Operating method for optimizing mining stopping line coal pillar through roof cutting, pressure relief and roadway protection during end mining

By collecting engineering geological profiles in the coal mine final mining stage and setting fan holes for hydraulic fracturing, the surrounding rock deformation problem caused by the propulsion of the mining face is solved, the width of the coal column in the stop mining line is optimized, and the coal resource recovery rate and operating efficiency are improved. , reduces costs.

CN119083996AActive Publication Date: 2024-12-06TAIYUAN UNIVERSITY OF TECHNOLOGY

Patent Information

Application Number
CN202411199307.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

During the coal mine final mining stage, the advancement of the mining face causes serious deformation of the surrounding rock of the tunnel, affecting the underground transportation, ventilation and pedestrian operation safety. The existing technologies include excavation retracement channels and vertical drilling blasting or water pressure-induced fracture and top pressure relief. There are problems such as complex operation, high cost and low efficiency.

Method used

Collect engineering geological overview, determine the drilling site location and parameters, set up fan holes for hydraulic fracturing, cut off the top slab rock layer, reduce the surrounding rock pressure of large tunnels, and optimize the width of the coal column in the stop-pull line through anchor cable reinforcement and real-time monitoring.

Benefits of technology

It improves the stability of the surrounding rock of the large tunnel, optimizes the width of the coal column of the stop-mining line, improves the recovery rate of coal resources, shortens the working cycle, reduces costs, and solves the problems of complex operation and low efficiency in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083996A_ABST
    Figure CN119083996A_ABST
Patent Text Reader

Abstract

The invention provides an operation method for optimizing a mining stopping line coal pillar through roof cutting pressure relief roadway protection during end mining, and the method comprises the steps: S10, collecting an engineering geological general situation of an operation position, and determining a drill site position, a roof cutting height, a fan-shaped hole parameter and a hydraulic fracturing parameter according to the engineering geological general situation; s20, a drill site is arranged near the original stopping line according to the position of the drill site; s30, a fan-shaped hole is formed in the drill site according to the top cutting height and the fan-shaped hole parameters, and hydraulic fracturing is conducted in the fan-shaped hole according to the top cutting height and the hydraulic fracturing parameters; s40, when the stope face is advanced to the original stopping line, stoping continues, anchor cable reinforcement is conducted on the two sides of the main roadway, and the surrounding rock deformation and damage conditions of the main roadway to be protected are monitored in real time; when the deformation rate of the surrounding rock of the main roadway exceeds an early warning value, stopping recovery immediately to form a new stopping line; the distance between the new stopping line and the original stopping line is the optimized stopping line coal pillar width; the method has the beneficial effects that the stability of main roadway surrounding rock is improved, the mining stopping line width is optimized, and the roof cutting pressure relief effect is good; the method is suitable for coal mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of coal mining, and in particular to an operation method for optimizing the coal pillar of the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining. Background Art

[0002] Roadways are various passages drilled between the surface and the ore body, used for transportation, mining, ventilation and drainage, pedestrians, and various necessary preparation works. They are generally divided into development roadways, preparation roadways, and mining roadways according to their uses. Development roadways include transportation roadways, track roadways, return air roadways, and other passages from the ground to the mining area. Mining roadways include cutting holes, mining face transportation roadways, and return air roadways.

[0003] When the underground mining of a coal mine enters the final mining stage, the mining face is mined to the vicinity of the original stop mining line. As the mining face advances forward during the mining process, the main tunnel is within the impact range of mining, which directly affects the stability of the surrounding rock of the main tunnel. When the tunnel is severely deformed, it will affect normal operations such as underground transportation, ventilation, and pedestrians, which can easily cause danger.

[0004] In order to solve the above problems, a withdrawal channel is usually excavated, vertical holes are drilled in the withdrawal channel, and the final mining is carried out by blasting or hydraulic fracturing to cut the top and relieve pressure. However, this method has the problems of complex operation, high cost and low operating efficiency. Summary of the invention

[0005] In order to solve one of the above-mentioned technical defects, the present application provides an operation method for cutting the top to relieve pressure and protect the lane at the end of mining, and optimizing the coal pillar of the stop mining line.

