Novel shield tunnel single-double mixed slurry synchronous grouting method

By using the synchronous grouting method of single and double mixed slurry in the super-large diameter shield tunnel, the gravity and theoretical injection volume of the pipe sheet are calculated, and the single and double slurry is injected at intervals. The rapid condensation characteristics of double slurry are used to solve the problem of poor engineering adaptability and achieve the realization of the realization of the smallest adaptability of the double slurry. Maximizes the stability and cost-effectiveness of the tube sheet.

CN119084016APending Publication Date: 2024-12-06SUZHOU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411369229.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The poor engineering adaptability during grouting process during the construction of super-large diameter shield tunnels, resulting in difficult to ensure the floating and stability of the pipe sheets, and the existing technology is costly and limited in application.

Method used

The new shield tunnel double and double mixed slurry synchronous grouting method is adopted. By calculating the gravity and theoretical injection volume of the pipe sheet, the diverting pipeline is set up, and single and double slurry are injected at intervals. The rapid condensation characteristics of double slurry are used to improve early strength and ensure the pipe Tablet stability.

Benefits of technology

Early balance of large-diameter shield pipe sheets has been achieved, engineering adaptability has been improved, pipe sheets have been prevented, processing cycles have been shortened, costs have been reduced, and support functions have been enhanced and the ability to prevent formation collapse and groundwater seepage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084016A_ABST
    Figure CN119084016A_ABST
Patent Text Reader

Abstract

The invention provides a novel shield tunnel single-double mixed slurry synchronous grouting method. The novel shield tunnel single-double mixed slurry synchronous grouting method comprises the steps that S1, the gravity F of a tunnel segment is calculated; s2, calculating the theoretical injection rate of single slurry; s3, a shield grouting pipeline is improved, and a flow dividing pipeline is arranged; s4, the theoretical injection amount of the double grout is calculated; s5, the actual injection amount of single grout and the actual injection amount of double grout are calculated; and S6, single grout and double grout are injected synchronously. On the premise of ensuring the basic performance requirements of the slurry, the large-diameter shield segment lining reaches early balance, the double slurry is injected on the basis, the early strength of the slurry and the early coagulation rate of the slurry are improved based on the characteristic that the double slurry can be quickly coagulated, the segment can be effectively prevented from floating, and the service life of the shield segment lining is prolonged. And the purpose of maximizing the economic benefit of the synchronous grouting project under the large-diameter shield is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of synchronous grouting in shield construction, and in particular relates to providing a novel synchronous grouting method for single-double mixed slurry in a shield tunnel. Background Art

[0002] With the rapid development of urban infrastructure construction in my country, shield construction technology has become more mature and has become an important means of underground space development. In order to meet the growing transportation needs, the construction of ultra-large diameter shield tunnels has been promoted and applied. However, ultra-large diameter shield tunnel projects often face many challenges, such as environmentally sensitive areas, complex geological environments, and increasing uncertainties. In particular, how to reduce the disturbance of large shield tunneling to the surrounding strata and prevent the strata from floating has always been a hot issue of concern in the industry.

[0003] Grouting technology plays a vital role in shield tunneling construction. It is not only a key measure to reduce ground disturbance and improve engineering quality, but also a necessary means to ensure tunnel stability. In conventional diameter shield construction, due to the small gap, synchronous grouting often relies on experience to operate, and its importance has not been fully valued. However, with the increase of shield diameter, the gap at the shield tail also increases, resulting in the expansion of the gap between the outer ring of the lining and the excavated soil. The existing large-diameter shield gap size has reached 30%-50% of the thickness of the segment. The filling amount and effect of synchronous grouting are becoming more and more significant, and the problem of engineering adaptability is becoming increasingly prominent. Therefore, optimizing grouting technology and improving its engineering adaptability have become the core issues of controlling the floating of the lining in large shield construction.

[0004] During the shield construction process, the stability and sealing of the tunnel, as well as the stability and uniform force of the segments, must be ensured, and the synchronous grouting construction must be carried out quickly and effectively. However, due to the large cross-section, ultra-deep burial, and high water pressure of large-diameter shield tunnels, the gap space at the shield tail is large, the synchronous grouting volume is large, and the grouting pressure control is difficult. It is difficult to ensure that the synchronous grouting effect of each ring can meet expectations during the construction process.

