Method capable of realizing time dynamic monitoring of mine fault activation degree

By monitoring the drill bit and abnormal device to obtain the resistivity and polarization data of the fault, use time to advance the trend chart and fault shape equivalence chart to dynamically monitor the degree of fault activation, and solve the problem of insufficient accuracy of fault activation prediction in the prior art. The prediction accuracy of fault activation under the influence of mining has been improved and mine losses have been reduced.

CN119087509APending Publication Date: 2024-12-06SHANDONG ENERGY GRP CO LTD

Patent Information

Application Number
CN202411161064.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art has insufficient accuracy in prediction of fault activation and is difficult to predict timely surrounding rock slip instability caused by fault activation under the influence of mining, which brings huge losses to the mine.

Method used

Using monitoring drill bits and abnormal devices, by obtaining resistivity and polarization data within the fault range, using time-propulsion trend charts and fault shape equality charts for dynamic monitoring, judge the degree of activation of faults, and improve prediction accuracy.

Benefits of technology

Through dual-parameter monitoring, the accuracy of fault activation prediction is improved, technical support for mining tunnel boring and mining work is provided, and the risk of mining power disasters is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119087509A_ABST
    Figure CN119087509A_ABST
Patent Text Reader

Abstract

The invention discloses a method capable of dynamically monitoring the activation degree of a mine fault in time, and relates to the technical field of mining disaster monitoring. The method comprises the following steps: by taking a fault surface of a fault as a central axial surface, installing an abnormal device in an upper disc of the fault, installing a monitoring drill bit in a lower disc, applying current to the monitoring drill bit to form an electric field in a monitoring range, converting an electric field signal collected by the electric field into a digital signal, analyzing resistivity and polarizability data in the digital signal, and determining the electrical resistivity and polarizability of the fault. And the time activation degree of the fault is judged according to the time change trend of the image, and time dynamic monitoring of the fault activation degree is formed. Compared with single parameter monitoring, the method is more accurate, the visual image is more persuasive, the prediction precision is further improved, and technical support is provided for mine roadway tunneling and working face stoping work.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining disaster monitoring, and in particular to a method capable of realizing temporal dynamic monitoring of the activation degree of a mine fault. Background Art

[0002] As a low-strength zone in the rock mass, faults are often activated by mining. Fault activation will cause strong deformation and destruction to the surrounding rock of the mine tunnel. The relative displacement of the upper and lower plates of the fault caused by mining activities and the sudden release of their relative elastic strain energy often cause mining dynamic disasters such as mine earthquakes, which bring huge losses to the mine.

[0003] The research reports on fault activation in the prior art include:

[0004] Application No. 202311291285.4 discloses a method, device and system for determining fault activation, the method comprising: first obtaining microseismic data of microseismic events, and determining the mining impact area (target area) based on the obtained microseismic frequency (quantity) and microseismic data, so as to preliminarily delineate an area in which activation may occur. Therefore, this scheme first delineates an area, which narrows the scope of subsequent judgment of activation and avoids disturbances in other unrelated areas. There is no need to make judgments based on a large range, and then clustering analysis is performed on the microseismic events in the mining impact area to determine the rupture mechanism of the microseismic events (i.e., the proportion of rupture components), that is, different fault rupture situations, different situations lead to different fault activation situations, and according to this proportion, the activation situation of the fault affected by mining disturbance is clarified.

[0005] Although the above existing technologies have predicted fault activation, their prediction accuracy needs to be further improved. Therefore, it is necessary to seek a fault activity status monitoring method to make a correct prediction of the fault activity status and make timely predictions of surrounding rock slip instability induced by fault activation under the influence of mining. Summary of the invention

[0006] The purpose of the present invention is to provide a method for realizing time-dynamic monitoring of the activation degree of mine faults. A monitoring drill bit and an abnormal device are installed corresponding to the fault surface. After multiple adjustments and monitoring, the resistivity and polarizability data within the fault range can be obtained. The dual-parameter data can be converted into a visualization to dynamically activate the displacement conditions of the upper and lower plates of the fault from the time level. The activation degree of the fault is judged by using the monitored time advancement trend chart and fault shape contour map. The prediction accuracy is further improved, providing technical support for mine tunnel excavation and working face recovery.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] A method for realizing time-dynamic monitoring of the activation degree of a mine fault comprises the following steps:

[0009] Step 1: According to different mine fault types, determine the hanging wall and the foot wall with the fault plane as the central axis;

[0010] Step 2: drilling holes perpendicular to the fault plane in the upper plate and the lower plate respectively. The number of holes is set according to the size of the fault plane. The number of holes in the upper plate and the number of holes in the lower plate are the same and their positions are relative.

