Method and device for adjusting seepage barrier coefficient distribution, medium and electronic equipment
By correcting and adjusting the seepage barrier coefficient distribution in block bottom water reservoirs, the problem of poor horizontal well development results in the existing technology is solved, and the production efficiency and guiding significance of new well deployment is improved.
Patent Information
- Application Number
- CN202310655768.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-05
- Publication Date
- 2024-12-06
AI Technical Summary
In block bottom water reservoirs, it is difficult for the prior art to effectively adjust the seepage barrier coefficient distribution, resulting in large differences in the development effects of horizontal wells, and the configuration relationship of the interlayer cannot be fully considered, which affects production efficiency.
By obtaining the anhydrous oil production period and water content rise rate of horizontal wells, identifying the production section and oil-water interface, correcting the initial seepage barrier coefficient distribution curve, generating a seepage barrier coefficient distribution correction curve, and adjusting the seepage barrier coefficient distribution curve of the superimposed separator The seepage barrier coefficient distribution diagram of the effective interlayer section improves the degree of fit with actual production.
The compatibility between the seepage barrier coefficient distribution and horizontal well development is improved, the production efficiency of horizontal wells is optimized, and data support and guidance for new well deployment is provided.
Smart Images

Figure CN119089126A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of petroleum development, and in particular relates to a method, device, medium and electronic equipment for adjusting the distribution of seepage barrier coefficient. Background Art
[0002] Massive bottom water reservoirs are a common type of reservoir in domestic oil fields. They are generally characterized by large reserves, good reservoir properties, active edge and bottom water, and well-developed interlayers. The application of horizontal well production can effectively improve the development problems of vertical well development, such as small plane utilization range, rapid water content increase, rapid production decline, and bottom water cone advance.
[0003] At the same time, the large-scale implementation of horizontal wells has also brought new problems that need to be solved urgently, such as: First, when the production effects of horizontal wells vary greatly, how to combine geological bodies to conduct production dynamic analysis, carry out residual oil research and adaptability research on extraction methods; second, how to guide and optimize the deployment and design of new horizontal wells through the implemented horizontal wells; third, how to determine a reasonable working system for the produced horizontal wells to improve the reservoir development indicators.
[0004] Since fluid movement in reservoir development is a complex migration process, the production characteristics and water content characteristics of each single well can reflect the accuracy of the seepage barrier coefficient characterization results to a certain extent. In the actual production process, the initial results of the quantitative characterization of the seepage barrier coefficient cannot be completely matched with the development, so in the application process of the seepage barrier coefficient distribution results, the seepage barrier coefficient distribution should be continuously corrected and improved according to the dynamic production characteristics and the production trajectory of the new well.
[0005] The article "Study on the Development Law of Seepage Barriers in Deepwater Turbidity Channel Sand Bodies" takes the AKPO oil field in West Africa as an example, combined with the typical outcrop area in Gannan, to conduct a study on the connectivity of sand bodies, explore the appropriate characterization method of the seepage barrier inside the turbidite sand body, and combine it with the actual production to analyze the injection and production effect mode and water content increase law under different connectivity conditions. However, the current research method ignores the trajectory of the horizontal well production section and the configuration relationship between the interlayer during the development process. The engineering trajectory factor still plays a key role in affecting production.
[0006] Therefore, the present invention provides a method for adjusting the distribution of seepage barrier coefficients to correct the distribution of seepage barrier coefficients to achieve the above technical requirements. Summary of the invention
[0007] The present invention provides a method, device, medium and electronic device for adjusting the distribution of seepage barrier coefficients. The method for adjusting the distribution of seepage barrier coefficients provided by the present invention can improve the compatibility of the distribution of seepage barrier coefficients with horizontal well development.
[0008] Other features and advantages of the present invention will become apparent from the following detailed description, or may be learned in part by the practice of the present invention.
