of the invention
[0008] In view of the above-mentioned shortcomings of the prior art, the purpose of the present application is to provide an LPG gas supply system for a large gas tanker and a large gas tanker, so as to solve the problems of high cost and high difficulty in maintenance and management of the LPG gas supply system in the prior art.
[0009] To achieve the above-mentioned purpose and other related purposes, the first aspect of the present application provides an LPG gas supply system for a large gas tanker, wherein the hull of the large gas tanker includes a bow, a hull and a stern, the upper surface of the hull is provided with a main deck, the main deck is laid with pipelines, and the interior of the stern is provided with an engine; it is characterized in that the LPG gas supply system comprises: a low-temperature and high-pressure deck fuel tank, the low-temperature and high-pressure deck fuel tank is arranged on the main deck, and the low-temperature and high-pressure deck fuel tank stores low-temperature and high-pressure LPG; a fuel preparation device, the fuel preparation device is arranged on the main deck, the fuel preparation device is connected to the low-temperature and high-pressure deck fuel tank through a boosting pipeline, and the fuel preparation device is connected to the engine through a gas transmission pipeline; the LPG transported through the low-temperature and high-pressure deck fuel tank is subjected to pressurization and temperature treatment by the fuel preparation device, and then transported to the engine through the gas transmission pipeline.
[0010] In some embodiments of the first aspect of the present application, the number of the low-temperature and high-pressure deck fuel tanks is one or two.
[0011] In some embodiments of the first aspect of the present application, when the number of cryogenic and high-pressure deck fuel tanks is one, the cryogenic and high-pressure deck fuel tank is arranged on a side close to the bow to avoid the pipelines on the large gas tanker.
[0012] In some embodiments of the first aspect of the present application, when the number of cryogenic and high-pressure deck fuel tanks is two, the cryogenic and high-pressure deck fuel tanks are connected to each other to supply gas to the engine at the same time; the two cryogenic and high-pressure deck fuel tanks are respectively arranged on the two sides close to the bow to avoid the pipelines on the large gas tanker.
[0013] In some embodiments of the first aspect of the present application, the two low-temperature and high-pressure deck fuel tanks are symmetrically arranged on the two sides of the transport ship or staggered front and back on the two sides of the transport ship.
[0014] In some embodiments of the first aspect of the present application, the fuel preparation equipment is disposed on the main deck near the stern; the fuel preparation equipment includes an LPG booster pump and a heat exchanger.
[0015] To achieve the above-mentioned purpose and other related purposes, the second aspect of the present application provides a large gas tanker, including: an LPG gas supply system for a large gas tanker; a hull, the hull including a bow, a hull and a stern, the upper surface of the hull is provided with a main deck, the main deck is laid with pipes, and the engine is arranged inside the stern; a plurality of cryogenic storage tanks, the plurality of cryogenic storage tanks are arranged in sequence below the main deck along the bow and stern direction of the hull.
[0016] In some embodiments of the second aspect of the present application, each cryogenic storage tank is equipped with a gas chamber for monitoring and controlling the cryogenic storage tank.
[0017] In some embodiments of the second aspect of the present application, a gas preparation room is provided on the main deck; and the fuel preparation equipment is provided in the gas preparation room.
[0018] In some embodiments of the second aspect of the present application, the stern has an upper front wall; the distance between the gas preparation room and the upper front wall is greater than 40 meters and not more than 45 meters.
[0019] As described above, the LPG gas supply system for a large gas carrier and the large gas carrier of the present application have the following beneficial effects:
[0020] The LPG gas supply method of the present application reduces the cost and construction period of the LPG fuel containment system, reduces the cost of the LPG gas supply system, reduces the space occupied by the LPG gas supply system on the ship, makes the system operation simpler, and reduces maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 Shown is a side structural schematic diagram of a large gas transport ship and a single-deck fuel tank LPG gas supply system in one embodiment of the present application.
[0022] Figure 2 Shown is a top view schematic diagram of a large gas transport ship and a single-deck fuel tank LPG gas supply system in one embodiment of the present application.
[0023] Figure 3 Shown is a side structural schematic diagram of a large gas transport ship and a double-deck fuel tank LPG gas supply system in one embodiment of the present application.