[0011] Step 3: Install the required system

[0012] The system includes a surface monitoring center, a movable monitoring device and an abnormal device. The movable monitoring device includes a monitoring drill bit, a slide rail and a fixing part. The slide rail with the same length as the drill hole is installed in the lower plate, and the slide rail is fixed by the fixing part. The monitoring drill bit is installed on the slide rail and can move forward and backward along the slide rail. The abnormal device is installed in the drill hole in the upper plate. The monitoring drill bit includes a drill bit body and two electrodes located in the drill bit body. The two electrodes are used to monitor resistivity and polarizability respectively. The monitoring drill bit is connected to the surface monitoring center through a signal transmission line.

[0013] Step 4: Conduct initial monitoring

[0014] Start the system, monitor the drill bit excitation current to obtain the electric field signal, collect the electric field signal through the data collection system of the surface monitoring center and convert it into dual-parameter data, and form a visualized image of the initial measuring point by visualizing the dual-parameter data, wherein the visualized image includes a time advancement trend graph and a fault shape contour graph; adjust the monitoring drill bit through the slide rail to ensure that the monitoring drill bit time advancement trend graph and the fault shape contour graph can detect the corresponding abnormal device;

[0015] Step 5: Conduct periodic monitoring

[0016] The monitoring cycle is 10 to 20 hours. Data is collected every other monitoring cycle. The collected data is processed by the surface monitoring center to obtain a visual image of the fault at the measuring point after one monitoring cycle.

[0017] Step 6: Analyze the visualized image of the initial measuring point described in step 4 and the visualized image after one monitoring cycle described in step 5. Combined with theoretical knowledge, the dynamic activation process and degree of the mine fault over time can be monitored.

[0018] The above-mentioned method can realize time-dynamic monitoring of the activation degree of mine faults. The spacing between adjacent boreholes in the upper plate is 30m, the spacing between adjacent boreholes in the lower plate is 30m, the boreholes in the lower plate are 5m away from the fault edge, the depth of each borehole in the lower plate is 20m, and the boreholes in the upper plate are drilled through to the fault plane; the monitoring range of each monitoring drill bit is 20 to 30m.

[0019] The above-mentioned method can realize time-dynamic monitoring of the activation degree of mine faults. The abnormal device is made of spherical copper skin wrapped with liquefied ethane, which is used to form a clear contrast with the image of the fault in the visualized image; the abnormal device is fitted with the fault surface of the upper plate. When the fault is in an activated state, the upper plate and the lower plate undergo relative displacement, and the abnormal device and the monitoring drill bit also undergo relative displacement. At this time, the monitoring drill bit has a more obvious monitoring target during monitoring.

[0020] The above method can realize time-dynamic monitoring of the activation degree of mine faults. A signal transmission line and a power supply cable are set at the tail of the drill body of each monitoring drill bit, and both are connected to the surface monitoring center.

[0021] The above-mentioned method can realize time dynamic monitoring of the activation degree of mine faults. In step six, whether the upper plate and lower plate of the fault are displaced is judged by the time advancement trend diagram and the fault shape contour diagram, and the fault activation degree is judged by the displacement characteristics of the upper plate and lower plate; the time advancement trend diagram includes the apparent resistivity-time advancement trend diagram and the apparent polarizability-time advancement trend diagram.

[0022] The above-mentioned method can realize time dynamic monitoring of the activation degree of mine faults, and judges whether the upper plate and lower plate of the fault are displaced through the time advancement trend diagram and the fault shape contour diagram. The specific steps are: when the lateral distance between the valley area and the peak area in the apparent resistivity-time advancement trend diagram and the apparent polarizability-time advancement trend diagram becomes larger, it means that the fault distance is enlarged, and the upper plate and lower plate have displaced perpendicular to the fault plane direction; when in the fault shape contour diagram, the abnormal device display area facing the monitoring drill bit is not in the center of the opposite side, it means that the monitoring drill bit and the abnormal device have relative displacement, and then the upper plate and lower plate have relative displacement.

