Stockpiling method and device for C-shaped stockyard and storage medium
By obtaining the height distribution map of the material stack and calculating the operation-limited parameters, and using laser scanning and stream detection devices to automatically control the fabric path of the unloading truck, the problem of manual control of the irregularity of the material stack in the C-type material field is solved, and the material field is realized Unmanned pile materials and efficient flattening management.
Patent Information
- Application Number
- CN202411414896.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-10-10
AI Technical Summary
In the existing C-type material pile operation, manual control leads to irregular shape of the material pile, making it difficult to achieve precise control and leveling management, affecting the space utilization rate of the material field and the efficiency of the material pile.
By obtaining the height distribution map of the material stack, calculating the operation limits the material height and position, using laser scanning devices and material flow detection devices, the automatic fabric path control of the unloading truck is realized, ensuring the smoothness and precise stacking of the material stack.
The unmanned material pile operation of the C-type material yard is realized, the space utilization rate and material pile efficiency of the material yard are improved, and the leveling management of the material pile is ensured.
Smart Images

Figure CN119079579A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of stockpiling operations, and in particular to a stockpiling method, a stockpiling device and a storage medium for a C-type stockyard. Background Art
[0002] At present, in the C-type material yard stacking operation, the on-site operators determine the unloading point based on the planned stacking quantity and the shape of the material pile in the stacking grid based on their experience, drive the unloading truck to the unloading point for fixed-point unloading, and manually observe the shape of the material pile at regular intervals, and then adjust the unloading position of the unloading truck according to the pile shape for fixed-point stacking.
[0003] The on-site operators of this stockpiling operation method are quite arbitrary and the adjustment frequency is too low, resulting in irregular shapes of the stockpiles, affecting the rational use of the yard space and the stockpiling efficiency. It is difficult to achieve precise control and leveling management of the stockpiles, which increases the difficulty and time of subsequent material retrieval operations.
[0004] Therefore, it is of great practical application value to develop a stacking method, a stacking device and a storage medium that can intelligently control the stacking process and realize the leveling management of the stacking. Summary of the invention
[0005] The present invention aims to provide a stacking method for a C-type stockyard, aiming to solve the problem that it is difficult to achieve accurate control and leveling management of stacking in the prior art. The specific technical solution is as follows:
[0006] A stockpiling method for a C-type stockyard comprises the following steps:
[0007] Step S1, obtaining a height distribution diagram of a material pile in a material grid;
[0008] Step S2: Obtaining the limit material height h max , the material grid stacking starting point sp, the material grid stacking end point ep and the material pile repose angle α form a cross-sectional trapezoid, and obtain the material height array H = [h 1 、h 2 ,...,h i , 3h n ] and position array P = [p 1 、p 2 , 3, p i 、3p n ], n is the sum of the number of peaks and the number of troughs, and i represents any integer between 1 and n;
[0009] Step S3, calculating the operation limited material height hl, the operation starting position spl and the operation end position epl according to the material grid stacking starting point sp, the material grid stacking end point ep, the stacking angle α and the height distribution diagram of the stacking;
[0010] Step S4, the unloading vehicle travels and piles materials between the operation starting position spl and the operation end position epl, and scans the volume shape of the piled materials at the travel position, and updates the height distribution map of the pile;
[0011] Step S5: If the real-time material height h detected by the running position s All less than the limit material height h max , then go to step S6, otherwise go to step S7;
[0012] Step S6: If the real-time material height h detected by the running position s If both are less than the operation limit material height hl, then go to step S4, otherwise go to step S2;
[0013] Step S7, end the stacking.