[0024] Figure 4 Shown is a top view schematic diagram of a large gas carrier and a double-deck fuel tank LPG gas supply system in one embodiment of the present application. DETAILED DESCRIPTION
[0025] The following describes the embodiments of the present application through specific examples, and those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. The present application can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0026] It should be noted that in the following description, with reference to the accompanying drawings, several embodiments of the present application are described in the accompanying drawings. It should be understood that other embodiments may also be used, and mechanical composition, structure, electrical and operational changes may be made without departing from the spirit and scope of the present application. The following detailed description should not be considered restrictive, and the scope of the embodiments of the present application is limited only by the claims of the published patents. The terms used here are only for describing specific embodiments and are not intended to limit the present application. Spatially related terms, such as "upper", "lower", "left", "right", "below", "below", "lower", "above", "upper", etc., may be used in the text to facilitate the description of the relationship between an element or feature shown in the figure and another element or feature.
[0027] In this application, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix", "hold" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0028] Furthermore, as used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context indicates otherwise. The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments described here can be implemented in an order other than that illustrated or described here. In addition, the terms "comprising" and "including" indicate the presence of the described features, operations, elements, components, items, kinds, and / or groups, but do not exclude the presence, occurrence or addition of one or more other features, operations, elements, components, items, kinds, and / or groups. It should be further understood that the terms "or" and "and / or" used herein are interpreted as inclusive, or mean any one or any combination. Therefore, "A, B or C" or "A, B and / or C" means "any of the following: A; B; C; A and B; A and C; B and C; A, B and C". Exceptions to this definition occur only when a combination of elements, functions, or operations are inherently mutually exclusive in some manner.
[0029] The present application provides an LPG gas supply system for a large gas carrier and a large gas carrier. The hull of the large gas carrier includes a bow, a hull and a stern. The upper surface of the hull is provided with a main deck, and the main deck is paved with pipelines. An engine is provided inside the stern, and a low-temperature and high-pressure deck fuel tank is provided on the main deck. The LPG delivered via the low-temperature and high-pressure deck fuel tank is subjected to a pressurization and temperature-raising treatment by an LPG booster pump and a heat exchanger, and then delivered to the engine through a gas pipeline. The LPG gas supply method of the present application reduces the cost and construction period of the LPG fuel containment system, reduces the cost of the LPG gas supply system, reduces the space occupied by the LPG gas supply system on the ship, makes the system operation simpler, and reduces the maintenance cost.
[0030] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the technical solution in the embodiments of the present invention is further described in detail through the following embodiments and in combination with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the invention.
[0031] like Figures 1 to 4 FIG. 1 shows a schematic diagram of the structure of a large gas carrier and the LPG gas supply system thereon.
[0032] The structure of a large gas carrier includes:
[0033] An LPG gas supply system for a large gas transport ship; a hull, the hull comprising a bow, a hull and a stern, the upper surface of the hull being provided with a main deck, the main deck being paved with pipes, and the engine being arranged inside the stern; a plurality of cryogenic storage tanks, the plurality of cryogenic storage tanks being arranged in sequence below the main deck along the bow and stern direction of the hull.
[0034] In one embodiment, the gas transported by the large gas tanker is stored in cryogenic tanks.
[0035] In one embodiment, if Figures 1 to 4 As shown, each cryogenic storage tank is equipped with a gas chamber for monitoring and controlling the cryogenic storage tank.
[0036] It should be noted that the gas chamber is equipped with multiple monitoring devices, such as thermometers, pressure gauges, etc., and valves are also provided to control the corresponding low-temperature storage tanks.
[0037] In one embodiment, if Figures 1 to 4 As shown, a compressor room is also provided on the main deck.
[0038] In one embodiment, if Figures 1 to 4 As shown, the stern has an upper front wall.
[0039] In one embodiment, the types of pipelines laid include but are not limited to cargo pipelines, steam pipelines, cooling water pipelines, and communication and control cable pipelines.
[0040] In one embodiment, if Figure 1 as well as Figure 3 As shown, a gas tower for gas discharge and treatment is also provided on the main deck.
[0041] Based on the structure of the large gas carrier described above, the LPG gas supply system for the large gas carrier is as follows: Figures 1 to 4 ,include:
[0042] A low-temperature and high-pressure deck fuel tank, wherein the low-temperature and high-pressure deck fuel tank is arranged on the main deck and stores low-temperature and high-pressure LPG;
[0043] A fuel preparation device, the fuel preparation device is arranged on the main deck, the fuel preparation device is connected to the low-temperature and high-pressure deck fuel tank through a booster pipeline, and the fuel preparation device is connected to the engine through a gas pipeline;
[0044] The LPG delivered from the low-temperature and high-pressure deck fuel tank is pressurized and heated by the fuel preparation equipment, and then delivered to the engine through the gas pipeline.
