Design method of pedestrian cross passage of shield tunnel
By optimizing the design of the cross-passage of the shield tunnel, including the boundary size, section shape and structure type, and selecting the construction method and pipe sheet lining type in combination with geological data, the problems of insufficient design and construction safety hazards in the existing technology are solved, and the problem of insufficient design and hidden dangers in construction is realized. Higher applicability and stability.
Patent Information
- Application Number
- CN202411127546.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The pedestrian cross-channel design method of existing shield tunnels lacks systematicity and targetedness, making it difficult to adapt to complex geological conditions, resulting in insufficient structural stability and durability, and safety hazards during construction.
By optimizing the boundary size, section shape, structure type, hole opening position and pipe sheet lining type of the pedestrian cross passage, selecting appropriate construction methods based on engineering geology, hydrogeology and other data, designing reasonable pipe sheet opening shapes and sizes, and Specific pipe lining types and temporary support measures are used to monitor construction impacts in real time.
It improves the applicability, safety and construction stability of pedestrian cross passages, enhances the overall stability and durability of the structure, reduces construction risks, and ensures project quality and safety.
Smart Images

Figure CN119089543A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel design, and in particular to a design method for a pedestrian cross passage in a shield tunnel. Background Art
[0002] Tunnel engineering is an important part of infrastructure construction, especially in urban transportation and highway construction. Shield tunnels are widely used as a common tunnel construction technology. However, designing and constructing pedestrian crossings in shield tunnels is a complex engineering task. The design of pedestrian crossings in shield tunnels not only involves the structural safety of the tunnel, but also the convenience and safety of pedestrians. Therefore, how to reasonably design pedestrian crossings in shield tunnels has become an important topic of concern in the engineering community.
[0003] The existing design methods for pedestrian crossings in shield tunnels face many challenges and shortcomings. For example, the existing methods mostly focus on the design of motor vehicle lanes, and lack systematicity and pertinence in the design of pedestrian crossings, which leads to potential safety hazards during construction. In addition, the existing design methods are difficult to effectively respond to changes in complex geological conditions and underground environments, and cannot fully guarantee the structural stability and durability of the passages. In particular, when encountering complex geological conditions such as high-pressure water-rich sand layers, the existing technology is difficult to meet safety requirements.
[0004] Therefore, there is an urgent need for a new shield tunnel pedestrian cross passage design method that can adapt to complex geological conditions and improve passage safety. Summary of the invention
[0005] The present invention aims to provide a design method for a pedestrian cross passage in a shield tunnel. By optimizing the limit size, cross-sectional shape, and structural type of the pedestrian cross passage, and selecting a suitable opening position, segment lining type, and construction method, the present invention solves the problems in the prior art of narrow application range, insufficient stability and durability, and easy safety hazards in the design of pedestrian cross passages in shield tunnel structures.
[0006] According to one aspect of the present invention, a method for designing a pedestrian crossing passage in a shield tunnel is provided, comprising the following steps:
[0007] S1: Determine the limit size of the pedestrian crossing according to the road properties of the shield tunnel; S2: Determine the construction method of the pedestrian crossing according to the information data of the tunnel, including mining method, jacking method or shield method, and the information data includes engineering geology, hydrogeology, ground buildings, underground structure conditions, usage conditions and load characteristics; S3: According to the limit size and the construction method, formulate the cross-sectional shape and structural type of the pedestrian crossing; S4: Determine the shape and size of the segment opening in the shield tunnel according to the cross-sectional shape and structural type of the proposed pedestrian crossing; S5: Determine the specific position of the opening of the pedestrian crossing for the lining ring in the shield tunnel and the type of special segment lining required by the lining ring of the shield tunnel according to the cross-sectional shape and structural type of the pedestrian crossing and the shape and size of the segment opening in the shield tunnel.