[0009] According to the first aspect of the present invention, a method for adjusting the distribution of seepage barrier coefficient is provided, characterized in that the method includes: obtaining the water-free production period and water-cut rising rate of a horizontal well, and determining the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well, and obtaining the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and the initial seepage barrier coefficient distribution map corresponding to the effective interlayer section; correcting the initial seepage barrier coefficient distribution curve according to the water-free production period and the water-cut rising rate, so as to obtain a corrected seepage barrier coefficient distribution curve; obtaining the seepage barrier coefficient distribution map corresponding to the effective interlayer section based on the corrected seepage barrier coefficient distribution curve; if the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map, the seepage barrier coefficient distribution is adjusted.
[0010] In some embodiments of the present invention, based on the aforementioned scheme, the initial seepage barrier coefficient distribution curve is corrected according to the water-free oil production period and the water cut rising rate, including: judging whether the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference according to the water-free oil production period and the water cut rising rate; if the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference, then based on the water-free oil production period and the water cut rising rate, the initial seepage barrier coefficient distribution curve is corrected.
[0011] In some embodiments of the present invention, based on the aforementioned scheme, the seepage barrier coefficient distribution correction curve is used to obtain the seepage barrier coefficient distribution map corresponding to the effective interlayer section, including: superimposing the seepage barrier coefficient distribution correction curves corresponding to each interlayer in the effective interlayer section to obtain the seepage barrier coefficient distribution map corresponding to the effective interlayer section.
[0012] In some embodiments of the present invention, based on the above scheme, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained by the following formula:
[0013] T 总 =T 1-2 +T 2-3 +T 3-4 ……+T n-n+1
[0014] Among them, T 总 is the distribution diagram of seepage barrier coefficient corresponding to the effective interlayer section, T 1-2is the seepage barrier coefficient distribution curve of the first interlayer, T 2-3 is the seepage barrier coefficient distribution curve of the second interlayer, T 3-4 is the seepage barrier coefficient distribution curve of the third interlayer, T n-n+1 is the seepage barrier coefficient distribution curve of the nth interlayer.
[0015] In some embodiments of the present application, based on the aforementioned scheme, if the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map, the seepage barrier coefficient distribution is adjusted, including: calculating the first production fit according to the seepage barrier coefficient distribution map and the actual production parameters of the current horizontal well; calculating the second production fit according to the initial seepage barrier coefficient distribution map and the actual production parameters of the current horizontal well; if the first production fit is greater than the second production fit, the seepage barrier coefficient distribution is adjusted.
[0016] In some embodiments of the present invention, based on the aforementioned scheme, the method further includes: if the first production fit is less than the second production fit, then using the seepage barrier coefficient distribution map as a new initial seepage barrier coefficient distribution map, and returning to execute the step of correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water content increase rate to obtain a seepage barrier coefficient distribution correction curve.
[0017] In some embodiments of the present application, based on the aforementioned scheme, after realizing the adjustment of the seepage barrier coefficient distribution, the method further includes: adjusting the development parameters of the horizontal well according to the seepage barrier coefficient distribution map corresponding to the effective interlayer section, thereby improving the production efficiency of the horizontal well.
[0018] According to a second aspect of the present invention, a device for adjusting the distribution of seepage barrier coefficients is provided, characterized in that the device comprises: an acquisition unit for acquiring the water-free production period and the water-cut rising rate of a horizontal well, and determining the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well, and acquiring the seepage barrier coefficient of the vertical well corresponding to the horizontal well, as well as the initial seepage barrier coefficient distribution curve and the initial seepage barrier coefficient distribution map corresponding to the effective interlayer section; a correction unit for correcting the initial seepage barrier coefficient distribution curve according to the water-free production period and the water-cut rising rate, so as to obtain a seepage barrier coefficient distribution correction curve; a calculation unit for obtaining the seepage barrier coefficient distribution map corresponding to the effective interlayer section based on the seepage barrier coefficient distribution correction curve; and a judgment unit for adjusting the seepage barrier coefficient distribution if the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map.
[0019] According to a third aspect of the present invention, a computer-readable storage medium is provided, wherein at least one program code is stored in the computer-readable storage medium, and the at least one program code is loaded and executed by a processor to implement the operations performed by the described method.
