Middle partition wall construction tunnel primary support deformation limit invasion treatment method

Through the misaligned arch replacement method combining jump section construction and split trolley support, the problem of initial branch deformation caused by softening of the surrounding rock of the tunnel during the middle partition method is solved, and efficient and safe treatment of the initial branch of the tunnel is achieved, ensuring construction Efficiency and deformation control effect.

CN119084023APending Publication Date: 2024-12-06CCFEB CIVIL ENG +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410984293.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During the construction of the middle partition method, the softening and self-stabilizing capacity of the tunnel surrounding rock is reduced, resulting in initial support deformation and invasion of the secondary lining range of the tunnel, resulting in the thickness of the secondary lining cannot meet the structural design requirements, and it is easy to have full-section invasion limit or guide holes. Invasion, and the traditional arch replacement method has problems such as poor deformation control effect, slow work efficiency and high safety risks.

Method used

The misaligned arch replacement method combined with skipping section construction and split trolley support is used to measure and treat the deformation treatment section of the tunnel at the initial branch and segment. Active support force is applied to divide the new area and The demolition areas are alternately distributed, lock opening reinforcement and dislocation of arches are carried out to ensure high construction efficiency and safety.

Benefits of technology

It improves construction efficiency, inhibits the deformation of surrounding rock again, reduces the disturbance of construction to the original structure, ensures deformation control effect, avoids the support vacuum period, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084023A_ABST
    Figure CN119084023A_ABST
Patent Text Reader

Abstract

The invention discloses a median septum method construction tunnel primary support deformation invasion treatment method which is characterized by comprising the following steps: S1, measuring the section of a treated section of a left pilot tunnel and / or a right pilot tunnel where invasion deformation occurs in a tunnel to obtain primary support deformation invasion data of each treated section; s2, according to the initial support deformation limit invasion data obtained in the step S1, deformation limit invasion treatment construction is sequentially carried out on all treatment sections forwards section by section from outside of the tunnel to inside of the tunnel; and S3, quality detection and later maintenance are carried out on all treatment sections subjected to primary support deformation limit invasion treatment. The jump section construction treatment is adopted for all treatment sections, the treatment sections are subjected to deformation invasion treatment through split type trolley supporting and staggered arch changing combined construction, the construction efficiency is high, a supporting vacuum period does not exist in construction, surrounding rock secondary deformation can be effectively restrained, construction safety is guaranteed, and the construction period is shortened. Meanwhile, disturbance to surrounding rock, anchor rods of an original system and a constructed treatment section is small, and the deformation control effect is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of mountain tunnel construction, and in particular relates to a method for treating initial support intrusion of a tunnel constructed by a middle partition wall method. Background Art

[0002] In recent years, with the widespread construction and implementation of tunnel projects, when the middle partition wall method (CD method) or the cross middle partition wall method (CRD method) is used to construct tunnels through shallow loose strata, high ground stress strata, fault fracture zones and other unfavorable geological strata, the surrounding rock of the tunnel softens and its self-stabilizing ability decreases due to the influence of geological and rainfall factors. As a result, the surrounding rock deforms greatly, squeezes the initial support of the tunnel, and invades the secondary lining of the tunnel, resulting in the secondary lining thickness failing to meet the structural design requirements. The specific form is full-section intrusion, or intrusion of the left and right pilot tunnels in the presence of the middle partition wall, or both. If the tunnel intrusion section is not properly handled, it is easy to reduce the bearing capacity of the secondary lining, resulting in secondary diseases such as deformation and cracking, which will bring additional economic losses and cause immeasurable losses.

