Solar energy and biomass energy coupled combined heat and power generation system and use method
By designing a two-stage organic Rankine cycle structure and preheater, the problem of insufficient utilization of energy levels in the coupling system of solar energy and biomass energy in the prior art is solved, and the triple supply of hot and hot electricity and electricity is realized Improved system stability.
Patent Information
- Application Number
- CN202411225246.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-12-06
AI Technical Summary
The existing solar and biomass energy coupling system has room for improvement in temperature matching and energy cascade utilization. It has failed to effectively use waste heat recovery devices to transfer the energy of biomass energy into the solar power generation cycle, resulting in short ORC running time and insufficient comprehensive performance. .
A cogeneration system including air preheater, biomass boiler, PV/T, solar vacuum tube heat collector, two-stage organic Rankine cycle assembly and jet refrigeration cycle assembly was designed, through two-stage organic Rankine cycle The structure better couples solar energy with biomass energy, and uses preheaters to preheat the high-pressure fluid of the first-stage organic Rankine cycle assembly to improve system stability and heat output.
The triple supply effect of hot and hot electricity is achieved, the system stability and energy utilization are improved, and the solar energy and biomass energy are better coupled through the two-stage organic Rankine cycle structure, extending the operating time of ORC and improving the overall performance.
Smart Images

Figure CN119085164A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of energy and environmental technology, and in particular to a method for using a heat and power cogeneration system coupled with solar energy and biomass energy. Background Art
[0002] The huge consumption of fossil fuels and environmental pollution have become hot topics at present. Human beings are trying to find environmentally friendly renewable energy to replace traditional energy. Considering the global coverage and free access of solar energy, as well as the fact that my country has the world's largest total biomass, and biomass energy can be directly stored and transported, it is very feasible to use the sustainability of biomass energy to alleviate the volatility of solar energy. Solar Photovoltaic / thermal System (PV / T) has become one of the key research objects in the solar combined heat and power (CHP) system due to its photovoltaic and photothermal integrated technology. The main utilization pathways of biomass energy include physical conversion, thermochemical conversion and biochemical conversion, among which direct combustion of biomass is the main technology for large-scale commercial application of biomass energy today. In addition, since the heat quality of PV / T is low and the energy density of biomass energy is low, the organic Rankine cycle (ORC) can be used to recover the low-grade heat energy of the two to improve energy utilization.
[0003] In the existing technology, in terms of the multi-energy complementary application of solar energy and biomass energy, there is still room for improvement in the design principle of "temperature matching and energy cascade utilization" of the energy system. The waste heat recovery device has not been effectively used to transfer the energy of biomass energy to the solar power generation cycle to improve the short operation time of ORC in the PV / T and ORC coupling system. In order to improve the comprehensive performance of ORC, many researchers have improved it based on the working principle of ORC and designed a regenerative organic Rankine cycle, an exhaust heat recovery organic Rankine cycle, a reheat-exhaust heat recovery-internal heat recovery organic Rankine cycle and a dual organic Rankine cycle. In the improved ORC unit, due to differences in operating conditions, there may be more than one heat source, and the temperature and energy density of the heat source are uncertain, so it is necessary to design the energy system of the coupled improved ORC unit in detail. Summary of the invention
[0004] The purpose of the present invention is to provide a solar energy and biomass energy coupled heat and power cogeneration system, which better couples solar energy and biomass energy and improves system stability by designing a two-stage organic Rankine cycle structure.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a solar energy and biomass energy coupled cogeneration system, the cogeneration system comprising an air preheater, a biomass boiler, a PV / T, a solar vacuum tube collector, a first-stage organic Rankine cycle component, a second-stage organic Rankine cycle component and an ejector refrigeration cycle component, the fluid outlet of the PV / T is connected to the fluid inlet of the solar vacuum tube collector, the flue gas outlet of the biomass boiler is connected to the hot fluid inlet of the air preheater, and the cold fluid outlet of the air preheater is connected to the air inlet of the biomass boiler; the first-stage organic Rankine cycle component comprises a first evaporator, a first turbine, a first condenser and a first working fluid pump; the second-stage organic Rankine cycle component comprises a preheater, a second evaporator, a second turbine, a second condenser and a second working fluid pump; the ejector refrigeration cycle component comprises an ejector, a heat exchanger, a third evaporator, a third condenser and a third working fluid pump.
