Heat absorption tower conversion platform and concrete cylinder wall joint connecting structure and manufacturing method

Through the node connection structure of embedded annular steel, transverse stiffener and attachment plates, the problems of large usage and high construction difficulty in connecting the heat absorption tower conversion platform and the concrete cylinder wall are solved, and material saving, simple construction and high efficiency transmission are achieved. , improves the overall performance of the heat absorption tower.

CN119083600APending Publication Date: 2024-12-06ZHEJIANG ELECTRIC POWER DESIGN INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411121457.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The connecting structure of the existing heat absorption tower conversion platform and the concrete cylinder wall requires large sections of beef legs and densely arranged steel bars, resulting in problems such as large amount of concrete and steel bars, high construction difficulty and long cycle.

Method used

The node connection structure of pre-embedded annular steel, transverse stiffener and attachment plates is adopted. The annular steel bears radial horizontal thrust, and the transverse stiffener achieves coordinated deformation. The attachment plates transmit load to reduce the impact on the concrete cylinder wall. Enhance the bearing capacity, and form an integrated structure through factory segment processing and on-site welding to simplify construction.

Benefits of technology

It has achieved material saving, low cost, simple construction, direct force transmission and good load-bearing performance connection with the concrete cylinder wall node, improving overall performance and solving the problems of large usage and high construction difficulty in traditional practices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083600A_ABST
    Figure CN119083600A_ABST
Patent Text Reader

Abstract

The invention discloses a heat absorption tower conversion platform and concrete cylinder wall joint connecting structure and a manufacturing method. The joint connecting structure is pre-buried in the cylinder wall of a heat absorption tower concrete cylinder. The node connecting structure comprises an annular profile steel used for bearing the annular tensile force of the cylinder wall of the concrete cylinder of the heat absorption tower caused by the radial horizontal thrust transmitted by the main truss of the conversion platform; the transverse stiffening ribs are arranged on the annular section steel in a manner of being perpendicular to the axis of the annular section steel and are used for realizing coordinated deformation and common stress of the annular section steel and the cylinder wall of the heat absorption tower concrete cylinder; one side of the auxiliary plate is connected with the annular profile steel, and the other side of the auxiliary plate is exposed out of the heat absorption tower concrete cylinder wall and used for being connected with the conversion platform main truss and transmitting loads. Load transmitted by the main truss of the conversion platform can be reliably transmitted to the concrete cylinder wall, the structure is simple, force transmission is direct, materials are saved, the manufacturing cost is low, and the overall performance of the heat absorption tower is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of civil engineering structures for solar thermal power generation projects, and in particular to a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall and a manufacturing method thereof. Background Art

[0002] The heat absorption tower is a tall structure used to support the absorber and its supporting system. It is the core structure of a tower solar thermal power station. Its total structural height is generally more than 200m. According to the structural type, it can be divided into concrete structure heat absorption tower, hybrid structure heat absorption tower and steel structure heat absorption tower.

[0003] The lower part of the hybrid structure heat absorption tower is a concrete structure, and the upper part is a steel structure for supporting the heat absorber. The steel structure part and the concrete structure part are transitioned through a conversion platform. The conversion platform bears the load from the upper steel structure and transfers it to the lower concrete structure.

[0004] For a hybrid structure heat absorption tower with a concrete cylindrical tower structure at the bottom and a transfer platform with several trusses arranged radially in a plane as the main load-bearing structure, the load transmitted to the concrete structure by the lower chords of each main truss of the transfer platform mainly includes the vertical component and the radial horizontal thrust pointing outside the tower.

[0005] In previous projects, an annular corbel was usually installed on the inner side of the concrete cylinder wall to withstand the vertical force transmitted from the lower chord of the main truss of the transfer platform; at the same time, an annular steel bar was arranged in the cylinder wall to form an annular hidden beam to withstand the annular tension of the cylinder wall caused by the radial horizontal thrust transmitted from the lower chord of each main truss of the transfer platform. The above method requires the installation of a large-section corbel, and the dense arrangement of steel bars along the radial, annular, and vertical directions of the cylinder wall in the node area, so the amount of concrete and steel bars is very large, and the construction is difficult and the construction period is long.

[0006] Therefore, a hybrid structure heat absorption tower conversion platform and concrete cylinder wall connection node is designed to solve the above problems. Summary of the invention

[0007] The purpose of the present invention is to solve the problems that the existing connection structure needs to adopt large-section brackets and densely arrange steel bars along the radial, circumferential and vertical directions of the cylinder wall in the node area, resulting in large amounts of concrete and steel bars, great construction difficulty and long construction period, and to provide a heat absorption tower conversion platform and concrete cylinder wall node connection structure with simple structure, direct force transmission, material saving and low cost, and a method for making the same.

