Heating furnace temperature self-adaptive control method based on heating rhythm
By adjusting the heating furnace temperature in real time and establishing adaptive control based on the production rhythm and billet temperature, the problem of difficult temperature control in the heating of mixed steel is solved, and the accuracy and production efficiency of the billet outlet temperature are improved.
Patent Information
- Application Number
- CN202310661752.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-05
- Publication Date
- 2024-12-06
AI Technical Summary
During the steel production process, the heating requirements of different steel billets vary greatly during the heating of mixed steel, which makes the heating temperature difficult to control and affects product quality. Existing methods such as spaced fabrics or continuous steel installation can easily lead to energy waste or temperature instability.
By determining the production rhythm and billet temperature in real time, establishing adaptive control from two dimensions, dynamically adjusting the heating furnace temperature, dividing virtual physical segments, calculating the billet position weight and product weight, and realizing the adaptive setting of the furnace temperature.
It improves the control accuracy of the billet's outgoing temperature, adapts to the fluctuations in production rhythm, ensures the temperature balance of different types of billets, and improves heating quality and production efficiency.
Smart Images

Figure CN119082438A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of metallurgical production, and in particular relates to a heating furnace temperature adaptive control method based on heating rhythm. Background Art
[0002] In the hot rolling process of steel production, the billet is heated by the heating furnace to meet the deformation control requirements of the rolling process. From the perspective of product performance and manufacturability, the billet temperature out of the furnace is required to be controlled within a given target temperature range. Under the state of large-scale stable production of a single product, the heating control of the billet is stable and easy to meet the production requirements. With the diversification of product specifications, billets of different specifications and requirements are often mixed and heated in the heating furnace at the same time. Therefore, when performing automatic steel burning control, the heating requirements of different billets in the control section will be comprehensively considered. When mixing steel, different billets have very different heating requirements, which can easily lead to fluctuations in production rhythm, making the heating temperature difficult to control and affecting the heating quality of the product. In the face of this situation, the current method is generally to perform intermittent feeding based on experience, or to choose continuous steel loading, sacrificing products with small weights to ensure the heating requirements of products with large weights. Intermittent feeding reduces the density of the furnace bottom feeding, reduces production capacity, increases energy consumption per ton of steel, and wastes energy. It is rarely used in on-site production. When laying materials continuously, the weighted setting is completely based on the physical segment at different rhythms, which can easily lead to excessively high or low temperatures in some parts of the billet. For example, when the rhythm is very slow, the weighted control is based on physical control, which can easily cause premature temperature rise and fall when mixing steel. Therefore, how to achieve stable furnace temperature control during mixed steel heating while meeting the heating requirements of different billets and heating rhythm fluctuations is a specific problem faced by on-site heating control.
[0003] The invention application with application number: CN2005100248050 discloses "a method for dynamically setting and controlling the furnace temperature of a hot rolling heating furnace", which includes the following four steps: (1) using a slab temperature prediction model to calculate the end temperature of the section where the slab is located, and the calculation method is forward recursive; (2) dynamically calculating the target temperature at the end of each section of the slab according to the moving distance of the slab; (3) calculating the furnace gas temperature required for the current section of the slab, that is, the necessary furnace temperature; (4) considering the differences of all slabs in the current section, weighted setting is performed based on expert experience.
[0004] The invention application with application number: CN2012100219518 discloses "a model control method and device for a heating furnace for bars, wires and square billets", including using PLC to control the furnace temperature of the heating furnace in different zones. The PLC includes a steel loading PLC, a steel discharging PLC and a heating furnace combustion control PLC. The heating furnace is divided into a furnace tail section, a preheating section, a heating section and a soaking section. The steel billets to be treated pass through each section of the heating furnace in turn for heating treatment. The invention is characterized in that three thermocouples are respectively arranged in the furnace width direction of each section of the heating furnace to quickly and stably track and determine the temperature of the head, middle and tail of the steel billet, and realize the furnace temperature control of each section of the heating furnace. At the same time, combined with the radiation pyrometer according to the rough rolling entrance, the temperature distribution of the head and tail of the steel billet is accurately controlled, and the temperature in the length direction of the steel billet is tracked and determined in real time to control the control accuracy of the temperature distribution in the length direction of the steel billet.