[0006] Furthermore, the fluid outlet of the solar vacuum tube collector is connected to the hot fluid inlet of the first evaporator through a first pipeline, the cold fluid outlet of the first evaporator is connected to the fluid inlet of the first turbine, the fluid outlet of the first turbine is connected to the hot fluid inlet of the first condenser, the hot fluid outlet of the first condenser is connected to the fluid inlet of the first working fluid pump through a second pipeline, the fluid outlet of the first working fluid pump is connected to the cold fluid inlet of the preheater, and the cold fluid outlet of the preheater is connected to the cold fluid inlet of the evaporator.
[0007] Furthermore, the hot fluid outlet of the biomass boiler is connected to the hot fluid inlet of the second evaporator, the cold fluid outlet of the second evaporator is connected to the fluid inlet of the second turbine, the fluid outlet of the second turbine is connected to the hot fluid inlet of the preheater through a third pipeline, the hot fluid outlet of the preheater is connected to the hot fluid inlet of the second condenser through a fourth pipeline, the hot fluid outlet of the second condenser is connected to the fluid inlet of the second working fluid pump, and the fluid outlet of the second working fluid pump is connected to the cold fluid inlet of the second evaporator.
[0008] Furthermore, the hot fluid outlet of the second evaporator is connected to the hot fluid inlet of the heat exchanger, the cold fluid outlet of the heat exchanger is connected to the fluid inlet of the ejector, the fluid outlet of the ejector is connected to the hot fluid inlet of the third condenser, the hot fluid outlet of the third condenser is respectively connected to the fluid inlets of the throttle valve and the third working fluid pump, the fluid outlet of the third working fluid pump is connected to the cold fluid inlet of the heat exchanger, the fluid outlet of the throttle valve is connected to the cold fluid inlet of the third evaporator, the cold fluid outlet of the third evaporator is connected to the fluid inlet of the ejector, the flue gas outlet of the biomass boiler is connected to the hot fluid inlet of the air preheater, and the cold fluid outlet of the air preheater is connected to the air inlet of the biomass boiler.
[0009] Furthermore, a valve No. 1 is provided on the first pipeline, and the valve No. 1 controls the amount of hot water entering the evaporator from the solar vacuum tube collector.
[0010] Furthermore, a second valve is provided on the second pipeline, and the second valve controls the flow rate of the working fluid entering the first evaporator from the first working fluid pump.
[0011] Furthermore, a No. 3 valve is provided on the third pipeline, and the No. 3 valve controls the flow rate of the working fluid entering the preheater from the second turbine.
[0012] Furthermore, a fourth valve is provided on the fourth pipeline, and the fourth valve controls the flow rate of the working fluid entering the second condenser from the second turbine.
[0013] A method for using a heat and power cogeneration system coupled with solar energy and biomass energy, the method comprising the following steps: Step S1: according to the characteristics of the combined cooling, heating and power system, the biomass boiler, the second-stage organic Rankine cycle component and the ejector refrigeration cycle are started to operate around the clock; Step S2: when the solar radiation value is greater than 0, the PV / T and the solar vacuum tube collector are in operation, and when the fluid temperature output by the solar vacuum tube collector is greater than the minimum heat source temperature of the first-stage organic Rankine cycle component, the first-stage organic Rankine cycle component is in operation; Step S3: When the first-stage organic Rankine cycle component starts to operate, the waste heat of the second turbine passes through the preheater component to preheat the fluid of the first-stage organic Rankine cycle component. When the first-stage organic Rankine cycle component does not operate, the waste heat of the second turbine directly enters the second condenser for condensation.
[0014] Beneficial effects of the present invention: (1) The present invention proposes an energy system based on the coupling of PV / T, solar vacuum tube collector, biomass boiler, organic Rankine cycle and ejector refrigeration cycle, which achieves the effect of trigeneration of cooling, heating and electricity.