[0008] Preferably, S1 includes: the shield tunnel road is an urban expressway or a main road, the pedestrian cross passage limit net width is greater than or equal to 2.0m, and the net height is greater than or equal to 2.2m; the shield tunnel road is an expressway or a first-class highway, the pedestrian cross passage limit net width is greater than or equal to 2.0m, and the net height is greater than or equal to 2.5m.
[0009] Preferably, when the determined construction method is the mining method, the cross-sectional shape of the pedestrian crossing is a vaulted straight wall or a horseshoe shape, the structural type of the pedestrian crossing is a composite lining structure, and the secondary lining is a cast-in-place reinforced concrete structure; the shape of the segment opening in the shield tunnel is a rectangle or a vaulted straight wall, and the size is consistent with the contour section of the pedestrian crossing.
[0010] Preferably, S5 includes: the specific position is the opening position of the pedestrian crossing, and 2 rings of segments or 3 rings of segments are selected to be longitudinally broken in the lining ring; it is determined that the lining ring is assembled with through seams or staggered seams; it is determined that the lining ring is located in a specific position or a specific block; the type of the special segment lining is determined according to the construction conditions and the stress and deformation of the controlled structure; the type of the special segment lining is an ordinary reinforced concrete segment, a steel-fiberglass reinforced concrete composite segment, a steel structure segment, or a steel structure-reinforced concrete composite segment.
[0011] Preferably, after S5, the method further includes: determining a method for opening holes in the segments of the shield tunnel, which is manual chiseling or manual block disassembly; determining a range of stratum reinforcement for the pedestrian crossing, and the range of stratum reinforcement covers the entire length of the pedestrian crossing.
[0012] Preferably, when the determined construction method is the pipe jacking method or the shield method, the cross-sectional shape of the pedestrian crossing is circular, and the structural type of the pedestrian crossing is prefabricated reinforced concrete or steel structure; the shape of the opening of the pipe segment in the shield tunnel is circular, and the size is consistent with the contour section of the pedestrian crossing.
[0013] Preferably, S5 includes: the specific position is the opening position of the pedestrian crossing passage, and 2 rings of segments or 3 rings of segments are selected to be longitudinally broken in the lining ring; it is determined that the shield lining ring is assembled with through seams or staggered seams; it is determined that the lining ring is located in a specific position or a specific block; the type of the special segment lining is determined according to the construction conditions and the control structure stress and deformation; the type of the special segment lining is an ordinary reinforced concrete segment, a steel-fiberglass reinforced concrete composite segment, a steel structure segment, or a steel structure-reinforced concrete composite segment.
[0014] Preferably, after S5, the method also includes: determining a method for opening holes in the segment in the shield tunnel, which is direct mechanical cutting, and the segment structure at the opening is glass fiber reinforced concrete or plain concrete; determining a stratum reinforcement range for the pedestrian crossing, and the stratum reinforcement range is the intersection section between the pedestrian crossing and the shield tunnel.
[0015] Preferably, after determining the scope of the stratum reinforcement of the pedestrian crossing, the method also includes: designing temporary support measures and scope in the shield tunnel; the temporary support measures are longitudinal connecting bars, temporary ring beam steel supports, temporary steel skeleton supports or servo hydraulic internal support systems; the temporary support scope is symmetrically arranged in an area of 2 to 4 rings on both sides of the opening according to the numerical results of the segment opening in the shield tunnel; the temporary support measures and scope are used to ensure that the stratum deformation and displacement caused by the opening can be resisted, and the support layout and strength are dynamically adjusted according to real-time monitoring data.
[0016] Preferably, after designing the temporary support measures and scope in the shield tunnel, the method also includes: designing monitoring measurements to monitor the impact of construction on the environment and structure; the objects of the monitoring measurements include surface settlement, settlement of surrounding buildings, settlement of pedestrian cross-passage vaults and clearance convergence, settlement of shield tunnel vaults and clearance convergence, and groundwater level at the cross-passage.