[0014] In the above technical solution, preferably, step S3 is specifically:
[0015] Extract the minimum value from the material height array H and find the material height h of the lowest trough i ;
[0016] Get the lowest valley material height h from the material height array H i Adjacent material height h i-1 and h i+1 , so as to calculate the operation limit material height hl, the operation starting point position spl and the operation end point position epl, specifically:
[0017] If the adjacent material height h i-1 and h i+1 If neither exists, then the operating limit material height hl=h i +h z , the operation starting point position spl = sp + hl / tanα and the operation end point position epl = ep - hl / tanα, where h z For additional material high;
[0018] If the adjacent material height h i-1 Existence and h i+1 If it does not exist, then p i-1 As the operation starting point spl, the operation limit material height hl = h i-1 , operation end position epl = ep-hl / tanα;
[0019] If the adjacent material height h i-1 Does not exist and h i+1 If exists, then p i+1 As the operation end position epl, the operation limit material height hl=h i+1 , calculate the operation starting point position spl = sp + hl / tanα;
[0020] If the adjacent material height h i-1 and h i+1 Both exist and h i-1 <h i+1 When h is found in the cross-sectional trapezoid i With h i+1 Between i-1 At the same height position cp, p i-1 As the operation starting point spl, cp as the operation end point epl, the operation limit material height hl = h i-1 ;
[0021] If the adjacent material height h i-1 and h i+1 Both exist and h i-1 >h i+1 When h is found in the cross-sectional trapezoid i With h i-1 Between i+1 At the same height position cp, p i+1 As the operation end position epl, cp is taken as the operation starting position spl, and the operation limit material height hl=h i+1 ;
[0022] If the adjacent material height h i-1 and h i+1 Both exist and h i-1 =h i+1 When p i+1 As the end position of the operation epl, p i-1 As the operation starting point spl, the operation limit material height hl is equal to h i-1 or equal to h i+1 .
[0023] The above technical solution is preferred, wherein the additional material is high h z Should be less than or equal to the limit material height h max .
[0024] Preferably in the above technical solution, the unloading vehicle moves on a T-type stage, and scans the material grid by a laser scanning device to obtain a height distribution diagram of the material pile in the material grid.
[0025] In the above technical solution, the preferred operation limit material height hl should be less than or equal to the limit material height h max .
[0026] In the above technical solution, preferably, when the unloading vehicle is moving between the operation starting position spl and the operation end position epl: when the material flow detection device detects incoming material, the unloading vehicle is in a moving state; when the material flow detection device does not detect incoming material, the unloading vehicle stops moving.
[0027] The present invention also provides a stockpiling device for a C-type stockyard, comprising:
[0028] The detection unit is used to obtain the volume and shape data of the pile, the real-time material height under the unloading vehicle, and detect whether there is material coming;
[0029] A control model calculation unit is used to construct a digital model of the volume shape of the pile according to the volume shape data of the pile, and to execute the pile method to generate the material distribution control parameters of the unloading vehicle;
[0030] The control unit is used to collect the status signal of the unloading vehicle, the position signal of the unloading vehicle, the real-time material height signal under the unloading vehicle, and the incoming material signal; and receive the material distribution control parameters to control the material distribution of the unloading vehicle.
[0031] Preferably, in the above technical solution, the detection unit comprises:
[0032] Laser scanning device, used to scan the pile of materials while the unloading vehicle is moving, and obtain the volume and shape data of the pile of materials;
[0033] Material height detection device, used to detect the real-time material height under the unloading vehicle;
[0034] Material flow detection device is used to detect whether there is incoming material.
[0035] The present invention also provides a storage medium, in which the material stacking method is stored.
[0036] The application of the technical solution of the present invention has the following beneficial effects:
[0037] The stacking method of the present invention realizes unmanned stacking operation of unloading vehicles on site in C-type material yards, as well as precise control and leveling management of the stacking, and solves the problems of disorderly stacking in manual control of C-type material yards, low efficiency of stacking and unloading operations, and low utilization rate of material yard space.
[0038] The stacking method of the present invention takes the leveling of the material pile as the goal, scans the material pile height distribution map in real time, and dynamically calculates the operation starting position, operation end position and operation limited material height based on the material characteristics and stacking balance in the material stacking balance, so as to plan the material distribution path of the unloading vehicle, control the movement and stacking of the unloading vehicle, ensure the leveling and precise control of the material pile, and improve the space utilization rate of the material yard.
[0039] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0041] Figure 1 This is a schematic diagram of the structure of a C-type material yard;
[0042] Figure 2 is a flow chart of the stockpiling method of the present invention;
[0043] Figure 3 It is a cross-sectional trapezoidal schematic diagram of the pile;
[0044] Figure 4 It is a schematic diagram of the first type of trapezoidal cross section of the pile;
[0045] Figure 5 It is a schematic diagram of the second cross-section trapezoid of the pile;
[0046] Figure 6 It is a schematic diagram of the third cross-section trapezoid of the pile;
[0047] Figure 7 It is a schematic diagram of the fourth type of trapezoidal cross section of the pile;
[0048] Figure 8 It is a schematic diagram of the fifth type of trapezoidal cross section of the pile;
[0049] Fig. 9 It is a schematic diagram of the sixth cross-section trapezoid of the pile;
[0050] Among them, 1. unloading car, 2. T-type platform, 3. retaining wall, 4. material grid. DETAILED DESCRIPTION
[0051] In order to facilitate the understanding of the present invention, the present invention will be described more fully below, and preferred embodiments of the present invention are provided. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.