[0015] (2) The present invention designs a two-stage organic Rankine cycle structure, which better couples solar energy and biomass energy. The high-pressure fluid output by the first working fluid pump is preheated by the preheater, thereby improving the operating stability and output heat of the first-stage organic Rankine cycle and improving the system stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Schematic diagram of the system structure of the present invention.
[0017] Among them: 1. air preheater, 2. biomass boiler, 3. PV / T, 4. solar vacuum tube collector, 5. valve No. 1, 6. first turbine, 7. first condenser, 8. valve No. 2, 9. first working fluid pump, 10. preheater, 11. second condenser, 12. second working fluid pump, 13. first evaporator, 14. valve No. 3, 15. valve No. 4, 16. second turbine, 17. second evaporator, 18. third working fluid pump, 19. heat exchanger, 20. throttle valve, 21. third evaporator, 22. ejector, 23. third condenser. DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with the accompanying drawings.
[0019] See also Figure 1The present invention provides an embodiment: a solar energy and biomass energy coupled heat and power cogeneration system, the heat and power cogeneration system comprises an air preheater 1, a biomass boiler 2, a PV / T3, a solar vacuum tube collector 4, a first-stage organic Rankine cycle component, a second-stage organic Rankine cycle component and an ejector refrigeration cycle component, the fluid outlet of the PV / T3 is connected to the fluid inlet of the solar vacuum tube collector 4, the flue gas outlet of the biomass boiler 2 is connected to the hot fluid inlet of the air preheater 1, and the cold fluid outlet of the air preheater 1 is connected to the air inlet of the biomass boiler 2; the first-stage organic Rankine cycle component comprises a first evaporator 13, a first turbine 6, a first condenser 7 and a first working fluid pump 9; the second-stage organic Rankine cycle component comprises a preheater 10, a second evaporator 17, a second turbine 16, a second condenser 11 and a second working fluid pump 12; the ejector refrigeration cycle component comprises an ejector 22, a heat exchanger 19, a third evaporator 21, a third condenser 23 and a third working fluid pump 18. A two-stage organic Rankine cycle component structure is used to couple biomass energy and solar energy, and the waste heat of the biomass direct combustion and the second-stage organic Rankine cycle coupling system is input into the PV / T3 and the first-stage organic Rankine cycle component coupling system, so as to preheat the organic fluid entering the evaporator in the PV / T3 and the first-stage organic Rankine cycle component coupling system, thereby improving the operating stability and heat output of the first-stage organic Rankine cycle component; in addition, using the waste heat of the biomass boiler 2, an ejector refrigeration cycle is designed to achieve trigeneration of cooling, heating and electricity.
[0020] Please continue reading Figure 1 As shown, in one embodiment of the present invention, the fluid outlet of the solar vacuum tube collector 4 is connected to the hot fluid inlet of the first evaporator 13 through a first pipeline, the cold fluid outlet of the first evaporator 13 is connected to the fluid inlet of the first turbine 6, the fluid outlet of the first turbine 6 is connected to the hot fluid inlet of the first condenser 7, the hot fluid outlet of the first condenser 7 is connected to the fluid inlet of the first working fluid pump 9 through a second pipeline, the fluid outlet of the first working fluid pump 9 is connected to the cold fluid inlet of the preheater 10, and the cold fluid outlet of the preheater 10 is connected to the cold fluid inlet of the evaporator. Water enters the back pipe of PV / T3 as a working medium to absorb the heat of the photovoltaic panel, and the water working medium preheated by PV / T3 flows to the solar vacuum tube collector 4 for secondary heating, and then enters the first evaporator 13 as a heat source to exchange heat with the organic working medium of the first-stage organic Rankine cycle component, so that the organic working medium becomes a high-temperature and high-pressure gas and expands in the first turbine 6 to do work. The working fluid after expansion and work is condensed by the first condenser 7 and pressurized by the first working fluid pump 9 and then enters the first evaporator 13 again, thereby forming a first-stage organic Rankine cycle. The water after heat exchange in the first evaporator 13 is greater than 50°C and is used as domestic hot water.