[0005] The invention application with application number: CN201810628022 0 discloses "a production rhythm and furnace temperature online control method for mixed steel heating," which includes: 1) formulating a process furnace temperature table for different products under different production rhythms, and setting product weights; 2) when the heating furnace completes actions such as loading, moving, and withdrawing steel, the PLC of the heating furnace sends the corresponding signal to the model machine to realize the material tracking information management of the products in the furnace; 3) after the model machine obtains the steel loading signal and completes step 2), it dynamically determines the material spacing of the next product to be entered into the furnace; 4) after the model machine obtains the moving signal and completes step 2), it dynamically calculates the current production rhythm, and determines whether the material spacing of the products to be entered into the furnace is met based on the position of the most recent product to enter the furnace; 5) after the model machine obtains the cycle setting signal, it determines the process furnace temperature setting value and the production rhythm setting value.
[0006] The invention application with application number: CN202210936250.0 discloses "a control method for the temperature setting of a heating furnace", which sends the distribution and information of the billets in the furnace to the heating system module and the expert prediction system module. After analysis and calculation, the heating curve of each section of each slab is obtained, and the initial temperature setting of each section is obtained through the weighted average algorithm, and then the expert system predicts the temperature prediction optimization compensation of each section. The control method module combines the optimization of the heating system and the expert prediction system, gives the final temperature setting of each section through dynamic weighting, and then sends it to the L1 level automatic control system. Summary of the invention
[0007] The object of the present invention is to provide an adaptive dynamic adjustment scheme of the control section which can adapt to the fluctuation of the production rhythm.
[0008] In order to achieve the above technical objectives, the present invention provides a heating furnace temperature adaptive control method based on heating rhythm, and its technical solution is as follows:
[0009] A heating furnace temperature adaptive control method based on heating rhythm,
[0010] For the heating section and / or soaking section of the heating furnace, adaptive control of the billet furnace temperature set value is established from two dimensions: production rhythm and billet temperature.
[0011] Further,
[0012] The adaptive control of the billet furnace temperature setting value from the two dimensions of production rhythm and billet temperature specifically includes the following steps:
[0013] S1: Determine the current production rhythm in real time; and determine the current actual corresponding impact length based on the current production rhythm;
[0014] S2: Mapping the determined current actual corresponding impact length to the corresponding physical segment to form a virtual physical segment length;
[0015] S3: counting the serial number and total number of steel billets within the length of the virtual physical segment; and calculating the position weight of each steel billet within the length of the virtual physical segment in sequence;
[0016] S4: According to the position weight and product weight of each billet, combined with the current billet's own furnace temperature, complete the adaptive control of the billet furnace temperature set value based on the current production rhythm and the corresponding billet furnace temperature of the entire virtual physical section.
[0017] Further,
[0018] The real-time determination of the current production rhythm in step S1 is specifically as follows:
[0019]
[0020] Based on this, the actual corresponding impact length is determined according to the current production rhythm, specifically:
[0021]
[0022] In the above formula,
[0023] L 步进 : The distance of one step movement of the walking beam, unit: m;
[0024] Δt i : The i-th step interval, unit: min;
[0025] V act : Current stepping speed, unit: m / min;
[0026] Reference adjustment time, unit: min;
[0027] The actual impact length corresponding to the current step speed, unit: m.
[0028] Further,
[0029] The reference adjustment time It is determined according to the statistical mean of the residence time of the billet in the control section when the production rhythm is stable.
[0030] Further,
[0031] Step S2 is specifically as follows:
[0032] The end position of the physical segment is taken as the end position of the current actual impact length, so as to determine the start position of the virtual physical segment length;
[0033] The determination of the billet serial number and the total number of billets in step S3 is specifically as follows:
[0034] Taking the position of the previous steel billet as less than the determined starting position of the actual physical segment length and the position of the adjacent next steel billet as greater than or equal to the determined starting position of the actual physical segment length as the constraint condition, the position corresponding to each steel billet in the current in-furnace tracking information is compared one by one with the determined starting position of the actual physical segment length;
[0035] When the constraint conditions are met, all the billets from the last billet in the constraint conditions to the end of the segment are defined as billets within the length of the virtual physical segment, and the statistics of the corresponding billet serial numbers and the total number of billets are completed.