[0006] The present application provides an operation method for optimizing the coal pillar of the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining, comprising the following steps:

[0007] S10, collecting the engineering geological profile of the operation location, and determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile;

[0008] S20, arranging drilling sites near the original stop-mining line according to the determined drilling site positions, and the drilling sites are arranged on both sides of the mining working face;

[0009] S30, setting a fan-shaped hole in the drilling site according to the determined top cutting height and fan-shaped hole parameters, and then performing hydraulic fracturing in the fan-shaped hole according to the determined top cutting height and hydraulic fracturing parameters to cut off the top rock layer and reduce the pressure of the surrounding rock of the large tunnel; the fan-shaped hole includes a plurality of boreholes, and the plurality of boreholes are inclined toward the middle of the mining working face;

[0010] S40, when the mining face advances to the original stop-mining line, mining will continue, while anchor cables will be reinforced on both sides of the main tunnel to be protected, and the deformation and damage of the surrounding rock of the main tunnel to be protected will be monitored in real time; when the deformation rate of the surrounding rock of the main tunnel to be protected exceeds the warning value, mining will be stopped immediately to form a new stop-mining line;

[0011] The distance between the new stop mining line and the original stop mining line is the optimized stop mining line coal pillar width.

[0012] Preferably, the step S10 of collecting the engineering geological profile of the operation location specifically includes:

[0013] S101, collect the engineering geological profile of the mining face and the main tunnel to be protected, including the coal seam inclination, the tunneling operation procedures of the main tunnel, the mining operation procedures of the mining face, the drilling column chart, the mining engineering plan, the hydrogeological conditions, the structural conditions and the impact of mining;

[0014] S102, collecting the geomechanical characteristics of the surrounding rock of the main tunnel to be protected, so as to determine the position and thickness of the roof rock layer which plays a key role in the pressure on the mining face; the geomechanical characteristics of the surrounding rock include the lithology and thickness of the roof rock layer of the main tunnel, the physical and mechanical properties of the surrounding rock, the ground stress state, the step distance of the mining face pressure, and the coefficient of the expansion of the goaf.

[0015] More preferably, the step S10, determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile, specifically includes:

[0016] S103, determining the drilling site location;

[0017] S104, determining fan-shaped hole parameters according to the position and thickness of the roof rock layer that plays a key role in the pressure of the mining face and the coal seam inclination, wherein the fan-shaped hole parameters include: the relative position of the fan-shaped hole and the stop-mining line, the hole spacing, the number of drill holes, the length of the drill holes, and the drilling angle;

[0018] S105, determining hydraulic fracturing parameters according to the uniaxial tensile strength and ground stress state of the rock in the fracturing rock formation, wherein the hydraulic fracturing parameters include: hydraulic pressure, fracturing direction and fracturing section;

[0019] S106, calculate the top cutting height H:

[0020]

[0021] Where: is the sum of the heights of the different rock layers, in meters; M is the thickness of the mined coal seam, in meters; K p is the average expansion coefficient of the goaf.

[0022] More preferably, the step S104, determining the fan-shaped hole parameters according to the position and thickness of the roof rock layer and the coal seam inclination angle that play a key role in the pressure of the mining working face, specifically includes:

[0023] (1) The inclination angle of the nearly horizontal coal seam is less than 8°, and two groups of drill holes are arranged symmetrically, with 6 to 12 drill holes in each group;

[0024] (2) The dip angle of the gently inclined coal seam is 8 to 25°, the upper part of the stope has 5 to 11 boreholes, and the number of boreholes in the lower part of the stope is arranged to increase by 1 to 2 compared with the upper part of the stope;

[0025] (3) The dip angle of the medium-sloping coal seam is 25-45°, the upper part of the stope is 4-10 boreholes, and the number of boreholes in the lower part of the stope is arranged to increase by 3-4 compared with the upper part of the stope;

[0026] (4) The inclination angle of the steeply inclined coal seam is greater than 45°. There are 3 to 9 drill holes in the upper part of the stope, and the number of drill holes in the lower part of the stope is 5 to 6 more than that in the upper part of the stope.