[0005] In response to these problems, the industry has begun to gradually explore solutions. For example, the new synchronous grouting material and its preparation method disclosed in patent CN116217176A are intended to solve the problems of difficult operation and difficulty in controlling the floating of the pipe segments in the existing synchronous slurry grouting. However, the engineering cost of this material is high, it is not easy to obtain and transport, and its practical application is limited. Although the improved double slurry ratio disclosed in patent CN112723836A has improved the slurry performance to a certain extent, the engineering cost is still high, and there is still a risk of pipe blockage in ultra-large diameter shield tunnels. The waste mud regeneration single slurry mix design method disclosed in patent CN114888958A reduces the cost and pipe blockage risk, but the initial strength is low, and there is still a potential risk of pipe segment floating.

[0006] In summary, although a series of technical explorations have been carried out in the industry, the problem of engineering adaptability of the grouting method for ultra-large diameter shield tunnels has not been fundamentally solved. Summary of the invention

[0007] To this end, the technical problem to be solved by the present invention is to overcome the problem of poor engineering adaptability in the grouting process of large-diameter shield tunnels in the prior art and to provide a new type of single-double mixed slurry synchronous grouting method for shield tunnels.

[0008] In order to solve the above technical problems, the present invention provides a novel shield tunnel single double mixed slurry synchronous grouting method, which comprises the following steps: Step S1, calculating the tunnel segment gravity F 重 ; Step S2, calculate the theoretical injection volume Q of the single slurry 单 , where Q 单 The buoyancy generated is F 单 , F 单 =F 重 ; Step S3, improve the shield grouting pipeline and set up a diversion pipeline; Step S4, and through the theoretical total grouting volume Q 总 And the theoretical injection volume Q of the single slurry 单 Calculate the theoretical injection volume Q of dual slurry 双 , where Q 双 =Q 总 -Q 单 Step S5, calculate the actual injection volume Q of the single slurry by the single slurry filling coefficient K1 and the double slurry filling coefficient K2 respectively 单 ' and the actual injection volume of double slurry Q 双 '; Step S6, during the shield tunneling process, a total amount of Q is synchronously injected to the back of the segment lining through the lower grouting pipeline of the shield machine 单 ' single slurry, a total amount of Q is injected synchronously into the back of the segment lining through the upper grouting pipeline of the shield machine 双 ' double grout until the grouting is completed.

[0009] In the present invention, in step S1, the tunnel segment gravity F 重 =ρ 衬砌 gV, where ρ 衬砌 is the segment lining density, V is the segment lining volume, and g is the gravitational acceleration.

[0010] In the present invention, in step S2, the buoyancy F generated by the theoretical injection amount of the single slurry 单 =F 重 , Q 单 =F 单 / γ 浆液 g, where γ 浆液It is a serous heavy substance.

[0011] In the present invention, in step S4, the total grouting amount Q 总 =πL(D 2 -d 2 ) / 4, where D is the shield excavation diameter; d is the outer diameter of the tunnel segment; and L is the length of the grouting area.

[0012] In the present invention, in step S5, the actual injection amount Q of the single slurry is 单 '=K1Q 单 , Q 双 '=K2Q 双 Among them, K1 is the single slurry filling coefficient, and K2 is the double slurry filling coefficient.

[0013] In the present invention, in step S6, the single slurry and the double slurry are injected synchronously and at intervals. When the single slurry and the double slurry are injected synchronously, Q 单 'With Q 双 The ratio of ' corresponds to setting the injection rate of the two.

[0014] The above technical solution of the present invention has the following advantages compared with the prior art:

[0015] The novel shield tunnel single-double mixed slurry synchronous grouting method described in the present invention controls the single slurry in the grouting process to ensure the basic performance requirements of the slurry, so that the large-diameter shield segment lining reaches early equilibrium, and on this basis, injects double slurry. Based on the characteristic of rapid coagulation of double slurry, the early strength of the slurry is greatly improved, and the early coagulation rate of the slurry is greatly improved. In this process, the single slurry and the double slurry can make the slurry material reach a certain strength in the early stage, further prevent the segment from floating, and ensure the stability of the segment lining. In particular, it has achieved significant and effective control on the problem of segment floating, thereby achieving the purpose of maximizing the economic benefits of the synchronous grouting project under large-diameter shield. In addition, compared with conventional grouting technology, the present application also has the advantages of shortening the processing cycle, high filling degree, stable supporting effect, and prevention of stratum collapse and groundwater seepage, providing a new idea for the grouting processing of large-diameter shield tunnel projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to make the contents of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments of the present invention in conjunction with the accompanying drawings.