[0036] Further,
[0037] The position weight calculation of each billet within the virtual physical segment length is performed in sequence in step S3, specifically:
[0038]
[0039] In the above formula,
[0040] The position corresponding to the i-th billet in the current furnace tracking information, unit: m;
[0041] The starting position of the virtual physical segment length, unit: m;
[0042] The actual impact length corresponding to the current step speed, unit: m.
[0043] Further,
[0044] Step S4 is specifically as follows:
[0045] S41: Calculating the weighted coefficient and process weighted temperature of each steel billet according to the position weight and product weight of each steel billet;
[0046] S42: Determine the process furnace temperature reference value of the entire virtual physical section according to the weighted temperature of each steel billet and the process weighted temperature;
[0047] S43: According to the process furnace temperature reference value of the entire virtual physical section and the influence factor of the billet temperature on the furnace temperature in the section, the process furnace temperature of the entire virtual physical section is set.
[0048] Further,
[0049] The weighting coefficient in step S41 is specifically:
[0050] λ 1i =k i ×α i ,
[0051] The process weighted temperature described in step S41 is specifically:
[0052]
[0053] The process furnace temperature reference value described in step S42 is specifically:
[0054]
[0055] In the above formula,
[0056] λ 1i : weighting coefficient of the i-th billet;
[0057] λ 2i : Process weighted temperature of the ith billet, unit: °C;
[0058] k i : product weight of the i-th billet;
[0059] α i : The position weight of the i-th billet;
[0060] The process furnace temperature of the i-th steel billet corresponding to the control section;
[0061] The process furnace temperature reference value of the entire virtual physical section, unit: °C;
[0062] i: billet serial number.
[0063] Further,
[0064] The process furnace temperature of the control section corresponding to the i-th steel billet is determined by linear interpolation according to the process furnace temperature table.
[0065] Further,
[0066] Step S43 is specifically:
[0067]
[0068] In the above formula,
[0069] The process furnace temperature set for the entire virtual physical segment is in °C.
[0070] The process furnace temperature reference value of the entire virtual physical section, unit: °C;
[0071] ΔT k : The influence factor of the billet temperature on the furnace temperature in this section, unit: ℃.
[0072] Further,
[0073] The influence factor of billet temperature on furnace temperature in this section ΔT k , specifically:
[0074] ΔT k =ΔT dis +ΔT mid ,
[0075] In the above formula,
[0076] ΔT k : The influence factor of the billet temperature on the furnace temperature in this section, unit: ℃;
[0077] ΔT dis : Temperature compensation for furnace temperature based on the current billet temperature, unit: °C;
[0078] ΔT mid : Temperature compensation for furnace temperature based on the temperature of the billet from the center position to the end position of the actual physical segment of the current control segment, unit: ℃.
[0079] Further,
[0080] Temperature compensation ΔT for furnace temperature based on current billet temperature dis , specifically:
[0081]
[0082] In the above formula,
[0083] ΔT dis : Temperature compensation for furnace temperature based on the current billet temperature, unit: °C;
[0084] α: influence coefficient;
[0085] T dis,aim : Current target steel drawing temperature of billet out of furnace, unit: °C;
[0086] T dis,cal : Calculate the drawing temperature of the current billet out of the furnace, unit: ℃.
[0087] Further,
[0088] The temperature compensation ΔT for the furnace temperature is formed based on the temperature of the billet from the center position to the end position of the actual physical segment of the current control segment mid , specifically:
[0089]
[0090] In the above formula,
[0091] ΔT mid : Temperature compensation for furnace temperature formed by the temperature of the billet from the center position to the end position of the virtual physical segment of the current control segment, unit: °C;
[0092] β: influence coefficient;
[0093] Under the current steel drawing, the target steel drawing temperature of each billet from the center position to the end position of the virtual physical segment of the current control segment The current calculation of steel extraction temperature The mean of the sum of the differences, unit: °C;
[0094] The target drawing temperature of each billet of the corresponding billet in the previous drawing The current calculation of steel extraction temperature The mean of the sum of the differences, unit: °C.