[0017] The invention discloses a design method for a pedestrian cross passage of a shield tunnel, comprising the following steps: S1: determining the limit size of the pedestrian cross passage according to the road properties of the shield tunnel; S2: determining the construction method of the pedestrian cross passage according to the information data of the tunnel, including the mining method, the jacking method or the shield method, and the information data includes the engineering geology, hydrogeology, ground buildings, underground structure conditions, use conditions and load characteristics; S3: formulating the cross-sectional shape and structure type of the pedestrian cross passage according to the limit size and the construction method; S4: determining the shape and size of the segment opening in the shield tunnel according to the cross-sectional shape and structure type of the proposed pedestrian cross passage; S5: determining the specific position of the opening of the pedestrian cross passage required for the lining ring in the shield tunnel and the type of special segment lining according to the cross-sectional shape and structure type of the pedestrian cross passage and the shape and size of the segment opening in the shield tunnel. The present invention can improve the applicability and safety of the pedestrian crossing design and the stability of the construction process, and at the same time enhance the real-time monitoring capability of the impact of the construction on the environment and structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings described herein are used to provide further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0019] Figure 1 A flow chart of a method for designing a pedestrian cross passage in a shield tunnel according to an embodiment of the present invention;
[0020] Figure 2 It is a detailed schematic diagram of a method for designing a pedestrian cross passage in a shield tunnel according to an embodiment of the present invention. DETAILED DESCRIPTION
[0021] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0022] Reference will now be made in detail to various embodiments of the present invention, examples of which are shown in the accompanying drawings and described below. For ease of interpretation and precise definition in the appended claims, the terms "upper", "lower", "inner" and "outer" are used to describe features of the exemplary embodiments shown in the drawings with reference to their positions.
[0023] The embodiment of the present invention provides a design method for a pedestrian crossing passage in a shield tunnel, such as Figure 1As shown, the following steps are included: S1: determining the limit size of the pedestrian crosswalk according to the road properties of the shield tunnel; S2: determining the construction method of the pedestrian crosswalk according to the information data of the tunnel, including the mining method, the jacking method or the shield method, and the information data includes engineering geology, hydrogeology, ground buildings, underground structure conditions, use conditions and load characteristics; S3: formulating the cross-sectional shape and structure type of the pedestrian crosswalk according to the limit size and the construction method; S4: determining the shape and size of the segment opening in the shield tunnel according to the cross-sectional shape and structure type of the proposed pedestrian crosswalk; S5: determining the specific position of the opening of the pedestrian crosswalk required for the lining ring in the shield tunnel and the type of special segment lining according to the cross-sectional shape and structure type of the pedestrian crosswalk and the shape and size of the segment opening in the shield tunnel.
[0024] In the relevant technologies, the design requirements or regulations for pedestrian crosswalks between main line twin-tunnels are mainly based on the "Highway Tunnel Design Code, Volume 1, Civil Engineering", but this code is only applicable to tunnels constructed by drilling and blasting, and the design principles and methods for pedestrian crosswalks are not applicable to shield tunnels. The "Shield Tunnel Engineering Design Standard" only makes principled provisions on the construction method and cross-section structure of the connecting channel, and does not systematically and comprehensively stipulate other aspects involved in the design of the connecting channel, such as the cross-section size, the intersection shield segment form and the opening size.
[0025] As a key structure connecting double-track tunnels, pedestrian crosswalks are important life passages for personnel evacuation and fire rescue when tunnel disasters occur. However, the construction of pedestrian crosswalks in large-diameter shield tunnels is extremely risky. If you are not careful, it may cause major accidents such as stratum instability and soil and water influx into the tunnel. In addition, hole opening construction will also make the shield tunnel structure more unfavorable, which will have a huge impact on the overall deformation and safety control of the structure. Due to the huge risks of hole opening, especially in the construction of ultra-large diameter shield tunnels or cross-river and sea shield tunnels with high water pressure, in order to avoid risks, pedestrian crosswalks are often chosen not to be opened. Therefore, there is a lack of technical standards and even engineering case experience for reference in the construction of crosswalks in large-diameter shield tunnels, such as engineering design and construction.
