Pipeline heat preservation auxiliary device and pipeline installation device

By designing the pipeline insulation auxiliary device, the arc-shaped sections and connection sections of the semicircular pipe and the clamping plate form an installation gap, and the locking parts are locked on the mounting frame, solving the difficulties in disassembly and assembly of the transportation pipeline and installation of the insulation parts, realizing the More efficient installation and disassembly of insulation materials.

CN119084710APending Publication Date: 2024-12-06CHINA NUCLEAR POWER ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411237511.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The transportation pipelines in the nuclear island factory in the nuclear power plant are difficult to disassemble and assembling and the insulation materials are inefficient in installation efficiency. In the prior art, the insulation materials are directly wrapped around the outer wall of the transportation pipeline, resulting in inconvenient disassembly and assembly and difficulty in installation.

Method used

Provided is a pipe insulation auxiliary device, including a first semicircular tube, a second semicircular tube, a first clamping plate and a second clamping plate, and a mounting gap is formed by an arcuate section and a connecting section, and the locking member is used to lock in the On the mounting rack, simplify the installation process of insulation parts.

Benefits of technology

It improves the installation efficiency and disassembly and assembly of insulation parts of the transportation pipeline, and is simpler and more efficient than the method of directly wrapping it on the outer wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084710A_ABST
    Figure CN119084710A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipeline design, and discloses a pipeline heat preservation auxiliary device and a pipeline mounting device.The pipeline heat preservation auxiliary device comprises a first semicircular pipe, a second semicircular pipe, a first clamping plate, a second clamping plate and a locking piece, the first clamping plate is provided with a first arc-shaped section, the second clamping plate is provided with a second arc-shaped section, and the first clamping plate is connected with the inner wall of the first semicircular pipe; the first clamping plate is connected with the inner wall of the first semicircular pipe, the second clamping plate is connected with the inner wall of the second semicircular pipe, the first semicircular pipe and the second semicircular pipe are oppositely combined, the first arc-shaped section and the second arc-shaped section form a fastening ring used for fastening a conveying pipeline, and a first mounting gap used for mounting a heat preservation part is formed between the first semicircular pipe and the first clamping plate. According to the pipeline heat preservation auxiliary device and the pipeline installation device, the problems that a transportation pipeline is difficult to disassemble and assemble, and the heat preservation part is inconvenient to install are solved or improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipeline design, and in particular to a pipeline insulation auxiliary device and a pipeline installation device. Background Art

[0002] Materials need to be transported in the nuclear island of a nuclear power plant, so multiple transport pipelines are installed, and these transport pipelines need to be insulated. In the related art, a mounting frame is usually fixed on the wall of the nuclear island of a nuclear power plant, and then the transport pipeline is welded on the mounting frame, and then insulation cotton or insulation materials are wrapped on the transport pipeline. However, when the transport pipeline is repaired and replaced, it is very inconvenient to disassemble and assemble, and the installation of insulation materials is difficult and inefficient. Summary of the invention

[0003] In view of this, the present application provides a pipeline insulation auxiliary device and an installation device to solve or improve the problem that the transport pipeline is difficult to disassemble and assemble and the insulation parts are inconvenient to install.

[0004] In the first aspect, the present application provides a pipeline insulation auxiliary device, including: a first semicircular tube, a second semicircular tube, a first clamping plate, a second clamping plate and a locking piece, the first clamping plate is provided with a first arc segment, the second clamping plate is provided with a second arc segment, the first clamping plate is connected to the inner wall of the first semicircular tube, and the second clamping plate is connected to the inner wall of the second semicircular tube. When the first semicircular tube and the second semicircular tube are aligned, the first arc segment and the second arc segment form a fastening ring for fastening the transport pipeline, a first installation gap for installing the insulation piece is formed between the first semicircular tube and the first clamping plate, a second installation gap for installing the insulation piece is formed between the second semicircular tube and the second clamping plate, and the locking piece is used to lock the first semicircular tube and the second semicircular tube on the mounting frame.

