Water plant field three-dimensional display system integrating BIM and AR

By integrating BIM and AR technology, the three-dimensional on-site display of water plant design is solved, the designers lack of understanding of the field environment is improved, the design efficiency and construction quality are improved, errors and resource waste are reduced, and the water plant design is achieved efficiently , convenient and visual coordination.

CN119089531AInactive Publication Date: 2024-12-06POWERCHINA HUADONG ENG CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310662405.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-06
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the water plant design, the lack of on-site environmental understanding of the designers leads to mismatch between the drawings and construction conditions, resulting in delayed construction periods and unqualified project quality. The poor intuitiveness of traditional two-dimensional design drawings leads to difficulty in coordination with the design team and on-site personnel.

Method used

Using a water plant field 3D display system that integrates BIM and AR, it realizes the superposition of three-dimensional models and field scenes through two-dimensional drawing import, BIM three-dimensional modeling, model data processing and AR front-end rendering, and uses GPS, gyroscope and camera for real-time use. Interaction, providing augmented reality effects.

Benefits of technology

It improves the work efficiency of designers, reduces design changes and construction errors, ensures high-quality and efficient completion of water plant projects, reduces the probability of accidents and resource waste, and enhances the visualization and coordination of the design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089531A_ABST
    Figure CN119089531A_ABST
Patent Text Reader

Abstract

The invention discloses a water plant field three-dimensional display system fusing BIM and AR, and the system comprises the steps: carrying out the standardization of a conventional two-dimensional drawing, carrying out the rapid modeling based on a BIM three-dimensional modeling module, enabling a three-dimensional water plant design model to be matched with a real scene of target construction through employing the AR technology, forming a visual target water plant building structure virtual image, and carrying out the construction of a target water plant. According to the method, the AR mobile application program can be utilized to display the entity live-action scheme of the design achievement after complete construction, so that construction management personnel and operation maintenance personnel can participate in a design task in advance, meanwhile, the design scheme and specific implementation rules can be conveniently determined, and the possibility of design change during later implementation of the design scheme is reduced. Moreover, after the construction of the designed BIM model is completed, the model component information is in one-to-one correspondence with the entity objects, so that the real scene collision check of space management can be performed in advance in the design stage, and the convenience and efficiency of the coordination design of the water plant are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of water plant design systems, and in particular to a water plant on-site three-dimensional display system integrating BIM and AR. Background Art

[0002] The design and construction of water plant pump stations, tanks, pipelines, machinery and other structures are difficult. When designers design these structures, some drawings do not match the actual construction conditions and need to be changed later. This is partly because the designers did not have a deep understanding and analysis of the actual environment at the beginning of the design. At the same time, due to the poor intuitive display of traditional two-dimensional design drawings, many design teams such as civil engineering, pipe networks, and electrical engineering are involved, which makes it impossible to organically coordinate with other design departments, on-site construction personnel, and on-site conditions, which ultimately leads to delays in construction period and substandard project quality, resulting in a delay in the final construction progress of the water plant.

[0003] The concept of BIM was first proposed by Autodesk in the United States in 2002, but the research on related technologies can be traced back to 1970. BIM (full name: Building Information Modeling), Chinese for Building Information Model, can share and communicate project information at all stages of the building life cycle, and provide a platform for collaborative communication for all parties involved in the construction. It has the characteristics of coordination, visualization, plotting, optimization, simulation, parameterization, information completeness and integration. The core of BIM technology lies in BIM model visualization, parametric design, component association design, parameter-driven building form design, collaborative operation, information big data, solution optimization, collision inspection, pipeline integration, etc., which can effectively improve the work efficiency of designers, managers and other participants in the entire life cycle of the building.

[0004] Augmented Reality, or AR technology for short, can seamlessly connect virtual scenes with real scenes and achieve real-time interaction, giving users a sensory experience of real scenes. AR technology uses interactive technology, display technology, and multiple sensing technologies to integrate the real and the virtual, further improving the user's perception of real scenes, and giving the senses a new experience through visual, auditory, tactile, and taste perception. AR technology superimposes real scenes with virtual scenes, and uses mobile terminals such as mobile phones and tablets to display and present them to users, turning two-dimensional content into "three-dimensional", adding more virtual information to objects in the real environment, enhancing their three-dimensional sense, strengthening user visual effects, and increasing interactive experience.

