Roadway filling method and device

By injecting quick-coagulant and aggregate into the upstream and downstream of the coal tunnel, and combining the inclination angle of the tunnel, the problem of loss and poor management of the tunnel grouting slurry during coal mining is solved, and the compactness of the tunnel is improved and water resistance reduce construction costs and safety risks.

CN119084069APending Publication Date: 2024-12-06CHINA UNIV OF MINING & TECH (BEIJING)
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411004023.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The waste tunnels left over during coal mining cause upstream groundwater to flow into the downstream, increasing the mine drainage pressure and water damage risks. The traditional filling and grouting method leads to waste of slurry and poor treatment effects.

Method used

A tunnel filling method is adopted, by drilling holes upstream and downstream of the tunnel, injecting quick-coagulant and aggregate into the upper and lowerstreams of the tunnel, combining the inclination angle of the tunnel to achieve the bottom mixing of the double slurry holes to form a filling area, and the branch holes are arranged and segmented. The grouting process improves the compactness and water resistance of the tunnel.

Benefits of technology

It effectively reduces construction costs, improves project quality, enhances the water resistance and durability of the tunnel, reduces construction safety risks, and provides reliable guarantees for underground projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084069A_ABST
    Figure CN119084069A_ABST
Patent Text Reader

Abstract

The invention provides a roadway filling method and device. The method comprises the steps that a first drill hole and a second drill hole are obtained through construction; the first drill hole is used for filling aggregate; the second drill hole is used for injecting and filling an accelerator; the aperture of the first drill hole is larger than that of the second drill hole; the first drill hole is located at the downstream of a roadway, and the second drill hole is located at the upstream of the roadway; an accelerator is injected into the second drill hole; after the first time, aggregate is injected into the first drill hole, so that the accelerator and the aggregate are mixed and formed in the roadway at the bottom of the hole, and a first filling area is obtained. According to the embodiment of the invention, double-slurry hole bottom mixing is realized by combining the inclination angle of the roadway, the problem that a large amount of roadway grouting slurry is lost is solved, the construction cost is effectively reduced, and the engineering quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of mining technology, and in particular to a tunnel filling method and device. Background Art

[0002] During the coal mining process, a large number of abandoned tunnels are left behind. The upstream groundwater flows along the abandoned tunnels into the downstream working face or goaf, which not only increases the mine drainage pressure but also increases the risk of mine water hazards.

[0003] Most of the tunnels are long and long in the direction of the strike. In the past, extensive tunnel filling or grouting inevitably caused the slurry to carry aggregates along the tunnel, flowing from high to low, which not only caused a large amount of slurry waste, but also made it difficult to ensure the construction effect. At the same time, traditional filling and grouting only filled and managed the tunnel space, and the surrounding rock plastic zone caused by tunnel excavation became a new water channel, and the management effect was poor. Summary of the invention

[0004] In view of this, the purpose of the present application is to provide a tunnel filling method and device.

[0005] Based on the above purpose, the present application provides a tunnel filling method, comprising:

[0006] The first borehole and the second borehole are obtained by construction; the first borehole is used for filling aggregate; the second borehole is used for filling accelerator; the aperture of the first borehole is larger than the aperture of the second borehole; the first borehole is located downstream of the roadway, and the second borehole is located upstream of the roadway;

[0007] injecting an accelerating setting agent into the second borehole;

[0008] After the first time, aggregate is injected into the first borehole so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

[0009] In a possible implementation, the method further includes:

[0010] In response to the first filling area being unable to meet the filling demand of the tunnel, continuing construction to obtain a third borehole and a fourth borehole;

[0011] Injecting an accelerating setting agent into the fourth borehole, and injecting aggregate into the third borehole after a second time, so that the accelerating setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a second filling area;

[0012] In response to the filling area satisfying the filling demand of the tunnel, the construction of the drilling is stopped.

[0013] In a possible implementation manner, the first time is calculated by the following method:

[0014] Obtaining a first flow rate of the aggregate and a second flow rate of the accelerating agent;

[0015] Obtaining a first length of the first borehole and a second length of the second borehole;

[0016] Obtaining an inclined distance between the first borehole and the second borehole;

[0017] The first time is calculated according to the first flow rate, the second flow rate, the first length, the second length and the inclined distance.