[0020] According to a fourth aspect of the present invention, an electronic device is provided, characterized in that the electronic device includes one or more processors and one or more memories, at least one program code is stored in the one or more memories, and the at least one program code is loaded and executed by the one or more processors to implement the operations performed by the method.
[0021] Compared with the prior art, the present invention has at least the following beneficial effects:
[0022] After quantifying the seepage barrier of the interlayer, the present invention obtains the water-free oil production period and water content rise rate of the horizontal well, and determines the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well. The effective interlayer section represents the area where the oil-water interface in the massive bottom water reservoir intersects with the area below the horizontal well.
[0023] By obtaining the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution map corresponding to the effective interlayer section. Among them, the initial seepage barrier coefficient distribution curve is obtained by plane phase-controlled interpolation of the interlayer seepage barrier coefficient, and the initial seepage barrier coefficient distribution map is obtained by superimposing multiple initial seepage barrier coefficient distribution curves.
[0024] According to the water-free oil production period and water content increase rate of the horizontal well, the initial seepage barrier coefficient distribution curve can be corrected to obtain the seepage barrier coefficient distribution correction curve. Based on the obtained seepage barrier coefficient distribution correction curve, the seepage barrier coefficient distribution map corresponding to the effective interlayer section is obtained by superposition.
[0025] Then, the seepage barrier coefficient of the interlayer can be corrected according to the first production fit corresponding to the calculated seepage barrier coefficient distribution map and the second production fit corresponding to the initial seepage barrier coefficient distribution map. If the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map, it means that the seepage barrier coefficient of the interlayer after correction is more in line with the actual production situation than the seepage barrier coefficient of the interlayer before correction, thereby achieving the adjustment of the seepage barrier coefficient distribution.
[0026] Based on this, the method for adjusting the seepage barrier coefficient distribution provided by the present invention can improve the compatibility of the seepage barrier coefficient distribution with the horizontal well development. At the same time, it can provide data support and good guidance in the process of new well deployment.
[0027] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present invention, and together with the specification, are used to explain the principles of the present invention. Obviously, the drawings described below are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0029] Figure 1 A schematic diagram showing the characterization range of the effective seepage barrier of a horizontal well in an embodiment of the present application is shown;
[0030] Figure 2 A flow chart showing a method for adjusting the distribution of seepage barrier coefficients in an embodiment of the present application is shown;
[0031] Figure 3 The horizontal well production curves of different water-free oil production periods and different water cut increase rates in the embodiment of the present application are shown;
[0032] Figure 4 The interlayer seepage barrier coefficient distribution curve and the seepage barrier coefficient distribution diagram in the embodiment of the present application are shown;
[0033] Figure 5 A schematic diagram showing the development of interlayers in an embodiment of the present application is shown;
[0034] Figure 6 Another schematic diagram of interlayer development in an embodiment of the present application is shown;
[0035] Figure 7 Another schematic diagram of interlayer development in an embodiment of the present application is shown;
[0036] Figure 8 Another schematic diagram of interlayer development in an embodiment of the present application is shown;
[0037] Fig. 9 A schematic diagram of the structure of a device for adjusting the distribution of seepage barrier coefficients in an embodiment of the present application is shown;
[0038] Fig.10 A schematic diagram of the structure of an electronic device in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present invention. However, it will be appreciated by those skilled in the art that the technical scheme of the present invention can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the present invention.
[0041] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.
[0042] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.
[0043] Reference Figure 1 , showing a schematic diagram of the characterization range of the effective seepage barrier of the horizontal well in the embodiment of the present application. In a massive bottom water reservoir, interlayers are distributed in the oil zone and the water zone. The effective interlayer section characterizes the area where the oil-water interface in the massive bottom water reservoir intersects with the area below the horizontal well. The reason why the effective interlayer section is selected as the area for adjusting the distribution of the seepage barrier coefficient is that the seepage barrier coefficient of the interlayer in the effective interlayer section can play a good role in production comparison.