[0003] In this regard, the construction party must take quick and effective measures to reduce the impact on the construction period and ensure the quality of tunnel construction and operational safety. The traditional arch replacement method is: radial grouting reinforcement → erection of full-chamber support → removal of the limit-breaking arch frame → re-installation of the arch frame in situ → advance support → next cycle, but there are also problems or defects such as poor deformation control effect, slow work efficiency, high safety risk, and large disturbance to the original structure. Technical personnel in the industry have proposed some new solutions and methods, but they have not involved how to safely and quickly handle the limit in the presence of the intermediate partition wall, nor have they involved the construction method of the limit intrusion treatment. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a method for treating initial support intrusion of a tunnel constructed by the middle partition wall method, which adopts skip-section construction treatment for each treatment section, and utilizes split-type trolley support and staggered arch replacement combined construction to treat deformation intrusion of the treatment section. Not only is the construction efficiency high, but there is no support vacuum period during construction, which can effectively inhibit the surrounding rock from deforming again and ensure construction safety. At the same time, the disturbance to the surrounding rock, the original system anchor rods and the constructed treatment section is small, and the deformation control effect is better.

[0005] The present invention is achieved through the following technical solutions.

[0006] A method for treating deformation intrusion of initial support of a tunnel constructed by a middle partition wall method, characterized by comprising the following steps:

[0007] S1. Measure the cross-section of the treatment section of the left pilot tunnel and / or the right pilot tunnel where the tunnel has intrusion deformation to obtain the initial support deformation intrusion data of each treatment section;

[0008] S2. According to the deformation intrusion limit data of the initial support obtained in step S1, deformation intrusion limit treatment construction is carried out on each treatment section in sequence from the outside of the tunnel to the inside of the tunnel, section by section. If the interval between the current treatment section to be constructed and the adjacent treatment section that has been constructed is less than 3m, a skipping construction process is carried out, that is, the current treatment section to be constructed is skipped and the next adjacent treatment section is constructed. After the corresponding treatment section is constructed in the above manner, deformation intrusion limit treatment construction is carried out on the treatment section of the skipping section in sequence from the outside of the tunnel to the inside of the tunnel, section by section.

[0009] The steps of the deformation and intrusion treatment construction are as follows:

[0010] S21. Location division: the treatment section is divided into a plurality of arch replacement locations, in which new construction areas and demolition areas are alternately distributed and sequentially adjacent to each other, wherein the demolition areas correspond to and cover the locations of the steel arch frames, and the new construction areas are located between adjacent steel arch frames;

[0011] S22, trolley support: Move the split support trolley to the treatment section near the tunnel entrance, so that multiple construction spaces for arch replacement positions are left in the longitudinal direction of the split support trolley, and use the split support trolley to apply active support force to stabilize the surrounding rock structure on both sides of the corresponding construction space;

[0012] S23, Locking reinforcement: First, construct a small pipe radial grouting lock reinforcement in the middle of the first new construction area near the tunnel entrance, then remove the original mesh spraying support in the first new construction area, then build a new steel arch frame, and then construct a double-layer advance small pipe, and restore the mesh spraying support in the first new construction area as a surrounding rock stabilization measure;

[0013] S24, staggered arch replacement: from the outside of the tunnel to the inside, first dismantle the original mesh spraying support in the second newly built area, then build a new steel arch frame, and then construct a double-layer advance small duct to restore the mesh spraying support in the second newly built area; dismantle the original steel arch frame and the original mesh spraying support in the first demolished area, then construct a double-layer advance small duct and restore the mesh spraying support in the first demolished area;

[0014] S25, cyclic arch replacement: cyclically perform step S24, from the outside of the tunnel to the inside of the tunnel, sequentially construct the subsequent new construction area and demolition area, and synchronously move the split support trolley to apply active support force, until the original mesh spraying support in all the new construction areas in the treatment section is removed and a new steel arch frame is built and the mesh spraying support is restored, and the original steel arch frame and the original mesh spraying support in all the demolition areas in the treatment section are removed and a new mesh spraying support is built;

[0015] S3. Carry out quality inspection and post-maintenance on each treatment section that has completed the treatment of primary support deformation and intrusion.

[0016] Preferably, the initial support deformation intrusion limit data include the intrusion limit depth and position of each treatment section, the starting and ending pile numbers of each treatment section, the existing steel arch frame model and the steel arch frame spacing d of each treatment section.