[0005] As water plant structures, equipment, pipes and valves, electrical appliances, instruments, automatic control and other process facilities gradually become larger, more complex and more diverse, the difficulty of water plant design is increasing. Through actual investigation and analysis of water plant design work with different construction methods such as park-style and underground-style, it is found that the development of a three-dimensional display system for coordinated design of water plants is the actual demand of many design units and construction units. The construction of a three-dimensional display system for coordinated design of water plants enables all project participants to experience the actual effect of the final operation of the unfinished project through BIM and AR technology. In the real environment, virtual information superimposed on the real environment can be seen, so that they can perceive the multi-dimensional virtual model of water plant design without being separated from the real world. It can ensure that the water plant project is completed in an all-round, high-quality and efficient manner, and reduce the probability of accidents and waste of resources. At the same time, it also truly realizes the design from the perspective of human feelings, so that the design is integrated into people's real sensory experience, more in line with human environmental feelings, solves the problems existing in traditional design methods, improves the efficiency of conveying design intentions, and provides technical support for promoting the intelligent, convenient, visual and efficient coordinated design of water plants.

[0006] Based on the above situation, the present invention proposes a water plant on-site three-dimensional display system integrating BIM and AR to effectively solve the above problems. Summary of the invention

[0007] In order to solve the problems existing in the background technology, the present invention provides a water plant on-site three-dimensional display system integrating BIM and AR.

[0008] The present invention adopts the following technical solution: A water plant on-site three-dimensional display system integrating BIM and AR, comprising a two-dimensional drawing import module, a BIM three-dimensional modeling module, a model data writing module, a model data processing module, a background model file conversion and output module, a front-end three-dimensional model rendering module, and a three-dimensional model interaction module connected in sequence through wireless communication signals; the system comprises the following steps: S1. The 2D drawing import module imports the 2D electronic drawings into the BIM 3D modeling module after standardization and modification; S2. Build a 3D model through the BIM 3D modeling module; S3, extracting the parameters of the three-dimensional model file and inputting them into the model data processing module; S4, the model data processing module recodes and rearranges the BIM three-dimensional data model processed into .revit, and converts it into a data format that can be recognized and used by the AR front-end display; S5, the model in S4 is converted into an output module through the background model file, and the converted data format is encoded and output for the front-end three-dimensional effect display and three-dimensional comparison of the actual design results; S6, the front-end 3D model rendering module performs front-end drawing and rendering of the parameterized BIM 3D data model in S5, and interacts through the 3D model interaction module.

[0009] Furthermore, the system also includes a real-world scene three-dimensional import module, which uses GPS positioning to obtain the current position and orientation, performs preliminary calibration on the BIM design model rendered in S6, and then uses the gyroscope three-axis position discrimination technology and the AR rendering model display technology in S5 to align the real scene with the BIM model, thereby achieving the superposition of the BIM three-dimensional model and the real scene.

[0010] Furthermore, the system also includes a three-dimensional AR effect display module. The mobile three-dimensional AR effect display module uses a mobile terminal access interface to call a camera and a gyroscope to perform a three-dimensional display of an on-site preview of pipelines and plant construction.

[0011] Furthermore, S2 identifies the parameters of position, elevation, length, and professional attributes of the imported two-dimensional electronic drawings, selects the attributes of water plant components for identification and processing, and converts the relevant parameters into three-dimensional ones to construct a three-dimensional model.

[0012] Furthermore, S3 uses a three-dimensional model attribute classification and recognition method to extract the parameters of the three-dimensional model file.

[0013] Furthermore, the model data processing module in S4 uses a plug-in conversion method for similar model parameters to re-encode the BIM three-dimensional data model; the data formats include .fbx and .gltf.