[0095] Further,
[0096] The adaptive control of the billet furnace temperature setting value from the two dimensions of production rhythm and billet temperature specifically includes the following steps:
[0097] SS1: Determine the current production rhythm in real time; and calculate the steel drawing temperature of the current billet out of the furnace;
[0098] SS2: Compare the calculated steel drawing temperature of the current steel billet with the set threshold interval. If it does not fall within the set threshold interval, a temperature abnormality prompt is issued, and the steel drawing rhythm control processing is performed, and then step SS3 is entered to perform furnace temperature adaptive adjustment calculation; if it falls within the set threshold interval, step SS3 is directly entered to perform furnace temperature adaptive adjustment calculation;
[0099] SS3: Determine the actual corresponding impact length according to the current production rhythm;
[0100] SS4: Map the determined current actual corresponding impact length to the corresponding physical segment to form a corresponding virtual physical segment length;
[0101] SS5: Count the serial number and total number of billets within the length of the virtual physical segment; and calculate the position weight of each billet within the length of the virtual physical segment in sequence;
[0102] SS6: According to the position weight and product weight of each billet, combined with the current billet's own furnace temperature, complete the adaptive control of the billet furnace temperature set value based on the current production rhythm and the corresponding billet furnace temperature of the entire virtual physical section.
[0103] The heating furnace temperature adaptive control method based on the heating rhythm of the present invention can meet the continuous production process, especially when mixed steel is heated and the production rhythm fluctuates, dynamically divide the influence area of the control section according to the actual production rhythm, and use the influence area as a new control section to achieve dynamic adjustment of the set furnace temperature, meet the dynamic adjustment ability when the rhythm fluctuates, and improve the control accuracy of the billet out of the furnace temperature. In short, the dynamic adaptive adjustment of the furnace temperature of the corresponding control section when the production rhythm fluctuates can be achieved, which is applicable to both a single type of steel and mixed steel of different types. BRIEF DESCRIPTION OF THE DRAWINGS
[0104] Figure 1 It is a schematic diagram of the specific steps of the present invention;
[0105] Figure 2 It is a schematic diagram of the overall control steps in the specific operation process of the present invention. DETAILED DESCRIPTION
[0106] Below, a heating furnace temperature adaptive control method based on heating rhythm of the present invention is further described in detail according to the drawings and specific implementation methods of the specification.
[0107] In order to form a clearer understanding of this technical solution, the following is a detailed description of this technical solution from the perspective of its working principle and process:
[0108] First of all, the setting idea of this technical solution can be summarized as follows:
[0109] Under stable production conditions, the furnace temperature of the steel billet is maintained at the set furnace temperature corresponding to the set production rhythm. However, when the production rhythm fluctuates or there is mixed steel, in order to improve control accuracy, it is often necessary to perform adaptive regulation that is consistent with actual conditions based on the process setting parameters.
[0110] In order to establish an adaptive furnace temperature setting that can adapt to the actual working conditions, this technical solution starts from the actual production rhythm, determines the actual impact length according to the current actual production rhythm, and uses the end position of the corresponding control segment as the end position of the actual impact length. The actual impact length is mapped to the physical segment, and the billet serial number in the impact segment is determined based on the mapping result. Then, adaptive control of the billet furnace temperature setting value of the current impact segment is established from the two dimensions of production rhythm and billet temperature. Due to the existence of empty cloth in actual production, the time interval between two steps may be small, resulting in large fluctuations in the calculated moving speed. In order to shield this interference and establish a control that is more conducive to process stability, the moving speed in this technical solution adopts a setting idea based on the average of three steps.
[0111] While carrying out specific adaptive control, it is possible to further determine whether the current rhythm is controllable by comparing whether the actual steel extraction temperature of the current steel billet falls within the allowed temperature range; when the actual steel extraction temperature of the current steel billet does not fall within the allowed temperature range, it is considered that the current production rhythm itself is inappropriate and corresponding speed control processing is required.