[0027] More preferably, the step S30, performing hydraulic fracturing in the fan-shaped hole according to the hydraulic fracturing parameters to cut off the roof rock layer and reduce the pressure of the surrounding rock of the large tunnel, specifically includes:

[0028] Arrange high-pressure water injection pumps in the drilling site;

[0029] Multiple hydraulic fracturings are performed in each borehole in a backward manner using a high-pressure water injection pump, with a frequency of one fracturing every 2m and each fracturing lasting ≥30min. The hydraulic fracturing is stopped when the water pressure drops sharply. The above steps are repeated until the top rock layer is completely fractured.

[0030] Preferably, in step S40, the deformation and damage conditions of the surrounding rock of the large tunnel include: roof subsidence, bottom bulging, two-wall displacement and roof delamination conditions.

[0031] The method for cutting the top to relieve pressure and protect the lane by optimizing the coal pillar of the stop mining line provided in the present application is adopted, and the top is cut by hydraulic fracturing, which improves the stability of the surrounding rock of the large lane, optimizes the width of the coal pillar of the stop mining line, further improves the recovery rate of coal resources, and increases economic benefits; the working cycle is short, the cost is reduced, and the operation efficiency of the last mining is improved, which solves the problem that the operation of digging a withdrawal channel, vertically drilling holes in the withdrawal channel, and cutting the top to relieve pressure by blasting or hydraulic fracturing in the prior art is complicated, costly, and inefficient. Since the middle part of the roof rock layer is easier to break than the two sides, the fan-shaped distribution of multiple boreholes makes the boreholes on both sides of the roof rock layer more dense, and the boreholes in the middle part of the roof rock layer are relatively sparse. When the lithology and thickness of the roof rock layer are basically the same, the top cutting and pressure relief effect of the roof rock layer is better.

[0032] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained by the contents indicated in the written description and the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0034] Figure 1 A schematic diagram of the inclined profile design of the mining working face provided in Example 1 of the present application;

[0035] Figure 2 A schematic diagram of the design of the strike profile of the mining working face provided in Example 1 of the present application;

[0036] Figure 3 A schematic diagram of the inclined profile design of the mining working face provided in Example 2 of the present application;

[0037] Figure 4 This is a schematic diagram of the design of the strike profile of the mining face provided in Example 2 of the present application. DETAILED DESCRIPTION

[0038] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the exemplary embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.

[0039] The main tunnel to be protected in this application is the one close to the mining working face.

[0040] Embodiment 1

[0041] Figure 1 This is a schematic diagram of the inclined profile design of the mining working face provided in Example 1 of the present application. Figure 2 This is a schematic diagram of the design of the section of the mining working face provided in Example 1 of the present application. Figure 2 The direction indicated by the arrow in the middle is the direction of the mining operation surface. Figure 1 and Figure 2 As shown, the present application provides an operation method for optimizing the coal pillar of the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining, including the following steps:

[0042] S10, collecting the engineering geological profile of the operation location of the A mining area, and determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile;

[0043] S101, collect the engineering geological profile of the mining face and the main tunnel to be protected, including the coal seam inclination, the tunneling operation procedures of the main tunnel, the mining operation procedures of the mining face, the drilling column chart, the mining engineering plan, the hydrogeological conditions, the structural conditions and the impact of mining; specifically, the coal seam inclination is 15°;

[0044] S102, collecting the geomechanical characteristics of the surrounding rock of the main tunnel to be protected, so as to determine the position and thickness of the top rock layer that plays a key role in the pressure of the mining face; the geomechanical characteristics of the surrounding rock include the lithology and thickness of the top rock layer of the main tunnel, the physical and mechanical properties of the surrounding rock, the ground stress state, the step distance of the pressure of the mining face, and the coefficient of the expansion of the goaf;

[0045] The rock layers of the main tunnel roof from top to bottom are: mudstone 2.1m, limestone 9.95m, fine-grained sandstone 2.0m, siltstone 1.85m, sandy mudstone 3.5m, No. 8 coal 2.65m;

[0046] The hydraulic fracturing method was used to measure the ground stress of the tunnel, and the maximum principal stress was 11.5MPa, which was perpendicular to the tunnel axis; the minimum principal stress was 7.8MPa, which was parallel to the tunnel axis; the expansion coefficient of the goaf was 1.36, and the height between the mining face and the coal seam was 2.65m;