[0044] Next, the present invention application will be described in detail:
[0045] Figure 2The flowchart of the method for adjusting the distribution of the seepage barrier coefficient in the embodiment of the present application is shown. The method for adjusting the distribution of the seepage barrier coefficient can be performed by a device with a computing and processing function, for example, by a device for adjusting the distribution of the seepage barrier coefficient. Figure 2 As shown, the method for adjusting the distribution of the seepage barrier coefficient includes at least steps 210 to 240, which are described in detail as follows:
[0046] Step 210, obtaining the water-free production period and water cut rise rate of the horizontal well, and determining the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well, and obtaining the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution diagram corresponding to the effective interlayer section;
[0047] Step 220, correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water cut increase rate, thereby obtaining a seepage barrier coefficient distribution correction curve;
[0048] Step 230, based on the seepage barrier coefficient distribution correction curve, obtain a seepage barrier coefficient distribution diagram corresponding to the effective interlayer section;
[0049] Step 240: If the first production fit corresponding to the seepage barrier coefficient distribution diagram is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution diagram, the seepage barrier coefficient distribution is adjusted.
[0050] In this application, reference is made to Figure 3 , shows the horizontal well production curves of different water-free oil production periods and different water content increase rates in the embodiment of the present application. First, Figure 3 The water-free production period and water-cut rise rate of the horizontal well are obtained. Under normal circumstances, the larger the seepage barrier coefficient, the longer the water-free production period under the original reservoir conditions in the current area, and the lower the water-cut rise rate. Therefore, by obtaining the water-free production period and water-cut rise rate of the horizontal well, it is possible to clearly know whether the actual seepage barrier coefficient in the current area conflicts with the seepage barrier coefficient in the initial seepage barrier coefficient distribution map.
[0051] Then, the effective interlayer section is determined by identifying the horizontal well production section and the oil-water interface. Figure 4 , shows the interlayer seepage barrier coefficient distribution curve and seepage barrier coefficient distribution diagram in the embodiment of the present application. In the case of introducing the concept of seepage barrier coefficient, the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution diagram corresponding to the effective interlayer section are obtained. Figure 4The upper part shows the initial seepage barrier coefficient distribution curve and the initial seepage barrier coefficient distribution diagram. The initial seepage barrier coefficient distribution curve is obtained by plane phase-controlled interpolation of the interlayer seepage barrier coefficient, while the initial seepage barrier coefficient distribution diagram is obtained by superimposing multiple initial seepage barrier coefficient distribution curves.
[0052] According to the water-free oil production period and the water content increase rate obtained above, the initial seepage barrier coefficient in the initial seepage barrier coefficient distribution curve is judged, so as to correct the initial seepage barrier coefficient and obtain the seepage barrier coefficient distribution correction curve. Figure 4 The lower part shows the distribution correction curve of the seepage barrier coefficient.
[0053] Among them, in the process of judging the initial seepage barrier coefficient in the initial seepage barrier coefficient distribution curve, thereby correcting the initial seepage barrier coefficient and obtaining the seepage barrier coefficient distribution correction curve, the following steps can be included: according to the water-free oil production period and the water cut rising rate, judging whether the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference; if the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference, then based on the water-free oil production period and the water cut rising rate, correcting the initial seepage barrier coefficient distribution curve.
[0054] It should be noted that when correcting the initial seepage barrier coefficient, it is necessary to find reasonable values from the H and Kv values of the interlayers corresponding to the vertical wells in the corresponding area, because there will be certain calculation errors when performing plane phase control interpolation when the well spacing is large.
[0055] After obtaining the seepage barrier coefficient distribution correction curve, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained based on the seepage barrier coefficient distribution correction curve. Figure 4 As shown in the lower part, a seepage barrier coefficient distribution diagram is presented. In the process of obtaining the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section based on the seepage barrier coefficient distribution correction curve, the following steps may be included: obtaining the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section by superimposing the seepage barrier coefficient distribution correction curves corresponding to each interlayer in the effective interlayer section.
[0056] Furthermore, in one embodiment of the present application, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained by the following formula:
[0057] T 总 =T 1-2 +T 2-3 +T 3-4 ……+T n-n+1
[0058] Among them, T 总 is the distribution diagram of seepage barrier coefficient corresponding to the effective interlayer section, T 1-2 is the seepage barrier coefficient distribution curve of the first interlayer, T 2-3 is the seepage barrier coefficient distribution curve of the second interlayer, T 3-4 is the seepage barrier coefficient distribution curve of the third interlayer, T n-n+1 is the seepage barrier coefficient distribution curve of the nth interlayer.