[0018] In a possible implementation manner, after obtaining the first filling area, the method further includes:

[0019] Construct four branch holes from the second borehole to the surrounding rock; the four branch holes are parachute-shaped;

[0020] The specific positions of the four branch holes are determined based on the Mohr-Coulomb theory.

[0021] In a possible implementation, the four branch holes include a first group of branch holes and a second group of branch holes;

[0022] The four branch holes constructed from the second borehole to the surrounding rock include:

[0023] constructing the first group of branch holes from the second borehole to the roof and floor of the tunnel; the roof and floor of the tunnel are rock;

[0024] The second group of branch holes are constructed from the second borehole to the two sides of the tunnel; the two sides of the tunnel are coal seams.

[0025] In a possible implementation, constructing the first group of branch holes from the second borehole to the roof and the floor of the tunnel includes:

[0026] Constructing the first group of branch holes from the second borehole to the roof and floor of the tunnel along the tunnel surrounding rock;

[0027] The step of constructing the second group of branch holes from the second borehole to the two sides of the tunnel includes:

[0028] The second group of branch holes are constructed from the second borehole to the surrounding rock of the tunnel on both sides of the tunnel.

[0029] In a possible implementation, the position of the branch hole is calculated by the following formula:

[0030]

[0031] Among them, Rp represents the distance from the branch hole to the surrounding rock of the tunnel, R0 represents the tunnel radius, p0 represents the original rock stress, p1 represents the support reaction force, c represents the cohesion, represents the internal friction angle.

[0032] In a possible implementation, the method further includes:

[0033] The slurry is fed into the goaf in sections one by one through the slurry delivery pipeline;

[0034] In response to the grouting pressure of a single section satisfying the preset conditions, continue to input slurry into the next section of the goaf until the grouting pressure of the last section satisfies the preset conditions, and then stop inputting slurry; the preset conditions of the first group of branch holes are different from the preset conditions of the second group of branch holes.

[0035] In a possible implementation, the preset condition is calculated by the following formula:

[0036]

[0037] Among them, R p It represents the distance from the branch hole to the surrounding rock of the tunnel, P represents the ground stress at the grouting position of the branch hole, t represents the grouting time, σ represents the grouting completion pressure, b represents the crack width at the grouting position of the branch hole, μ represents the slurry viscosity, and r represents the radius of the branch hole.

[0038] Based on the same inventive concept, the embodiment of the present application also provides a tunnel filling device, including:

[0039] The construction module is configured to construct a first borehole and a second borehole; the first borehole is used for filling aggregate; the second borehole is used for filling accelerator; the aperture of the first borehole is larger than the aperture of the second borehole; the first borehole is located downstream of the roadway, and the second borehole is located upstream of the roadway;

[0040] an injection module configured to inject an accelerating setting agent into the second borehole;

[0041] The filling module is configured to inject aggregate into the first borehole after a first time, so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

[0042] As can be seen from the above, the tunnel filling method and device provided by the present application obtains the first borehole and the second borehole through construction; the first borehole is used to fill aggregate; the second borehole is used to fill the accelerator; the aperture of the first borehole is larger than the aperture of the second borehole; the first borehole is located downstream of the tunnel, and the second borehole is located upstream of the tunnel; the accelerator is injected into the second borehole; after the first time, the aggregate is injected into the first borehole so that the accelerator and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain the first filling area. The embodiment of the present application realizes the mixing of the double slurry at the bottom of the hole by combining the inclination of the tunnel, solves the problem of large-scale loss of grouting slurry in the tunnel, effectively reduces the construction cost, improves the quality of the project, and realizes multiple processes in the same tunnel, including the full grouting of the plastic ring and the full grouting. This not only improves the construction efficiency, but also effectively reduces the project cost. The grouting process improves the compactness and bearing capacity of the tunnel, strengthens its overall stability, prevents the penetration of groundwater and impurities, and improves the water resistance and durability of the tunnel. Most importantly, this method also effectively reduces safety risks during the construction process, providing reliable guarantees for the successful implementation and long-term operation of underground projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions in the present application or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0044] Figure 1 A schematic diagram of a tunnel filling method process according to an embodiment of the present application;

