Impermeable setting accelerator for mountainous area tunnel and preparation method of impervious setting accelerator

By using anti-seepage quick-setting agent in tunnel construction, the problem of water seepage of sprayed concrete is solved. Through specific compositions and treatment devices, the efficient anti-seepage performance of sprayed concrete and the satisfaction of construction standards are achieved.

CN119080421APending Publication Date: 2024-12-06GUIZHOU KEZHU CHUANGPIN CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411195626.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing tunnel jet concrete is prone to seepage in mountainous construction, and the proportion of added anti-seepage and coagulant accelerators is difficult to control, affecting the construction quality.

Method used

Using an anti-seepage type quick-coagulant for mountain tunnels, a composition that is liquid in whole is formed by mixing a coagulant, a water reducing agent, an anti-seepage agent and a suspension agent in a specific proportion, and through a specific static The container and separation device are processed to ensure uniformity of the suspension and precipitation efficiency.

Benefits of technology

The effective anti-seepage performance of sprayed concrete is achieved, the water seepage problem is solved, and the efficiency of the precipitation process and the uniformity of the mixture are improved, meeting the tunnel construction standards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119080421A_ABST
    Figure CN119080421A_ABST
Patent Text Reader

Abstract

The invention provides an impervious accelerator for a mountain tunnel and a preparation method thereof, and relates to the field of concrete construction. According to the anti-seepage accelerator for the mountainous area tunnel and the preparation method of the anti-seepage accelerator, raw materials comprise a coagulant, a water reducing agent, an anti-seepage agent, a suspension agent and water, the coagulant accounts for 80%-85% of the total mass of a composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, the balance is water, and the anti-seepage agent is a polyurethane anti-seepage agent. The coagulant is formed by calcining a mixture of bauxite and limestone, and the water reducing agent is a melamine water reducing agent. According to the impermeable accelerator for the mountainous area tunnel, when the liquid prepared by mixing the accelerator, the water reducing agent, the impermeable agent and the suspending agent is doped into concrete for use, sprayed concrete meeting the tunnel construction standard can be formed, and the problem that the sprayed concrete is prone to water seepage in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete construction, in particular to an anti-seepage quick-setting agent for mountain tunnels and a preparation method thereof. Background Art

[0002] Tunnel wet shotcrete is a commonly used support method in tunnel engineering. Shotcrete is a process of spraying concrete mixture on rock walls such as tunnels and mines using a pressure spray gun. The quality inspection of shotcrete includes indicators such as appearance quality, strength and thickness. Among them, the appearance quality should meet the design requirements, without cracks, looseness, falling off, etc.; the strength should meet the design requirements and can be tested through tests; the thickness should meet the design requirements and can be tested by drilling or non-destructive testing.

[0003] The existing tunnel shotcrete needs to add anti-seepage agent to resist water seepage in the tunnel, and needs to add accelerator to reduce the initial setting time. Some of the additives are solid and some are liquid, and the addition ratio is not easy to control. Therefore, a whole liquid anti-seepage quick-setting agent is needed. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides an anti-seepage quick-setting agent for mountain tunnels and a preparation method thereof, which solves the problems raised in the background technology.

[0005] To achieve the above purpose, the present invention is implemented by the following technical scheme: an anti-seepage quick-setting agent for mountain tunnels and a preparation method thereof, wherein the raw materials include a coagulant, a water reducing agent, an anti-seepage agent, a suspending agent and water, the coagulant accounts for 80%-85% of the total mass of the composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, and the rest is water, and the anti-seepage agent is a polyurethane anti-seepage agent.

[0006] Preferably, the coagulant is formed by calcining a mixture of bauxite and limestone, and the water reducer is a melamine-based water reducer.

[0007] The method comprises the following steps:

[0008] S1. Preparation of a suspension carrier, mixing water and a suspending agent and stirring so that the suspending agent is evenly dispersed in water;

[0009] S2. The coagulant is mixed with the suspension carrier, and the coagulant is evenly dispersed inside the suspension carrier by stirring;

[0010] S3. Transfer the suspended carrier to a stationary container with a high diameter-to-height ratio;

[0011] S4. Separate the suspension from the precipitate and remove the precipitate.