[0017] Preferably, the width of the newly constructed area and the demolished area are both half of the existing steel arch spacing d, and the center line of the demolished area coincides with the axis of the corresponding covered steel arch.

[0018] Preferably, in said S21, when dividing the treatment section into zones, from outside the tunnel to inside the tunnel, the first arch change zone and the last arch change zone of the treatment section are controlled to be newly built zones.

[0019] Preferably, when the boundary line of the tunnel deformation and intrusion in the treatment section is located at the demolition area, that is, the first arch change position and / or the last arch change position of the treatment section is the demolition area, the corresponding range of the treatment section is expanded outward by one arch change position, so that the first arch change position and the last arch change position of the treatment section are both new construction areas.

[0020] Preferably, the treatment section includes the following three types of intrusion deformation: the treatment section undergoes intrusion deformation only in the left guide tunnel, the treatment section undergoes intrusion deformation only in the right guide tunnel, and the treatment section undergoes intrusion deformation at the same longitudinal position of the left guide tunnel and the right guide tunnel at the same time.

[0021] Preferably, the split support trolley includes a left guide tunnel trolley and a right guide tunnel trolley which can move independently and support the surrounding rock, so that the left guide tunnel trolley and the right guide tunnel trolley can be used separately, or the two can be used in combination to cope with three types of intrusion deformation conditions in the treatment section.

[0022] Preferably, during the surrounding rock support construction, the active support force applied by the split support trolley shall not exceed the surrounding rock deformation pressure and the maximum bearing capacity of the trolley structure. The surrounding rock deformation pressure is calculated according to the surrounding rock pressure of shallow buried tunnels in the "Highway Tunnel Design Code", and the load sharing coefficient is considered to be 20% to 40%. At the same time, dynamic adjustments are made according to the changes in soil pressure during the construction process.

[0023] Preferably, the small-duct radial grouting uses small ducts with a diameter of 50 mm, a length of 5 m / duct, and an annular spacing of 1 m.

[0024] Preferably, in the construction of the double-layer advance small duct, a small duct with a diameter of 50 mm is used, with a length of 4.5 to 6 meters per duct, a longitudinal spacing of 4d to 6d, a circumferential spacing of 30 to 50 cm, an upper layer external insertion angle of 40 to 50°, a lower layer external insertion angle of 12 to 18°, and a lower layer longitudinal horizontal lap length of not less than 1 meter, wherein d is the steel arch frame spacing.

[0025] Compared with the prior art, the present invention has at least the following beneficial effects:

[0026] 1. The present invention reduces the time for erecting a full-frame scaffold by using a split-type support trolley, and a construction vehicle passage is reserved in the trolley portal steel frame, so that construction traffic will not be interrupted and construction efficiency is improved. In the present invention, the split-type support trolley includes a left guide tunnel trolley and a right guide tunnel trolley that can move independently and support surrounding rock, so that the left guide tunnel trolley and the right guide tunnel trolley can be used separately, or the two can be used in combination, which has good applicability to tunnels constructed by the center partition method.

[0027] 2. The present invention adopts a split support trolley to establish an active support system, which is closely attached to the surrounding rock, can share the surrounding rock pressure, and limit the deformation development of the surrounding rock. It also adopts a staggered arch replacement construction method to divide the treatment section into a plurality of areas in which new construction areas and demolition areas are alternately distributed and adjacent to each other in sequence, and the demolition areas cover the positions of the steel arch frames one by one, and the new construction areas are located between adjacent steel arch frames. In this way, when the new construction area is constructed, the initial support steel arch frames in the adjacent demolition areas can still play a certain role. When the initial support steel arch frames in the adjacent demolition areas are subsequently demolished, the support structure of the new construction area has been established, so that there is always a steel arch frame within the construction width of a frame to form effective support. Therefore, there is no support "vacuum period" during the arch replacement construction, which can effectively suppress the deformation of the surrounding rock, reduce the disturbance of the arch replacement construction to the surrounding rock and the anchor rods of the original system, avoid the high-risk operation of directly dismantling the steel arch frames, and ensure safety. In addition, the present invention adopts skipping treatment when constructing each treatment section, which can avoid the disturbance of the constructed treatment section by the later constructed treatment section due to the adjacent treatment sections being too close, thereby effectively improving the construction efficiency, and ensuring the safety during construction and the control effect of tunnel limit deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A top view showing the distribution of each treatment section in the present invention;