[0026] In the embodiment of the present invention, by reasonably determining the limit size according to the nature of the road, selecting the appropriate construction method in combination with the engineering information data, and formulating the cross-sectional shape and structural type of the pedestrian crossing passage based on this, and further by accurately designing the shape and size of the segment openings, and reasonably arranging the opening positions and selecting the special segment lining type, the applicability, safety and structural stability of the passage design are effectively improved, which provides a reference for the construction of cross passages in large-diameter shield tunnels.
[0027] According to an embodiment of the present invention, S1 includes: the shield tunnel road is an urban expressway or a main road, the pedestrian cross passage limit net width is greater than or equal to 2.0m, and the net height is greater than or equal to 2.2m; the shield tunnel road is a highway or a first-class highway, the pedestrian cross passage limit net width is greater than or equal to 2.0m, and the net height is greater than or equal to 2.5m.
[0028] According to an embodiment of the present invention, when the determined construction method is the mining method, the cross-sectional shape of the pedestrian crossing is a vaulted straight wall or a horseshoe shape, the structural type of the pedestrian crossing is a composite lining structure, and the secondary lining is a cast-in-place reinforced concrete structure; the shape of the segment opening in the shield tunnel is a rectangle or a vaulted straight wall, and the size is consistent with the contour section of the pedestrian crossing.
[0029] In the embodiment of the present invention, by adopting a vaulted straight wall or horseshoe-shaped cross-section shape, combined with a composite lining structure, and using cast-in-place reinforced concrete as the secondary lining, the structural strength and durability of the channel are ensured. In addition, by designing the segment openings in the shield tunnel as rectangles or vaulted straight walls, and making their sizes consistent with the cross-section of the channel profile, the stress concentration problem during construction is effectively reduced, ensuring the safety of the construction process and the overall stability of the structure.
[0030] According to an embodiment of the present invention, S5 includes: the specific position is the opening position of the pedestrian crossing passage, and 2 rings of segments or 3 rings of segments are selected to be longitudinally broken in the lining ring; it is determined that the lining ring is assembled with through seams or staggered seams; it is determined that the lining ring is located in a specific position or a specific block; the type of the special segment lining is determined according to the construction conditions and the stress and deformation of the controlled structure; the type of the special segment lining is an ordinary reinforced concrete segment, a steel-fiberglass reinforced concrete composite segment, a steel structure segment, or a steel structure-reinforced concrete composite segment.
[0031] In the embodiment of the present invention, by longitudinally breaking 2 or 3 rings of segments in the lining ring and determining the method of through-seam assembly or staggered seams as required, the force distribution at the opening position is effectively optimized. In addition, by selecting appropriate special segment lining types in combination with the construction conditions, such as ordinary reinforced concrete segments, reinforced-glass fiber reinforced concrete composite segments, etc., the structural stress and deformation can be better controlled, thereby improving the overall safety and durability of tunnels and pedestrian crossings.
[0032] According to an embodiment of the present invention, after S5, the method also includes: determining a method for opening holes in the segments of the shield tunnel, which is manual chiseling or manual block disassembly; determining a range of stratum reinforcement for the pedestrian crossing, and the range of stratum reinforcement covers the entire length of the pedestrian crossing.
[0033] In the embodiment of the present invention, by selecting a suitable segment opening method after S5, such as manual chiseling or manual block disassembly, the risk in the construction process is effectively reduced. In addition, by ensuring that the stratum reinforcement range covers the entire length of the pedestrian cross passage, the overall stability of the tunnel structure is ensured, and the negative impact of stratum deformation on the tunnel and cross passage is avoided, thereby improving the safety of construction and the quality of the project.