[0023] The above-mentioned method can realize time-dynamic monitoring of the degree of activation of mine faults. At the time level, when the fault is not activated, the time-advancing trend graph is a repetitive linear graph that remains unchanged over time. When the fault is activated, there will be a significant difference between the latter trend graph and the former trend graph in the time-advancing trend graph. The degree of fault activation can be judged by observing the length of peak and trough areas over time.

[0024] The above method can realize dynamic monitoring of the activation degree of mine faults. The abnormal device is installed at the deepest part of the borehole located in the upper wall and grouting is performed to seal it.

[0025] Compared with the prior art, the present invention brings the following beneficial technical effects:

[0026] (1) The measurement points are flexibly arranged, and the installation and operation are simple and convenient, eliminating complicated steps. The monitoring drill bit is installed corresponding to the abnormal device, which saves costs and improves monitoring efficiency.

[0027] (2) The time-advanced trend graph and the fault shape contour graph are used to determine whether the upper and lower plates of the fault have shifted, and the degree of fault activation is determined by the displacement characteristics of the upper and lower plates.

[0028] (3) The dual parameters of apparent resistivity and apparent polarizability are used to jointly monitor fault activation, which is more accurate than single parameter monitoring. The visualized images are more convincing. The changes in dual parameter data can dynamically monitor the degree of fault activation from the perspectives of time advancement and spatial shape. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will be further described below in conjunction with the accompanying drawings:

[0030] Figure 1 This is a schematic diagram of the installation of the drill bit and abnormality monitoring device of the present invention;

[0031] Figure 2 This is a schematic diagram of the corresponding positions of the monitoring drill bit and the abnormal device of the present invention;

[0032] Figure 3 It is the monitoring flow chart of the present invention;

[0033] Figure 4 (4a) and (4b) are comparisons of the detection time advancement trend diagrams of the initial state and the activated state of the measuring point 1;

[0034] Figure 5 (5a) and (5b) are comparisons of the detection time advancement trend diagrams of the initial state and the activated state of the measurement point 2;

[0035] Figure 6 (6a) and (6b) are comparisons of the detection time advancement trend diagrams of the initial state and the activated state of the measuring point three;

[0036] Figure 7 (7a) and (7b) are the comparison of the apparent polarizability-fault shape contour diagrams in the initial state and the activated state;

[0037] Figure 8 (8a) and (8b) are the comparison of the apparent resistivity-fault shape contour maps in the initial state and the activated state;

[0038] Fig. 9 Comparison of 3D trajectories of fault shapes in the initial state and the activated state. DETAILED DESCRIPTION

[0039] The present invention proposes a method for realizing time-dynamic monitoring of the activation degree of mine faults. In order to make the advantages and technical solutions of the present invention clearer and more specific, the present invention is further described below in conjunction with specific embodiments.

[0040] The monitoring drill bit mentioned in the present invention comprises a drill bit body, and the drill bit body comprises two independent electrodes, which are respectively used for monitoring resistivity and polarizability, that is, the monitoring drill bit serves as a detection drill bit.

[0041] The abnormal device described in the present invention is a device with extremely low resistivity and extremely high polarizability, which is made of spherical copper skin wrapped with liquefied ethane, and is used to form a clear contrast to the image of the fault in the visualization image.

[0042] The surface monitoring center mentioned in the present invention is a place for dynamically monitoring the degree of fault activation and visually converting dual-parameter data. It is set on the ground of the mine and includes a data processing system and other systems that can convert data into images.

[0043] Figure 1 This is a schematic diagram of the corresponding installation of the monitoring drill bit and the abnormal device of the present invention. Figure 2 This is a schematic diagram of the corresponding positions of the monitoring drill bit and the abnormal device of the present invention. Figure 3 It is a schematic diagram of the workflow, as shown in the schematic diagram: a method of the present invention that can realize time dynamic monitoring of the activation degree of mine faults is based on the dynamic monitoring of the already discovered faults in the early detection process of mining. Under the influence of mining, this method is used to dynamically monitor the activation degree of the faults at the time level. First, the discovered faults are analyzed, the fault planes of the faults are located, the upper plate and the lower plate are distinguished, a monitoring drill is installed in the lower plate, an abnormal device is installed in the upper plate, the system is started, and the monitoring drill transmits the electric field signal to the surface monitoring center through the transmission line. The surface monitoring center converts the signal into a visual image, and the activation degree of the fault at the time and space levels is judged by analyzing the visual image.