[0045] Figure 2 A schematic diagram of a tunnel filling process according to an embodiment of the present application;

[0046] Figure 3 This is a schematic diagram of the arrangement of branch holes in an embodiment of the present application;

[0047] Figure 4 This is a schematic diagram of the structure of the tunnel filling device according to an embodiment of the present application. DETAILED DESCRIPTION

[0048] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0049] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be the usual meanings understood by people with ordinary skills in the field to which the present application belongs. The "first", "second" and similar words used in the embodiments of the present application do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0050] It is understandable that before using the technical solutions of each embodiment of the present disclosure, the type, scope of use, usage scenarios, etc. of the personal information involved will be informed to the user in an appropriate manner, and the user's authorization will be obtained.

[0051] For example, in response to receiving an active request from a user, a prompt message is sent to the user to clearly remind the user that the operation requested to be performed will require obtaining and using the user's personal information. Thus, the user can independently choose whether to provide personal information to software or hardware such as an electronic device, application, server, or storage medium that performs the operation of the technical solution of the present disclosure according to the prompt message.

[0052] As an optional but non-limiting implementation, in response to receiving the user's active request, the prompt information may be sent to the user in the form of a pop-up window, in which the prompt information may be presented in text form. In addition, the pop-up window may also carry a selection control for the user to choose "agree" or "disagree" to provide personal information to the electronic device.

[0053] It is understandable that the above notification and the process of obtaining user authorization are merely illustrative and do not constitute a limitation on the implementation of the present disclosure. Other methods that meet relevant laws and regulations may also be applied to the implementation of the present disclosure.

[0054] As described in the background technology section, a large number of abandoned tunnels are left behind during the coal mining process. The upstream groundwater flows along the abandoned tunnels into the downstream working face or goaf, which not only increases the drainage pressure of the mine, but also increases the risk of mine water hazards. Most tunnels are long and have a very long length in the direction of travel. In the past, extensive tunnel filling or grouting inevitably resulted in slurry entraining aggregates along the tunnel, flowing from high to low, which not only caused a large amount of slurry waste, but also made it difficult to ensure the construction effect. At the same time, traditional filling and grouting only fills and manages the tunnel space, and the surrounding rock plastic zone caused by tunnel excavation becomes a new water channel, and the management effect is poor.

[0055] Taking the above into consideration, the embodiment of the present application proposes a tunnel filling method, which realizes the mixing of double slurry at the bottom of the hole by combining the inclination angle of the tunnel, solves the problem of large-scale loss of tunnel grouting slurry, effectively reduces the construction cost, improves the project quality, and realizes multiple processes in the same hole, including full grouting and comprehensive grouting of the plastic circle. This not only improves the construction efficiency, but also effectively reduces the project cost. The grouting process improves the compactness and bearing capacity of the tunnel, strengthens its overall stability, prevents the penetration of groundwater and impurities, and improves the water resistance and durability of the tunnel. Most importantly, this method also effectively reduces the safety risks in the construction process, and provides a reliable guarantee for the successful implementation and long-term operation of underground projects.

[0056] The technical solutions of the embodiments of the present application are described in detail below through specific examples.

[0057] refer to Figure 1 The tunnel filling method of the embodiment of the present application comprises the following steps:

[0058] Step S101, constructing a first borehole and a second borehole; the first borehole is used for filling aggregate; the second borehole is used for filling accelerator; the aperture of the first borehole is larger than the aperture of the second borehole; the first borehole is located downstream of the roadway, and the second borehole is located upstream of the roadway;

[0059] Step S102, injecting an accelerating agent into the second borehole;

[0060] Step S103, after the first time, injecting aggregate into the first borehole, so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

[0061] In some embodiments, the method also includes: in response to the first filling area being unable to meet the filling needs of the tunnel, continuing construction to obtain a third borehole and a fourth borehole; injecting an accelerator into the fourth borehole, and injecting aggregate into the third borehole after a second time, so that the accelerator and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a second filling area; in response to the filling area meeting the filling needs of the tunnel, stopping the drilling construction.