[0008] The technical solution adopted by the present invention to achieve the first invention object is: a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall, wherein the node connection structure is pre-buried in the cylinder wall of the heat absorption tower concrete cylinder; the node connection structure comprises: The annular steel is used to bear the annular tension of the concrete cylinder wall of the heat absorption tower caused by the radial horizontal thrust transmitted from the main truss of the conversion platform; The transverse stiffening ribs are arranged on the annular steel perpendicular to the axis of the annular steel and are used to achieve coordinated deformation and joint force between the annular steel and the wall of the concrete tube of the heat absorption tower; The auxiliary plate is connected to the annular steel on one side and exposed on the concrete wall of the heat absorption tower on the other side. It is used to connect with the main truss of the conversion platform and transfer the load.

[0009] The node connection structure of the heat absorption tower conversion platform and the concrete cylinder wall, by pre-embedding the node connection structure mainly composed of annular steel, transverse stiffening ribs and auxiliary plates inside the concrete cylinder wall, not only solves the problems of using large-section brackets in the prior art, but also densely arranging steel bars along the radial, circumferential and vertical directions of the cylinder wall in the node domain, resulting in large amounts of concrete and steel bars, great construction difficulty, and long construction period. At the same time, it realizes effective transmission and bearing of force, and through the setting of the node connection structure, the bearing capacity of the concrete cylinder wall to the circumferential tension can be enhanced, and the circumferential tension can be transmitted to the internal annular steel, thereby reducing or lowering the impact on the concrete cylinder wall. Through the setting of the transverse stiffening ribs, the annular steel is subjected to uniform stress and deformation, and the annular steel and the concrete cylinder wall can be coordinated in deformation and subjected to joint stress, thereby enhancing the performance of the entire heat absorption tower. In order to effectively transmit the load of the main truss, an auxiliary plate is arranged between the main truss and the annular steel, so that the connection is more firm and reliable, and the force transmission is more direct and stable. Moreover, this pre-buried node connection structure is cast together with the concrete cylinder, is easy to construct, has a simple structure, can effectively save materials and reduce construction costs.

[0010] Preferably, the annular steel comprises a plurality of annular steel splicing blocks formed in sections, and two adjacent annular steel splicing blocks are connected by on-site welding to form a whole. The annular steel is processed in sections in the factory and then welded on-site, which can greatly save construction time and is more convenient to operate.

[0011] Preferably, the surface of the annular steel is provided with exhaust holes for vibrating and compacting the concrete during the pouring of the cylinder wall. The purpose of providing the exhaust holes is to enable the concrete to form a dense integrated structure with the node connection structure and the concrete cylinder wall during the concrete pouring process, with higher strength and better bearing capacity.

[0012] Preferably, the annular steel is provided with a plurality of web openings for vibrating and compacting concrete during the cylinder wall casting. The web openings are provided to facilitate the vibrating and compacting of concrete during the cylinder wall casting, and the integrated structure has higher strength and better bearing capacity.

[0013] Preferably, the surface of the auxiliary plate is provided with a plurality of plate openings for realizing continuous arrangement of vertical and circumferential reinforcements of the concrete cylinder wall. The plate openings are also for realizing the passage of vertical and circumferential reinforcements of the concrete cylinder wall at corresponding positions, realizing continuous arrangement of reinforcements, without the need for segmented arrangement of reinforcements, which would affect strength.

[0014] Preferably, the main truss comprises a main truss upper chord and a main truss lower chord, and the main truss upper chord and the main truss lower chord are connected as a whole through a conversion truss support web, a vertical web and an oblique web. In order to increase the bearing capacity of the main truss, the main truss upper chord and the main truss lower chord, and the main truss upper chord and the main truss lower chord are connected as a whole through a conversion truss support web, a vertical web and an oblique web, which has better strength and higher bearing capacity. Moreover, such a structure can realize force transmission and bearing more effectively by respectively setting node connection structures at corresponding positions of the main truss upper chord and the main truss lower chord.

[0015] Preferably, the node connection structure comprises an upper chord node connection structure and a lower chord node connection structure. The node connection structure is provided with an upper chord node connection structure and a lower chord node connection structure corresponding to the positions of the upper chord and the lower chord of the main truss.