[0014] Furthermore, the front-end 3D model rendering module in S6 uses the front-end Webgl 3D drawing method and is based on the Webgl.threejs plug-in to perform front-end drawing and rendering of the parameterized BIM 3D data model.

[0015] The present invention provides a three-dimensional display system for a water plant integrating BIM and AR: forming a visualized virtual image of a target water plant structure, realizing the visualization of the water plant design structure, so that the design results after the complete construction can be displayed in a physical real scene scheme using an AR mobile application, so that construction management personnel and operation and maintenance personnel can participate in the design task in advance, including design scheme confirmation meetings, scheme expansion meetings, and scheme deepening meetings, etc., and conveniently determine the design scheme and specific implementation details at the same time, reducing the possibility of design changes during the later implementation of the design scheme. In addition, after the design BIM model is constructed, since the model component information is one-to-one corresponding to the physical object, the real-scene collision check of space management can be carried out in advance in the design stage to determine whether the spatial layout of equipment and pipelines has problems such as intersection with the actual equipment and terrain, and timely multi-department feedback is carried out to improve the convenience and efficiency of coordinated design of water plants. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the framework principle of an embodiment of the system of the present invention; Figure 2 A modeling result diagram of the BIM three-dimensional modeling module of the system embodiment of the present invention; Figure 3 Rendering an AR conversion result diagram of the front-end three-dimensional model of the system embodiment of the present invention; Figure 4 This is a real-life picture showing the mobile three-dimensional AR effect of an embodiment of the system of the present invention. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0018] Refer to the attached Figure 1-4 , a water plant on-site three-dimensional display system integrating BIM and AR, including a two-dimensional drawing import module, a BIM three-dimensional modeling module, a model data writing module, a model data processing module, a background model file conversion and output module, a front-end three-dimensional model rendering module, and a three-dimensional model interaction module connected in sequence through wireless communication signals; the system includes the following steps: S1. The 2D drawing import module imports the 2D electronic drawings into the BIM 3D modeling module after standardization and modification; S2. Identify the parameters of position, elevation, length, and professional attributes of the imported two-dimensional electronic drawings, select the attributes of the water plant components for identification and processing, and convert the relevant parameters into three-dimensional ones. Use the BIM three-dimensional modeling module to build a water plant sedimentation tank. Revit three-dimensional model, refer to Figure 2 .

[0019] The two-dimensional drawing import module imports the traditional two-dimensional drawings of the architectural design of a water plant sedimentation tank, and constructs the spatial structure of different modular units based on the architectural construction drawings, and parameterizes the material, size, space and other attributes of the relevant material units used to configure the spatial structure.

[0020] S3. Utilize the three-dimensional model attribute classification and identification method to extract the parameters of the three-dimensional model file and input them into the model data processing module. Transmit the constructed .revit three-dimensional model of the water plant sedimentation tank to the model data writing module through wireless communication signals, and perform parameter decomposition, extraction and encoding of the .revit three-dimensional model in terms of size, space, material, etc., to obtain a parameter data set of a water plant sedimentation tank.

[0021] S4. The model data processing module uses the same model parameter plug-in conversion method to re-encode the BIM three-dimensional data model and convert it into a data format that can be recognized and used by the AR front-end display. The data formats include .fbx and .gltf.

[0022] S5, the model in S4 is converted and output by the background model file conversion and output module, and the converted .fbx and .gltf data files are transmitted to the background model file conversion and output module through wireless communication signals, and the converted data format is encoded, produced, stored, and output to the AR port by file generation and storage, so as to provide the front-end 3D effect display and 3D comparison of the actual design results; S6. The .fbx and .gltf data files of the water plant sedimentation tank that have been output to the AR port are transmitted to the front-end 3D model rendering module through wireless communication signals, and the front-end Webgl technology is used to use the threejs plug-in based on Webgl to perform high-performance lightweight rendering of the BIM 3D model data front-end to obtain the AR rendering model of the water plant sedimentation tank. Figure 3 , interact through the 3D model interaction module.