[0005] Beneficial effects: The first semicircular tube and the second semicircular tube are installed on the transport pipe, the first semicircular tube and the second semicircular tube are matched, the locking piece locks the first semicircular tube and the second semicircular tube on the mounting frame, the first arc segment and the second arc segment are assembled into a fastening ring, which is fixed on the transport pipe, a first installation gap is formed between the first semicircular tube and the first clamping plate, and a second installation gap is formed between the second semicircular tube and the second clamping plate, and the thermal insulation piece is filled into the first installation gap and the second installation gap, which is more convenient. Compared with the related art, the method of directly wrapping the thermal insulation piece on the outer wall of the transport pipe is simpler and more efficient.

[0006] In an optional embodiment, the first clamping plate is provided with a first connecting section, a first arc section and a first fixed section in sequence along its length, one end of the first connecting section and one end of the first fixed section are respectively connected to the inner wall of the first semicircular tube, and the second clamping plate is provided with a second connecting section, a second arc section and a second fixed section along its length direction, one end of the second connecting section and one end of the second fixed section are respectively connected to the inner wall of the second semicircular tube.

[0007] The first connecting section and the first fixed section are connected to the inner wall of the first semicircular tube, providing support for the first arc section, which can keep it away from the inner wall of the first semicircular tube to form a larger first installation gap. The second connecting section and the second fixed section are connected to the inner wall of the second semicircular tube, providing support for the second arc section, which can keep it away from the inner wall of the second semicircular tube to form a larger second installation gap, which is convenient for installing insulation parts or filling insulation materials.

[0008] In an optional embodiment, longitudinal cross-sections of the first arc segment and the second arc segment are both semicircular.

[0009] In an optional embodiment, the first connecting section has a first through hole, and the first fixing section has a first threaded hole; the second connecting section has a second threaded hole corresponding to the first through hole, and the second fixing section has a second through hole corresponding to the first threaded hole.

[0010] The screw rod of the first bolt passes through the first through hole and is screwed to the second threaded hole, the screw rod of the second bolt passes through the second through hole and is screwed to the first threaded hole, the first bolt fixes the first connecting section and the second connecting section, and the second bolt fixes the first fixed section and the second fixed section, and the structure is more compact.

[0011] In an optional embodiment, a first through hole is formed on the side wall of the first semicircular tube corresponding to the first through hole.

[0012] The first semicircular tube and the second semicircular tube are aligned, the first through hole and the second threaded hole are arranged correspondingly, the first bolt is inserted from the first through hole, and the first bolt is connected to the second threaded hole, so that the installation is more convenient.

[0013] In an optional embodiment, it also includes a first guide tube, which is located in the first installation gap, one end of the first guide tube is fixed to the inner wall of the first semicircular tube corresponding to the first through hole, and the other end of the first guide tube is fixed to the first connecting section corresponding to the first through hole.

[0014] The first guide tube can guide the first bolt, so that the first bolt can pass through the first through hole and be screwed with the second threaded hole more quickly, and after the insulation component is filled in the first installation gap, the disassembly and assembly of the first bolt will not be affected.

[0015] In an optional embodiment, a second through hole is formed on the side wall of the second semicircular tube corresponding to the second through hole.

[0016] The first semicircular tube and the second semicircular tube are aligned, the second through hole and the first threaded hole are arranged correspondingly, the second bolt is inserted from the second through hole, and the second bolt is connected to the first threaded hole, so that the installation is more convenient.

[0017] In an optional embodiment, a second guide tube is further included, which is located in the second installation gap, one end of the second guide tube is fixed to the inner wall of the second semicircular tube corresponding to the second through hole, and the other end of the second guide tube is fixed to the second fixed section corresponding to the second through hole.

[0018] The second guide tube can guide the second bolt, so that the second bolt can pass through the second through hole and be screwed with the first threaded hole more quickly, and after the insulation component is filled in the second installation gap, the disassembly and assembly of the second bolt will not be affected.