[0021] Please continue reading Figure 1 As shown, in one embodiment of the present invention, the hot fluid outlet of the biomass boiler 2 is connected to the hot fluid inlet of the second evaporator 17, the cold fluid outlet of the second evaporator 17 is connected to the fluid inlet of the second turbine 16, the fluid outlet of the second turbine 16 is connected to the hot fluid inlet of the preheater 10 through a third pipeline, the hot fluid outlet of the preheater 10 is connected to the hot fluid inlet of the second condenser 11 through a fourth pipeline, the hot fluid outlet of the second condenser 11 is connected to the fluid inlet of the second working fluid pump 12, and the fluid outlet of the second working fluid pump 12 is connected to the cold fluid inlet of the second evaporator 17. The biomass fuel and the air preheated by the air preheater 1 are fully burned in the biomass boiler 2, and the heat is transferred to the cold water injected into the biomass boiler 2 to generate pressurized hot water, which enters the second evaporator 17 to exchange heat with the organic working medium of the second-stage organic Rankine cycle component. If the pressurized hot water after heat exchange is greater than 50°C, it is used as domestic hot water. The organic fluid at the outlet of the second evaporator 17 is first pressurized by the second working fluid pump 12 and then absorbs heat in the second evaporator 17 to become a high-temperature and high-pressure organic fluid. The fluid enters the second turbine 16 and expands rapidly, driving the second turbine 16 to work and generate electricity. The expanded fluid still has residual heat, so it is designed to enter the preheater 10 to preheat the high-pressure organic fluid of the first-stage organic Rankine cycle component and reduce its own temperature to reduce the cooling water flow of the second condenser 11. The second condenser 11 condenses the working fluid at the outlet of the preheater 10 into liquid and sends it to the second working fluid pump 12 for pressurization. The pressurized organic working fluid then enters the second evaporator 17 to evaporate, thus forming a second-stage organic Rankine cycle.
[0022] Please continue reading Figure 1As shown, in one embodiment of the present invention, the hot fluid outlet of the second evaporator 17 is connected to the hot fluid inlet of the heat exchanger 19, the cold fluid outlet of the heat exchanger 19 is connected to the fluid inlet of the ejector 22, the fluid outlet of the ejector 22 is connected to the hot fluid inlet of the third condenser 23, the hot fluid outlet of the third condenser 23 is respectively connected to the fluid inlet of the throttle valve 20 and the third working fluid pump 18, the fluid outlet of the third working fluid pump 18 is connected to the cold fluid inlet of the heat exchanger 19, the fluid outlet of the throttle valve 20 is connected to the cold fluid inlet of the third evaporator 21, the cold fluid outlet of the third evaporator 21 is connected to the fluid inlet of the ejector 22, the flue gas outlet of the biomass boiler 2 is connected to the hot fluid inlet of the air preheater 1, and the cold fluid outlet of the air preheater 1 is connected to the air inlet of the biomass boiler 2. The working principle of the jet refrigeration cycle component is as follows: the boiler pressurized hot water still has a relatively high temperature after releasing heat in the second evaporator 17, so it enters the heat exchanger 19 to heat the working medium R600a of the jet refrigeration cycle component. The heated R600a enters the ejector 22 and is fully mixed with the low-pressure gaseous working medium ejected by the ejector 22, and then enters the third condenser 23 for condensation. A part of the condensed R600a is depressurized by the throttle valve 20 and enters the third evaporator 21 to absorb heat and refrigerate. The working medium after absorbing heat becomes a vapor state and enters the ejector 22. The other part is pressurized in the third working medium pump 18 and then returns to the heat exchanger 19 for heating. This reciprocating cycle forms a jet refrigeration cycle. According to the characteristics of the trigeneration system, the present invention operates when the solar radiation value is greater than 0; the first working fluid pump 9 operates simultaneously with the first-stage organic Rankine cycle component, that is, the solar vacuum tube collector 4 operates when the output fluid temperature is greater than the minimum heat source temperature of the first-stage organic Rankine cycle component; the biomass boiler 2 operates around the clock, and when the first-stage organic Rankine cycle component starts to operate, the waste heat of the second turbine 16 passes through the preheater 10 to preheat the fluid of the first-stage organic Rankine cycle component, and when the first-stage organic Rankine cycle component does not work, the waste heat of the second turbine 16 directly enters the second condenser 11 for condensation. The first turbine 6, the second turbine 16 and the PV / T3 are the main power output components of the trigeneration system.