[0045] It should be noted that in the LPG gas supply system in the embodiment of the present invention, the low-temperature and high-pressure deck fuel tank outputs high-pressure gas. Compared with the LPG gas supply scheme in the prior art, since there is no need to use a first-stage pump for pressurization, the cost of the LPG gas supply system is reduced and the space occupied by the LPG gas supply system on the ship is reduced. In addition, the LPG gas supply system in the embodiment of the present invention only uses the gas in the deck fuel tank to supply gas to the engine, and the storage tank does not participate in the gas supply. Therefore, there is no need to use low-temperature steel plates to enclose the storage tank as in the prior art, which reduces the cost and construction period of the LPG fuel containment system, and also reduces the cost of the LPG fuel supply system.
[0046] It should also be noted that, for the LPG gas supply system of the embodiment of the present invention, since the deck fuel tank is arranged on the deck, it is convenient for technicians to perform monitoring and maintenance, and the threshold requirements for technicians are lowered, which greatly reduces the maintenance cost of the gas supply system.
[0047] In one embodiment, the fuel preparation equipment is disposed on the main deck near the stern.
[0048] In one embodiment, the fuel preparation device includes a booster pump and a heat exchanger.
[0049] In one embodiment, the distance between the fuel preparation equipment and the front wall of the superstructure of the transport vessel is greater than 40 meters and not more than 45 meters.
[0050] It should be noted that the distance between the fuel preparation equipment and the front wall of the upper structure of the transport ship can only ensure the pressure of the gas when the fuel preparation equipment supplies gas to the engine within a range of more than 40 meters and less than 45 meters. If the distance between the fuel preparation equipment and the front wall of the upper structure of the transport ship is too long, there will be a problem of insufficient pressure of the gas when the fuel preparation equipment supplies gas to the engine.
[0051] In one embodiment, an LPG booster pump is arranged on the main deck, and the LPG booster pump is connected to the low-temperature and high-pressure deck fuel tank through a booster pipeline; a heat exchanger is connected to the LPG booster pump, and is connected to the engine through a gas pipeline; the LPG delivered from the low-temperature and high-pressure deck fuel tank is pressurized and heated by the LPG booster pump and the heat exchanger, and then delivered to the engine through the gas pipeline.
[0052] In one embodiment, if Figures 1 to 4 As shown, a gas preparation room is provided on the main deck; the fuel preparation equipment is arranged in the gas preparation room.
[0053] In one embodiment, when there is space in the compressor room, the fuel preparation equipment may also be arranged in the compressor room. It should be noted that the advantage of arranging the fuel preparation equipment in the compressor room is that it saves space on the main deck.
[0054] In one embodiment, if Figures 1 to 4 As shown, the number of cryogenic and high-pressure deck fuel tanks is one or two.
[0055] In one embodiment, when there is only one cryogenic and high-pressure deck fuel tank, the cryogenic and high-pressure deck fuel tank is disposed on a side close to the bow to avoid pipelines on the large gas transport ship.
[0056] In one embodiment, when the number of cryogenic and high-pressure deck fuel tanks is two, the cryogenic and high-pressure deck fuel tanks are connected to each other to supply gas to the engine at the same time; the two cryogenic and high-pressure deck fuel tanks are respectively arranged on the two sides close to the bow to avoid the pipelines on the large gas transport ship.
[0057] In one embodiment, the two low-temperature and high-pressure deck fuel tanks are symmetrically arranged on two sides of the transport ship or staggered front and back on two sides of the transport ship.
[0058] The following will describe the arrangement of low-temperature and high-pressure deck fuel tanks in conjunction with a specific embodiment:
[0059] Embodiment 1: A layout of a single deck fuel tank.
[0060] like Figure 1 as well as Figure 2 As shown, the transport ship has four cryogenic storage tanks arranged in sequence along the bow and stern direction of the hull under the main deck. Each storage tank is equipped with an air chamber. There are four air chambers on the transport ship, namely, air chamber 1, air chamber 2, air chamber 3 and air chamber 4.
[0061] Single deck fuel tank such as Figure 2 As shown, it is arranged on the main deck between air chamber 1 and air chamber 2 (air chamber 1 and air chamber 2 are close to the bow) and is located on one side.
[0062] Embodiment 2: An arrangement of two deck fuel tanks.
[0063] like Figure 3 as well as Figure 4 As shown, the transport ship has four cryogenic storage tanks arranged in sequence along the bow and stern direction of the hull under the main deck. Each storage tank is equipped with an air chamber. There are four air chambers on the transport ship, namely, air chamber 1, air chamber 2, air chamber 3 and air chamber 4.