[0012] S5. The anti-seepage agent and the water reducing agent are mixed with the suspension, and the anti-seepage agent and the water reducing agent are uniformly dispersed in the interior of the suspension carrier by stirring;

[0013] Preferably, the high-diameter-ratio stationary container comprises a plurality of sleeves whose diameters are greater than their heights, a square frame is arranged on the outer surface of the sleeve, a drainage hole is arranged on the inner bottom end of the square frame, all the square frames are connected as a whole, a collecting trough is arranged on the bottom end of the square frame, a bearing sleeve is sleeved on the inner ring of the top end of the sleeve, the upper surface of the bearing sleeve is fixedly connected through the same bearing plate, a placeholder is arranged on the upper surface of the bearing plate inside the bearing sleeve, the placeholder is fixedly connected to the bearing plate, and a limiting frame is fixedly installed on the outer surface of the bearing plate.

[0014] Preferably, the device for separating the suspension and the sediment is a through hole distributed vertically and equidistantly arranged on one side of the sleeve, a sealing plug is slidably connected inside the through hole, a short rack plate is fixedly installed on the end of the sealing plug away from the sleeve, a short support sleeve supporting the short rack plate is fixedly installed inside the square frame, a driving gear is meshed above the short rack plate, the driving gear on the same axis is fixedly connected through a rotating shaft, the rotating shaft is rotatably connected to the square frame, a power gear is fixedly installed on one end of the rotating shaft located outside the square frame, the power gear on the same horizontal plane is meshed with the same long rack plate, the bottom end of the long rack plate is slidably connected with a long support sleeve, the long support sleeve is fixedly connected to the square frame, a collecting hole is provided at one end of the collecting trough, the inner bottom wall of the collecting trough is inclined, the lowest end of the collecting trough is located at the collecting hole, a support beam is fixedly installed on the inner bottom wall of the collecting trough, and the support beam is fixedly connected to the square frame.

[0015] The present invention has the following beneficial effects:

[0016] 1. The anti-seepage quick-setting agent for mountain tunnels is a liquid made by mixing a coagulant, a water reducer, an anti-seepage agent, and a suspending agent. When added to concrete, it can form shotcrete that meets the tunnel construction standards, solving the problem of easy water seepage in shotcrete in the prior art.

[0017] 2. In the production method of the anti-seepage quick-setting agent for mountain tunnels, by setting a high diameter ratio and multiple groups of individually distributed sleeves, the suspension is set in such sleeves, which can reduce the time used for sedimentation. At the same time, a bearing plate, a limit frame and a placeholder block are set, so that the suspension can be poured into multiple sleeves at the same time and evenly.

[0018] 3. In the production method of the anti-seepage quick-setting agent for mountain tunnels, a group of through holes distributed sequentially from top to bottom are set on the side wall of the sleeve, and the through holes are covered with sealing plugs. After the sedimentation is completed, the sealing plugs are opened sequentially from top to bottom to allow the suspension to flow out, thereby enabling the suspension to flow smoothly, thereby preventing the sediment from flowing out with the suspension during the separation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the present invention;

[0020] Figure 2 This is a schematic diagram of the connection of the carrier board of the present invention;

[0021] Figure 3 It is a schematic diagram of the connection of the blocks of the present invention;

[0022] Figure 4 This is a schematic diagram of the sleeve connection of the present invention;

[0023] Figure 5 It is a schematic diagram of the rotation axis connection of the present invention.

[0024] Among them, 1. sleeve; 2. square frame; 3. drainage hole; 4. collecting trough; 5. bearing sleeve; 6. placeholder block; 7. limit frame; 8. through hole; 9. sealing plug; 10. short rack plate; 11. short support sleeve; 12. driving gear; 13. rotating shaft; 14. power gear; 15. long rack plate; 16. long support sleeve; 17. collecting hole; 18. support beam; 19. bearing plate. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] The embodiment of the present invention provides an anti-seepage quick-setting agent for mountain tunnels:

[0027] The coagulant is a coagulant produced by Jinan Hongbo Chemical Co., Ltd., whose raw materials at least include a mixture of bauxite and limestone, and the water reducer is a melamine-based water reducer produced by Shandong Tianfeng Chemical Technology Co., Ltd.

[0028] The anti-seepage agent is a polyurethane anti-seepage agent produced by Nantong Yuru Engineering Materials Co., Ltd.

[0029] The impermeability test is carried out in accordance with the Standard for Test Methods of Long-term Performance and Durability of Ordinary Concrete (GB / T50082-2009).

[0030] The initial setting test of concrete shall comply with the Standard Test Method for Performance of Ordinary Concrete Mixtures (GB / T50080-2016).