[0062] refer to Figure 2 , which is a schematic diagram of the tunnel filling process of an embodiment of the present application.

[0063] For step S101, firstly, it is necessary to construct the first borehole and the second borehole, i.e., Z1 and Z2 in the figure. The first borehole is used for filling aggregate, and the second borehole is used for filling accelerator. The third borehole is the same as the first borehole, and the fourth borehole is the same as the second borehole. The difference is that the positions of the third borehole and the first borehole are different, and the positions of the fourth borehole and the second borehole are different. It should be noted that the aperture of the first borehole needs to be larger than the aperture of the second borehole. Correspondingly, the aperture of the third borehole also needs to be larger than the aperture of the fourth borehole. During construction here, it should be noted that the first borehole is located downstream of the roadway, and the second borehole is located upstream of the roadway. The relative position between the first borehole and the second borehole is that the first borehole is located downstream of the second borehole, and the same is true for the third borehole and the fourth borehole.

[0064] In this embodiment, the tunnel generally has a high slope, and there is generally high-speed flowing water in the tunnel. Therefore, when the accelerator is lowered, the flowing water will carry the accelerator with it. Because the aggregate in the embodiment of the present application is a porous structure with a large specific surface area, it can effectively slow down the flow rate of water, so that the accelerator is in contact with the aggregate for a longer time and the contact area with the accelerator is larger. Based on the above two advantages, the embodiment of the present application can form the first filling area faster and the support effect of the formed first filling area is better.

[0065] In this embodiment, the specific steps of the aforementioned drilling construction are:

[0066] According to the water pressure that the tunnel filling body needs to withstand after construction, the filling body thickness L is calculated. According to the effective radius of the filling construction of 5 meters, L / 10 filling boreholes need to be constructed.

[0067] Construction of Z1 filling hole: The filling hole is first constructed with a 311mm diameter hole, drilled to 10m into the complete bedrock, and a 273*10mm casing is lowered (the outer ring gap of the casing is sealed with 0.6:1 cement single-liquid slurry); the second hole is 215mm, drilled to 7m on the top plate of the tunnel, and a 168*8mm casing is lowered (the outer ring gap of the casing is sealed with 0.6:1 cement single-liquid slurry); then a 133mm diameter tunnel is used (the tunnel hole deviation rate is ≦0.5‰) for filling aggregate and grouting.

[0068] Construction of Z2 accelerator hole: The accelerator hole is first constructed with a 180mm diameter hole, drilled to 10m into the complete bedrock, and a 159*10mm casing is lowered (the gap between the outer ring of the casing is sealed with 0.6:1 cement single-liquid slurry); the second hole is 108mm, drilled to 7m on the top plate of the tunnel, and a 90*8mm casing is lowered (the gap between the outer ring of the casing is sealed with 0.6:1 cement single-liquid slurry); then a 30mm diameter hole is used to penetrate the tunnel (the deviation rate of the tunnel hole is ≤0.5‰) for injecting accelerator.

[0069] The following points should be noted during the above drilling process:

[0070] Selection and preparation of hole-making equipment: Select hole-making equipment according to grouting depth, hole position and hole diameter to ensure that its hole-making capacity is not less than 1000m.

[0071] Drilling site foundation construction: Ensure that the drilling platform is compacted and the site is flat, and avoid placing the drilling rig on unstable ground to prevent the drilling tower from tilting. When arranging the drilling site, it is necessary to reserve water diversion and slurry drainage grooves to handle the discharged mud and water in time.

[0072] Equipment installation: When installing the drilling rig, make sure it is straight, level and stable. Make sure the vertical axis center, grouting hole center and lifter center of the drilling rig are on the same plumb line to prevent the hole from tilting and ensure the smooth progress of drilling.