[0019] In an optional embodiment, a plurality of first clamping plates and a plurality of second clamping plates are provided, the plurality of first clamping plates are connected to the inner wall of the first semicircular tube, and the plurality of second clamping plates are connected to the inner wall of the second semicircular tube.

[0020] On the second aspect, the present application also provides a pipeline installation device, including: a mounting frame and a pipeline insulation auxiliary device, the locking part includes a U-shaped rod and a plurality of locking nuts, both ends of the U-shaped rod are provided with threads, and the mounting frame has two mounting holes corresponding to the two ends of the U-shaped rod. When the first semicircular tube and the second semicircular tube are in a state of alignment, the two ends of the U-shaped rod pass through the two mounting holes correspondingly, and a plurality of locking nuts are connected to the U-shaped rod to lock the first semicircular tube and the second semicircular tube on the mounting frame.

[0021] The U-shaped rod is sleeved on the first semicircular tube and the second semicircular tube, and its two ends pass through two mounting holes. The U-shaped rod is locked on the mounting frame through multiple locking nuts for easy disassembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the specific implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0023] Figure 1 This is a schematic structural diagram of a pipeline thermal insulation auxiliary device according to an embodiment of the present application;

[0024] Figure 2 This is a schematic structural diagram of another pipeline thermal insulation auxiliary device according to an embodiment of the present application;

[0025] Figure 3 This is a schematic structural diagram of a first semicircular tube and a first clamping plate in a pipeline thermal insulation auxiliary device according to an embodiment of the present application;

[0026] Figure 4 This is a schematic structural diagram of a first clamping member in a pipeline thermal insulation auxiliary device according to an embodiment of the present application;

[0027] Figure 5 This is a schematic structural diagram of a pipeline installation device according to an embodiment of the present application.

[0028] Description of reference numerals:

[0029] 1. First semicircular tube; 11. First through hole; 2. Second semicircular tube; 21. Second through hole; 3. First clamping plate; 31. First arc section; 32. First connecting section; 321. First through hole; 33. First fixing section; 331. First threaded hole; 4. Second clamping plate; 41. Second arc section; 42. Second connecting section; 421. Second threaded hole; 43. Second fixing section; 431. Second through hole; 5. Locking piece; 51. U-shaped rod; 52. Locking nut; 6. First installation gap; 7. Second installation gap; 8. Mounting frame; 9. First bolt; 10. Second bolt. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of this application.

[0031] Combine the following Figures 1 to 5 , describing an embodiment of the present application.

[0032] According to an embodiment of the present application, on the one hand, a pipeline insulation auxiliary device is provided, including: a first semicircular tube 1, a second semicircular tube 2, a first clamping plate 3, a second clamping plate 4 and a locking piece 5, the first clamping plate 3 is provided with a first arc segment 31, the second clamping plate 4 is provided with a second arc segment 41, the first clamping plate 3 is connected to the inner wall of the first semicircular tube 1, and the second clamping plate 4 is connected to the inner wall of the second semicircular tube 2. When the first semicircular tube 1 and the second semicircular tube 2 are aligned, the first arc segment 31 and the second arc segment 41 form a fastening ring for fastening the transport pipeline, a first installation gap 6 for installing the insulation piece is formed between the first semicircular tube 1 and the first clamping plate 3, a second installation gap 7 for installing the insulation piece is formed between the second semicircular tube 2 and the second clamping plate 4, and the locking piece 5 is used to lock the first semicircular tube 1 and the second semicircular tube 2 on the mounting frame 8.

[0033] The first semicircular tube 1 and the second semicircular tube 2 are installed on the transport pipe, the first semicircular tube 1 and the second semicircular tube 2 are matched, the locking piece 5 locks the first semicircular tube 1 and the second semicircular tube 2 on the mounting frame 8, the first arc segment 31 and the second arc segment 41 are assembled into a fastening ring, which is fixed on the transport pipe, and a first installation gap 6 is formed between the first semicircular tube 1 and the first clamping plate 3, and a second installation gap 7 is formed between the second semicircular tube 2 and the second clamping plate 4. Filling the thermal insulation part into the first installation gap 6 and the second installation gap 7 is more convenient. Compared with the related art, the method of directly wrapping the thermal insulation material on the outer wall of the transport pipe is simpler and more efficient.