[0059] Based on the seepage barrier coefficient distribution map corresponding to the above-mentioned effective interlayer section, if the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map, the seepage barrier coefficient distribution is adjusted.
[0060] In one embodiment of the present application, if the first production fit corresponding to the seepage barrier coefficient distribution diagram is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution diagram, the seepage barrier coefficient distribution is adjusted, which may specifically include steps 241 to 243:
[0061] Step 241, calculating a first production compliance according to the seepage barrier coefficient distribution map and actual production parameters of the current horizontal well.
[0062] Step 242, calculating a second production compliance according to the initial seepage barrier coefficient distribution map and the actual production parameters of the current horizontal well.
[0063] Step 243: if the first production conformity is greater than the second production conformity, the seepage barrier coefficient distribution is adjusted.
[0064] In this application, the adjustment of the interlayer seepage barrier coefficient distribution in the effective interlayer section is a dynamic adjustment process, and the production fit after each adjustment should be higher than the production fit after the previous adjustment. After obtaining the seepage barrier coefficient distribution map and the initial seepage barrier coefficient distribution map, the first production fit and the second production fit are calculated respectively in combination with the actual production parameters of the current horizontal well.
[0065] If the first production fit is greater than the second production fit, the seepage barrier coefficient distribution of the interlayer in the effective interlayer section is adjusted according to the seepage barrier coefficient distribution diagram, thereby achieving the adjustment of the seepage barrier coefficient distribution.
[0066] Furthermore, in one embodiment of the present application, the adjustment of the seepage barrier coefficient distribution of the interlayer in the above-mentioned effective interlayer section is a dynamic adjustment process. Therefore, if the first production fit is less than the second production fit, the seepage barrier coefficient distribution map is used as a new initial seepage barrier coefficient distribution map, and the step of returning to execute the step of correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water content increase rate, thereby obtaining the seepage barrier coefficient distribution correction curve.
[0067] Furthermore, in one embodiment of the present application, after the seepage barrier coefficient distribution is adjusted, the development parameters of the horizontal well can be adjusted according to the seepage barrier coefficient distribution map corresponding to the effective interlayer section, thereby improving the production efficiency of the horizontal well.
[0068] Specifically, refer to Figure 5 , showing a schematic diagram of the interlayer development in the embodiment of the present application. In the case where the interlayer of the water injection vertical well is not developed and the interlayer of the lower part of the oil production horizontal well is developed, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section will show that the seepage barrier coefficient of the water injection vertical well is small and the seepage barrier coefficient of the oil production horizontal well is large, and the horizontal well production effect is good, but the water injection effect is not good. Since the vertical well water injection and bottom water are connected, and the residual oil between the wells cannot be effectively mobilized, at this time, the horizontal well can be produced by lifting liquid.
[0069] Reference Figure 6 , shows another schematic diagram of the interlayer development in the embodiment of the present application. In the case where interlayers are developed in water injection vertical wells and interlayers are not developed in the lower part of oil production horizontal wells, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section will show that the seepage barrier coefficient of the water injection vertical well is large and the seepage barrier coefficient of the oil production horizontal well is small, which will result in poor production effect of the horizontal well, and good oil production effect before the vertical well is transferred to injection, but poor water injection effect. At present, the remaining oil between wells cannot be effectively used. It can be considered to increase the water injection volume of the vertical wells and control the liquid production of the horizontal wells.
[0070] Reference Figure 7 , shows another schematic diagram of the interlayer development in the embodiment of the present application. In the case of interlayer development in water injection vertical wells and interlayer development in the lower part of oil production horizontal wells, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section shows that the water injection vertical well has a large seepage barrier coefficient and the oil production horizontal well has a large seepage barrier coefficient, and the horizontal well has a good production effect and a good water injection effect. Vertical well water injection can effectively mobilize the remaining oil between wells, and such horizontal wells are suitable for liquid extraction.