[0112] After determining the billet number in the affected section, the specific adaptive control is completed by adding two calculation parameters set in the technical solution; the two calculation parameters are: the process furnace temperature reference value of the virtual physical section And the influence factor ΔT of the billet temperature in the influencing section on the furnace temperature k . In determining In addition to using the mean value as the basic setting concept, the furnace temperature of each billet process is determined by considering both the product material characteristics and the importance of the product at different positions in the furnace. k In order to reflect the influence of billet temperature on the set furnace temperature on the one hand, and to note that different billets have different heating requirements on the other hand, if only the drawn steel product is considered for feedback, there will inevitably be a delay. Secondly, if the drawn steel product and the to-be-drawn steel product have different heating requirements, the feedback compensation cannot achieve the expected effect. Therefore, in order to take both into account, it is determined based on the current billet drawing temperature and the billet drawing temperature of each billet in the affected section. Here, the adjustment ability and the rhythm of the heating furnace are also taken into consideration, so the billets in the affected section here refer to the billets from the center position of the affected section to the end position of the section.
[0113] Secondly, according to the above specific process, as follows (the understanding of the following can be combined with Figure 1 , Figure 2 conduct):
[0114] This technical solution involves the model machine and the heating furnace PLC control system. The model machine is responsible for the real-time tracking of the steel billet and the management of the heating process table during the production process, the model steel withdrawal permission and the furnace temperature setting calculation; the PLC control system is responsible for combustion control and automatic control of steel loading, steel withdrawal, stepping, etc. It specifically includes the following steps:
[0115] 1) According to the actual rhythm variation range, formulate the billet process furnace temperature table under different production rhythms and save it in the model machine to realize the weighted control of furnace temperature;
[0116] The process furnace temperature table includes: product category, product weight, production rhythm, control section process furnace temperature and billet out-of-furnace temperature;
[0117] 2) The model machine obtains the heating furnace loading, stepping, and steel extraction action instructions from the PLC system, and establishes real-time tracking queue information of the steel billet in the furnace; and dynamically calculates the current temperature of the steel billet according to a certain period based on the temperature measured by the heating furnace thermocouple and the known previous state temperature of the steel billet; and when obtaining the stepping information, the current moving speed V is weightedly calculated act :
[0118]
[0119] Satisfaction: V min ≤V i ≤V max , unit: m / min;
[0120]
[0121] 3) The model machine is based on the current rhythm V act Calculate the length of the influence segment corresponding to the physical control segment k The furnace temperature of the corresponding physical control section is controlled based on the steel billet in the affected section:
[0122]
[0123] in, As a reference adjustment time, the statistical average of the residence time of the billet in the control section k under the stable production state is obtained through statistics.
[0124] Affects the end position of the segment Take the end position of the corresponding physical segment and affect the start position of the segment for:
[0125]
[0126] 4) The model machine performs weighted calculation on the process temperature of the steel billet in the influencing section as the weighted value of the process furnace temperature of the current physical control section.
[0127]
[0128] in, is the process furnace temperature of billet i in the influencing segment corresponding to physical control segment k, obtained by linear interpolation of the process furnace temperature table, k i is the product weight in the process furnace temperature table of the model machine; α i is the position weight of the current billet in the affected section, and the calculation formula is:
[0129]
[0130] 5) After the model machine obtains the PLC steel extraction signal, it performs furnace temperature compensation calculation for the current billet out of the furnace and the billet from the middle position to the end position of the soaking section influence interval, where:
[0131] ΔTk=ΔT dis +ΔT mid ,
[0132]
[0133]
[0134] in,
[0135]
[0136] Specifically, when drawing steel, ΔT is calculated for the drawn steel product. dis At the same time, take all the billets m to n from the center position to the end position in the current influence interval and calculate ΔT mid , are the ΔT corresponding to the current steel extraction and the previous steel extraction respectively. mid .
[0137] The previous description is mainly for the soaking section. For other control sections, if the target temperature at the end of the section is given in the heating process, the same compensation method can be used. Therefore, in continuous production, the final set furnace temperature of control section k is:
[0138]
[0139] 6) The calculated temperature of the billet out of the furnace exceeds the range Prompt abnormal temperature to remind the heating furnace to reduce the steel extraction rhythm.