[0052] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0053] Example:
[0054] like Figure 1As shown, the C-type stockyard is a long closed stockyard with retaining walls 3 between stockpiles, and the stockpiling area separated by the retaining wall 3 is called a stock grid 4. The materials are input from the top of the stockyard by a belt conveyor on a T-shaped platform 2 at the top of the stockyard mid-span, and the unloading vehicle 1 on the T-shaped platform 2 is used for stockpiling operations, and the materials are transported and stored in the designated stock grids.
[0055] In order to achieve precise control and leveling management of stockpiling and improve the rational use of stockyard space and stockpiling effect, this embodiment provides a stockpiling device and a stockpiling method for a C-type stockyard.
[0056] Preferably, the stacking device comprises:
[0057] The detection unit is used to obtain the volume and shape data of the pile, the real-time material height under the unloading vehicle, and detect whether there is material coming;
[0058] The control model calculation unit constructs a digital model of the volume shape of the pile according to the volume shape data of the pile, and executes the pile method to generate the material distribution control parameters of the unloading vehicle;
[0059] The control unit is used to collect the status signal of the unloading vehicle, the position signal of the unloading vehicle, the real-time material height signal under the unloading vehicle, and the incoming material signal; and receive the material distribution control parameters to control the material distribution of the unloading vehicle.
[0060] Specifically, the detection unit includes:
[0061] Laser scanning device, used to scan the pile of materials while the unloading vehicle is moving, and obtain the volume and shape data of the pile of materials;
[0062] Material height detection device, used to detect the real-time material height under the unloading vehicle;
[0063] Material flow detection device is used to detect whether there is incoming material.
[0064] Specifically, the control model calculation unit also includes a storage medium, in which the stockpiling method is stored. The control model calculation unit generates the material distribution control parameters according to the digital model of the stockpiling volume shape and the stockpiling method, thereby controlling the unloading vehicle to distribute the material. Figure 2 As shown, the stacking method comprises the following steps:
[0065] Step S1, obtaining a height distribution diagram of a material pile in a material grid;
[0066] Specifically, in step S1, the unloading vehicle walks on a T-shaped stage, and scans the material grid through a laser scanning device to obtain a height distribution map of the material pile in the material grid.
[0067] Step S2: Figure 3 As shown, obtain the limit material height h max, the material grid stacking starting point sp, the material grid stacking end point ep and the material pile repose angle α form a cross-sectional trapezoid, and obtain the material height array H = [h 1 、h 2 , 3, h i , 3h n ] and position array P = [p 1 、p 2 ,…,p i ,…p n ], n is the sum of the number of peaks and the number of troughs, and i represents any integer between 1 and n;
[0068] Step S3, calculating the operation limited material height hl, the operation starting position spl and the operation end position epl according to the material grid stacking starting point sp, the material grid stacking end point ep, the stacking angle α and the height distribution diagram of the stacking;
[0069] Preferably, the step S3 specifically comprises:
[0070] 1) Extract the minimum value from the material height array H and find the material height h of the lowest trough i ;
[0071] 2) Get the lowest valley material height h from the material height array H i Adjacent material height h i-1 and h i+1 , so as to calculate the operation limit material height hl, the operation starting point position spl and the operation end point position epl, specifically:
[0072] like Figure 4 As shown, if the adjacent material height h i-1 and h i+1 If none of them exist, that is, the upper surface of the pile is a flat surface, then the operating limit material height hl = h i +h z , the operation starting point position spl = sp + hl / tanα and the operation end point position epl = ep - hl / tanα, where h z For additional material high;
[0073] like Figure 5 As shown, if the adjacent material height h i-1 Existence and h i+1 If it does not exist, then p i-1 As the operation starting point spl, take the operation limit material height hl=h i-1 , take the operation end position epl = ep-hl / tanα;
[0074] like Figure 6 As shown, if the adjacent material height h i-1 Does not exist and h i+1 If exists, then pi+1 As the operation end position epl, take the operation limit material height hl = h i+1 , calculate the operation starting point position spl = sp + hl / tanα;
[0075] like Figure 7 As shown, if the adjacent material height h i-1 and h i+1 Both exist and h i-1 <h i+1 When h is found in the cross-sectional trapezoid i With h i+1 Between i-1 At the same height position cp, p i-1 As the operation starting point spl, take cp as the operation end point epl, and take the operation limit material height hl = h i-1 ;
[0076] like Figure 8 As shown, if the adjacent material height h i-1 and h i+1 Both exist and h i-1 >h i+1 When h is found in the cross-sectional trapezoid i With h i-1 Between i+1 At the same height position cp, p i+1 As the operation end position epl, take cp as the operation starting position spl, and take the operation limit material height hl=h i+1 ;
[0077] like Fig. 9 As shown, if the adjacent material height h i-1 and h i+1 Both exist and h i-1 =h i+1 When p i+1 As the operation end position epl, p i-1 As the operation starting point spl, take the operation limit material height hl equal to h i-1 or equal to h i+1 .