[0034] According to an embodiment of the present invention, when the determined construction method is the pipe jacking method or the shield method, the cross-sectional shape of the pedestrian crossing is circular, and the structural type of the pedestrian crossing is prefabricated reinforced concrete or steel structure; the shape of the opening of the pipe segment in the shield tunnel is circular, and the size is consistent with the contour section of the pedestrian crossing.
[0035] In the embodiment of the present invention, the cross-sectional shape of the pedestrian passage is designed to be circular, and a prefabricated reinforced concrete or steel structure is adopted, which significantly improves the stability of the structure and the convenience of construction. In addition, the shape of the segment opening in the shield tunnel is designed to be circular and its size is consistent with the contour section of the passage, which effectively reduces the complexity of construction and ensures the integrity and safety of the tunnel structure.
[0036] According to an embodiment of the present invention, S5 includes: the specific position is the opening position of the pedestrian crossing passage, and 2 rings of segments or 3 rings of segments are selected to be longitudinally broken in the lining ring; it is determined whether the shield lining ring is assembled with through seams or staggered seams; it is determined that the lining ring is located in a specific position or a specific block; the type of the special segment lining is determined according to the construction conditions and the control structure stress and deformation; the type of the special segment lining is an ordinary reinforced concrete segment, a steel bar-glass fiber reinforced concrete composite segment, a steel structure segment, or a steel structure-reinforced concrete composite segment.
[0037] In the embodiment of the present invention, by longitudinally breaking 2 or 3 rings of segments in the lining ring and reasonably determining the through-seam assembly or staggered seam method, the force distribution at the opening position is optimized. At the same time, according to the construction situation, the appropriate special segment lining type is selected, such as ordinary reinforced concrete segments, reinforced-glass fiber reinforced concrete composite segments, etc., to effectively control the structural stress and deformation, thereby improving the safety and durability of tunnels and pedestrian crossings.
[0038] According to an embodiment of the present invention, after S5, the method also includes: determining a method for opening holes in the segment in the shield tunnel, which is direct mechanical cutting, and the segment structure at the opening is glass fiber reinforced concrete or plain concrete; determining a stratum reinforcement range for the pedestrian crossing, and the stratum reinforcement range is the intersection section between the pedestrian crossing and the shield tunnel.
[0039] In the embodiment of the present invention, by determining to use a mechanical direct cutting method for opening holes after S5, and using glass fiber reinforced concrete or plain concrete as the segment structure at the opening, the construction efficiency and the hole opening quality are significantly improved. In addition, by clearly defining the stratum reinforcement range to cover the intersection section of the pedestrian cross passage and the shield tunnel, the stratum stability is enhanced, ensuring the overall safety of the tunnel and passage in the intersection area.
[0040] According to an embodiment of the present invention, after determining the scope of the stratum reinforcement of the pedestrian crossing, the method also includes: designing temporary support measures and scope in the shield tunnel; the temporary support measures are longitudinal connecting bars, temporary ring beam steel supports, temporary steel skeleton supports or servo hydraulic internal support systems; the temporary support scope is symmetrically arranged in an area of 2 to 4 rings on both sides of the opening according to the numerical results of the segment opening in the shield tunnel; the temporary support measures and scope are used to ensure that the stratum deformation and displacement caused by the opening can be resisted, and the support layout and strength are dynamically adjusted according to real-time monitoring data.
[0041] In the embodiment of the present invention, after determining the stratum reinforcement range of the pedestrian crosswalk, temporary support measures such as longitudinal connecting strips, temporary ring beam steel support, temporary steel skeleton support or servo hydraulic internal support system are designed, and they are symmetrically arranged in the 2 to 4 ring areas on both sides of the opening, ensuring that the tunnel can effectively resist stratum deformation and displacement during construction. At the same time, the temporary support measures are dynamically adjusted according to real-time monitoring data, further improving the construction safety and structural stability of the tunnel and pedestrian crosswalk.