[0073] Drilling operation and flushing fluid use: According to the design requirements, select appropriate drilling tools and hole diameters for drilling. Use mud wall protection technology, and use the borehole's own mud making machine to perform mud drilling when the borehole is not leaking. In the case of leakage, use high-quality mud to fill the wall to prevent the borehole from collapsing.

[0074] Lowering and fixing the casing: In areas where the rock is relatively stable and intact, lower the casing according to the design requirements. After the casing is lowered, ensure that the casing is carefully fixed and the annular gap outside the casing is sealed.

[0075] Use a grouting pump to pressurize cement slurry into the casing to consolidate it, ensuring that the slurry completely fills the outer wall of the casing.

[0076] Finally, a certain amount of clean water is pressed in to replace the slurry, and the slurry is closed for 5 to 6 hours. After curing for 72 hours, the next process is carried out.

[0077] Borehole inclination measurement and correction: Strictly follow the operating procedures during drilling, and pay attention to the concentricity and verticality of the drill. Adjust the drilling pressure and drilling speed according to the changes in the softness and hardness of the rock formation to ensure that the drill always remains vertical. Measure the inclination once for each section, increase the number of measurement points when necessary, and record and fill in the data on the borehole inclination plan in a timely manner.

[0078] Directional drilling method: To ensure the quality of the entire tunnel plugging, the drilling trajectory is required to be smooth and gentle to ensure that the drill hole enters the tunnel smoothly. Adjust the drilling tool combination as needed to ensure that the drilling is carried out along the trajectory direction required by the design.

[0079] Inclinometer use: During the drilling process, a fluxgate inclinometer and a gyro inclinometer are used for monitoring. After obtaining accurate inclinometer data, the hole inclination is analyzed, and a hole inclination plan is drawn in time to guide the directional correction work and ensure that the borehole is drilled along the trajectory direction required by the design.

[0080] Further, with respect to step S102 and step S103, an accelerating setting agent is injected into the second borehole, and after a first time, aggregate is injected into the first borehole, so that the accelerating setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

[0081] In some embodiments, the first time is calculated by the following method: obtaining a first flow rate of the aggregate and a second flow rate of the accelerating agent; obtaining a first length of the first borehole and a second length of the second borehole; obtaining an inclined distance between the first borehole and the second borehole; and calculating the first time based on the first flow rate, the second flow rate, the first length, the second length and the inclined distance.

[0082] In this embodiment, since most of the tunnels are coal tunnels at this stage, the tunnels have a certain inclination along the strike direction. Based on this, a mixed filling scheme for the strike direction hole bottom is designed. First, the accelerator is injected from the Z2 hole. According to the cement aggregate mixture flow rate v1, the accelerator flow rate v2, the length of the Z1 hole x1, the length of the Z2 hole x2, and the inclination distance X between the Z1 hole and the Z2 hole, the time to be injected into the Z2 hole is obtained. Finally, aggregate and cement slurry are introduced from hole Z1, so that the two are mixed at the bottom of the hole, quickly solidified into a wall, and gradually accumulated until they reach above hole Z2. At this time, the pressure in hole Z2 will inevitably rise rapidly. When the pressure reaches 0.5 to 1MPa, the filling is completed. The specific pressure value can be adjusted according to the geological conditions.

[0083] Furthermore, after the tunnel is filled, branch holes can be constructed on the completed Z2 hole.

[0084] refer to Figure 3 , is a schematic diagram of the branch hole setting of an embodiment of the present application.

[0085] In some embodiments, after obtaining the first filling area, the method further includes: constructing four branch holes from the second borehole to the surrounding rock; the four branch holes are parachute-shaped; and determining specific positions of the four branch holes based on the Mohr-Coulomb theory.

[0086] In some embodiments, the four branch holes include a first group of branch holes and a second group of branch holes; the construction of the four branch holes from the second borehole to the surrounding rock includes: constructing the first group of branch holes from the second borehole to the roof and bottom plates of the tunnel; the roof and bottom plates of the tunnel are rock; constructing the second group of branch holes from the second borehole to both sides of the tunnel; both sides of the tunnel are coal seams.