[0078] Step S4, the unloading vehicle travels and piles materials between the operation starting position spl and the operation end position epl, and scans the volume shape of the piled materials at the travel position, and updates the height distribution map of the pile;
[0079] Preferably, in step S4, the unloading vehicle first moves to the operation starting position spl, and if incoming material is detected, it moves to the operation end position epl, and if no incoming material is detected, it stops moving and waits for incoming material; during the moving process, the unloading vehicle stacks materials and scans the shape of the piled materials below, thereby dynamically updating the height distribution map of the piled materials.
[0080] Step S5: If the real-time material height h detected by the running position s All less than the limit material height h max , then go to step S6, otherwise go to step S7;
[0081] Specifically, step S5 is to compare the updated stockpile height in the walking position with the limit stock height h max If the judgment condition in S5 is met, it means that the height of the pile has not reached the limit material height h. max , it is necessary to continue to pile up materials. If the judgment condition in S5 is met, it means that the pile height has reached the limit material height h max , the stacking should be ended at this time.
[0082] Step S6: If the real-time material height h detected by the running position s If both are less than the operation limit material height hl, then go to step S4, otherwise go to step S2;
[0083] Specifically, step S6 is to determine whether the stockpile between the operation starting position and the operation end position in a single small cycle has reached the set operation limit material height hl. If the judgment condition of S6 is met, it means that the stockpile between the operation starting position and the operation end position in a single small cycle has not reached the operation limit material height hl, and the unloading vehicle needs to continue to walk between the operation starting position and the operation end position to stack materials. If the judgment condition of S6 is not met, it means that the single small cycle stockpile operation has been completed. At this time, it is necessary to re-acquire the limit material height h according to the updated height distribution map of the stockpile. max , the material grid stacking starting point sp, the material grid stacking end point ep and the material pile repose angle α formed by the cross-sectional trapezoid and the material height array H of all the peaks and troughs in the cross-sectional trapezoid = [h 1 、h 2 ,…,h i ,…h n ] and position array P = [p 1 、p 2 ,…,p i ,…p n ] and start a new large-cycle stacking operation.
[0084] Step S7, end the stacking.
[0085] Preferably, in the stacking method of this embodiment, the additional material height h z Should be less than or equal to the limit material height h max , the operating limit material height hl should be less than or equal to the limit material height h max To prevent the pile from exceeding the limit material height h max .
[0086] Preferably, after the control model calculation unit obtains the cross-sectional trapezoid, material height array H and position array P according to the collected material pile height distribution diagram, it is necessary to calculate the material height h of the lowest trough according to the material height h of the lowest trough. i Height h with adjacent material i-1 、h i+1 The relationship between the current pile shape and the Figure 4-Figure 9 The stacking device and stacking method of this embodiment dynamically calculate the operation starting point position, operation end point position and operation limited material height based on the material characteristics and stacking balance in the material stacking balance, which can realize unmanned stacking operation, ensure the flatness of the material pile, and improve the space utilization rate of the material yard.
[0087] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A stacking method for a C-type stockyard, characterized in that: The following steps are involved: Step S1, obtaining a height distribution diagram of a material pile in a material grid; Step S2: Obtaining the limit material height h max , the material grid stacking starting point sp, the material grid stacking end point ep and the material pile repose angle α form a cross-sectional trapezoid, and obtain the material height array H = [h1, h2, ..., h i ,…h n ] and position array P = [p1, p2, ..., p i ,...p n ], n is the sum of the number of peaks and the number of troughs, and i represents any integer between 1 and n; Step S3, calculating the operation limited material height hl, the operation starting position spl and the operation end position epl according to the material grid stacking starting point sp, the material grid stacking end point ep, the stacking angle α and the height distribution diagram of the stacking; Step S4, the unloading vehicle travels and piles materials between the operation starting position spl and the operation end position epl, and scans the volume shape of the piled materials at the travel position, and updates the height distribution map of the pile; Step S5: If the real-time material height h detected by the running position s All less than the limit material height h max , then go to step S6, otherwise go to step S7; Step S6: If the real-time material height h detected by the running position s If both are less than the operation limit material height hl, then go to step S4, otherwise go to step S2; Step S7, end the stacking.