[0034] In a specific embodiment, the inner diameters of the first semicircular tube 1 and the second semicircular tube 2 are the same as the outer diameter of the thermal insulation component, which can reduce damage to the thermal insulation component after installation.

[0035] In one embodiment, Figures 1 to 3 As shown, the first clamping plate 3 is provided with a first connecting section 32, a first arc section 31 and a first fixing section 33 in sequence along its length, one end of the first connecting section 32 and one end of the first fixing section 33 are respectively connected to the inner wall of the first semicircular tube 1, and the second clamping plate 4 is provided with a second connecting section 42, a second arc section 41 and a second fixing section 43 along its length direction, one end of the second connecting section 42 and one end of the second fixing section 43 are respectively connected to the inner wall of the second semicircular tube 2.

[0036] The first connecting section 32 and the first fixing section 33 are connected to the inner wall of the first semicircular tube 1, providing support for the first arc section 31, which can keep it away from the inner wall of the first semicircular tube 1, forming a larger first installation gap 6. The second connecting section 42 and the second fixing section 43 are connected to the inner wall of the second semicircular tube 2, providing support for the second arc section 41, which can keep it away from the inner wall of the second semicircular tube 2, forming a larger second installation gap 7, which is convenient for installing insulation parts or filling insulation materials.

[0037] In a specific embodiment, one end of the first connecting segment 32 and one end of the first fixing segment 33 are welded to the inner wall of the first semicircular tube 1 , and one end of the second connecting segment 42 and one end of the second fixing segment 43 are respectively welded to the inner wall of the second semicircular tube 2 .

[0038] In one embodiment, Figure 4 As shown, the longitudinal sections of the first arc segment 31 and the second arc segment 41 are both semicircular.

[0039] In a specific embodiment, the inner diameters of the first arc segment 31 and the second arc segment 41 are smaller than the outer diameter of the transport pipe, thereby improving the clamping effect between the first arc segment 31 and the second arc segment 41 and the transport pipe.

[0040] In one embodiment, Figure 1 to Figure 2 As shown, the first connecting section 32 defines a first through hole 321 , and the first fixing section 33 defines a first threaded hole 331 ; the second connecting section 42 defines a second threaded hole 421 corresponding to the first through hole 321 , and the second fixing section 43 defines a second through hole 431 corresponding to the first threaded hole 331 .

[0041] The screw rod of the first bolt 9 passes through the first through hole 321 and is screwed into the second threaded hole 421, and the screw rod of the second bolt 10 passes through the second through hole 431 and is screwed into the first threaded hole 331. The first bolt 9 fixes the first connecting section 32 and the second connecting section 42, and the second bolt 10 fixes the first fixed section 33 and the second fixed section 43. The structure is more compact and there is no need to set connecting parts on the first semicircular tube 1 and the second semicircular tube 2 for connection.

[0042] In one embodiment, Figure 2 As shown, a first through hole 11 is formed on the side wall of the first semicircular tube 1 corresponding to the first through hole 321 .

[0043] The first semicircular tube 1 and the second semicircular tube 2 are aligned, the first through hole 321 and the second threaded hole 421 are arranged correspondingly, the first bolt 9 is inserted from the first through hole 11, and the first bolt 9 is connected to the second threaded hole 421, so that the installation is more convenient.

[0044] In one embodiment, a first guide tube is further included. The first guide tube is located in the first installation gap 6. One end of the first guide tube is fixed to the inner wall of the first semicircular tube 1 corresponding to the first through hole 11, and the other end of the first guide tube is fixed to the first connecting section 32 corresponding to the first through hole 321.

[0045] The first guide tube can guide the first bolt 9 so that the first bolt 9 can pass through the first through hole 321 and be threaded with the second threaded hole 421 more accurately and quickly, and after the insulation component is filled in the first installation gap 6, the first guide tube can isolate the first bolt 9 from the insulation component and will not affect the disassembly and assembly of the first bolt 9.