[0140] Example
[0141] The capacity of a billet heating furnace is 130t / h, the total length is 21m, and it is divided into preheating section, heating section, and soaking section. The lengths of each section are 6.8m, 7.5m, and 6.7m respectively. The preheating section does not have a furnace temperature setting control. Assume that different types of carbon steel are mixed for heating, the size is 160mm×160mm×10m, the charging temperature is 20℃, the target temperatures for drawing steel are 960℃ and 1000℃ respectively, and the product weights are 1 and 2 respectively.
[0142] 1) Without loss of generality, based on the minimum in-furnace time of 65 min and the maximum in-furnace time of 210 min, the standard furnace temperatures corresponding to different rhythms obtained through offline process simulation are as follows:
[0143]
[0144]
[0145] Steel extraction target temperature 960℃ corresponding to standard furnace temperature table
[0146]
[0147] Standard furnace temperature table corresponding to the steel extraction target temperature of 1000℃
[0148] 2) Assuming that the stepping distance of the heating furnace walking beam is 0.200m, and the intervals of the last three steps are 0.8min, 0.8min, and 0.9min respectively, the current stepping speed is obtained by weighted calculation:
[0149]
[0150] 3) Without loss of generality, it is assumed here that the reference adjustment time corresponding to each control segment is:
[0151] Control segment Preheating section Heating section Heat soaking section Reference time min 29 32 29
[0152] Here we only take the soaking section as an example, and k=2 in the soaking section:
[0153]
[0154]
[0155] Because the rhythm is slightly faster, the calculated length of the influence area of the heat-saturation section is 0.26m longer than the original physical section, and the middle position of the influence area of the heat-saturation section is 17.52m.
[0156] 4) The current furnace tracking information is as follows:
[0157]
[0158]
[0159]
[0160] For the equalizing section, billet numbers 71 to 104 are within the influence area of the equalizing section. The billets closest to the center of the influence area, 17.52 m away, are billets numbered 87 and 88. At this time, the average value of the two is taken for processing.
[0161] The current rhythm is 0.24m / min, i.e. 240mm / min, which is between 225 and 250 in the heating process table. The target furnace temperature is 960℃, and the furnace temperature of the steel billet in the soaking section is:
[0162] 1010+(1020-1010)÷(250-225)×(240-225)=1016℃;
[0163] Similarly, the target furnace temperature of the billet out of the furnace is 1000℃, and the process furnace temperature in the soaking section is 1066℃.
[0164] The position weighting coefficient takes billet number 71 as an example.
[0165] α 71 =(14.216-14.04) / 6.96=0.025,
[0166] In this way, the process information and process weighted furnace temperature corresponding to the influence area of the soaking section are calculated as follows:
[0167]
[0168]
[0169] 5) After the model machine obtains the PLC steel extraction signal, it performs furnace temperature compensation calculation for the current billet out of the furnace and the billet in the middle position of the soaking section influence interval.
[0170] As the furnace temperature gradually increases, the steel billet extraction temperature has also shown a gradual increasing trend recently. From the tracking list, it can be obtained that the current extracted steel billet temperature is 974.17℃, and the corresponding extraction target temperature is 960℃. The billet numbers from the center position to the end position of the affected section are 88~104, that is, m=88, n=104.
[0171] Serial number Location Average temperature ℃ Target steel extraction temperature℃ Temperature deviation℃ 88 17.62 895.18 1000 104.82 89 17.82 901.67 1000 98.33 90 18.02 907.98 1000 92.02 91 18.22 914.08 960 45.92 92 18.42 919.94 960 40.06 93 18.62 925.53 960 34.47 94 18.82 930.85 960 29.15 95 19.022 935.9 960 24.10 96 19.222 940.7 960 19.30 97 19.422 945.25 960 14.75 98 19.622 949.57 960 10.43 99 19.822 953.67 960 6.33 100 20.022 957.56 960 2.44 101 20.222 961.24 960 -1.24 102 20.422 964.74 960 -4.74 103 20.622 968.05 960 -8.05 104 20.824 971.19 960 -11.19
[0172] Without loss of generality, we take coefficients α=1, β=1 here.