[0064] Two interconnected deck fuel tanks (deck fuel tank 1 and deck fuel tank 2) are as follows Figure 4 As shown, the front and rear staggered positions are arranged on the main deck above the storage tanks of air chamber 1 and air chamber 2 (air chamber 1 and air chamber 2 are close to the bow) and are located on two sides respectively.
[0065] In one embodiment, if the LPG gas in the deck fuel pipe is exhausted, the gas stored in the tank can also be used to supply gas to the generator.
[0066] In summary, the present application provides an LPG gas supply system for a large gas carrier and a large gas carrier. The hull of the large gas carrier includes a bow, a hull and a stern. The upper surface of the hull is provided with a main deck, and the main deck is paved with pipes. The interior of the stern is provided with an engine, and a low-temperature and high-pressure deck fuel tank is provided on the main deck. The LPG delivered via the low-temperature and high-pressure deck fuel tank is pressurized and heated by an LPG booster pump and a heat exchanger, and then delivered to the engine through a gas pipeline. The LPG gas supply method of the present application reduces the cost and construction period of the LPG fuel containment system, reduces the cost of the LPG gas supply system, reduces the space occupied by the LPG gas supply system on the ship, makes the system operation simpler, and reduces the maintenance cost. Therefore, the present application effectively overcomes the various shortcomings of the prior art and has a high industrial utilization value.
[0067] The above embodiments are merely illustrative of the principles and effects of the present application and are not intended to limit the present application. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present application. Therefore, all equivalent modifications or changes made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed in the present application shall still be covered by the claims of the present application.
Claims
1. An LPG gas supply system for a large gas carrier, wherein the hull of the large gas carrier comprises a bow, a hull and a stern, the upper surface of the hull is provided with a main deck, the main deck is paved with pipelines, and an engine is provided inside the stern; characterized in that: The LPG gas supply system comprises: A low-temperature and high-pressure deck fuel tank, wherein the low-temperature and high-pressure deck fuel tank is arranged on the main deck and stores low-temperature and high-pressure LPG; A fuel preparation device, the fuel preparation device is arranged on the main deck, the fuel preparation device is connected to the low-temperature and high-pressure deck fuel tank through a booster pipeline, and the fuel preparation device is connected to the engine through a gas pipeline; The LPG delivered from the low-temperature and high-pressure deck fuel tank is pressurized and heated by the fuel preparation equipment, and then delivered to the engine through the gas pipeline.
2. The LPG gas supply system for a large gas carrier according to claim 1, characterized in that: The number of the low-temperature and high-pressure deck fuel tanks is one or two.
3. The LPG gas supply system for a large gas carrier according to claim 2, characterized in that: When the number of the low-temperature and high-pressure deck fuel tank is one, the low-temperature and high-pressure deck fuel tank is arranged on a side close to the bow to avoid the pipeline on the large gas transport ship.
4. The LPG gas supply system for a large gas carrier according to claim 2, characterized in that: When there are two cryogenic and high-pressure deck fuel tanks, the cryogenic and high-pressure deck fuel tanks are connected to each other to supply gas to the engine at the same time; the two cryogenic and high-pressure deck fuel tanks are respectively arranged on the two sides close to the bow to avoid the pipelines on the large gas transport ship.
5. The LPG gas supply system for a large gas carrier according to claim 4, characterized in that: The two low-temperature and high-pressure deck fuel tanks are symmetrically arranged on the two sides of the transport ship or staggered front and back on the two sides of the transport ship.
6. The LPG gas supply system for a large gas carrier according to claim 1, characterized in that: The fuel preparation equipment is arranged on the main deck near the stern; the fuel preparation equipment comprises an LPG booster pump and a heat exchanger.
7. A large gas tanker, characterized in that: include: An LPG gas supply system for a large gas transport ship as described in any one of claims 1 to 7; a hull, the hull comprising a bow, a hull and a stern, the upper surface of the hull being provided with a main deck, the main deck being paved with pipes, and an engine being arranged inside the stern; a plurality of cryogenic storage tanks, the plurality of cryogenic storage tanks being arranged in sequence below the main deck along the bow and stern directions of the hull.
8. The large gas carrier according to claim 7, characterized in that: Each cryogenic storage tank is equipped with a gas chamber for monitoring and controlling the cryogenic storage tank.
9. The large gas carrier according to claim 7, characterized in that: A gas preparation room is provided on the main deck; The fuel preparation equipment is arranged in the gas preparation room.
10. The large gas carrier according to claim 9, characterized in that: The stern has an upper front wall; the distance between the gas preparation room and the upper front wall is greater than 40 meters and not more than 45 meters.