[0046] In one embodiment, Figure 2 As shown, the side wall of the second semicircular tube 2 is provided with a second through hole 21 corresponding to the second through hole 431 .

[0047] The first semicircular tube 1 and the second semicircular tube 2 are aligned, the second through hole 431 and the first threaded hole 331 are arranged correspondingly, the second bolt 10 is inserted from the second through hole 21, and the second bolt 10 is connected to the first threaded hole 331, so that the installation is more convenient.

[0048] In one embodiment, a second guide tube is further included. The second guide tube is located in the second installation gap 7. One end of the second guide tube is fixed to the inner wall of the second semicircular tube 2 corresponding to the second through hole 21, and the other end of the second guide tube is fixed to the second fixing section 43 corresponding to the second through hole 431.

[0049] The second guide tube can guide the second bolt 10 so that the second bolt 10 can pass through the second through hole 431 and be screwed into the first threaded hole 331 more accurately and quickly, and after the insulation component is filled in the second installation gap 7, the second guide tube can isolate the second bolt 10 from the insulation component and will not affect the disassembly and assembly of the second bolt 10.

[0050] In another embodiment, the first fixing section 33 is provided with a first connecting hole, and a first nut is fixed on the first fixing section 33 corresponding to the first connecting hole; the second connecting section 42 is provided with a second connecting hole corresponding to the first through hole 321, and a second nut is fixed on the second connecting section 42 corresponding to the second connecting hole, one connecting bolt passes through the second through hole 431 and the first connecting hole and is connected to the first nut, and one connecting bolt passes through the first through hole 321 and the second connecting hole and is connected to the second nut, and the two connecting bolts fix the first clamping plate and the second clamping plate together.

[0051] In one embodiment, a plurality of first clamping plates 3 and a plurality of second clamping plates 4 are provided, and a plurality of first clamping plates 3 are connected to the inner wall of the first semicircular tube 1 , and a plurality of second clamping plates 4 are connected to the inner wall of the second semicircular tube 2 .

[0052] In a specific embodiment, Figure 3 As shown, two first clamping plates 3 are provided on the first semicircular tube 1, and two second clamping plates 4 are provided on the second semicircular tube 2. The two first clamping plates 3 and the two second clamping plates 4 are arranged correspondingly, and the connection with the transport pipeline is more secure.

[0053] More specifically, the two first clamping plates 3 connected to the first semicircular tube 1 are installed in opposite directions.

[0054] According to the embodiments of the present application, Figure 5 As shown, a pipeline installation device is also provided, including: a mounting frame 8 and a pipeline insulation auxiliary device, the locking member 5 includes a U-shaped rod 51 and a plurality of locking nuts 52, both ends of the U-shaped rod 51 are provided with threads, and the mounting frame 8 has two mounting holes corresponding to the two ends of the U-shaped rod 51. When the first semicircular tube 1 and the second semicircular tube 2 are in a matched state, the two ends of the U-shaped rod 51 pass through the two mounting holes correspondingly, and the plurality of locking nuts 52 are connected to the U-shaped rod 51 to lock the first semicircular tube 1 and the second semicircular tube 2 on the mounting frame 8.

[0055] The U-shaped rod 51 is sleeved on the first semicircular tube 1 and the second semicircular tube 2, and its two ends pass through two mounting holes. The U-shaped rod 51 is locked on the mounting frame 8 by a plurality of locking nuts 52 for easy disassembly.

[0056] Although the embodiments of the present application are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present application, and such modifications and variations are all within the scope defined by the attached present application.