[0017] Figure 1 It is a schematic diagram of the grouting process using a single slurry in the prior art;

[0018] Figure 2 It is a schematic diagram of the double grout grouting process used in the prior art;

[0019] Figure 3 It is a flow chart of a novel single-double mixed slurry synchronous grouting method for shield tunnels in a preferred embodiment of the present invention;

[0020] Figure 4 It is a schematic diagram of the synchronous grouting process of single-double mixed slurry for the new shield tunnel segment in the preferred embodiment of the present invention.

[0021] Explanation of the markings in the drawings in the specification: 1. Segment lining; 2. Single slurry; 3. Double slurry; 4. Grouting port; 5. Initial segment center; 6. Segment center after grouting. DETAILED DESCRIPTION

[0022] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.

[0023] It is worth noting that in the current existing technology, in order to effectively prevent the pipe segments from floating up, increase the bearing capacity of the tunnel, strengthen the stability and sealing of the tunnel, and ensure the stability and uniform force of the pipe segments, the slurry must be filled quickly and effectively during the shield synchronous grouting construction. However, due to the characteristics of large-diameter or ultra-large-diameter shield tunnels, large cross-sections, ultra-deep burials, and high water pressure, the gap space behind the pipe segments is large, the grouting volume of synchronous grouting is large, and the grouting pressure balance control is difficult. It is difficult to ensure that the effect of each ring of synchronous grouting can reach the expected effect during construction.

[0024] Embodiment 1

[0025] See also Figure 1 and Figure 2 As shown in the figure, the synchronous grouting grouting method and grouting material replacement of a section of a certain city's rail transit line 2 are optimized. The outer diameter of the lining ring of the shield section is 12.4m, the inner diameter is 11.3m, and the lining ring material is C60 / C50 corrosion-resistant reinforced concrete. As shown in the figure, the geological conditions of the main soil layers traversed by the shield tunnel are shown.

[0026] The original plan of this project was to use corrosion-resistant and water-resistant dispersed cement mortar, with a grouting pressure of 0.5-1MPa and a grouting rate of 1.5. Single grout: composed of cement, bentonite and water in a mixing ratio of 280:450:615; through the force analysis of a single lining ring, it can be seen that the buoyancy F generated by the synchronous grouting slurry during the construction process 浮 =ρ 浮 gV=3787.12KN, the lining ring is subject to its own gravity F 重 =1003.29KN, so F 浮 >F 重 Therefore, the original construction plan using single liquid slurry is not easy to control the floating of the pipe segments.

[0027] The usual method of optimizing synchronous grouting of shield tunnel segments is to use double grouting for synchronous grouting construction in this section. It is preliminarily assumed that the ratio of double grouting is liquid A: composed of cement, bentonite, and water in a mixing ratio of 236:148:380; liquid B: 45 degrees Baume water glass; the volume ratio of liquid A to liquid B is 1:0.164. The cost of double grouting in this scheme is as high as 420.445 yuan / m3, and the total construction cost is as high as 58.7663 million yuan, which is difficult to apply in actual construction.

[0028] Based on the above introduction, this embodiment refers to Figure 3 and Figure 4 As shown, this embodiment provides a new type of single-double mixed slurry synchronous grouting method for shield tunnels, which is used to avoid the problem of controlling the floating of the lining in large shield construction, so as to improve the problem of poor engineering adaptability in the construction of large-diameter shield tunnels. Specifically, the outer diameter of the lining ring of the preset shield section in this embodiment is 12.4m, the inner diameter is 11.3m, and the lining ring material is corrosion-resistant reinforced concrete. This embodiment controls the single slurry 2 during the grouting process to ensure the basic performance requirements of the slurry, so that the large-diameter shield segment lining 1 reaches early balance, and based on the characteristic of the rapid solidification of the double slurry 3, the engineering adaptability in the processing process is greatly improved. In this process, the single slurry 2 and the double slurry 3 can make the slurry material reach a certain strength in the early stage, further preventing the segment from floating up, ensuring the stability of the segment lining 1, and especially achieving significant and effective control over the problem of segment floating, thereby achieving the purpose of maximizing the economic benefits of the synchronous grouting project under the large-diameter shield. In addition, compared with conventional grouting technology, the present application also has the advantages of shortening the processing cycle, high filling degree, stable supporting effect, and preventing formation collapse and groundwater seepage, providing a new idea for the grouting processing of large-diameter shield tunnel projects.