[0016] Preferably, the lower chord node connection structure comprises lower chord annular steel, lower chord transverse stiffening ribs and lower chord auxiliary plates. The lower chord node connection structure is arranged at the lower chord connection of the main truss, which can effectively bear the radial horizontal thrust and vertical force transmitted from the lower chord of the main truss.

[0017] Preferably, the upper chord node connection structure includes upper chord annular steel, upper chord transverse stiffening ribs and upper chord auxiliary plates; or, the upper chord node connection structure adopts an integrated embedded reinforcement, which can effectively bear the radial horizontal thrust and vertical force transmitted from the upper chord of the main truss.

[0018] The technical solution adopted by the present invention to achieve the second invention object is: a method for manufacturing a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall, comprising the following steps: Step 1: Opening a node connection structure groove on the concrete cylinder wall of the heat absorption tower; Step 2: Process the circular steel sections in sections in the factory and assemble them into an integrated structure at the construction site; Step 3: Weld transverse stiffening ribs on the annular steel 4, and weld accessory plates at the locations where the node connection structures are slotted; Step 4: pouring the concrete cylinder wall of the heat absorption tower, so that the node connection structure is pre-buried in the cylinder wall of the heat absorption tower concrete cylinder, which is used to withstand the vertical force and radial horizontal thrust transmitted from the main truss of the heat absorption tower conversion platform; Step 5: Connect the main trusses of the conversion platform to the auxiliary panels respectively.

[0019] The manufacturing method of the heat absorption tower conversion platform and the concrete cylinder wall node connection structure has simple structure, convenient manufacturing, material saving, low cost, direct force transmission and good bearing performance.

[0020] The beneficial effects of the present invention are as follows: the node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall can reliably transfer the load transmitted by the main truss of the conversion platform to the concrete cylinder wall, has a simple structure, direct force transmission, material saving, and low cost, which greatly improves the overall performance of the heat absorption tower and effectively solves the problems in traditional practices such as the need to set large-section concrete corbels, the need to densely distribute steel bars in three directions within the node area, the large amount of concrete and steel bars, consumables, great difficulty in construction and processing, and a long construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a plan layout diagram of the node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall of the present invention.

[0022] Figure 2 It is a partial cross-sectional view of the node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall of the present invention.

[0023] Figure 3 yes Figure 3 Schematic diagram of the decomposition structure in.

[0024] Figure 4 It is a partial enlarged view of the node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall of the present invention.

[0025] Figure 5 This Figure 4 Middle DD section view.

[0026] Figure 6 It is a plan layout diagram of the connection between the node connection structure and the lower chord of the main truss in the present invention.

[0027] Figure 7 yes Figure 6 Enlarged view of point A in the middle.

[0028] Figure 8 yes Figure 7 Middle BB section view.

[0029] Fig. 9 It is a plan layout diagram of the connection between the node connection structure and the upper chord of the main truss in the present invention.

[0030] Fig.10 yes Fig. 9 Enlarged cross-sectional view at point E in the middle.

[0031] Fig.11 It is a plan layout diagram of the connection between the node connection structure and the upper chord of the main truss in Example 3 of the present invention.

[0032] Fig.12 yes Fig.11 Enlarged view of point C in the middle.

[0033] In the figure: 1, node connection structure, 1-1, upper chord node connection structure, 1-2, lower chord node connection structure; 2. Concrete tube of heat absorption tower, 21. Outside of tube wall, 22. Inside of tube wall, 23. Circumferential reinforcement of outer side of tube wall, 24. Circumferential reinforcement of inner side of tube wall, 25. Slots of node connection structure, 25-1. Slots of upper chord, 25-2. Slots of lower chord, 26. Additional circumferential reinforcement; 3. Main truss, 31. Main truss upper chord, 32. Main truss lower chord, 33. Conversion truss support web, 34. Vertical web, 35. Diagonal web; 4. Annular steel, 4-1. Upper chord annular steel, 4-2. Lower chord annular steel, 41. Exhaust hole, 42. Annular steel joint block, 43. Welding joint point, 44. Web opening; 5. Transverse stiffening ribs, 5-1, upper chord transverse stiffening ribs, 5-2, lower chord transverse stiffening ribs; 6. Accessory plates, 6-1. Upper chord accessory plates, 6-2. Lower chord accessory plates, 61. Plate openings. DETAILED DESCRIPTION

[0034] In order to enable those skilled in the art to more clearly understand the objectives, technical solutions and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0035] In the description of the present invention, it is necessary to understand that the orientation or position relationship indicated by the terms such as "up", "down", "left", "right", "inside", "outside", "horizontal" and "vertical" is based on the orientation or position relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention, rather than indicating or implying that the device or original referred to must have a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0036] Embodiment 1: exist Figure 1 , Figure 2 , Figure 3 In the illustrated embodiment, a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall is provided. The node connection structure 1 is embedded in the cylinder wall of a heat absorption tower concrete cylinder 2 and is used to withstand the vertical force and radial horizontal thrust transmitted from the main truss 3 of the heat absorption tower conversion platform.