[0087] In some embodiments, constructing the first group of branch holes from the second borehole to the top and bottom plates of the tunnel includes: constructing the first group of branch holes from the second borehole to the top and bottom plates of the tunnel along the tunnel surrounding rock; constructing the second group of branch holes from the second borehole to both sides of the tunnel includes: constructing the second group of branch holes from the second borehole to both sides of the tunnel along the tunnel surrounding rock.

[0088] In some embodiments, the position of the branch hole is calculated by the following formula:

[0089]

[0090] Among them, R p represents the distance from the branch hole to the surrounding rock of the tunnel, R0 represents the tunnel radius, p0 represents the original rock stress, p1 represents the support reaction force, c represents the cohesion, represents the internal friction angle.

[0091] In some embodiments, the method further includes: injecting slurry into the goaf in sections in sequence through the slurry delivery pipeline; in response to the grouting pressure of a single section satisfying a preset condition, continuing to inject slurry into the next section of the goaf until the grouting pressure of the last section satisfies the preset condition, and stopping injecting slurry; the preset conditions of the first group of branch holes are different from the preset conditions of the second group of branch holes.

[0092] In some embodiments, the preset condition is calculated by the following formula:

[0093]

[0094] Among them, R pIt represents the distance from the branch hole to the surrounding rock of the tunnel, P represents the ground stress at the grouting position of the branch hole, t represents the grouting time, σ represents the grouting completion pressure, b represents the crack width at the grouting position of the branch hole, μ represents the slurry viscosity, and r represents the radius of the branch hole.

[0095] In this embodiment, when constructing and grouting the parachute-type branch holes, it is necessary to build on the premise that the filling area is formed in the tunnel in the aforementioned steps. This has a sequence, because after the filling area is formed, when the branch holes are subsequently constructed and grouted, a good support is formed in the tunnel, so that the cracking of the holes can be effectively avoided during the subsequent construction, and the leakage of slurry can be effectively prevented during grouting, which leads to the problem of insufficient final strength. In addition, based on the above-mentioned technical solution of filling the tunnel first and then grouting the branch holes, the advantageous diffusion channel of the slurry can be transferred from the tunnel to the cracks in the plastic zone of the surrounding rock. Therefore, the construction according to the aforementioned steps can make the branch holes after grouting more solid and reliable.

[0096] like Figure 3 As shown, in this embodiment, the completed Z2 hole is used to construct branch holes. The branch hole targets are the four vertices of the surrounding rock plastic circle, the drilling trajectory is a line parallel to the tunnel axis, and the trajectory of the four branch holes finally formed is parachute-shaped. The direction parallel to the tunnel axis is the grouting section, and the construction scheme of drilling and grouting is adopted. Every 5 meters is a grouting section. After every 5 meters, the drill is withdrawn to the starting point and the grouting operation begins. The grouting pressure is stopped when it reaches 1.5 times the ground stress, and the next grouting section is started after standing for 8 to 12 hours. Until the entire grouting section construction is completed.

[0097] In this embodiment, the radius of the plastic zone is 2.85 meters and the radius of the tunnel is 1.5 meters. Therefore, the branch hole is constructed 1.35 meters outward from the surrounding rock of the tunnel.

[0098] Specifically, after the tunnel is filled, the following steps may be included when reinforcing the tunnel plastic ring:

[0099] Complete the grouting filling operation of a single goaf; when grouting, first prepare the slurry on the ground, input the slurry into the goaf through the slurry pipeline, and cooperate with the slurry isolation wall to form a relatively closed goaf every time the coal mining working face advances L meters;

[0100] The grouting is carried out in a cycle until the entire coal seam is completely mined; when a single goaf grouting area is filled, the slurry input into the slurry pipeline above the corresponding goaf is stopped.

[0101] The slurry isolation wall adopts the form of flower tube grouting, and the slurry is accumulated to form an isolation wall. The function of the slurry isolation wall is to isolate the goaf from the coal mining working face, and limit the goaf formed after the coal has been mined to a relatively closed area.

[0102] The grouting radius to the bottom plate is calculated based on the height of the goaf, grouting pressure, grouting outlet size and slurry parameters.