[0071] Reference Figure 8, shows another schematic diagram of the interlayer development in the embodiment of the present application. In the case where the interlayer of the water injection vertical well is not developed and the interlayer of the lower part of the oil production horizontal well is not developed, the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section will show that the seepage barrier coefficient of the water injection vertical well is small, and the seepage barrier coefficient of the oil production horizontal well is small, which will result in poor production effect of the horizontal well and poor water injection effect. Adjustment limitations in this mode are very large, and liquid production needs to be controlled.
[0072] Based on the same inventive concept, the present invention also provides a device for adjusting the distribution of the seepage barrier coefficient, referring to Fig. 9 , showing a schematic diagram of the structure of the device for adjusting the distribution of the seepage barrier coefficient in the embodiment of the present application. The device 900 for adjusting the distribution of the seepage barrier coefficient includes: an acquisition unit 901, which is used to obtain the water-free oil production period and the water content rise rate of the horizontal well, and determine the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well, and obtain the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution map corresponding to the effective interlayer section; a correction unit 902, which is used to correct the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water content rise rate, so as to obtain the seepage barrier coefficient distribution correction curve; a calculation unit 903, which is used to obtain the seepage barrier coefficient distribution map corresponding to the effective interlayer section based on the seepage barrier coefficient distribution correction curve; a judgment unit 904, which is used to adjust the seepage barrier coefficient distribution if the first production fit corresponding to the seepage barrier coefficient distribution map is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution map.
[0073] For details not disclosed in the embodiments of the device of the present invention, please refer to the embodiments of the above method of the present invention.
[0074] Based on the same inventive concept, the present application also provides a computer-readable storage medium, characterized in that at least one program code is stored in the computer-readable storage medium, and the at least one program code is loaded and executed by a processor to implement the operations performed by the described method.
[0075] Based on the same inventive concept, the present invention application also provides an electronic device, referring to Fig.10 , Fig.10 A schematic diagram of the structure of an electronic device in an embodiment of the present application is shown.
[0076] The electronic device includes one or more memories 1004, one or more processors 1002, and at least one computer program (program code) stored in the memory 1004 and executable on the processor 1002. When the processor 1002 executes the computer program, the method described above is implemented.
[0077] Among them, Fig.10 In the embodiment of the present invention, a bus architecture (represented by bus 1000) is shown, and bus 1000 may include any number of interconnected buses and bridges, and bus 1000 links various circuits including one or more processors represented by processor 1002 and memory represented by memory 1004. Bus 1000 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 1005 provides an interface between bus 1000 and receiver 1001 and transmitter 1003. Receiver 1001 and transmitter 1003 may be the same element, namely a transceiver, providing a unit for communicating with various other devices over a transmission medium. Processor 1002 is responsible for managing bus 1000 and general processing, while memory 1004 may be used to store data used by processor 1002 when performing operations.
[0078] The functions described herein may be implemented in hardware, software executed by a processor, firmware, or any combination thereof. If implemented in software executed by a processor, the functions may be stored as one or more instructions or codes on a computer-readable medium or transmitted via a computer-readable medium. Other examples and implementations are within the scope and spirit of the present application and the appended claims. For example, due to the nature of software, the functions described above may be implemented using software executed by a processor, hardware, firmware, hard wiring, or a combination of any of these. In addition, each functional unit may be integrated into a processing unit, each unit may be physically present separately, or two or more units may be integrated into one unit.
[0079] In the several embodiments provided in the present application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0080] The units described as separate components may or may not be physically separated, and the components of the control device may or may not be physical units, that is, they may be located in one place or distributed in multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0081] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0082] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may be modified and varied in various ways. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.
Claims
1. A method for adjusting the distribution of seepage barrier coefficients, characterized in that: The method comprises: Obtain the water-free production period and water content rise rate of the horizontal well, and determine the effective interlayer section by identifying the production section and oil-water interface of the horizontal well, and obtain the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution map corresponding to the effective interlayer section; According to the water-free oil production period and the water content increase rate, the initial seepage barrier coefficient distribution curve is corrected to obtain a seepage barrier coefficient distribution correction curve; Based on the seepage barrier coefficient distribution correction curve, a seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained; If the first production fit corresponding to the seepage barrier coefficient distribution diagram is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution diagram, the seepage barrier coefficient distribution is adjusted.