[0047] The top rock layer that plays a key role in the pressure of the mining face is the limestone 7.35m away from the top of the roadway, and its rock layer thickness is 9.95m;

[0048] S103, determining the drilling site location;

[0049] S104, determining fan-shaped hole parameters according to the position and thickness of the roof rock layer that plays a key role in the pressure of the mining face and the coal seam inclination, wherein the fan-shaped hole parameters include: the relative position of the fan-shaped hole and the stop-mining line, the hole spacing, the number of drill holes, the length of the drill holes, and the drilling angle;

[0050] Specifically, the thicker the roof rock layer, the smaller the hole spacing of the fan-shaped holes; the thinner the roof rock layer, the larger the hole spacing of the fan-shaped holes; the larger the coal seam inclination, the greater the difference in the number of fan-shaped holes drilled on both sides of the mining face;

[0051] Specifically, a total of 18 boreholes are set in the two drilling sites, of which 8 boreholes H1-H8 are set in the drilling site in the upper part of the stope, and 10 drilling sites Y1-Y10 are set in the lower part of the stope;

[0052] The drilling angles of H1-H8 are: 0°, 5°, 10°, 16°, 24°, 35°, 51°, 70°, and the drilling lengths are: 17.4m, 19.0m, 22.6m, 27.8m, 34.2m, 41.48m, 49.3m, 48.1m;

[0053] The drilling angles of Y1-Y10 are 84°, 76°, 67°, 59°, 53°, 47°, 42°, 39°, 34°, 30°, and the drilling lengths are 18.5m, 20.0m, 22.0m, 24.8m, 28.4m, 32.7m, 37.7m, 43.3m, 49.3m, 48.1m;

[0054] Since the middle part of the roof rock formation is easier to break than the two sides, the fan-shaped distribution of multiple drill holes makes the drill holes on the two sides of the roof rock formation more dense and the drill holes in the middle part of the roof rock formation more sparse. When the lithology and thickness of the roof rock formation are basically the same, the top cutting and pressure relief effect of the roof rock formation is better;

[0055] S105, determining hydraulic fracturing parameters according to the uniaxial tensile strength and ground stress state of the rock in the fracturing rock formation, wherein the hydraulic fracturing parameters include: hydraulic pressure, fracturing direction and fracturing section;

[0056] Specifically, the hydraulic pressure is 20 MPa;

[0057] S106, calculate the top cutting height H:

[0058]

[0059] Where: is the sum of the heights of the different rock layers, in meters; M is the thickness of the mined coal seam, in meters; K p is the average expansion coefficient of the goaf.

[0060] S20, arranging drilling sites near the original stop-mining line according to the determined drilling site positions, and the drilling sites are arranged on both sides of the mining working face.

[0061] S30, setting a fan-shaped hole in the drilling site according to the determined top cutting height and fan-shaped hole parameters, and then performing hydraulic fracturing in the fan-shaped hole according to the determined top cutting height and hydraulic fracturing parameters to cut off the top rock layer and reduce the pressure of the surrounding rock of the large tunnel; the fan-shaped hole includes a plurality of boreholes, and the plurality of boreholes are inclined toward the middle of the mining working face;

[0062] Further, a high-pressure water injection pump is arranged in the drilling site;

[0063] Multiple hydraulic fracturings are performed in each borehole in a backward manner using a high-pressure water injection pump, with a frequency of one fracturing every 2m and each fracturing lasting ≥30min. The hydraulic fracturing is stopped when the water pressure drops sharply. The above steps are repeated until the top rock layer is completely fractured.

[0064] S40, when the mining face advances to the original stop-mining line, mining will continue, while anchor cables will be reinforced on both sides of the main tunnel to be protected, and the deformation and damage of the surrounding rock of the main tunnel to be protected will be monitored in real time; when the deformation rate of the surrounding rock of the main tunnel to be protected exceeds the warning value, mining will be stopped immediately to form a new stop-mining line;

[0065] Furthermore, the deformation and damage of the surrounding rock of the tunnel include: roof subsidence, bottom heave, two-wall displacement and roof delamination;

[0066] The distance between the new stop mining line and the original stop mining line is the optimized stop mining line coal pillar width.