[0037] The heat absorption tower concrete cylinder 2 comprises an outer cylinder wall 21 and an inner cylinder wall 22. Outer annular steel bars 23 are arranged circumferentially at regular intervals near the outer cylinder wall 21, and outer annular steel bars 24 are arranged circumferentially at regular intervals near the inner cylinder wall 22. The outer cylinder wall annular steel bars 23 and the inner cylinder wall annular steel bars 24 are both arranged horizontally along the circumferential direction of the heat absorption tower concrete cylinder 2. A node connection structure slot 25 is provided on the inner cylinder wall 22 of the heat absorption tower concrete cylinder corresponding to the location where the node connection structure 1 is provided.

[0038] In order to enhance the structural strength of the node connection structure slot 25, additional annular steel bars 26 are added inside the gaps between the annular steel bars 24 on the inner side of the cylinder wall on both sides of the node connection structure slot 25, thereby further increasing the strength of the node connection structure 1 and being able to better withstand the radial horizontal thrust transmitted from the main truss 3 of the heat absorption tower conversion platform.

[0039] The node connection structure 1 is arranged inside the node connection structure slot 25 and is flush with the edge of the inner side 22 of the cylinder wall.

[0040] like Figure 4 , Figure 5 As shown, the node connection structure 1 includes an annular steel section 4, a plurality of transverse stiffening ribs 5 and a plurality of auxiliary plates 6.

[0041] The annular steel section 4 is located in the middle of the concrete tube wall of the heat absorption tower, and is used to withstand the annular tension of the tube wall of the concrete tube 2 of the heat absorption tower caused by the radial horizontal thrust transmitted from each main truss 3 of the conversion platform.

[0042] The cross section of the annular steel 4 is welded H-shaped steel; a plurality of exhaust holes 41 are arranged on the surface of the annular steel 4 so that the concrete can be vibrated and compacted when the cylinder wall is poured; the annular steel 4 is processed in sections in the factory and spliced ​​and formed at the construction site. Specifically, in this embodiment, the annular steel 4 is designed with a total of 4 annular steel splicing blocks 42, and the adjacent annular steel splicing blocks 42 are connected as a whole by welding splicing points 43. A plurality of web openings 44 are arranged on the annular steel 4. The center line of the web opening 44 is parallel to the axis of the concrete cylinder 2 of the heat absorption tower.

[0043] The transverse stiffening ribs 5 are arranged perpendicular to the axis of the annular steel 4 to ensure that the annular steel 4 and the wall of the heat absorption tower concrete tube 2 are deformed in coordination and subjected to stress together.

[0044] Each annular steel splicing block is provided with at least one transverse stiffening rib 5. The transverse stiffening rib 5 is arranged inside the annular steel H-section and is welded to the three sides of the annular H-section steel. The three sides of the transverse stiffening rib are respectively welded to the upper flange, web and lower flange of the H-section steel.

[0045] One side of the auxiliary plate 6 is connected to the annular steel 4, and the other side is partially exposed on the inner surface of the concrete cylinder wall of the heat absorption tower, which is used to connect with the main truss 3 of the conversion platform and reliably transfer the load; the surface of the auxiliary plate 6 is provided with plate openings 61 to ensure the continuous arrangement of the vertical and annular steel bars of the concrete cylinder wall at the corresponding positions.

[0046] The auxiliary plate 6 is arranged at the connection between the main truss 3 of the conversion platform and the inner side 22 of the concrete cylinder wall. One side of the auxiliary plate 6 is connected to the inner wall of the annular steel 4, and the other side of the auxiliary plate 6 extends to the inner side 22 of the cylinder wall of the heat absorption tower concrete cylinder 2 and is connected to the main truss 3 of the conversion platform.

[0047] Embodiment 2: exist Figure 6 , Figure 7 , Figure 8 In the illustrated embodiment, a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall is provided. The node connection structure 1 is embedded in the cylinder wall of a heat absorption tower concrete cylinder 2 and is used to withstand the vertical force and radial horizontal thrust transmitted from the main truss 3 of the heat absorption tower conversion platform.