2. The method according to claim 1, characterized in that: The step of correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water cut increase rate comprises: According to the water-free oil production period and the water cut increase rate, determining whether the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference; If the difference between the actual seepage barrier coefficient of the current horizontal well and the preset seepage barrier coefficient is greater than the preset difference, the initial seepage barrier coefficient distribution curve is corrected based on the water-free production period and the water cut increase rate.
3. The method according to claim 1, characterized in that The method of obtaining the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section based on the seepage barrier coefficient distribution correction curve includes: By superimposing the seepage barrier coefficient distribution correction curves corresponding to each interlayer in the effective interlayer section, a seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained.
4. The method according to claim 3, characterized in that The seepage barrier coefficient distribution diagram corresponding to the effective interlayer section is obtained by the following formula: T 总 =T 1-2 +T 2-3 +T 3-4 ……+T n-n+1 Among them, T 总 is the distribution diagram of seepage barrier coefficient corresponding to the effective interlayer section, T 1-2 is the seepage barrier coefficient distribution curve of the first interlayer, T 2-3 is the seepage barrier coefficient distribution curve of the second interlayer, T 3-4 is the seepage barrier coefficient distribution curve of the third interlayer, T n-n+1 is the seepage barrier coefficient distribution curve of the nth interlayer.
5. The method according to claim 1, characterized in that If the first production fit degree corresponding to the seepage barrier coefficient distribution diagram is greater than the second production fit degree corresponding to the initial seepage barrier coefficient distribution diagram, adjusting the seepage barrier coefficient distribution includes: Calculating a first production fit according to the seepage barrier coefficient distribution map and actual production parameters of the current horizontal well; Calculating a second production fit according to the initial seepage barrier coefficient distribution map and actual production parameters of the current horizontal well; If the first production fitness is greater than the second production fitness, the seepage barrier coefficient distribution is adjusted.
6. The method according to claim 5, characterized in that The method further comprises: If the first production fit is less than the second production fit, the seepage barrier coefficient distribution map is used as a new initial seepage barrier coefficient distribution map, and the step of correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water content increase rate is returned to obtain the seepage barrier coefficient distribution correction curve.
7. The method according to claim 1, characterized in that After the adjustment of the seepage barrier coefficient distribution is achieved, the method further includes: According to the seepage barrier coefficient distribution diagram corresponding to the effective interlayer section, the development parameters of the horizontal well are adjusted to improve the production efficiency of the horizontal well.
8. A device for adjusting the distribution of seepage barrier coefficients, characterized in that: The device comprises: An acquisition unit is used to acquire the water-free production period and water content rise rate of the horizontal well, and to determine the effective interlayer section by identifying the production section and the oil-water interface of the horizontal well, and to acquire the seepage barrier coefficient of the vertical well corresponding to the horizontal well and the initial seepage barrier coefficient distribution curve and initial seepage barrier coefficient distribution diagram corresponding to the effective interlayer section; A correction unit, used for correcting the initial seepage barrier coefficient distribution curve according to the water-free oil production period and the water content increase rate, so as to obtain a seepage barrier coefficient distribution correction curve; A calculation unit, used for obtaining a seepage barrier coefficient distribution diagram corresponding to the effective interlayer section based on the seepage barrier coefficient distribution correction curve; A judgment unit is used to adjust the seepage barrier coefficient distribution if the first production fit corresponding to the seepage barrier coefficient distribution diagram is greater than the second production fit corresponding to the initial seepage barrier coefficient distribution diagram.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one program code, and the at least one program code is loaded and executed by a processor to implement the operations performed by the method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: The electronic device includes one or more processors and one or more memories, wherein the one or more memories store at least one program code, and the at least one program code is loaded and executed by the one or more processors to implement the operations performed by the method according to any one of claims 1 to 7.