[0067] In the example provided in the first embodiment of the present application, the width of the coal pillar at the stop mining line is optimized from the previous 76m to 50m, which is shortened by 26m.

[0068] Embodiment 2

[0069] Figure 3 This is a schematic diagram of the inclined profile design of the mining working face provided in Example 2 of the present application. Figure 4 This is a schematic diagram of the design of the section of the mining face provided in Example 2 of the present application. Figure 4 The direction indicated by the arrow in the middle is the direction of the mining operation surface. Figure 3 and Figure 4 As shown, the present application provides an operation method for optimizing the coal pillar of the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining, including the following steps:

[0070] S10, collecting the engineering geological profile of the operation location of the B mining area, and determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile;

[0071] S101, collect the engineering geological profile of the mining face and the main tunnel to be protected, including the coal seam inclination, the tunneling operation procedures of the main tunnel, the mining operation procedures of the mining face, the drilling column chart, the mining engineering plan, the hydrogeological conditions, the structural conditions and the impact of mining; specifically, the coal seam inclination is 26°;

[0072] S102, collecting the geomechanical characteristics of the surrounding rock of the main tunnel to be protected, so as to determine the position and thickness of the top rock layer that plays a key role in the pressure of the mining face; the geomechanical characteristics of the surrounding rock include the lithology and thickness of the top rock layer of the main tunnel, the physical and mechanical properties of the surrounding rock, the ground stress state, the step distance of the pressure of the mining face, and the coefficient of the expansion of the goaf;

[0073] The rock layers of the main tunnel roof are as follows from top to bottom: fine-grained sandstone 5.8m, limestone 5.5m, mudstone 1.4m, No. 14 coal 0.6m, sandy mudstone 0.8m, mudstone 7.0m, No. 15 coal 6.0m (of which the top coal is 3m thick);

[0074] The hydraulic fracturing method was used to measure the ground stress of the tunnel, and the maximum principal stress was 8MPa, which was perpendicular to the tunnel axis; the minimum principal stress was 5MPa, which was parallel to the tunnel axis; the expansion coefficient of the goaf was 1.21, and the height between the mining face and the coal seam was 3.0m;

[0075] The top rock layer that plays a key role in the pressure of the mining face is limestone and fine-grained sandstone 14.0m away from the top of the roadway, with rock layer thicknesses of 5.5m and 5.8m respectively;

[0076] S103, determining the drilling site location;

[0077] S104, determining fan-shaped hole parameters according to the position and thickness of the roof rock layer that plays a key role in the pressure of the mining face and the coal seam inclination, wherein the fan-shaped hole parameters include: the relative position of the fan-shaped hole and the stop-mining line, the hole spacing, the number of drill holes, the length of the drill holes, and the drilling angle;

[0078] Specifically, there are 17 boreholes in total in the two drilling sites, of which 7 boreholes E1-E7 are set in the drilling site in the upper part of the stope, and 10 drilling sites F1-F10 are set in the lower part of the stope;

[0079] The drilling angles of E1-E7 are 77°, 57°, 36°, 20°, 8°, -3°, -9°, and the drilling lengths are 25.5m, 25.0m, 28.1m, 34.0m, 43.8m, 55.1m, 55.7m respectively;

[0080] The drilling angles of F1-F10 are 39°, 43°, 47°, 50°, 54°, 59°, 64°, 71°, 79°, and 88°, and the drilling lengths are 28.1m, 31.0m, 34.9m, 39.9m, 45.7m, 52.5m, 60.0m, 68.3m, 75.2m, and 71.1m respectively;

[0081] S105, determining hydraulic fracturing parameters according to the uniaxial tensile strength and ground stress state of the rock in the fracturing rock formation, wherein the hydraulic fracturing parameters include: hydraulic pressure, fracturing direction and fracturing section;

[0082] Specifically, the hydraulic pressure is 20 MPa;

[0083] S106, calculate the top cutting height H:

[0084]

[0085] Where: is the sum of the heights of the different rock layers, in meters; M is the thickness of the mined coal seam, in meters; K p is the average expansion coefficient of the goaf.

[0086] S20, arranging drilling sites near the original stop-mining line according to the determined drilling site positions, and the drilling sites are arranged on both sides of the mining working face.