[0042] According to an embodiment of the present invention, after designing the temporary support measures and scope in the shield tunnel, the method also includes: designing monitoring measurements to monitor the impact of construction on the environment and structure; the objects of the monitoring measurements include surface settlement, settlement of surrounding buildings, settlement of pedestrian cross-passage vaults and clearance convergence, settlement of shield tunnel vaults and clearance convergence, and groundwater level at the cross-passage.
[0043] In the embodiment of the present invention, after designing the temporary support measures and scope in the shield tunnel, a detailed monitoring and measurement scheme is further designed to monitor in real time the impact of construction on surface settlement, settlement of surrounding buildings, settlement of pedestrian cross passage vaults and clearance convergence, settlement of shield tunnel vaults and clearance convergence, and groundwater level at the cross passage. Through these monitoring data, the construction strategy can be adjusted in time to effectively prevent structural deformation and environmental impact, thereby ensuring safety and engineering quality during the construction process.
[0044] The present invention is further described in detail below in conjunction with specific implementation modes and accompanying drawings.
[0045] Figure 2 Detailed schematic diagram of the design method for a pedestrian cross passage in a shield tunnel according to an embodiment of the present invention, as shown in FIG. Figure 2 As shown, the detailed scheme of the design method of the pedestrian cross passage of a shield tunnel according to the embodiment of the present invention includes:
[0046] (1) Determine the design principles;
[0047] (2) Determine the limit size of the pedestrian crossing according to the road characteristics of the shield tunnel;
[0048] (3) Determine the construction method of the pedestrian crossing based on the information data of the tunnel, including mining method, pipe jacking method or shield method;
[0049] (4) Determine the cross-sectional shape and structural type of the pedestrian crossing based on the limit dimensions and the construction method;
[0050] (5) Determine the shape and size of the segment openings in the shield tunnel based on the cross-sectional shape and structural type of the proposed pedestrian crossing;
[0051] (6) Determine the specific position of the opening of the pedestrian crossing with respect to the lining ring in the shield tunnel and the type of special segment lining required based on the cross-sectional shape and structural type of the pedestrian crossing and the shape and size of the segment opening in the shield tunnel;
[0052] (7) Determine the measures and scope for strengthening the ground at the pedestrian crossing;
[0053] (8) Clarify the temporary support measures and scope of the main tunnel;
[0054] (9) Monitoring and measurement design.
[0055] Suppose a city needs to build a new highway tunnel. The design parameters of the tunnel are as follows: the design speed is 80 km / h, the total length of the tunnel is 9160 m, of which the shield tunnel is 7340 m long. The inner diameter of the shield tunnel is 14.1 m, and the outer diameter is 15.4 m. It is an ultra-large diameter shield tunnel. According to relevant specifications, a pedestrian crosswalk is set up in the shield section. The average burial depth of the shield tunnel is about 32 m, and the maximum burial depth is 59 m. The stratum in which it is located is mainly a water-rich high-pressure sand layer. 9.0-10.0 m below the surface enters the phreatic layer. There are multiple layers of pressurized water in the sand layer of the tunnel site. The shield segment is 2.0 m wide and is assembled with staggered joints.
[0056] According to the above invention, the design of the pedestrian cross passage in the shield tunnel can be carried out according to the following steps:
[0057] (1) Determine the main design principles for pedestrian crossings
[0058] In combination with the project characteristics, the main design principles are determined as mentioned above.
[0059] (2) Determine the construction limits of pedestrian crossings
[0060] The nature of the road is a highway. According to the "Highway Tunnel Design Code, Volume 1, Civil Engineering" JTG 3370.1-2018, the pedestrian crossing passage limit width is 2.0m and the limit height is 2.5m.
[0061] (3) Clarify the construction method of pedestrian crossings
[0062] Taking into account the engineering geology, hydrogeology and surrounding environmental conditions of the shield tunnel, the mining method was adopted as the construction method for the pedestrian crossing passage after comparison.