[0044] The system required for the method of the present invention includes a surface monitoring center, a movable monitoring device and an abnormal device. The movable monitoring device includes a monitoring drill bit, a slide rail and a fixing part. A slide rail with the same length as the drill hole is installed in the drill hole located in the lower plate, and the slide rail is fixed by a fixing part. The monitoring drill bit is installed on the slide rail and can move forward and backward along the slide rail. The purpose of the forward and backward movement is to adjust the position of the monitoring drill bit so that it can monitor the corresponding abnormal device located in the upper plate.

[0045] As a preferred embodiment of the present invention, the fixing member is preferably a fixing buckle. After the position of the monitoring drill bit is adjusted, the slide rail is fixed with the fixing buckle, and the monitoring can be carried out.

[0046] The abnormal device is installed in the drill hole located in the upper plate; the monitoring drill bit includes a drill bit body and two electrodes located in the drill bit body, the two electrodes are used to monitor resistivity and polarizability respectively, and the monitoring drill bit is connected to the surface monitoring center through a signal transmission line.

[0047] The present invention provides a method for realizing time-dynamic monitoring of the activation degree of faults in a mine, which specifically comprises the following steps:

[0048] Step 1: According to different fault types, determine the hanging wall and the footwall with the fault plane as the central axis;

[0049] Step 2: Drill holes are marked in the footwall in a direction parallel to the fault plane and perpendicular to the fault line, with an interval of 30m between the holes. The drilling operation is carried out perpendicular to the fault plane, with a distance of 5m from the fault edge and a depth of 20m. Drill holes are also marked in the hanging wall in a direction parallel to the fault plane and perpendicular to the fault line. The holes are drilled perpendicular to the fault plane and penetrate the hanging wall to the depth of the hanging wall fault plane.

[0050] Three groups of drilling holes are pre-arranged, and the number of drilling holes can be appropriately increased according to the size of the fault surface;

[0051] Step 3: Install a slide rail of the same length in the borehole on the lower plate. Fix the monitoring drill bit on the slide rail and allow it to slide up and down. Use a fixed buckle to limit its displacement. Place the abnormal device close to the fault surface of the upper plate, and then seal the borehole on the upper plate with grouting material.

[0052] Step 4: Conduct initial monitoring

[0053] Start the system, monitor the drill bit to excite the current to obtain the electric field signal, collect the electric field signal through the data collection system of the surface monitoring center and transmit it to the surface monitoring center through the signal transmission line, the signal is converted into dual-parameter data (resistivity and polarizability) by the equipment and a visual image (time advancement trend chart and fault shape contour map) is drawn, and the monitoring drill bit is pushed to the appropriate position through the slide rail to ensure that the monitoring area of ​​the monitoring drill bit includes the abnormal device on the opposite side of the fault, and when it reaches the appropriate position, the fixed buckle is opened to limit the displacement of the monitoring drill bit. After the monitoring drill bit reaches the appropriate position, the time trend curve and fault shape contour map detected are the initial data of the proven fault, which are recorded and sealed for comparison of subsequent fault activation;

[0054] Step 5: Subsequent periodic dynamic monitoring

[0055] After recording the initial data of the time advancement trend chart and the fault shape contour map, the monitoring drill bit is permanently retained underground for dynamic monitoring. The monitoring cycle is 10 to 20 hours. The optimal monitoring time for a complete fault is about 15 hours, and the monitoring depth is 45 meters. Data collection is performed every other monitoring cycle, and the collected data is processed by the surface monitoring center to obtain a visual image of the fault at the measuring point after a monitoring cycle.