[0103] According to the grouting radius and the length required for grouting, calculate the number of grouting pipes and valves in the goaf to ensure grouting in the entire area.

[0104] The slurry ingredients in the slurry isolation wall are different from the grouting slurry in the goaf. The slurry ratio in the slurry isolation wall is a single-liquid cement slurry with a water-cement ratio of 0.6-1:1 (water glass can be added appropriately for thickening depending on the specific situation. If necessary, cement water glass single-liquid slurry, cement clay slurry, cement mortar and chemical additives can be used to increase the water resistance of the slurry). The addition of an accelerator can enable the slurry to solidify quickly after being injected from the flower tube into the slurry isolation wall.

[0105] It can be seen from the above embodiments that the tunnel filling method described in the embodiments of the present application realizes the mixing of the double slurry at the bottom of the hole by combining the inclination angle of the tunnel, solves the problem of large-scale loss of tunnel grouting slurry, effectively reduces the construction cost, improves the project quality, and realizes multiple processes in the same hole, including the full grouting of the plastic ring and comprehensive grouting. This not only improves the construction efficiency, but also effectively reduces the project cost. The grouting process improves the compactness and bearing capacity of the tunnel, strengthens its overall stability, prevents the penetration of groundwater and impurities, and improves the water resistance and durability of the tunnel. Most importantly, this method also effectively reduces the safety risks in the construction process, and provides a reliable guarantee for the successful implementation and long-term operation of underground projects.

[0106] It should be noted that the method of the embodiment of the present application can be performed by a single device, such as a computer or server. The method of this embodiment can also be applied to a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present application, and the multiple devices will interact with each other to complete the described method.

[0107] It should be noted that the above describes some embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0108] Based on the same inventive concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a tunnel filling device.

[0109] refer to Figure 4 , the tunnel filling device comprises:

[0110] The construction module 41 is configured to construct a first borehole and a second borehole; the first borehole is used for filling aggregate; the second borehole is used for filling accelerator; the aperture of the first borehole is larger than the aperture of the second borehole; the first borehole is located downstream of the roadway, and the second borehole is located upstream of the roadway;

[0111] An injection module 42, configured to inject a quick-setting agent into the second borehole;

[0112] The filling module 43 is configured to inject aggregate into the first borehole after the first time, so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

[0113] For the convenience of description, the above device is described in terms of functions divided into various modules. Of course, when implementing the present application, the functions of each module can be implemented in the same or multiple software and / or hardware.

[0114] The device of the above embodiment is used to implement the corresponding tunnel filling method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiments, which will not be repeated here.

[0115] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application (including the claims) is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.

[0116] In addition, to simplify the description and discussion, and in order not to make the embodiments of the present application difficult to understand, the known power supply / ground connection with the integrated circuit (IC) chip and other components may or may not be shown in the provided drawings. In addition, the device can be shown in the form of a block diagram to avoid making the embodiments of the present application difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform to be implemented in the embodiments of the present application (that is, these details should be fully within the scope of understanding of those skilled in the art). In the case of elaborating specific details (e.g., circuits) to describe exemplary embodiments of the present application, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details or when these specific details are changed. Therefore, these descriptions should be considered to be illustrative rather than restrictive.

[0117] Although the present application has been described in conjunction with specific embodiments of the present application, many replacements, modifications and variations of these embodiments will be apparent to those skilled in the art from the foregoing description. For example, other memory architectures (e.g., dynamic RAM (DRAM)) may use the embodiments discussed.

[0118] The embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present application should be included in the scope of protection of the present application.

Claims

1. A tunnel filling method, characterized in that: include: The first borehole and the second borehole are obtained by construction; the first borehole is used for filling aggregate; the second borehole is used for filling accelerating setting agent; The aperture of the first borehole is larger than that of the second borehole; the first borehole is located downstream of the lane, and the second borehole is located upstream of the lane; injecting an accelerating setting agent into the second borehole; After the first time, aggregate is injected into the first borehole so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

2. The method according to claim 1, characterized in that The method further comprises: In response to the first filling area being unable to meet the filling demand of the tunnel, continuing construction to obtain a third borehole and a fourth borehole; Injecting an accelerating setting agent into the fourth borehole, and injecting aggregate into the third borehole after a second time, so that the accelerating setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a second filling area; In response to the filling area satisfying the filling demand of the tunnel, the construction of the drilling is stopped.