[0029] Figure 2 for Figure 1 Cross-section at AA in the middle;

[0030] Figure 3 This is a schematic diagram of the main structure of the trolley support construction in the present invention;

[0031] Figure 4 It is a structural schematic diagram of the active support system;

[0032] Figure 5 This is a schematic diagram of the location division of the treatment section during the deformation and intrusion treatment construction;

[0033] Figure 6 It is a right view structural schematic diagram of the trolley support construction in the present invention;

[0034] Figure 7 This is an enlarged schematic diagram of the location division of the treatment section during the deformation and intrusion treatment construction;

[0035] Figure 8 This is a schematic diagram of the lock reinforcement during the deformation and intrusion treatment construction;

[0036] Fig. 9 It is a schematic diagram of dislocation arch replacement and cyclic arch replacement during deformation and intrusion treatment construction;

[0037] Fig.10 This is a schematic diagram of the treatment section after the deformation and intrusion treatment is completed;

[0038] The meanings of the symbols in the above figure are: left pilot tunnel 1, right pilot tunnel 2, treatment section 3, new construction area 301, demolition area 302, split support trolley 4, left pilot tunnel trolley 401, right pilot tunnel trolley 402, portal steel frame 403, active support system 404, maximum depth line of limit intrusion treatment 405, normal primary support inner contour line 406, limit intrusion primary support inner contour line 407, middle partition wall 5, boundary line of tunnel deformation limit intrusion 6, radial grouting of small duct 7, double-layer advanced small duct 8, treatment section of jump section 9, steel arch frame 10, actual range of deformation limit intrusion 11, surrounding rock 12. DETAILED DESCRIPTION

[0039] To facilitate understanding of the present invention, the present invention will be described more comprehensively below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings, but the present invention can be implemented in different forms and is not limited to the embodiments described in the text. On the contrary, these embodiments are provided to make the content disclosed in the present invention more thorough and comprehensive.

[0040] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0041] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0042] Example 1

[0043] A method for treating deformation intrusion of initial support of a tunnel constructed by a middle partition wall method comprises the following steps:

[0044] S1. Measure the treatment section 3 of the left pilot tunnel 1 and / or the right pilot tunnel 2 where the tunnel has intrusion deformation to obtain the initial support deformation intrusion data of each treatment section; the initial support deformation intrusion data includes the intrusion depth and position of each treatment section, the starting and ending pile numbers of each treatment section, the existing steel arch frame model and steel arch frame spacing d of each treatment section; please refer to Figure 1 and Figure 2The treatment section includes the following three types of limit deformation: the treatment section only has limit deformation in the left guide tunnel, the treatment section only has limit deformation in the right guide tunnel, and the treatment section has limit deformation in the same longitudinal position of the left and right guide tunnels;

[0045] S2. Please refer to Figure 1 and Figure 2 According to the initial support deformation limit intrusion data obtained in step S1, deformation limit intrusion treatment construction is carried out on each treatment section 3 in sequence from the outside of the tunnel to the inside of the tunnel, section by section. If the interval between the current treatment section to be constructed and the adjacent treatment section that has been constructed is less than 3m, a skipping construction process is carried out, that is, the current treatment section to be constructed is skipped and the next adjacent treatment section is constructed. After the corresponding treatment section is constructed in the above manner, deformation limit intrusion treatment construction is carried out on the skipping treatment section 9 in sequence from the outside of the tunnel to the inside of the tunnel, section by section. Since the treatment section is undergoing deformation limit intrusion treatment construction, After that, its internal grouting structure is difficult to reach the designed strength in a short time. If the interval between the subsequent adjacent treatment sections is relatively close, the immediate construction of the subsequent adjacent treatment sections will inevitably disturb the treatment sections that have been constructed, and waiting for the grouting structure strength of the treatment sections that have been constructed to reach the requirements will reduce the construction efficiency. The present invention can avoid the disturbance of the treatment sections that have been constructed by the subsequent treatment sections due to the adjacent treatment sections being too close, which can not only effectively improve the construction efficiency, but also ensure the safety during construction and the control effect of tunnel limit deformation.