[0056] From the time advancement trend chart, when the fault is not activated, the visualization image of the subsequent time monitoring of the time advancement trend chart is basically similar to the initial data; when the fault is activated, the visualization image of the subsequent time monitoring of the time advancement trend chart is significantly different from the initial data, which is specifically manifested as the peak area (apparent polarizability) or the trough area (apparent resistivity) on the time axis is significantly extended or shortened compared with the initial data. Because the monitoring direction of the monitoring drill is perpendicular to the fault plane, the monitoring data after fault activation can well reflect the displacement degree of the fault in the direction perpendicular to the fault plane. From the fault shape contour map, when the fault is not activated, the visualization image of the subsequent time drawn by the fault shape contour map is basically similar to the initial data; when the fault is activated, the fault shape contour map drawn by the monitoring drill is significantly different from the initial image, which is manifested in the change of apparent resistivity and apparent polarizability with the advancement of monitoring distance, and also manifested in the extension and shortening of the peak area and the trough area, which reflects that the upper and lower plates of the fault have displaced in the direction perpendicular to the fault plane. The second manifestation is that the shape of the fault drawn in the contour map is different from the initial fault shape, the left and right sides of the fault are extended or shortened, and the abnormal device and the monitoring drill bit are no longer positively corresponding, which means that the upper and lower plates of the fault have displaced in the direction parallel to the fault plane; when the upper and lower sides of the fault are extended or shortened, and the distance between the abnormal device and the monitoring drill bit is extended or shortened, it can also be said that the upper and lower plates of the fault have displaced in the direction perpendicular to the fault plane. If both situations occur, it means that the upper and lower plates of the fault have displaced in the directions parallel and perpendicular to the fault plane. The time advancement trend chart and the fault shape contour map complement each other in expression and jointly monitor the degree of activation of the fault.

[0057] Faults often contain fissure water, so the fault should be a whole with low resistivity and high polarizability. The apparent resistivity and apparent polarizability in the dual parameters are expressed as follows in the above two figures: in the apparent resistivity-time advancement trend diagram, the fault area is a continuous low valley area, and the abnormal device is displayed as a short-term extremely low valley area in the trend diagram; in the apparent polarizability-time advancement trend diagram, the fault area is a continuous peak area, and the abnormal device is displayed as a short-term extremely high peak area in the trend diagram; in the fault shape contour map, the fault area is an open or closed irregular area with a low amplitude line, and the abnormal device is displayed as a closed regular area with an extremely low amplitude line in the contour map.

[0058] The present invention is described in detail below with reference to specific embodiments.

[0059] Embodiment 1:

[0060] Taking a coal mining face in a mine as an example, during the mining process, the faults of the face are explained as follows:

[0061] Step 1: Before mining, conduct detailed exploration of the adjacent areas within different distances around the working face drift to detect the specific distribution, location and range of geological structures near the working face. It is found that there are two fault geological structures on the bottom plate of the working face. The fault is regarded as an aquifer with strong water-rich properties.

[0062] Step 2: Drill holes are arranged according to the fault structure. Drill holes are drilled every 30m along the fault direction in the footwall of the fault. The drilling direction is perpendicular to the fault plane. The drilling hole is 5m away from the fault edge and the drilling depth is 20m. Drill holes in the upper wall of the fault corresponding to the drilling position of the lower wall, and drill through the upper wall to the fault plane.

[0063] Step 3: After the borehole is cleaned, a slide rail of the same length as the borehole is fixed in the lower plate borehole, an integrated monitoring drill bit is installed on the slide rail, the tail of the monitoring drill bit is connected to the power supply cable and the signal transmission line to the surface monitoring center, and the abnormal device is installed at the deepest part of the upper plate borehole, and grouting is performed to seal it. In this embodiment, three abnormal devices are preferably installed;

[0064] Step 4: Perform initial monitoring, turn on the power, measure the electric field change signal through the mobile monitoring device arranged in the borehole, and transmit the electric field change signal to the surface monitoring center through the signal transmission line. The signal is converted into dual-parameter data (resistivity and polarizability) by the equipment and a visual image (time advancement trend chart and fault shape contour map) is drawn. The monitoring drill bit is pushed to the appropriate position through the slide rail to ensure that the monitoring area of ​​the monitoring drill bit includes the abnormal device on the opposite side of the fault. When it reaches the appropriate position, open the fixed buckle to limit the displacement of the monitoring drill bit. The time trend curve and fault shape contour map detected after the monitoring drill bit reaches the appropriate position are the initial data of the proven fault, which are recorded and sealed for comparison of subsequent fault activation;

[0065] Step 5: During tunnel excavation, the data collection system collects data every 15 hours and performs data analysis, specifically: Figures 4 to 9 A visualization of the collected data. Figure 4 (a) is the initial data of the time-advanced trend chart of measurement point 1, Figure 4(b) is the activation data of the time advancement trend diagram of measuring point 1. By comparing the two, it can be seen that the apparent resistivity and apparent polarizability of measuring point 1 did not change much before 45 hours, but after 45 hours, the apparent resistivity and apparent polarizability changed significantly, which was specifically manifested in the shortening of the trough area of ​​the apparent resistivity and the peak area of ​​the apparent polarizability, reflecting that the fault was activated after 45 hours, especially the displacement perpendicular to the fault plane.