[0023] The three-dimensional model interaction module uses camera image acquisition technology, QR code recognition technology, and GPS positioning technology to obtain the user's initialization orientation and load the associated model; uses gyroscope three-axis position discrimination technology to perform operations such as rotation and scaling of the BIM three-dimensional model; and uses gyroscope technology, model space rotation technology, etc. to perform operations such as rotation and scaling of the BIM three-dimensional model. At the same time, it uses image recognition technology to process the video acquired by the camera frame by frame, combines the user's real world and virtual world actions, aligns the actual scene with the BIM model, realizes the superposition of the BIM three-dimensional model and the actual conventional well, realizes the linkage of user actions in the actual scene and AR virtual reality, and finally presents an augmented reality effect display.

[0024] The system also includes a real-world scene 3D import module, which uses GPS positioning to obtain the current position and orientation, performs preliminary calibration on the BIM design model rendered in S6, and then uses the gyroscope three-axis position discrimination technology and the AR rendering model display technology in S5 to align the real-world scene with the BIM model, thereby achieving the superposition of the BIM 3D model and the real-world scene.

[0025] The result of superimposing the BIM 3D model of the water plant sedimentation tank with the actual scene is transmitted to the mobile 3D AR effect display module through wireless communication signals. By calling the mobile phone camera, GPS positioning and gyroscope calibration position, the design results of the factory sedimentation tank and the pipeline laying effect can be previewed on site. Figure 4 .

[0026] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may also include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A water plant on-site three-dimensional display system integrating BIM and AR, characterized in that: The system comprises a two-dimensional drawing import module, a BIM three-dimensional modeling module, a model data writing module, a model data processing module, a background model file conversion and output module, a front-end three-dimensional model rendering module, and a three-dimensional model interaction module, which are connected in sequence through wireless communication signals; the system comprises the following steps: S1. The 2D drawing import module imports the 2D electronic drawings into the BIM 3D modeling module after standardization and modification; S2. Build a 3D model through the BIM 3D modeling module; S3, extracting the parameters of the three-dimensional model file and inputting them into the model data processing module; S4, the model data processing module recodes and rearranges the BIM three-dimensional data model processed into .revit, and converts it into a data format that can be recognized and used by the AR front-end display; S5, the model in S4 is converted into an output module through the background model file, and the converted data format is encoded and output for the front-end three-dimensional effect display and three-dimensional comparison of the actual design results; S6, the front-end 3D model rendering module performs front-end drawing and rendering of the parameterized BIM 3D data model in S5, and interacts through the 3D model interaction module.

2. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: The system also includes a real-world scene 3D import module, which uses GPS positioning to obtain the current position and orientation, performs preliminary calibration on the BIM design model rendered in S6, and then uses the gyroscope three-axis position discrimination technology and the AR rendering model display technology in S5 to align the real-world scene with the BIM model, thereby achieving the superposition of the BIM 3D model and the real-world scene.

3. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: The system also includes a three-dimensional AR effect display module. The mobile three-dimensional AR effect display module uses a mobile terminal access interface to call a camera and a gyroscope to perform a three-dimensional display of an on-site preview of pipelines and plant construction.

4. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: In S2, the position, elevation, length, and professional attribute parameters of the imported two-dimensional electronic drawings are identified, the attributes of the water plant components are screened for identification and processing, and the relevant parameters are converted into three-dimensional ones to construct a three-dimensional model.

5. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: In S3, the three-dimensional model attribute classification and recognition method is used to extract the parameters of the three-dimensional model file.

6. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: The model data processing module described in S4 uses the plug-in conversion method of similar model parameters to re-encode the BIM three-dimensional data model; the data formats include .fbx and .gltf.

7. The water plant on-site three-dimensional display system integrating BIM and AR as claimed in claim 1, characterized in that: The front-end 3D model rendering module in S6 uses the front-end Webgl 3D drawing method and is based on the Webgl. threejs plug-in to perform front-end drawing and rendering of the parameterized BIM 3D data model.

Citation Information

Patent Citations

  • Display system based on integration of BIM and positioning technology

    CN112613102A

  • Construction BIM (Building Information Modeling) visualization method and system based on AR (Augmented Reality)

    CN116030229A