[0087] S30, setting a fan-shaped hole in the drilling site according to the determined top cutting height and fan-shaped hole parameters, and then performing hydraulic fracturing in the fan-shaped hole according to the determined top cutting height and hydraulic fracturing parameters to cut off the top rock layer and reduce the pressure of the surrounding rock of the large tunnel; the fan-shaped hole includes a plurality of boreholes, and the plurality of boreholes are inclined toward the middle of the mining working face;

[0088] Further, a high-pressure water injection pump is arranged in the drilling site;

[0089] Multiple hydraulic fracturings are performed in each borehole in a backward manner using a high-pressure water injection pump, with a frequency of one fracturing every 2m and each fracturing lasting ≥30min. The hydraulic fracturing is stopped when the water pressure drops sharply. The above steps are repeated until the top rock layer is completely fractured.

[0090] S40, when the mining face advances to the original stop-mining line, mining will continue, while anchor cables will be reinforced on both sides of the main tunnel to be protected, and the deformation and damage of the surrounding rock of the main tunnel to be protected will be monitored in real time; when the deformation rate of the surrounding rock of the main tunnel to be protected exceeds the warning value, mining will be stopped immediately to form a new stop-mining line;

[0091] Furthermore, the deformation and damage of the surrounding rock of the tunnel include: roof subsidence, bottom heave, two-wall displacement and roof delamination;

[0092] The distance between the new stop mining line and the original stop mining line is the optimized stop mining line coal pillar width.

[0093] In the example provided in Example 2 of the present application, the width of the coal pillar at the stop mining line is optimized from 88m to 65m, which is shortened by 23m.

[0094] The operating method for top cutting and pressure relief to protect the tunnel and optimize the coal pillar at the stop mining line provided in the present application is adopted, and the top cutting is carried out by hydraulic fracturing, which improves the stability of the surrounding rock of the large tunnel, optimizes the width of the coal pillar at the stop mining line, further improves the recovery rate of coal resources, and increases economic benefits; the working cycle is short, the cost is reduced, and the operating efficiency of the last mining is improved, which solves the problems in the prior art of needing to excavate a withdrawal channel, vertically drill holes in the withdrawal channel, and cut the top to relieve pressure by blasting or hydraulic fracturing, which are complicated, costly, and inefficient.

[0095] In the description of the present application, it should be understood that the terms "middle", "both sides", "axial", "length", "width", "thickness", "horizontal", "vertical", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present application.

[0096] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0097] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0098] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A method for optimizing the coal pillar of the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining. It is characterized in that The following steps are involved: S10, collecting the engineering geological profile of the operation location, and determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile; S20, arranging drilling sites near the original stop-mining line according to the determined drilling site positions, and the drilling sites are arranged on both sides of the mining working face; S30, setting a fan-shaped hole in the drilling site according to the determined top cutting height and fan-shaped hole parameters, and then performing hydraulic fracturing in the fan-shaped hole according to the determined top cutting height and hydraulic fracturing parameters to cut off the top rock layer and reduce the pressure of the surrounding rock of the large tunnel; the fan-shaped hole includes a plurality of boreholes, and the plurality of boreholes are inclined toward the middle of the mining working face; S40, when the mining face advances to the original stop-mining line, mining will continue, while anchor cables will be reinforced on both sides of the main tunnel to be protected, and the deformation and damage of the surrounding rock of the main tunnel to be protected will be monitored in real time; when the deformation rate of the surrounding rock of the main tunnel to be protected exceeds the warning value, mining will be stopped immediately to form a new stop-mining line; The distance between the new stop mining line and the original stop mining line is the optimized stop mining line coal pillar width.

2. The method for optimizing the coal pillar at the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining according to claim 1, It is characterized in that The step S10, collecting the engineering geological profile of the operation location, specifically includes: S101, collect the engineering geological profile of the mining face and the main tunnel to be protected, including the coal seam inclination, the tunneling operation procedures of the main tunnel, the mining operation procedures of the mining face, the drilling column chart, the mining engineering plan, the hydrogeological conditions, the structural conditions and the impact of mining; S102, collecting the geomechanical characteristics of the surrounding rock of the main tunnel to be protected, so as to determine the position and thickness of the roof rock layer which plays a key role in the pressure on the mining face; the geomechanical characteristics of the surrounding rock include the lithology and thickness of the roof rock layer of the main tunnel, the physical and mechanical properties of the surrounding rock, the ground stress state, the step distance of the mining face pressure, and the coefficient of the expansion of the goaf.