[0023] Please continue reading Figure 1 As shown, in one embodiment of the present invention, a valve No. 1 5 is provided on the first pipeline, and the valve No. 1 5 controls the amount of hot water entering the evaporator from the solar vacuum tube collector 4 .
[0024] Please continue reading Figure 1 As shown, in one embodiment of the present invention, a second valve 8 is provided on the second pipeline, and the second valve 8 controls the flow rate of the working fluid from the first working fluid pump 9 into the first evaporator 13 .
[0025] Please continue reading Figure 1 As shown, in one embodiment of the present invention, a third valve 14 is provided on the third pipeline, and the third valve 14 controls the flow rate of the working fluid entering the preheater 10 from the second turbine 16 .
[0026] Please continue reading Figure 1 As shown, in one embodiment of the present invention, a fourth valve 15 is provided on the fourth pipeline, and the fourth valve 15 controls the flow rate of the working fluid entering the second condenser 11 from the second turbine 16 .
[0027] See also Figure 1 The present invention provides an embodiment: a method for using a heat and power cogeneration system coupled with solar energy and biomass energy, the method comprising the following steps: Step S1, according to the characteristics of the combined cooling, heating and power system, start the biomass boiler 2, the second-stage organic Rankine cycle component and the ejector refrigeration cycle for all-weather operation; Step S2, when the solar radiation value is greater than 0, the PV / T3 and the solar vacuum tube collector 4 are in operation, and when the fluid temperature output by the solar vacuum tube collector 4 is greater than the minimum heat source temperature of the first-stage organic Rankine cycle component, the first-stage organic Rankine cycle component is in operation; in actual use, a solar radiation sensor can be used for measurement, and the solar radiation sensor can be directly installed on the bracket of the PV / T.
[0028] Step S3, when the first-stage organic Rankine cycle component starts to operate, the waste heat of the second turbine 16 passes through the preheater 10 component to preheat the fluid of the first-stage organic Rankine cycle component, and when the first-stage organic Rankine cycle component is not working, the waste heat of the second turbine 16 directly enters the second condenser 11 for condensation. The first turbine 6, the second turbine 16 and PV / T3 are the main power output components of the system of the present invention.
[0029] The above description is only a preferred embodiment of the present invention and should not be construed as limiting the present application. All equivalent changes and modifications made within the scope of the patent application of the present invention should fall within the scope of the present invention.
Claims
1. A solar energy and biomass energy coupled heat and power cogeneration system, characterized in that: The cogeneration system includes an air preheater, a biomass boiler, a PV / T, a solar vacuum tube collector, a first-stage organic Rankine cycle component, a second-stage organic Rankine cycle component and an ejector refrigeration cycle component. The fluid outlet of the PV / T is connected to the fluid inlet of the solar vacuum tube collector, the flue gas outlet of the biomass boiler is connected to the hot fluid inlet of the air preheater, and the cold fluid outlet of the air preheater is connected to the air inlet of the biomass boiler; the first-stage organic Rankine cycle component includes a first evaporator, a first turbine, a first condenser and a first working fluid pump; the second-stage organic Rankine cycle component includes a preheater, a second evaporator, a second turbine, a second condenser and a second working fluid pump; the ejector refrigeration cycle component includes an ejector, a heat exchanger, a third evaporator, a third condenser and a third working fluid pump.
2. A solar energy and biomass energy coupled heat and power cogeneration system and method according to claim 1, characterized in that: The fluid outlet of the solar vacuum tube collector is connected to the hot fluid inlet of the first evaporator through a first pipeline, the cold fluid outlet of the first evaporator is connected to the fluid inlet of the first turbine, the fluid outlet of the first turbine is connected to the hot fluid inlet of the first condenser, the hot fluid outlet of the first condenser is connected to the fluid inlet of the first working fluid pump through a second pipeline, the fluid outlet of the first working fluid pump is connected to the cold fluid inlet of the preheater, and the cold fluid outlet of the preheater is connected to the cold fluid inlet of the evaporator.