[0031] Embodiment 1: The raw materials include a coagulant, a water reducing agent, an anti-seepage agent, a suspending agent and water, wherein the coagulant accounts for 80% of the total mass of the composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, the suspending agent accounts for 2% of the total mass of the composition, and the rest is water. The anti-seepage agent is a polyurethane anti-seepage agent.

[0032]

[0033] Comparison table of initial setting time and penetration standards for different contents of each component when the coagulant accounts for 80% of the total mass of the composition

[0034] Embodiment 2: The raw materials include a coagulant, a water reducing agent, an anti-seepage agent, a suspending agent and water, wherein the coagulant accounts for 85% of the total mass of the composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, the suspending agent accounts for 2% of the total mass of the composition, and the rest is water. The anti-seepage agent is a polyurethane anti-seepage agent.

[0035]

[0036] Comparison table of initial setting time and penetration standards for different contents of each component when the coagulant accounts for 85% of the total mass of the composition

[0037] Embodiment 3: The raw materials include a coagulant, a water reducing agent, an anti-seepage agent, a suspending agent and water, wherein the coagulant accounts for 83% of the total mass of the composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, the suspending agent accounts for 2% of the total mass of the composition, and the rest is water. The anti-seepage agent is a polyurethane anti-seepage agent.

[0038]

[0039] Comparison table of initial setting time and penetration standards for different contents of each component when the coagulant accounts for 80% of the total mass of the composition

[0040] like Figure 1-5 As shown, the high diameter ratio static container includes a plurality of sleeves 1 whose diameter is greater than the height, a square frame 2 is arranged on the outer surface of the sleeve 1, a drainage hole 3 is arranged at the inner bottom end of the square frame 2, all the square frames 2 are connected as a whole, a collecting tank 4 is arranged at the bottom end of the square frame 2, a bearing sleeve 5 is sleeved on the top inner ring of the sleeve 1, the upper surface of the bearing sleeve 5 is fixedly connected through the same bearing plate 19, a placeholder 6 is arranged on the upper surface of the bearing plate 19 inside the bearing sleeve 5, the placeholder 6 is fixedly connected to the bearing plate 19, and a limiting frame 7 is fixedly installed on the outer surface of the bearing plate 19.

[0041] The device for separating the suspension from the sediment is a through hole 8 arranged at a vertically equidistant distribution on one side of the sleeve 1, a sealing plug 9 is slidably connected inside the through hole 8, a short rack plate 10 is fixedly installed at one end of the sealing plug 9 away from the sleeve 1, a short support sleeve 11 supporting the short rack plate 10 is fixedly installed inside the frame 2, a driving gear 12 is meshed above the short rack plate 10, the driving gear 12 on the same axis is fixedly connected by a rotating shaft 13, the rotating shaft 13 is rotatably connected to the frame 2, and the rotating shaft 13 is fixedly connected to the frame 2. A power gear 14 is fixedly installed at one end outside the square frame 2, and the power gear 14 on the same horizontal plane is meshed with the same long rack plate 15. The bottom end of the long rack plate 15 is slidably connected with a long support sleeve 16, and the long support sleeve 16 is fixedly connected to the square frame 2. A collecting hole 17 is provided at one end of the collecting trough 4, and the inner bottom wall of the collecting trough 4 is inclined. The lowest end of the collecting trough 4 is located at the collecting hole 17, and a support beam 18 is fixedly installed on the inner bottom wall of the collecting trough 4, and the support beam 18 is fixedly connected to the square frame 2.

[0042] The method comprises the following steps:

[0043] S1. Preparation of a suspension carrier, mixing water and a suspending agent and stirring so that the suspending agent is evenly dispersed in water;

[0044] S2. The coagulant is mixed with the suspension carrier, and the coagulant is evenly dispersed inside the suspension carrier by stirring;

[0045] S3. Transfer the suspended carrier to a stationary container with a high diameter-to-height ratio;

[0046] S4. Separate the suspension from the precipitate and remove the precipitate.

[0047] S5. The anti-seepage agent and the water reducing agent are mixed with the suspension, and the anti-seepage agent and the water reducing agent are uniformly dispersed in the interior of the suspension carrier by stirring;

[0048] In steps S3 and S4, the bearing sleeve 5 is inserted into the interior of the sleeve 1 and the bearing plate 19 is located above the square frame 2. At this time, the placeholder 6 is located inside the sleeve 1, and the suspension is poured into the interior of the limit frame 7 so that the liquid level is flush with the inner bottom wall of the limit frame 7. The limit frame 7 is separated from the sleeve 1. Since the placeholder 6 is located inside the sleeve 1 when the suspension is poured, the liquid level in the sleeve 1 drops to below the upper surface of the sleeve 1 after the placeholder 6 is removed. The sedimentation distance is reduced by pouring the suspension into multiple groups of individually set sleeves 1 with a diameter greater than the height, and the sedimentation efficiency is improved while avoiding mutual influence.