2. The stacking method for a C-type stockyard according to claim 1, characterized in that: Step S3 specifically includes: Extract the minimum value from the material height array H and find the material height h of the lowest trough i ; Get the lowest valley material height h from the material height array H i Adjacent material height h i-1 and h i+1 , so as to calculate the operation limit material height hl, the operation starting point position spl and the operation end point position epl, specifically: If the adjacent material height h i-1 and h i+1 If neither exists, then the operating limit material height hl=h i +h z , the operation starting point position spl = sp + hl / tanα and the operation end point position epl = ep - hl / tanα, where h z For additional material high; If the adjacent material height h i-1 Existence and h i+1 If it does not exist, then p i-1 As the operation starting point spl, the operation limit material height hl=h i-1 , operation end position epl = ep-hl / tanα; If the adjacent material height h i-1 Does not exist and h i+1 If exists, then p i+1 As the operation end position epl, the operation limit material height hl=h i+1 , calculate the operation starting point position spl = sp + hl / tanα; If the adjacent material height h i-1 and h i+1 Both exist and h i-1 <h i+1 When h is found in the cross-sectional trapezoid i With h i+1 Between i-1 At the same height position cp, p i-1 As the operation starting point spl, cp as the operation end point epl, the operation limit material height hl = h i-1 ; If the adjacent material height h i-1 and h i+1 Both exist and h i-1 >h i+1 When h is found in the cross-sectional trapezoid i With h i-1 Between i+1 At the same height position cp, p i+1 As the operation end position epl, cp is taken as the operation starting position spl, and the operation limit material height hl=h i+1 ; If the adjacent material height h i-1 and h i+1 Both exist and h i-1 =h i+1 When p i+1 As the end position of the operation epl, p i-1 As the operation starting point spl, the operation limit material height hl is equal to h i-1 or equal to h i+1 .
3. The stacking method for a C-type stockyard according to claim 2, characterized in that: The additional material is high h z Should be less than or equal to the limit material height h max .
4. The stacking method for a C-type stockyard according to claim 1, characterized in that: The unloading vehicle walks on the T-type stage, and scans the material grid by means of a laser scanning device to obtain a height distribution diagram of the material pile in the material grid.
5. The stacking method for a C-type stockyard according to claim 1, characterized in that: The operating limit material height hl should be less than or equal to the limit material height h max .
6. The stacking method for a C-type stockyard according to claim 1, characterized in that: During the process of the unloading vehicle moving between the operation starting position spl and the operation end position epl: when the material flow detection device detects incoming material, the unloading vehicle is in the moving state; when the material flow detection device does not detect incoming material, the unloading vehicle stops moving.
7. A stacking device for a C-type stockyard, characterized in that: include: The detection unit is used to obtain the volume and shape data of the pile, the real-time material height under the unloading vehicle, and detect whether there is material coming; A control model calculation unit, which constructs a digital model of the volume shape of the pile according to the volume shape data of the pile, and executes the pile method according to any one of claims 1 to 6 to generate the material distribution control parameters of the unloading vehicle; The control unit is used to collect the status signal of the unloading vehicle, the position signal of the unloading vehicle, the real-time material height signal under the unloading vehicle, and the incoming material signal; and receive the material distribution control parameters to control the material distribution of the unloading vehicle.
8. The stacking device for a C-type stockyard according to claim 7, characterized in that: The detection unit comprises: Laser scanning device, used to scan the pile of materials while the unloading vehicle is moving, and obtain the volume and shape data of the pile of materials; Material height detection device, used to detect the real-time material height under the unloading vehicle; Material flow detection device is used to detect whether there is incoming material.
9. A storage medium, characterized in that: The storage medium stores the stacking method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Stacking control method of coal yard stacker-reclaimer and related products
CN109976276A
C-shaped stockyard mobile stockpiling control system and method
CN114148706A
Stacking method and device of stacker, medium and equipment
CN118545464A
Raw material heap measuring system of raw material yard, raw material heap measuring method of raw material yard and computer program
JP2011157187A