3. A solar energy and biomass energy coupled heat and power cogeneration system and method according to claim 1, characterized in that: The hot fluid outlet of the biomass boiler is connected to the hot fluid inlet of the second evaporator, the cold fluid outlet of the second evaporator is connected to the fluid inlet of the second turbine, the fluid outlet of the second turbine is connected to the hot fluid inlet of the preheater through a third pipeline, the hot fluid outlet of the preheater is connected to the hot fluid inlet of the second condenser through a fourth pipeline, the hot fluid outlet of the second condenser is connected to the fluid inlet of the second working fluid pump, and the fluid outlet of the second working fluid pump is connected to the cold fluid inlet of the second evaporator.
4. A solar energy and biomass energy coupled heat and power cogeneration system according to claim 1, characterized in that: The hot fluid outlet of the second evaporator is connected to the hot fluid inlet of the heat exchanger, the cold fluid outlet of the heat exchanger is connected to the fluid inlet of the ejector, the fluid outlet of the ejector is connected to the hot fluid inlet of the third condenser, the hot fluid outlet of the third condenser is respectively connected to the fluid inlet of the throttle valve and the third working fluid pump, the fluid outlet of the third working fluid pump is connected to the cold fluid inlet of the heat exchanger, the fluid outlet of the throttle valve is connected to the cold fluid inlet of the third evaporator, the cold fluid outlet of the third evaporator is connected to the fluid inlet of the ejector, the flue gas outlet of the biomass boiler is connected to the hot fluid inlet of the air preheater, and the cold fluid outlet of the air preheater is connected to the air inlet of the biomass boiler.
5. The solar energy and biomass energy coupled heat and power cogeneration system according to claim 1, characterized in that: A valve No. 1 is arranged on the first pipeline, and the valve No. 1 controls the amount of hot water entering the evaporator from the solar vacuum tube collector.
6. A solar energy and biomass energy coupled heat and power cogeneration system and method according to claim 2, characterized in that: A second valve is provided on the second pipeline, and the second valve controls the flow rate of the working fluid entering the first evaporator from the first working fluid pump.
7. A solar energy and biomass energy coupled heat and power cogeneration system according to claim 3, characterized in that: The third pipeline is provided with a No. 3 valve, and the No. 3 valve controls the flow rate of the working fluid entering the preheater from the second turbine.
8. The solar energy and biomass energy coupled heat and power cogeneration system according to claim 3, characterized in that: A fourth valve is disposed on the fourth pipeline, and the fourth valve controls the flow rate of the working fluid from the second turbine into the second condenser.
9. A method for using the solar energy and biomass energy coupled heat and power cogeneration system according to claim 4, characterized in that: The method of use comprises the following steps: Step S1: according to the characteristics of the combined cooling, heating and power system, the biomass boiler, the second-stage organic Rankine cycle component and the ejector refrigeration cycle are started to operate around the clock; Step S2: when the solar radiation value is greater than 0, the PV / T and the solar vacuum tube collector are in operation, and when the fluid temperature output by the solar vacuum tube collector is greater than the minimum heat source temperature of the first-stage organic Rankine cycle component, the first-stage organic Rankine cycle component is in operation; Step S3: When the first-stage organic Rankine cycle component starts to operate, the waste heat of the second turbine passes through the preheater component to preheat the fluid of the first-stage organic Rankine cycle component. When the first-stage organic Rankine cycle component does not operate, the waste heat of the second turbine directly enters the second condenser for condensation.
Citation Information
Patent Citations
Biomass heat- and solar-energy multistage cooling, heating and power combined supply system
CN104154677A
Novel cooling and heating and power combined power generation system based on movable solar heat collector
CN107940789A
Solar energy and organic Rankine cycle coupled combined heat and power generation system
CN116907109A
Biomass organic Rankine cycle combined cooling heating and power system
CN216620349U
Solar energy and biomass energy coupled combined heat and power generation system
CN223077161U