[0063] (4) Propose the cross section and structural form of the pedestrian crossing
[0064] The pedestrian cross passage adopts the mining method for construction. Based on the building limit of 2.0m (width) × 2.5m (height), the pedestrian cross passage adopts the arched straight wall section with a net width of 2.2m and a net height of 3.0m. The cross passage adopts a composite lining structure, and the secondary lining adopts a cast-in-place reinforced concrete structure.
[0065] (5) Determine the shape and size of the shield segment opening
[0066] The pedestrian crossing is constructed using the mining method. In order to reduce the scope of the shield segment opening and the impact on other segments, the opening shape is an arched straight wall section, and the size is consistent with the contour section of the pedestrian crossing.
[0067] (6) Determine the special requirements of the shield lining ring for the opening of the pedestrian crossing
[0068] The cross-section of the pedestrian tunnel has a net width of 2.2m. At the opening position of the shield segment, it is longitudinally distributed in the range of 2 ring segments. In order to minimize the number of broken segments, the 2 ring segments are assembled with through seams. At the intersection with the cross-section of the pedestrian tunnel, 2 ring segments are broken in the circumferential direction, and a total of 4 segments are broken.
[0069] In order to facilitate construction and better control the stress and deformation of the structure, a special segment lining type is used in the opening range, using steel plate-reinforced concrete composite segments.
[0070] (7) Determine the method of opening (breaking) the shield segment
[0071] The pedestrian crossing is constructed using the mining method, and the shield segment holes are opened by manual chiseling.
[0072] (8) Select the reinforcement measures and scope of the ground for pedestrian crossings
[0073] The average buried depth of the shield tunnel is about 32m, and the maximum buried depth is 59m. The feasibility of ground reinforcement measures constructed from the surface is low. Therefore, the ground reinforcement measures adopt the freezing method constructed from inside the tunnel. The ground reinforcement covers the entire length of the cross channel vertically, and covers the 3m-3.5m range outside the excavation contour line horizontally according to the buried depth of the pedestrian cross channel.
[0074] (9) Design of temporary support measures and their scope in shield tunnels
[0075] Temporary ring beam steel support is used in the main tunnel shield tunnel. Combined with the impact range of relevant numerical analysis, temporary support reinforcement measures are taken for the 4-ring shield segments on both sides of the opening.
[0076] (10) Monitoring and measurement design
[0077] The pedestrian cross passage and shield tunnel intersection are monitored and measured within a certain range. The monitoring items include surface settlement, settlement of surrounding buildings, settlement of arches and clearance convergence of pedestrian cross passages, settlement of arches and clearance convergence of main tunnel shield tunnels, and groundwater level at the cross passage.
[0078] The above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications may be made based on the following description, and these various changes, modifications, substitutions and deformations derived from the principles and spirit of the present invention still fall within the scope of protection of the present invention.
Claims
1. A design method for a pedestrian crossing passage in a shield tunnel, characterized in that: The following steps are involved: S1: Determine the limit size of the pedestrian crossing passage according to the road properties of the shield tunnel; S2: Determine the construction method of the pedestrian crossing according to the information data of the tunnel, including mining method, pipe jacking method or shield method, and the information data includes engineering geology, hydrogeology, ground buildings, underground structure conditions, use conditions and load characteristics; S3: According to the limit size and the construction method, the cross-sectional shape and structural type of the pedestrian crossing are formulated; S4: Determine the shape and size of the segment openings in the shield tunnel according to the cross-sectional shape and structural type of the proposed pedestrian crossing; S5: According to the cross-sectional shape and structural type of the pedestrian crossing passage, and according to the shape and size of the segment opening in the shield tunnel, determine the specific position of the opening of the pedestrian crossing passage for the lining ring in the shield tunnel and the type of special segment lining.
2. The method according to claim 1, characterized in that S1 includes: The shield tunnel road is an urban expressway or trunk road, and the pedestrian cross passage has a clear width greater than or equal to 2.0 m and a clear height greater than or equal to 2.2 m; The shield tunnel road is an expressway or a first-class highway, and the pedestrian cross passage has a clear width greater than or equal to 2.0 m and a clear height greater than or equal to 2.5 m.