[0046] The steps of the deformation and intrusion treatment construction are as follows:

[0047] S21. Location division: please refer to Figure 5 and Figure 7 , the treatment section 3 is divided into a plurality of arch replacement locations, which are alternately distributed in the new construction area 301 and the demolition area 302 and are adjacent to each other in sequence, wherein the demolition area covers the position of the steel arch frame 10 one by one, the new construction area is located between adjacent steel arch frames 10, and the width of the new construction area and the demolition area are controlled to be half of the existing adjacent steel arch frame spacing d, that is, d / 2, and the center line of the demolition area coincides with the axis of the corresponding covered steel arch frame, and the range of the treatment section 3 is larger than the actual deformation and intrusion limit range 11 of the tunnel at this position; and, in order to facilitate the subsequent cyclic construction of dislocated arch replacement, when the treatment section is divided into locations, from the outside of the tunnel to the inside of the tunnel, the first arch replacement location and the last arch replacement location of the treatment section 3 are controlled to be the new construction area 301, that is, at this time, the treatment section 3 is divided into a plurality of arch replacement locations, which are alternately distributed in the new construction area, the demolition area, the new construction area, ..., the new construction area, the demolition area, and the new construction area;

[0048] In actual construction, if the boundary line 6 where the deformation and limit intrusion of the tunnel in the treatment section 3 occurs is located at the position of the new construction area 301, then the location division of the treatment section 3 just meets the above conditions; however, when the boundary line where the deformation and limit intrusion of the tunnel in the treatment section 3 occurs is located at the position of the demolition area 302, that is, at this time, the first arch change location and / or the last arch change location of the treatment section 3 is the demolition area 302, then the range corresponding to the treatment section needs to be expanded outward by one arch change location, so that the first arch change location and the last arch change location of the treatment section 3 are both the new construction area 301; in this embodiment, please refer to Figure 7 , the boundary line of the left tunnel in the treatment section 3 where deformation and limit intrusion occurs is located at the position of the demolition area 302, then the range of the treatment section on this side is expanded outward by one arch exchange position, so that the first arch exchange position is the new construction area 301, and the boundary line of the right tunnel in the treatment section 3 where deformation and limit intrusion occurs is located at the position of the new construction area 301, at this time, the last arch exchange position is the new construction area 301, then the range of the treatment section on this side does not need to be expanded outward; in this embodiment, please refer to Figure 5 and Figure 7 , treatment section 3 is divided into 11 arch replacement areas, which are newly built area X1, demolition area C1, newly built area X2, demolition area C2, newly built area X3, demolition area C3, newly built area X4, demolition area C4, newly built area X5, demolition area C5, and newly built area X6, which are alternately distributed and adjacent in sequence;

[0049] S22, Trolley support: please refer to Figure 3 and Figure 6 , move the split support trolley 4 to the treatment section 3 near the tunnel entrance, so that a plurality of construction spaces for arch replacement positions are left in the split support trolley 4 along the longitudinal direction, and use the split support trolley 4 to apply active support force to stabilize the surrounding rock 12 on both sides of the corresponding construction space; in this embodiment, please refer to Figure 6 , there are 5 construction spaces for arch replacement positions in the longitudinal direction in the split support trolley 4, that is, after the corresponding deformation and intrusion treatment construction of the 5 arch replacement positions is completed, the split support trolley 4 needs to be moved synchronously to continue the construction of the subsequent arch replacement positions;