Claims

1. A pipeline insulation auxiliary device, characterized in that: include: A first semicircular tube (1), a second semicircular tube (2), a first clamping plate (3), a second clamping plate (4) and a locking member (5), wherein the first clamping plate (3) is provided with a first arc segment (31), the second clamping plate (4) is provided with a second arc segment (41), the first clamping plate (3) is connected to the inner wall of the first semicircular tube (1), the second clamping plate (4) is connected to the inner wall of the second semicircular tube (2), and in a state where the first semicircular tube (1) and the second semicircular tube (2) are aligned In the state, the first arc segment (31) and the second arc segment (41) form a fastening ring for fastening the transport pipeline, a first installation gap (6) for installing a thermal insulation component is formed between the first semicircular tube (1) and the first clamping plate (3), a second installation gap (7) for installing a thermal insulation component is formed between the second semicircular tube (2) and the second clamping plate (4), and the locking member (5) is used to lock the first semicircular tube (1) and the second semicircular tube (2) on the mounting frame (8).

2. The pipeline insulation auxiliary device according to claim 1, characterized in that: The first clamping plate (3) is provided with a first connecting section (32), the first arc section (31) and a first fixing section (33) in sequence along its length; one end of the first connecting section (32) and one end of the first fixing section (33) are respectively connected to the inner wall of the first semicircular tube (1); the second clamping plate (4) is provided with a second connecting section (42), the second arc section (41) and a second fixing section (43) along its length direction; one end of the second connecting section (42) and one end of the second fixing section (43) are respectively connected to the inner wall of the second semicircular tube (2).

3. The pipeline insulation auxiliary device according to claim 2, characterized in that: The longitudinal cross-sections of the first arc-shaped segment (31) and the second arc-shaped segment (41) are both semicircular.

4. The pipeline insulation auxiliary device according to claim 3, characterized in that: The first connecting section (32) is provided with a first through hole (321), and the first fixing section (33) is provided with a first threaded hole (331); the second connecting section (42) is provided with a second threaded hole (421) corresponding to the first through hole (321), and the second fixing section (43) is provided with a second through hole (431) corresponding to the first threaded hole (331).

5. The pipeline insulation auxiliary device according to claim 4, characterized in that: A first through hole (11) is formed on the side wall of the first semicircular tube (1) corresponding to the first through hole (321).

6. The pipeline insulation auxiliary device according to claim 5, characterized in that: It also includes a first guide tube, which is located in the first installation gap (6), one end of the first guide tube is fixed to the inner wall of the first semicircular tube (1) corresponding to the first through hole (11), and the other end of the first guide tube is fixed to the first connecting section (32) corresponding to the first through hole (321).

7. The pipeline insulation auxiliary device according to claim 4, characterized in that: A second through hole (21) is formed on the side wall of the second semicircular tube (2) corresponding to the second through hole (431).

8. The pipeline insulation auxiliary device according to claim 7, characterized in that: It also includes a second guide tube, which is located in the second installation gap (7), one end of the second guide tube is fixed to the inner wall of the second semicircular tube (2) corresponding to the second through hole (21), and the other end of the second guide tube is fixed to the second fixing section (43) corresponding to the second through hole (431).

9. The pipeline insulation auxiliary device according to claim 2, characterized in that: A plurality of the first clamping plates (3) and the second clamping plates (4) are provided, wherein a plurality of the first clamping plates (3) are connected to the inner wall of the first semicircular tube (1), and a plurality of the second clamping plates (4) are connected to the inner wall of the second semicircular tube (2).

10. A pipeline installation device, characterized in that: The invention comprises a mounting frame (8) and a pipe insulation auxiliary device according to any one of claims 1 to 9, wherein the locking member (5) comprises a U-shaped rod (51) and a plurality of locking nuts (52), both ends of the U-shaped rod (51) are provided with threads, the mounting frame (8) is provided with two mounting holes corresponding to the two ends of the U-shaped rod (51), when the first semicircular tube (1) and the second semicircular tube (2) are in a matched state, the two ends of the U-shaped rod (51) pass through the two mounting holes correspondingly, and the plurality of locking nuts (52) are connected to the U-shaped rod (51) to lock the first semicircular tube (1) and the second semicircular tube (2) on the mounting frame (8).

Citation Information

Cited By

  • Horizontal sleeve butt joint guiding device and horizontal sleeve butt joint method

    CN121321915A