[0173] 974.17-960=14.17>10, so:
[0174] ΔT dis =α×(Tdis,aim -T dis,cal ) = 1 × (960-974.17) = -14.17,
[0175]
[0176] Similarly, using the tracking sequence data from the previous steel extraction, we can get:
[0177]
[0178]
[0179] The set furnace temperature of the current control section is obtained as follows:
[0180]
[0181] 6) The calculated temperature of the current steel billet out of the furnace is 974.17℃, which is between the range [940,980], and no rhythm prompt is required.
Claims
1. A heating furnace temperature adaptive control method based on heating rhythm, characterized in that: For the heating section and / or soaking section of the heating furnace, adaptive control of the billet furnace temperature set value is established from two dimensions: production rhythm and billet temperature.
2. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 1, characterized in that: The adaptive control of the billet furnace temperature setting value from the two dimensions of production rhythm and billet temperature specifically includes the following steps: S1: Determine the current production rhythm in real time; and determine the current actual corresponding impact length based on the current production rhythm; S2: Mapping the determined current actual corresponding impact length to the corresponding physical segment to form a virtual physical segment length; S3: counting the serial number and total number of steel billets within the length of the virtual physical segment; and calculating the position weight of each steel billet within the length of the virtual physical segment in sequence; S4: According to the position weight and product weight of each billet, combined with the current billet's own furnace temperature, complete the adaptive control of the billet furnace temperature set value based on the current production rhythm and the corresponding billet furnace temperature of the entire virtual physical section.
3. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 3 is characterized in that: The real-time determination of the current production rhythm in step S1 is specifically as follows: Based on this, the actual corresponding impact length is determined according to the current production rhythm, specifically: In the above formula, L 步进 : The distance of one step movement of the walking beam, unit: m; Δt i : The i-th step interval, unit: min; V act : Current stepping speed, unit: m / min; Reference adjustment time, unit: min; The actual impact length corresponding to the current step speed, unit: m.
4. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 3 is characterized in that: The reference adjustment time It is determined according to the statistical mean of the residence time of the billet in the control section when the production rhythm is stable.
5. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 3, characterized in that: Step S2 is specifically as follows: The end position of the physical segment is taken as the end position of the current actual impact length, so as to determine the start position of the virtual physical segment length; The determination of the billet serial number and the total number of billets in step S3 is specifically as follows: Taking the position of the previous steel billet as less than the determined starting position of the actual physical segment length and the position of the adjacent next steel billet as greater than or equal to the determined starting position of the actual physical segment length as the constraint condition, the position corresponding to each steel billet in the current in-furnace tracking information is compared one by one with the determined starting position of the actual physical segment length; When the constraint conditions are met, all the billets from the last billet in the constraint conditions to the end of the segment are defined as billets within the length of the virtual physical segment, and the statistics of the corresponding billet serial numbers and the total number of billets are completed.
6. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 5, characterized in that: The position weight calculation of each billet within the virtual physical segment length is performed in sequence in step S3, specifically: In the above formula, The position corresponding to the i-th billet in the current furnace tracking information, unit: m; The starting position of the virtual physical segment length, unit: m; The actual impact length corresponding to the current step speed, unit: m.
7. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 6, characterized in that: Step S4 is specifically as follows: S41: Calculating the weighted coefficient and process weighted temperature of each steel billet according to the position weight and product weight of each steel billet; S42: Determine the process furnace temperature reference value of the entire virtual physical section according to the weighted temperature of each steel billet and the process weighted temperature; S43: According to the process furnace temperature reference value of the entire virtual physical section and the influence factor of the billet temperature on the furnace temperature in the section, the process furnace temperature of the entire virtual physical section is set.
8. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 7, characterized in that: The weighting coefficient in step S41 is specifically: l 1i =k i ×a i , The process weighted temperature described in step S41 is specifically: The process furnace temperature reference value described in step S42 is specifically: In the above formula, λ 1i : weighting coefficient of the i-th billet; λ 2i : Process weighted temperature of the ith billet, unit: °C; k i : product weight of the i-th billet; α i : The position weight of the i-th billet; The process furnace temperature of the i-th steel billet corresponding to the control section; The process furnace temperature reference value of the entire virtual physical section, unit: °C; i: billet serial number.
9. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 7, characterized in that: The process furnace temperature of the control section corresponding to the i-th steel billet is determined by linear interpolation according to the process furnace temperature table.
10. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 7, characterized in that: Step S43 is specifically: In the above formula, The process furnace temperature set for the entire virtual physical segment is in °C. The process furnace temperature reference value of the entire virtual physical section, unit: °C; ΔT k : The influence factor of the billet temperature on the furnace temperature in this section, unit: ℃.
11. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 10, characterized in that: The influence factor of billet temperature on furnace temperature in this section ΔT k , specifically: ΔT k =ΔT dis +ΔT mid , In the above formula, ΔT k : The influence factor of the billet temperature on the furnace temperature in this section, unit: ℃; ΔT dis : Temperature compensation for furnace temperature based on the current billet temperature, unit: °C; ΔT mid : Temperature compensation for furnace temperature based on the temperature of the billet from the center position to the end position of the actual physical segment of the current control segment, unit: ℃.
12. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 11, characterized in that: Temperature compensation ΔT for furnace temperature based on current billet temperature dis , specifically: In the above formula, ΔT dis : Temperature compensation for furnace temperature based on the current billet temperature, unit: °C; α: influence coefficient; T dis,aim : Current target steel drawing temperature of billet out of furnace, unit: °C; T dis,cal : Calculate the drawing temperature of the current billet out of the furnace, unit: ℃.
13. The method for adaptively controlling the temperature of a heating furnace based on a heating rhythm according to claim 11, characterized in that: The temperature compensation ΔT for the furnace temperature is formed based on the temperature of the billet from the center position to the end position of the actual physical segment of the current control segment mid , specifically: In the above formula, ΔT mid : Temperature compensation for furnace temperature formed by the temperature of the billet from the center position to the end position of the virtual physical segment of the current control segment, unit: °C; β: influence coefficient; Under the current steel drawing, the target steel drawing temperature of each billet from the center position to the end position of the virtual physical segment of the current control segment The current calculation of steel extraction temperature The mean of the sum of the differences, unit: °C; The target drawing temperature of each billet of the corresponding billet in the previous drawing The current calculation of steel extraction temperature The mean of the sum of the differences, unit: °C.
14. A heating furnace temperature adaptive control method based on heating rhythm according to claim 12 or 13, characterized in that: The adaptive control of the billet furnace temperature setting value from the two dimensions of production rhythm and billet temperature specifically includes the following steps: SS1: Determine the current production rhythm in real time; and calculate the steel drawing temperature of the current billet out of the furnace; SS2: Compare the calculated steel drawing temperature of the current steel billet with the set threshold interval. If it does not fall within the set threshold interval, a temperature abnormality prompt is issued, and the steel drawing rhythm control processing is performed, and then step SS3 is entered to perform furnace temperature adaptive adjustment calculation; if it falls within the set threshold interval, step SS3 is directly entered to perform furnace temperature adaptive adjustment calculation; SS3: Determine the actual corresponding impact length according to the current production rhythm; SS4: Map the determined current actual corresponding impact length to the corresponding physical segment to form a corresponding virtual physical segment length; SS5: Count the serial number and total number of billets within the length of the virtual physical segment; and calculate the position weight of each billet within the length of the virtual physical segment in sequence; SS6: According to the position weight and product weight of each billet, combined with the current billet's own furnace temperature, complete the adaptive control of the billet furnace temperature set value based on the current production rhythm and the corresponding billet furnace temperature of the entire virtual physical section.
Citation Information
Patent Citations
Rod and wire billet heating furnace model control method and apparatus
CN103225017A
On-line control method for production rhythm and furnace temperature of mixed steel heating
CN110617716A
Heating furnace temperature setting control method
CN115449621A
Method for dynamic setting and control of hot-roll heating furnace temperature
CN1840715A