[0050] Among them, see Figure 3The split support trolley 4 includes a left guide tunnel trolley 401 and a right guide tunnel trolley 402 which can move independently and support the surrounding rock, so that the left guide tunnel trolley and the right guide tunnel trolley can be used separately, or the two can be used in combination to cope with the three kinds of intrusion deformation of the treatment section; during the surrounding rock support construction, the active support force applied by the split support trolley 4 to the front and rear areas of the treatment section shall not exceed the surrounding rock deformation pressure and the maximum bearing capacity of the trolley structure. The surrounding rock deformation pressure is calculated according to the surrounding rock pressure of shallow buried tunnels in the "Highway Tunnel Design Code", and the load sharing coefficient is considered to be 20% to 40%. At the same time, according to the construction process, the surrounding rock deformation pressure is calculated according to the surrounding rock pressure of shallow buried tunnels in the "Highway Tunnel Design Code", and the load sharing coefficient is considered to be 20% to 40%. Dynamic adjustment shall be made according to the changes of soil pressure during the process; the size and profile of the split support trolley 4 shall match the cross-sectional measurement results of the tunnel, and the existing intrusion limit situation and reserved deformation shall be considered at the same time. The reserved deformation shall be determined comprehensively according to the monitoring measurement results and the surrounding rock conditions. If the lower step still needs to be excavated after the arch is replaced, the reserved deformation shall be 0.5 to 1 times of the original designed reserved deformation. If it is judged that the deformation of the surrounding rock has been basically stable, no or less reserved deformation may be set. After the split support trolley 4 is designed according to the above parameters, it shall be assembled and tested outside the tunnel, and then moved to the tunnel entrance side of the treatment section 3 to be constructed first;

[0051] In this example, see Figure 3 and Figure 4 The design maximum intrusion limit treatment distance of the split support trolley 4 is 40cm. The left guide tunnel trolley 401 and the right guide tunnel trolley 402 in the split support trolley 4 are symmetrically arranged. Both include a portal steel frame 403 and an active support system 404; wherein the portal steel frame is composed of a main crossbeam, a portal frame angle brace, a portal frame column, a working platform, a working platform angle brace, an upper longitudinal tie beam and a bottom longitudinal tie beam. The portal steel frame is the main construction platform and bearing structure, and the clearance size inside the portal steel frame needs to meet the traffic requirements of construction vehicles. In this embodiment, the clearance is 4m high × 4m wide; the active support system is arranged along the longitudinal direction of the tunnel On the front and rear sides of the portal steel frame, so that construction space for multiple arch replacement positions is reserved in the split support trolley; the active support system is composed of an adjusting screw, a hydraulic jack, a connecting plate, a transverse stiffening rib and a support plate, which can apply active support force to the front and rear areas of the construction space; in addition, in other embodiments, the split support trolley 4 also includes a connecting piece, which is composed of an upper support piece, an upper connecting piece reserved interface, a lower support piece, and a lower support piece reserved interface, so that in the absence of a middle partition wall 5, the left guide tunnel trolley 401 and the right guide tunnel trolley 402 can be connected into an integral structure through the connecting piece for support use; Figure 3 The figure only shows the situation of the trolley when the upper steps of the left and right guide tunnels are excavated. This structure shall be used as a reference when both the upper and lower steps are excavated.

[0052] S23, Lock reinforcement: please refer to Figure 8First, a small pipe radial grouting 7 is constructed in the middle of the first newly built area X1 near the tunnel entrance to lock the mouth for reinforcement, and then the original mesh spraying support is first dismantled in the first newly built area X1, and then a new steel arch is constructed, and then a double-layer advanced small pipe 8 is constructed to restore the mesh spraying support of the first newly built area X1 as a surrounding rock stabilization measure; wherein, the small pipe radial grouting 7 uses a small pipe with a diameter of 50mm, a length of 5m / root, and a circumferential spacing of 1m;