3. The method according to claim 1, characterized in that The first time is calculated by the following method: Obtaining a first flow rate of the aggregate and a second flow rate of the accelerating agent; Obtaining a first length of the first borehole and a second length of the second borehole; Obtaining an inclined distance between the first borehole and the second borehole; The first time is calculated according to the first flow rate, the second flow rate, the first length, the second length and the inclined distance.

4. The method according to claim 1, characterized in that: After obtaining the first filling area, the method further comprises: Construct four branch holes from the second borehole to the surrounding rock; the four branch holes are parachute-shaped; The specific positions of the four branch holes are determined based on the Mohr-Coulomb theory.

5. The method according to claim 4, characterized in that The four branch holes include a first group of branch holes and a second group of branch holes; The four branch holes constructed from the second borehole to the surrounding rock include: constructing the first group of branch holes from the second borehole to the roof and floor of the tunnel; the roof and floor of the tunnel are rock; The second group of branch holes are constructed from the second borehole to the two sides of the tunnel; the two sides of the tunnel are coal seams.

6. The method according to claim 5, characterized in that The step of constructing the first group of branch holes from the second borehole to the roof and the floor of the tunnel comprises: Constructing the first group of branch holes from the second borehole to the roof and floor of the tunnel along the tunnel surrounding rock; The step of constructing the second group of branch holes from the second borehole to the two sides of the tunnel includes: The second group of branch holes are constructed from the second borehole to the surrounding rock of the tunnel on both sides of the tunnel.

7. The method according to claim 4, characterized in that The position of the branch hole is calculated by the following formula: Among them, R p represents the distance from the branch hole to the surrounding rock of the tunnel, R0 represents the tunnel radius, p0 represents the original rock stress, p1 represents the support reaction force, c represents the cohesion, represents the internal friction angle.

8. The method according to any one of claims 5 to 7, characterized in that: The method further comprises: The slurry is fed into the goaf in sections one by one through the slurry delivery pipeline; In response to the grouting pressure of a single section satisfying the preset conditions, continue to input slurry into the next section of the goaf until the grouting pressure of the last section satisfies the preset conditions, and then stop inputting slurry; the preset conditions of the first group of branch holes are different from the preset conditions of the second group of branch holes.

9. The method according to claim 8, characterized in that The preset condition is calculated by the following formula: Among them, R p It represents the distance from the branch hole to the surrounding rock of the tunnel, P represents the ground stress at the grouting position of the branch hole, t represents the grouting time, σ represents the grouting completion pressure, b represents the crack width at the grouting position of the branch hole, μ represents the slurry viscosity, and r represents the radius of the branch hole.

10. A tunnel filling device, characterized in that: include: The construction module is configured to construct a first borehole and a second borehole; the first borehole is used for filling aggregate; the second borehole is used for filling accelerating agent; The aperture of the first borehole is larger than that of the second borehole; the first borehole is located downstream of the lane, and the second borehole is located upstream of the lane; an injection module configured to inject an accelerating setting agent into the second borehole; The filling module is configured to inject aggregate into the first borehole after a first time, so that the quick-setting agent and the aggregate are mixed and formed in the tunnel at the bottom of the hole to obtain a first filling area.

Citation Information

Patent Citations

  • Double-fluid deep-hole bottom fixed-point accurate mixed construction process and grouting structure

    CN106894414A

  • River-oriented coal mine old goaf water disaster inspection and treatment integrated treatment method

    CN113279687A

  • Curtain grouting method for large-space large-dip-angle goaf

    CN113309565A

  • Combined drilling method for filling steeply-inclined multi-coal-seam goaf

    CN116220554A

  • Method for different strength backfills of underground drifts and device for implementation the same

    RU2055218C1