[0066] Figure 5 (a) is the initial data of the time-advancing trend chart of measurement point 2. Figure 5 (b) is the activation data of the time advancement trend diagram of measuring point 2. By comparing the two, it can be seen that the apparent resistivity and apparent polarizability of measuring point 2 did not change much before 45 hours, and did not change much after 45 hours. It can be judged that the fault area detected by measuring point 2 has not undergone obvious activation.

[0067] Figure 6 (a) is the initial data of the time advancement trend chart of measurement point 3. Figure 6 (b) is the activation data of the time advancement trend diagram of measuring point three. By comparing the two, it can be seen that the apparent resistivity and apparent polarizability of measuring point three did not change much before 45 hours, but changed significantly after 45 hours, which is specifically manifested in the extension of the trough area of ​​​​the apparent resistivity and the peak area of ​​​​the apparent polarizability, reflecting that the fault was activated after 45 hours, especially the displacement perpendicular to the fault direction.

[0068] Figure 7 (a) Figure 7 (b) Figure 8 (a) Figure 8 (b) shows the fault shape contour maps of measuring points one, two, and three.

[0069] From the position changes of the monitoring drill bit and the abnormal device in the figure, it can be seen that the measuring points 1 and 2 are Figure 4 , Figure 5 The monitoring results are consistent. The fault area monitored by measuring point 1 shows that the displacement of the fault perpendicular to the fault plane is reduced, and the direct fault distance between the upper and lower walls of the fault is shortened. The fault area detected by measuring point 2 shows that there is no obvious displacement in the fault area and the fault is not obviously activated. The effect of measuring point 3 is Figure 6 There are new changes on the basis of the above. It can be seen from the fault area monitored by measuring point three that the corresponding positions of the drill bit and the abnormal device have shifted. Therefore, it means that the fault area monitored by measuring point three has not only undergone displacement perpendicular to the fault direction, which is specifically manifested as an increase in the direct fault distance between the upper and lower plates of the fault, but also reflects that the upper and lower plates of the fault have undergone displacement parallel to the fault plane and perpendicular to the fault line, which is specifically manifested as a horizontal displacement of the upper and lower plates of the fault. Therefore, the activation of the fault area monitored by measuring point three is manifested as an increase in the fault distance between the upper and lower plates of the fault, and a horizontal displacement has occurred.

[0070] Fig. 9 (a) Fig. 9 (b) shows the 3D trajectory diagram of the initial data and activation data of the fault at measuring points 1, 2, and 3. It can be clearly seen from the figure that the fault area detected by measuring point 1 has been activated in the direction perpendicular to the fault plane, which is manifested by the shortening of the upper and lower wall fault throws; there is not much difference between the initial data and the activation data of measuring point 2, and it is determined that no obvious activation has occurred; the fault area monitored by measuring point 3 has shifted in the directions perpendicular to the fault plane and parallel to the fault plane, which is manifested by the increase of the upper and lower wall fault throws and the horizontal displacement of the upper and lower walls parallel to the fault plane, which is consistent with the above Figures 4 to 8 The conclusions drawn from the attached figure are consistent.

[0071] Parts not described in the present invention can be implemented by referring to the existing technology.

[0072] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present application and are not intended to be limiting of the present application. As long as they are within the spirit and scope of the present application, appropriate changes and modifications to the above embodiments are within the scope of protection claimed in the present application.