[0053] S24, offset arch replacement: please refer to Fig. 9 , from the outside of the tunnel to the inside of the tunnel, first dismantle the original mesh spraying support in the second newly built area X2, then build a new steel arch frame, and then construct a double-layer advanced small duct 8 to restore the mesh spraying support in the second newly built area X2; dismantle the original steel arch frame and the original mesh spraying support in the first demolished area C1, and then construct a double-layer advanced small duct 8 to restore the mesh spraying support in the first demolished area C1;

[0054] S25, cyclic arch change: please refer to Fig. 9 , and loop according to step S24, from the outside of the tunnel to the inside of the tunnel, and sequentially construct the subsequent new area X3 and demolition area C2, the new area X4 and demolition area C3, the new area X5 and demolition area C4, the new area X6 and demolition area C5, and synchronously move the split support trolley 4 to apply active support force until the original mesh spraying support in all the new areas 301 in the treatment section 3 is removed and a new steel arch frame and mesh spraying support are restored, and the original steel arch frame and the original mesh spraying support in all the demolition areas 302 in the treatment section 3 are removed and a new mesh spraying support is built; the state of the treatment section after the deformation and intrusion treatment construction is completed is as follows: Fig.10 As shown; in this embodiment, after the construction of the new area X4 and the demolition area C3 is completed, it is necessary to synchronously move the split support trolley 4 to apply active support force, and then construct the new area X5 and the demolition area C4, the new area X6 and the demolition area C5 in sequence;

[0055] In steps S24 and S25, a double-layer advanced small conduit is constructed using a small conduit with a diameter of 50 mm, a length of 4.5 to 6 meters per conduit, a longitudinal spacing of 4d to 6d, a circumferential spacing of 30 to 50 cm, an upper layer external insertion angle of 40 to 50°, a lower layer external insertion angle of 12 to 18°, and a lower layer longitudinal horizontal overlap length of not less than 1 meter;

[0056] S3. Carry out quality inspection and post-maintenance on each treatment section that has completed the treatment of primary support deformation and intrusion.

Claims

1. A method for treating deformation and intrusion of primary support of a tunnel constructed by the middle partition wall method, characterized in that The steps include: S1. Measuring the cross section of the treatment section (3) of the left pilot tunnel (1) and / or the right pilot tunnel (2) where the tunnel has intrusion deformation, so as to obtain the initial support deformation intrusion data of each treatment section; S2, according to the deformation intrusion limit data of the initial support obtained in step S1, deformation intrusion limit treatment construction is carried out on each treatment section (3) in sequence from the outside of the tunnel to the inside of the tunnel, section by section, wherein if the interval between the current treatment section to be constructed and the adjacent treatment section that has been constructed is less than 3m, a skipping construction process is carried out, that is, the current treatment section to be constructed is skipped and the next adjacent treatment section is constructed. After the corresponding treatment section is constructed in the above manner, deformation intrusion limit treatment construction is carried out on the skipped treatment section (9) in sequence from the outside of the tunnel to the inside of the tunnel, section by section, forward; The steps of the deformation and intrusion treatment construction are as follows: S21, location division: dividing the treatment section (3) into a plurality of arch replacement locations, which are alternately distributed in a new construction area (301) and a demolition area (301) and are sequentially adjacent, wherein the demolition areas correspond to and cover the positions of the steel arch frames (10), and the new construction areas are located between adjacent steel arch frames (10); S22, trolley support: moving the split support trolley (4) to the treatment section (3) close to the tunnel entrance side, so that a plurality of construction spaces for arch replacement positions are left in the longitudinal direction of the split support trolley (4), and using the split support trolley (4) to apply active support force to stabilize the surrounding rock structure on both sides of the corresponding construction space; S23, Locking reinforcement: First, construct a small pipe radial grouting lock reinforcement in the middle of the first new construction area near the tunnel entrance, then remove the original mesh spraying support in the first new construction area, then build a new steel arch frame, and then construct a double-layer advance small pipe, and restore the mesh spraying support in the first new construction area as a surrounding rock stabilization measure; S24, staggered arch replacement: from the outside of the tunnel to the inside, first dismantle the original mesh spraying support in the second newly built area, then build a new steel arch frame, and then construct a double-layer advance small duct to restore the mesh spraying support in the second newly built area; dismantle the original steel arch frame and the original mesh spraying support in the first demolished area, then construct a double-layer advance small duct and restore the mesh spraying support in the first demolished area; S25, cyclic arch replacement: cyclically perform step S24, from the outside of the tunnel to the inside of the tunnel, sequentially perform construction on the subsequent new construction area and demolition area, and synchronously move the split support trolley (4) to apply active support force, until the original mesh spraying support in all the new construction areas (301) in the treatment section (3) is removed and a new steel arch frame is built and the mesh spraying support is restored, and the original steel arch frame and the original mesh spraying support in all the demolition areas (302) in the treatment section (3) are removed and a new mesh spraying support is built; S3. Carry out quality inspection and post-maintenance on each treatment section that has completed the treatment of primary support deformation and intrusion.

2. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: The initial support deformation intrusion limit data include the intrusion limit depth and position of each treatment section, the starting and ending pile numbers of each treatment section, the existing steel arch frame model and the steel arch frame spacing d of each treatment section.

3. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 2, characterized in that: The widths of the newly constructed area and the demolished area are both half of the existing steel arch spacing d, and the center line of the demolished area coincides with the axis of the corresponding covered steel arch.

4. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: In said S21, when the treatment section is divided into zones, from outside the tunnel to inside the tunnel, the first arch change zone and the last arch change zone of the treatment section (3) are controlled to be the newly built zone (301).

5. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 4, characterized in that: When the boundary line (6) where the deformation and intrusion of the tunnel in the treatment section (3) occurs is located at the position of the demolition area (302), that is, at this time, the first arch replacement position and / or the last arch replacement position of the treatment section (3) is the demolition area (302), then the corresponding range of the treatment section is expanded outward by one arch replacement position, so that the first arch replacement position and the last arch replacement position of the treatment section (3) are both the new construction area (301).

6. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: The treatment section includes the following three types of intrusion deformation: the treatment section only undergoes intrusion deformation in the left guide tunnel, the treatment section only undergoes intrusion deformation in the right guide tunnel, and the treatment section undergoes intrusion deformation in the same longitudinal position of the left and right guide tunnels at the same time.

7. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 6, characterized in that: The split support trolley (4) comprises a left guide tunnel trolley (401) and a right guide tunnel trolley (402) which can move independently and support the surrounding rock, so that the left guide tunnel trolley and the right guide tunnel trolley can be used separately, or the two can be used in combination to cope with three kinds of intrusion deformation conditions in the treatment section.

8. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: During the surrounding rock support construction, the active support force applied by the split support trolley (4) shall not exceed the surrounding rock deformation pressure and the maximum bearing capacity of the trolley structure. The surrounding rock deformation pressure is calculated according to the surrounding rock pressure of shallow buried tunnels in the "Highway Tunnel Design Code", and the load sharing coefficient is considered to be 20% to 40%. At the same time, dynamic adjustment is made according to the change of soil pressure during the construction process.

9. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: The small-duct radial grouting uses small ducts with a diameter of 50 mm, a length of 5 m / duct, and a circumferential spacing of 1 m.

10. A method for treating deformation intrusion of primary support of a tunnel constructed by the middle partition wall method as claimed in claim 1, characterized in that: In the construction of the double-layer advanced small duct, a small duct with a diameter of 50 mm is used, with a length of 4.5 to 6 meters per duct, a longitudinal spacing of 4d to 6d, a circumferential spacing of 30 to 50 cm, an upper layer external insertion angle of 40 to 50°, a lower layer external insertion angle of 12 to 18°, and a lower layer longitudinal horizontal lap length of not less than 1 meter, where d is the steel arch frame spacing.