[0048] The main truss 3 comprises a main truss upper chord 31 and a main truss lower chord 32. The main truss upper chord 31 and the main truss lower chord 32 are supported and connected as a whole through a conversion truss support web member 33, a vertical web member 34 and an oblique web member 35.

[0049] In this embodiment, the node connection structure slot 25 includes an upper chord slot 25-1 and a lower chord slot 25-2 corresponding to the main truss upper chord 31 and the main truss lower chord 32. The node connection structure 1 includes an upper chord node connection structure 1-1 and a lower chord node connection structure 1-2.

[0050] The upper chord node connection structure 1 - 1 is arranged inside the upper chord slot 25 - 1 , and the lower chord node connection structure 1 - 2 is arranged inside the lower chord slot 25 - 2 .

[0051] The lower chord node connection structure 1-2 comprises a lower chord annular steel section 4-2, a lower chord transverse stiffening rib 5-2 and a lower chord auxiliary plate 6-2.

[0052] The lower chord annular steel 4-2 is located in the lower chord slot in the middle of the concrete cylinder wall of the heat absorption tower, the lower chord transverse stiffening rib 5-2 is arranged perpendicular to the axis of the lower chord annular steel 4-2, one side of the lower chord auxiliary plate 6-2 is connected to the lower chord annular steel 4-2, and the other side is partially exposed on the inner surface of the concrete cylinder wall and connected to the lower chord of the main truss of the conversion platform.

[0053] The lower chord annular steel 4-2 is used to withstand the annular tension of the cylinder wall caused by the radial horizontal thrust transmitted from the lower chords of each main truss of the conversion platform; the cross-section of the lower chord annular steel 4-2 can be welded H-shaped steel; exhaust holes can be set on the surface of the lower chord annular steel 4-2 to facilitate the vibration and compaction of concrete when pouring the cylinder wall; the lower chord annular steel 4-2 can be processed in sections in the factory and spliced ​​into shape at the construction site.

[0054] The lower chord transverse stiffening rib 5-2 is used to ensure that the lower chord annular steel section 4-2 and the concrete cylinder wall are deformed in coordination and subjected to stress together.

[0055] The lower chord auxiliary plate 6-2 is used to reliably transfer the lower chord load of the main truss of the conversion platform.

[0056] The hybrid structure heat absorption tower conversion platform and the lower chord node connection structure are processed and manufactured into shape and then integrally embedded in the concrete cylinder wall of the heat absorption tower.

[0057] The hybrid structure heat absorption tower conversion platform and the lower chord node connection structure can withstand the circumferential tension caused by the radial horizontal thrust transmitted from the lower chord of the main truss of the heat absorption tower conversion platform, and reliably transmit the vertical force transmitted from the lower chord of the main truss of the conversion platform to the concrete cylinder wall. It has the characteristics of simple structure, direct force transmission, material saving and low cost.

[0058] like Fig. 9 , Fig.10 As shown, the upper chord node connection structure 1-1 includes an upper chord annular steel section 4-1, an upper chord transverse stiffening rib 5-1 and an upper chord auxiliary plate 6-1.

[0059] The upper chord annular steel 4-1 is located in the upper chord slot in the middle of the concrete cylinder wall of the heat absorption tower, the upper chord transverse stiffening rib 5-1 is arranged perpendicular to the axis of the upper chord annular steel 4-1, one side of the upper chord auxiliary plate 6-1 is connected to the upper chord annular steel 4-1, and the other side is partially exposed on the inner surface of the concrete cylinder wall and connected to the upper chord of the main truss of the conversion platform.

[0060] The upper chord annular steel 4-1 is used to withstand the annular tension of the cylinder wall caused by the radial horizontal thrust transmitted from the upper chords of each main truss of the conversion platform; the cross-section of the upper chord annular steel 4-1 can be made of welded H-shaped steel; exhaust holes can be set on the surface of the upper chord annular steel 4-1 to facilitate the vibration and compaction of concrete when pouring the cylinder wall; the upper chord annular steel 4-1 can be processed in sections in the factory and spliced ​​into shape at the construction site.

[0061] The upper chord transverse stiffening rib 5-1 is used to ensure that the upper chord annular steel and the concrete cylinder wall are deformed in coordination and subjected to stress together.

[0062] The upper chord attachment plate 6 - 1 is used to reliably transmit the upper chord load of the main truss of the conversion platform.

[0063] The hybrid structure heat absorption tower conversion platform and the upper chord node connection structure are processed and manufactured into shape and then integrally embedded in the concrete cylinder wall of the heat absorption tower.