Claims

1. A method for dynamically monitoring the degree of fault activation in a mine over time, characterized in that: The following steps are involved: Step 1: According to different mine fault types, determine the hanging wall and the foot wall with the fault plane as the central axis; Step 2: drilling holes perpendicular to the fault plane in the upper plate and the lower plate respectively. The number of holes is set according to the size of the fault plane. The number of holes in the upper plate and the number of holes in the lower plate are the same and their positions are relative. Step 3: Install the required system The system includes a surface monitoring center, a movable monitoring device and an abnormal device. The movable monitoring device includes a monitoring drill bit, a slide rail and a fixing part. The slide rail with the same length as the drill hole is installed in the lower plate, and the slide rail is fixed by the fixing part. The monitoring drill bit is installed on the slide rail and can move forward and backward along the slide rail. The abnormal device is installed in the drill hole in the upper plate. The monitoring drill bit includes a drill bit body and two electrodes located in the drill bit body. The two electrodes are used to monitor resistivity and polarizability respectively. The monitoring drill bit is connected to the surface monitoring center through a signal transmission line. Step 4: Conduct initial monitoring Start the system, monitor the drill bit excitation current to obtain the electric field signal, collect the electric field signal through the data collection system of the surface monitoring center and convert it into dual-parameter data, and form a visualized image of the initial measuring point by visualizing the dual-parameter data, wherein the visualized image includes a time advancement trend graph and a fault shape contour graph; adjust the monitoring drill bit through the slide rail to ensure that the monitoring drill bit time advancement trend graph and the fault shape contour graph can detect the corresponding abnormal device; Step 5: Conduct periodic monitoring The monitoring cycle is 10 to 20 hours. Data is collected every other monitoring cycle. The collected data is processed by the surface monitoring center to obtain a visual image of the fault at the measuring point after one monitoring cycle. Step 6: Analyze the visualized image of the initial measuring point described in step 4 and the visualized image after one monitoring cycle described in step 5. Combined with theoretical knowledge, the dynamic activation process and degree of the mine fault over time can be monitored.

2. A method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 1, characterized in that: The spacing between adjacent boreholes in the upper plate is 30m, the spacing between adjacent boreholes in the lower plate is 30m, the boreholes in the lower plate are 5m away from the fault edge, the depth of each borehole in the lower plate is 20m, and the boreholes in the upper plate are drilled through to the fault plane; the monitoring range of each monitoring drill bit is 20 to 30m.

3. A method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 2, characterized in that: The abnormal device is made of liquefied ethane wrapped in a spherical copper skin, which is used to form a clear contrast with the image of the fault in the visualized image; the abnormal device is fitted with the fault surface of the upper plate. When the fault is in an activated state, the upper plate and the lower plate undergo relative displacement, and the abnormal device and the monitoring drill bit also undergo relative displacement. At this time, the monitoring drill bit has a more obvious monitoring target during monitoring.

4. The method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 1, characterized in that: A signal transmission line and a power supply cable are arranged at the tail of the drill body of each monitoring drill bit, and are connected to the surface monitoring center.

5. The method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 1, characterized in that: In step six, the time advancement trend diagram and the fault shape contour diagram are used to determine whether the upper and lower plates of the fault have been displaced, and the degree of fault activation is determined by the displacement characteristics of the upper and lower plates; the time advancement trend diagram includes an apparent resistivity-time advancement trend diagram and an apparent polarizability-time advancement trend diagram.

6. A method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 5, characterized in that: The time advancement trend diagram and fault shape contour diagram are used to determine whether the upper and lower plates of the fault have been displaced. The specific steps are as follows: when the lateral distance between the valley area and the peak area in the apparent resistivity-time advancement trend diagram and the apparent polarizability-time advancement trend diagram becomes larger, it means that the fault throw is enlarged and the upper and lower plates have been displaced perpendicular to the fault plane; when the abnormal device display area in the direction facing the monitoring drill bit in the fault shape contour diagram is not in the center of the opposite side, it means that the monitoring drill bit and the abnormal device have been relatively displaced, and then the upper and lower plates have been relatively displaced.

7. A method for realizing time-dynamic monitoring of the activation degree of faults in a mine according to claim 6, characterized in that: At the temporal level, when the fault is not activated, the time-advanced trend graph is a repetitive linear graph that remains unchanged over time. When the fault is activated, there will be a significant difference between the latter and former trend graphs in the time-advanced trend graph. The degree of fault activation can be determined by observing the length of peak and trough areas over time.

8. The method for dynamically monitoring the activation degree of faults in a mine according to claim 1, characterized in that: The abnormal device is installed at the deepest part of the borehole located in the upper wall and is sealed by grouting.

Citation Information

Patent Citations

  • Method, device and system for determining fault activation

    CN117310814A

  • Pressure-bearing fault activated water inrush multi-field information collaborative monitoring sudden-inrush forecasting method and system

    CN108412547A

  • Intelligent monitoring method and system for mine fault stability

    CN109387244A

  • Tectonic activation double-parameter monitoring system and monitoring method

    CN111077583A

  • Indoor test device and method for fault activation multi-field observation and prediction

    CN111861042A

Cited By

  • Method, device and system for determining fault activation

    CN117310814A

  • Method, device and system for determining fault activation

    CN117310814B