[0029] This embodiment specifically includes the following steps:

[0030] Step S1, calculating the tunnel segment gravity Fweight; wherein the tunnel segment gravity F 重 =ρ 衬砌 gV, where ρ 衬砌 is the density of the segment lining 1, V is the volume of the segment lining 1, and g is the gravitational acceleration. Specifically, in this embodiment, the segment gravity F 重 It is 5907378.44KN.

[0031] Step S2: Calculate the theoretical injection volume Q of the single slurry 2 单 , where Q 单 The buoyancy generated is F 单 , F 单 =F 重 Specifically, the buoyancy F generated by the theoretical injection volume of the single slurry 2 单 =F重 =5907378.44KN, Q 单 =F 单 / γ 浆液 g, where γ 浆液 is the slurry density. Further, in this embodiment, Q is calculated by combining the actual liquid level of the single slurry 2 and the distance between the bottom of the segment and the bottom of the excavation surface. 单 =34856.9606m3.

[0032] Step S3, improving the shield grouting pipeline, and setting a diversion pipeline to include an upper grouting pipeline and a lower grouting pipeline.

[0033] Step S4, and through the theoretical total grouting amount Q 总 And the theoretical injection amount Q of the single slurry 2 单 Calculate the theoretical injection volume Q of dual slurry 3 双 , where Q 双 =Q 总 -Q 单 ; Further, the total grouting volume Q 总 =πL(D 2 -d 2 ) / 4, where D is the shield excavation diameter; d is the outer diameter of the tunnel segment; and L is the length of the grouting area. Specifically, Q in this embodiment 总 =93181.1328m 3 , so Q 双 =Q 总 -Q 单 =93181.1328-34856.9606=58324.1722m 3 .

[0034] Step S5: Calculate the actual injection volume Q of the single slurry 2 by the filling coefficient K1 of the single slurry 2 and the filling coefficient K2 of the double slurry 3. 单 'And the actual injection volume Q of the double slurry 3 双 '; Further, the actual injection amount Q of the single slurry 2 单 '=K1Q 单 , Q 双 '=K2Q 双 Wherein, K1 is the filling factor of the single slurry 2, and K2 is the filling factor of the double slurry 3. Specifically, in this embodiment, K1=1.6, K2=1.4, so Q 单 '=55771.137m 3 , Q 双 '=81653.841m 3 .

[0035] Step S6: During the shield tunneling process, a total amount of Q is synchronously injected into the back of the segment lining through the lower grouting pipeline of the shield machine. 单 The single slurry 2 of ' is injected into the back of the segment lining through the upper grouting pipeline of the shield machine with a total amount of Q 双 ' of double slurry 3 until the grouting is completed. In this embodiment, step S6 is specifically as follows: a shield grouting pipeline is preset, and the shield grouting pipeline includes at least one first grouting pipe and at least one second grouting pipe, wherein the single slurry 2 is injected between the tunnel segment lining 1 and the shield pipeline through the first grouting pipe, and the double slurry 3 is injected between the tunnel segment lining 1 and the shield pipeline through the second grouting pipe. Further, in step S5, the single slurry 2 and the double slurry 3 are injected synchronously and at intervals, and when the single slurry 2 and the double slurry 3 are injected synchronously, Q 单 'With Q 双 The ratio of ' corresponds to setting the injection rate of the two.