3. The method according to claim 1, characterized in that When the construction method is determined to be the mining method, The cross-sectional shape of the pedestrian crossing is a vaulted straight wall or a horseshoe shape, and the structural type of the pedestrian crossing is a composite lining structure, and the secondary lining is a cast-in-place reinforced concrete structure; The shape of the opening of the segment in the shield tunnel is rectangular or with a vaulted straight wall, and the size is consistent with the profile section of the pedestrian crossing passage.
4. The method according to claim 3, characterized in that S5 include: The specific position is the opening position of the pedestrian crosswalk, and two or three rings of segments are longitudinally broken in the lining ring; it is determined that the lining ring is assembled with through seams or staggered seams; it is determined that the lining ring is located at a specific position or a specific block; The type of the special segment lining is determined according to the construction conditions, the stress and deformation of the controlled structure; the type of the special segment lining is ordinary reinforced concrete segment, reinforced-glass fiber reinforced concrete composite segment, steel structure segment or steel structure-reinforced concrete composite segment.
5. The method according to claim 4, characterized in that After S5, the method further includes: Determine the method of opening holes in the shield tunnel segments, which is manual chiseling or manual block disassembly; The scope of the stratum reinforcement of the pedestrian crossing is determined, and the scope of the stratum reinforcement covers the entire length of the pedestrian crossing.
6. The method according to claim 1, characterized in that When the determined construction method is pipe jacking or shield tunneling, The cross-sectional shape of the pedestrian crossing is circular, and the structural type of the pedestrian crossing is prefabricated reinforced concrete or steel structure; The opening shape of the segment in the shield tunnel is circular, and its size is consistent with the contour section of the pedestrian crossing passage.
7. The method according to claim 6, characterized in that S5 include: The specific position is the opening position of the pedestrian crosswalk, and two or three rings of segments are longitudinally broken in the lining ring; it is determined that the shield lining ring is assembled through seams or staggered seams; it is determined that the lining ring is located at a specific position or a specific block; The type of the special segment lining is determined according to the construction conditions, the stress and deformation of the controlled structure; the type of the special segment lining is ordinary reinforced concrete segment, reinforced-glass fiber reinforced concrete composite segment, steel structure segment or steel structure-reinforced concrete composite segment.
8. The method according to claim 7, characterized in that After S5, the method further includes: Determine the segment opening method in the shield tunnel as mechanical direct cutting, and the segment structure at the opening is glass fiber reinforced concrete or plain concrete; The stratum reinforcement range of the pedestrian cross passage is determined, and the stratum reinforcement range is the intersection section of the pedestrian cross passage and the shield tunnel.
9. The method according to claim 5 or 8, characterized in that: After determining the ground reinforcement range of the pedestrian crossing, the method further includes: Design the temporary support measures and scope in the shield tunnel; The temporary support measures are longitudinal tie bars, temporary ring beam steel support, temporary steel skeleton support or servo hydraulic internal support system; The temporary support range is symmetrically arranged in the area of 2 to 4 rings on both sides of the opening according to the numerical results of the segment opening in the shield tunnel; The temporary support measures and scope are used to ensure that the ground deformation and displacement caused by the opening can be resisted, and the support layout and strength can be dynamically adjusted according to real-time monitoring data.
10. The method according to claim 9, characterized in that After designing the temporary support measures and their scope in the shield tunnel, the method further comprises: Design monitoring measurements to monitor the impact of construction on the environment and structure; The objects of monitoring and measurement include surface settlement, settlement of surrounding buildings and structures, settlement of pedestrian cross-passage vault and clearance convergence, settlement of shield tunnel vault and clearance convergence, and groundwater level at the cross-passage.
Citation Information
Patent Citations
A construction method for a cross-river shield tunnel connecting passages in fractured strata.
CN102287198A
Pedestrian cross passage for shield tunnel
CN117189157A