[0064] The hybrid structure heat absorption tower conversion platform and upper chord node connection structure can withstand the circumferential tension caused by the radial horizontal thrust transmitted from the upper chord of the main truss of the heat absorption tower conversion platform, and reliably transmit the vertical force transmitted from the upper chord of the main truss of the conversion platform to the concrete cylinder wall. It has the characteristics of simple structure, direct force transmission, material saving and low cost.

[0065] Embodiment 3: exist Fig.11 , Fig.12 In the illustrated embodiment, a node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall is provided. The node connection structure 1 is embedded in the cylinder wall of a heat absorption tower concrete cylinder 2 and is used to withstand the vertical force and radial horizontal thrust transmitted from the main truss 3 of the heat absorption tower conversion platform.

[0066] The main truss 3 comprises a main truss upper chord 31 and a main truss lower chord 32. The main truss upper chord 31 and the main truss lower chord 32 are supported and connected as a whole through a conversion truss support web member 33, a vertical web member 34 and an oblique web member 35.

[0067] The heat absorption tower concrete cylinder 2 comprises an outer cylinder wall 21 and an inner cylinder wall 22. Outer annular steel bars 23 are arranged circumferentially at regular intervals near the outer cylinder wall 21, and outer annular steel bars 24 are arranged circumferentially at regular intervals near the inner cylinder wall 22. The outer cylinder wall annular steel bars 23 and the inner cylinder wall annular steel bars 24 are both arranged horizontally along the circumferential direction of the heat absorption tower concrete cylinder 2. A node connection structure slot 25 is provided on the inner cylinder wall 22 of the heat absorption tower concrete cylinder corresponding to the location where the node connection structure 1 is provided.

[0068] In order to enhance the structural strength of the node connection structure slot 25, additional annular steel bars 26 are added inside the gaps between the annular steel bars 24 on the inner side of the cylinder wall on both sides of the node connection structure slot 25, thereby further increasing the strength of the node connection structure 1 and being able to better withstand the radial horizontal thrust transmitted from the main truss 3 of the heat absorption tower conversion platform.

[0069] The node connection structure 1 is arranged inside the node connection structure slot 25 and is flush with the edge of the inner side 22 of the cylinder wall.

[0070] The node connection structure 1 comprises an annular steel section 4 , a plurality of transverse stiffening ribs 5 and a plurality of auxiliary plates 6 .

[0071] The annular steel section 4 is located in the middle of the concrete tube wall of the heat absorption tower, and is used to withstand the annular tension of the tube wall of the concrete tube 2 of the heat absorption tower caused by the radial horizontal thrust transmitted from each main truss 3 of the conversion platform.

[0072] The cross section of the annular steel 4 is welded H-shaped steel; a plurality of exhaust holes 41 are arranged on the surface of the annular steel 4 so that the concrete can be vibrated and compacted when the cylinder wall is poured; the annular steel 4 is processed in sections in the factory and spliced ​​and formed at the construction site. Specifically, in this embodiment, the annular steel 4 is designed with a total of 4 annular steel splicing blocks 42, and the adjacent annular steel splicing blocks 42 are connected as a whole by welding splicing points 43. A plurality of web openings 44 are arranged on the annular steel 4. The center line of the web opening 44 is parallel to the axis of the concrete cylinder 2 of the heat absorption tower.

[0073] The transverse stiffening ribs 5 are arranged perpendicular to the axis of the annular steel 4 to ensure that the annular steel 4 and the wall of the heat absorption tower concrete tube 2 are deformed in coordination and subjected to stress together.

[0074] Each annular steel splicing block is provided with at least one transverse stiffening rib 5. The transverse stiffening rib 5 is arranged inside the annular steel H-section and is welded to the three sides of the annular H-section steel. The three sides of the transverse stiffening rib are respectively welded to the upper flange, web and lower flange of the H-section steel.

[0075] One side of the auxiliary plate 6 is connected to the annular steel 4, and the other side is partially exposed on the inner surface of the concrete cylinder wall of the heat absorption tower, which is used to connect with the main truss 3 of the conversion platform and reliably transfer the load; the surface of the auxiliary plate 6 is provided with plate openings 61 to ensure the continuous arrangement of the vertical and annular steel bars of the concrete cylinder wall at the corresponding positions.

[0076] The auxiliary plate 6 is arranged at the connection between the main truss 3 of the conversion platform and the inner side 22 of the concrete cylinder wall. One side of the auxiliary plate 6 is connected to the inner wall of the annular steel 4, and the other side of the auxiliary plate 6 extends to the inner side 22 of the cylinder wall of the heat absorption tower concrete cylinder 2 and is connected to the main truss 3 of the conversion platform.