3. The method for optimizing the coal pillar at the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining according to claim 2, It is characterized in that The step S10, determining the drilling site location, top cutting height, fan-shaped hole parameters and hydraulic fracturing parameters according to the collected engineering geological profile, specifically includes: S103, determining the drilling site location; S104, determining fan-shaped hole parameters according to the position and thickness of the roof rock layer that plays a key role in the pressure of the mining face and the coal seam inclination, wherein the fan-shaped hole parameters include: the relative position of the fan-shaped hole and the stop-mining line, the hole spacing, the number of drill holes, the length of the drill holes, and the drilling angle; S105, determining hydraulic fracturing parameters according to the uniaxial tensile strength and ground stress state of the rock in the fractured rock formation, wherein the hydraulic fracturing parameters include: hydraulic pressure, fracturing direction and fracturing section; S106, calculate the top cutting height H: Where: is the sum of the heights of the different rock layers, in meters; M is the thickness of the mined coal seam, in meters; K p is the average expansion coefficient of the goaf.

4. The method for optimizing the coal pillar at the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining according to claim 3, It is characterized in that The step S104, determining the fan-shaped hole parameters according to the position and thickness of the roof rock layer and the coal seam inclination angle that play a key role in the pressure of the mining working face, specifically includes: (1) The inclination angle of the nearly horizontal coal seam is less than 8°, and two groups of drill holes are arranged symmetrically, with 6 to 12 drill holes in each group; (2) The dip angle of the gently inclined coal seam is 8 to 25°, 5 to 11 holes are drilled in the upper part of the stope, and the number of holes drilled in the lower part of the stope is arranged to increase by 1 to 2 compared with the holes drilled in the upper part of the stope; (3) The dip angle of the medium-sloping coal seam is 25-45°, the upper part of the stope is 4-10 boreholes, and the number of boreholes in the lower part of the stope is arranged to increase by 3-4 compared with the upper part of the stope; (4) The inclination angle of the steeply inclined coal seam is greater than 45°. There are 3 to 9 drill holes in the upper part of the stope, and the number of drill holes in the lower part of the stope is 5 to 6 more than that in the upper part of the stope.

5. The method for optimizing the coal pillar at the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining according to claim 4, It is characterized in that The step S30, performing hydraulic fracturing in the fan-shaped hole according to the hydraulic fracturing parameters to cut off the top rock layer and reduce the pressure of the surrounding rock of the large tunnel, specifically includes: Arrange high-pressure water injection pumps in the drilling site; Multiple hydraulic fracturings are performed in each borehole in a backward manner using a high-pressure water injection pump, with a frequency of one fracturing every 2m and each fracturing lasting ≥30min. The hydraulic fracturing is stopped when the water pressure drops sharply. The above steps are repeated until the top rock layer is completely fractured.

6. The method for optimizing the coal pillar at the stop mining line by cutting the top to relieve pressure and protect the lane at the end of mining according to claim 1, It is characterized in that In step S40, the deformation and damage of the surrounding rock of the tunnel includes: the amount of roof sinking, the amount of bottom heaving, the amount of movement of the two sides and the delamination of the roof.

Citation Information

Patent Citations

  • Roadway rock burst pressure structure cooperative prevention and control method influenced by repeated mining

    CN111720139A

  • Hydraulic fracturing roof-cutting pressure relief method for coal mine rock burst prevention and control

    CN113669059A

  • Structural arrangement suitable for caving treatment of large goaf of underground mine

    CN114810071A

  • Three-face upper-break single-roadway undercutting blasting construction method for roof-cutting entry retaining

    CN115183639A

  • Method for reducing main roadway dynamic pressure influence during end mining and optimizing mining stopping line coal pillar

    CN116771348A

Cited By

  • Bidirectional double-row water injection softening drill hole arrangement method suitable for weakly cemented stratum

    CN119914285A