[0049] After the precipitation is completed, the sealing plug 9 at the upper end will be separated from the through hole 8 through the rack gear transmission, and the precipitated suspension will be discharged from the through hole 8 to the inside of the frame 2 and flow into the inside of the collecting tank 4 through the drainage hole 3 for collection. The sealing plug 9 and the through hole 8 are separated one by one from high to low, and the suspension flows out smoothly to avoid the precipitation at the bottom flowing out together.

[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An anti-seepage quick-setting agent for mountain tunnels, characterized in that: The raw materials include a coagulant, a water reducing agent, an anti-seepage agent, a suspending agent and water; The coagulant accounts for 80%-85% of the total mass of the composition, the anti-seepage agent accounts for 7%-8% of the total mass of the composition, the water reducing agent accounts for 2%-3% of the total mass of the composition, and the rest is water; The anti-seepage agent is a polyurethane anti-seepage agent.

2. The anti-seepage quick-setting agent for mountain tunnels according to claim 1, characterized in that: The coagulant is prepared by calcining a mixture of bauxite and limestone, and the water reducing agent is a melamine-based water reducing agent.

3. The method for producing an anti-seepage quick-setting agent for mountain tunnels according to claim 2, characterized in that: The method comprises the following steps: S1. Preparation of a suspension carrier, mixing water and a suspending agent and stirring so that the suspending agent is evenly dispersed in water; S2. The coagulant is mixed with the suspension carrier, and the coagulant is evenly dispersed inside the suspension carrier by stirring; S3. Transfer the suspended carrier to a stationary container with a high diameter-to-height ratio; S4. Separate the suspension from the precipitate and remove the precipitate. S5. The anti-seepage agent and the water reducing agent are mixed with the suspension, and the anti-seepage agent and the water reducing agent are evenly dispersed in the interior of the suspension carrier by stirring.

4. The method for producing an anti-seepage quick-setting agent for mountain tunnels according to claim 3, characterized in that: The high diameter ratio static container comprises a plurality of sleeves (1) with a diameter greater than a height, a square frame (2) is arranged on the outer surface of the sleeve (1), a drainage hole (3) is arranged at the inner bottom end of the square frame (2), all the square frames (2) are connected as a whole, and a collecting tank (4) is arranged at the bottom end of the square frame (2); The top inner ring of the sleeve (1) is sleeved with a bearing sleeve (5), the upper surface of the bearing sleeve (5) is fixedly connected via a bearing plate (19), the upper surface of the bearing plate (19) is located inside the bearing sleeve (5) and is provided with a placeholder block (6), the placeholder block (6) is fixedly connected to the bearing plate (19), and a limit frame (7) is fixedly installed on the outer surface of the bearing plate (19).

5. The method for producing an anti-seepage quick-setting agent for mountain tunnels according to claim 4, characterized in that: The device for separating the suspension and the sediment comprises vertically equidistantly distributed through holes (8) arranged on one side of the sleeve (1), a sealing plug (9) is slidably connected inside the through hole (8), a short rack plate (10) is fixedly installed on one end of the sealing plug (9) away from the sleeve (1), a short support sleeve (11) supporting the short rack plate (10) is fixedly installed inside the square frame (2), a driving gear (12) is meshed above the short rack plate (10), the driving gear (12) on the same axis is fixedly connected through a rotating shaft (13), the rotating shaft (13) is rotatably connected to the square frame (2), a power gear (14) is fixedly installed on one end of the rotating shaft (13) located outside the square frame (2), the power gear (14) on the same horizontal plane is meshed with the same long rack plate (15), the bottom end of the long rack plate (15) is slidably connected to a long support sleeve (16), and the long support sleeve (16) is fixedly connected to the square frame (2); A collecting hole (17) is provided at one end of the collecting trough (4); the inner bottom wall of the collecting trough (4) is arranged obliquely; the lowest end of the collecting trough (4) is located at the collecting hole (17); a supporting beam (18) is fixedly installed on the inner bottom wall of the collecting trough (4); and the supporting beam (18) is fixedly connected to the frame (2).