[0077] In this embodiment, the node connection structure slot 25 includes an upper chord slot 25-1 and a lower chord slot 25-2 corresponding to the main truss upper chord 31 and the main truss lower chord 32. The node connection structure 1 includes an upper chord node connection structure 1-1 and a lower chord node connection structure 1-2.

[0078] The upper chord node connection structure 1 - 1 is arranged inside the upper chord slot 25 - 1 , and the lower chord node connection structure 1 - 2 is arranged inside the lower chord slot 25 - 2 .

[0079] The lower chord node connection structure 1-2 comprises a lower chord annular steel section 4-2, a lower chord transverse stiffening rib 5-2 and a lower chord auxiliary plate 6-2.

[0080] The lower chord annular steel 4-2 is located in the lower chord slot in the middle of the concrete cylinder wall of the heat absorption tower, the lower chord transverse stiffening rib 5-2 is arranged perpendicular to the axis of the lower chord annular steel 4-2, one side of the lower chord auxiliary plate 6-2 is connected to the lower chord annular steel 4-2, and the other side is partially exposed on the inner surface of the concrete cylinder wall and connected to the lower chord of the main truss of the conversion platform.

[0081] The lower chord annular steel 4-2 is used to withstand the annular tension of the cylinder wall caused by the radial horizontal thrust transmitted from the lower chords of each main truss of the conversion platform; the cross-section of the lower chord annular steel 4-2 can be welded H-shaped steel; exhaust holes can be set on the surface of the lower chord annular steel 4-2 to facilitate the vibration and compaction of concrete when pouring the cylinder wall; the lower chord annular steel 4-2 can be processed in sections in the factory and spliced ​​into shape at the construction site.

[0082] The lower chord transverse stiffening rib 5-2 is used to ensure that the lower chord annular steel section 4-2 and the concrete cylinder wall are deformed in coordination and subjected to stress together.

[0083] The lower chord auxiliary plate 6-2 is used to reliably transfer the lower chord load of the main truss of the conversion platform.

[0084] The hybrid structure heat absorption tower conversion platform and the lower chord node connection structure are processed and manufactured into shape and then integrally embedded in the concrete cylinder wall of the heat absorption tower.

[0085] The hybrid structure heat absorption tower conversion platform and the lower chord node connection structure can withstand the circumferential tension caused by the radial horizontal thrust transmitted from the lower chord of the main truss of the heat absorption tower conversion platform, and reliably transmit the vertical force transmitted from the lower chord of the main truss of the conversion platform to the concrete cylinder wall. It has the characteristics of simple structure, direct force transmission, material saving and low cost.

[0086] The upper chord node connection structure 1-1 adopts an integrated embedded reinforcement.

[0087] The hybrid structure heat absorption tower conversion platform and upper chord node connection structure can reliably transmit the radial horizontal tension from the upper chord of the main truss of the conversion platform to the concrete cylinder wall, so that the concrete cylinder wall can bear the annular pressure caused by the above radial horizontal tension by itself, and has the characteristic of fully utilizing the compressive strength of the concrete material.

[0088] The method for manufacturing the node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall in the above embodiment comprises the following steps: Step 1: First, a node connection structure slot 25 is opened on the wall of the heat absorption tower concrete cylinder 2; Step 2: Process the annular steel 4 in sections in the factory and splice them together at the construction site. The annular steel 4 is designed with 4 annular steel splicing blocks 42, which are hoisted into the wall of the heat absorption tower concrete cylinder 2, and two adjacent annular steel splicing blocks 42 are connected as a whole through welding splicing points 43.

[0089] Step 3: Weld the transverse stiffening ribs 2 to the annular steel section 4, and weld the auxiliary plates at the positions of the node connection structure slots 25.

[0090] Step 4: The concrete wall of the heat absorption tower is poured so that the node connection structure 1 is embedded in the wall of the concrete wall 2 of the heat absorption tower to withstand the vertical force and radial horizontal thrust from the main truss 3 of the heat absorption tower conversion platform.

[0091] Step 5: Connect the main truss 3 of the conversion platform to the auxiliary panels respectively.