[0036] It should be noted that the double slurry 3 in this embodiment includes a first mixed liquid and a second mixed liquid, wherein the first mixed liquid includes cement, bentonite and water, and the second mixed liquid is 45-degree Baume water glass. Further, in different embodiments, the volume ratio of the first mixed liquid to the second mixed liquid can be configured as 1:0.15 to 1:0.17; the single slurry 2 includes cement, bentonite and water, and the concentration of cement and bentonite in the single slurry 2 is lower than the concentration of cement and bentonite in the first mixed liquid. Based on this, the present application can improve its adaptability during the construction process through the double slurry 3, avoid displacement of the pipe segment, and reduce the construction cost by mixing the single slurry 2. Thereby overcoming the problem of poor engineering adaptability during the grouting process of large-diameter shield tunnels in the prior art.

[0037] In summary, the new type of single-double mixed slurry synchronous grouting method for shield tunnel described in the present invention, by controlling the single slurry 2 during the grouting process while ensuring the basic performance requirements of the slurry, enables the large-diameter shield segment lining 1 to reach early balance, and based on the characteristic of the double slurry 3 that can quickly solidify, the engineering adaptability in the processing process is greatly improved. In this process, the single slurry 2 and the double slurry 3 can make the slurry material reach a certain strength in the early stage, further prevent the segment from floating, and ensure the stability of the segment lining 1. In particular, it has achieved significant and effective control over the problem of segment floating, thereby achieving the purpose of maximizing the economic benefits of the synchronous grouting project under large-diameter shield. In addition, compared with conventional grouting technology, the present application also has the advantages of shortening the processing cycle, high filling degree, stable supporting effect, and prevention of stratum collapse and groundwater seepage, providing a new idea for grouting processing of large-diameter shield tunnel projects.

[0038] Obviously, the above embodiments are merely examples for clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the protection scope of the invention.

Claims

1. A novel shield tunnel single-double mixed slurry synchronous grouting method, characterized in that: The steps include: Step S1: Calculate the tunnel segment gravity F 重 ; Step S2: Calculate the theoretical injection volume Q of the single slurry 单 , where Q 单 The buoyancy generated is F 单 , F 单 =F 重 ; Step S3, improving the shield grouting pipeline and setting a diversion pipeline; Step S4, and through the theoretical total grouting amount Q 总 And the theoretical injection volume Q of the single slurry 单 Calculate the theoretical injection volume Q of dual slurry 双 , where Q 双 =Q 总 -Q 单 ; Step S5: Calculate the actual injection volume Q of the single slurry by using the single slurry filling coefficient K1 and the double slurry filling coefficient K2 respectively. 单 ' and the actual injection volume of double slurry Q 双 '; Step S6: During the shield tunneling process, a total amount of Q is synchronously injected into the back of the segment lining through the lower grouting pipeline of the shield machine. 单 ' single slurry, a total amount of Q is injected synchronously into the back of the segment lining through the upper grouting pipeline of the shield machine 双 ' double grout until the grouting is completed.

2. The novel shield tunnel single-double mixed slurry synchronous grouting method according to claim 1 is characterized in that: In step S1, the tunnel segment gravity F 重 =ρ 衬砌 gV, where ρ 衬砌 is the segment lining density, V is the segment lining volume, and g is the gravitational acceleration.

3. The novel shield tunnel single-double mixed slurry synchronous grouting method according to claim 1 is characterized in that: In step S2, the buoyancy F generated by the theoretical injection volume of the single slurry is 单 =F 重 , Q 单 =F 单 / γ 浆液 g, where γ 浆液 It is a serous heavy substance.

4. The novel shield tunnel single-double mixed slurry synchronous grouting method according to claim 1 is characterized in that: In step S4, the total grouting volume Q 总 =πL(D 2 -d 2 ) / 4, where D is the shield excavation diameter; d is the outer diameter of the tunnel segment; and L is the length of the grouting area.

5. The novel shield tunnel single-double mixed slurry synchronous grouting method according to claim 1 is characterized in that: In step S5, the actual injection amount of the single slurry Q 单 '=K1Q 单 , Q 双 '=K2Q 双 Among them, K1 is the single slurry filling coefficient, and K2 is the double slurry filling coefficient.

6. The novel shield tunnel single-double mixed slurry synchronous grouting method according to claim 1 is characterized in that: In step S6, the single slurry and the double slurry are injected synchronously and at intervals. When the single slurry and the double slurry are injected synchronously, Q 单 'With Q 双 The ratio of ' corresponds to setting the injection rate of the two.