[0092] The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall described in the above embodiment, the main truss upper chord 31 and / or the main truss lower chord 32 in the main truss 3 of the heat absorption tower conversion platform are set using a node connection structure 1, and the node connection structure 1 mainly includes annular steel, transverse stiffening ribs and auxiliary plates. The annular steel is located in the middle of the concrete cylinder wall of the heat absorption tower, and is used to withstand the annular tension of the cylinder wall caused by the radial horizontal thrust transmitted from the upper chord and / or lower chord of each main truss of the conversion platform; the transverse stiffening ribs are arranged perpendicular to the axis of the annular steel, and are used to ensure that the annular steel and the concrete The cylinder wall deforms in coordination and bears stress together; one side of the auxiliary plate is connected to the annular steel section, and the other side is partially exposed on the inner surface of the concrete cylinder wall, which is used to connect with the lower chord of the main truss of the conversion platform and reliably transfer the load; openings are set on the surface of the auxiliary plate to ensure the continuous arrangement of the vertical and annular steel bars of the concrete cylinder wall at the corresponding position; after the node is processed and formed, it is embedded in the concrete cylinder wall of the heat absorption tower as a whole, with good strength and strong bearing capacity. There is no need to use large-section concrete corbels, which avoids the problem of dense steel bars in three directions in the node area. It has a simple structure, direct force transmission, material saving and low cost.

[0093] The specific embodiments described herein are merely illustrative of the principles and effects of the present invention and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A node connection structure between a heat absorption tower conversion platform and a concrete cylinder wall, wherein the node connection structure (1) is pre-buried in the cylinder wall of a heat absorption tower concrete cylinder (2); characterized in that: The node connection structure (1) comprises: The annular steel (4) is used to withstand the annular tensile force on the wall of the heat absorption tower concrete cylinder (2) caused by the radial horizontal thrust transmitted from the main truss of the conversion platform; The transverse stiffening rib (5) is arranged on the annular steel section perpendicular to the axis of the annular steel section (4) and is used to achieve coordinated deformation and joint force bearing between the annular steel section (4) and the wall of the heat absorption tower concrete tube (2); The auxiliary plate (6) has one side connected to the annular steel section (4) and the other side exposed on the concrete cylinder wall of the heat absorption tower, and is used to connect to the main truss (3) of the conversion platform and transfer load.

2. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 1 is characterized in that: The annular steel (4) comprises a plurality of annular steel splicing blocks (42) formed in sections, and two adjacent annular steel splicing blocks (42) are connected by on-site welding to form a whole.

3. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 1 is characterized in that: The surface of the annular steel section (4) is provided with exhaust holes (41) for vibrating and compacting concrete during the pouring of the cylinder wall.

4. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 1 is characterized in that: The annular steel section (4) is provided with a plurality of web openings (44) for vibrating and compacting concrete during the pouring of the cylinder wall.

5. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 1 is characterized in that: The surface of the auxiliary plate (6) is provided with a plurality of plate openings (61) for realizing continuous arrangement of vertical and circumferential reinforcement bars of the concrete cylinder wall.

6. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to any one of claims 1 to 5, characterized in that: The main truss (3) comprises a main truss upper chord (31) and a main truss lower chord (32), and the main truss upper chord (31) and the main truss lower chord (32) are supported and connected as a whole by a conversion truss support web member (33), a vertical web member (34) and an inclined web member (35).

7. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 6 is characterized in that: The node connection structure (1) comprises an upper chord node connection structure (1-1) and a lower chord node connection structure (1-2).

8. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 7 is characterized in that: The lower chord node connection structure (1-2) comprises a lower chord annular steel section (4-2), a lower chord transverse stiffening rib (5-2) and a lower chord auxiliary plate (6-2).

9. The node connection structure between the heat absorption tower conversion platform and the concrete cylinder wall according to claim 7 is characterized in that: The upper chord node connection structure (1-1) comprises an upper chord annular steel section (4-1), an upper chord transverse stiffening rib (5-1) and an upper chord auxiliary plate (6-1); or, the upper chord node connection structure (1-1) adopts an integrated embedded reinforcement.

10. A method for manufacturing a node connection structure of a heat absorption tower conversion platform and a concrete cylinder wall according to any one of claims 1 to 9, characterized in that The following steps are involved: Step 1: Opening a node connection structure groove on the concrete cylinder wall of the heat absorption tower; Step 2: Process the circular steel sections in sections in the factory and assemble them into an integrated structure at the construction site; Step 3: Weld transverse stiffening ribs on the annular steel and weld accessory plates at the locations where the node connection structures are slotted; Step 4: pouring the concrete cylinder wall of the heat absorption tower, so that the node connection structure is pre-buried in the cylinder wall of the heat absorption tower concrete cylinder, which is used to withstand the vertical force and radial horizontal thrust transmitted from the main truss of the heat absorption tower conversion platform; Step 5: Connect the main trusses of the conversion platform to the auxiliary panels respectively.