Silt dam site selection method based on hydrological and hydrodynamic coupling model

Through the hydrological and hydrodynamic coupling model and multi-objective optimization algorithm, the site selection and scale of silt dams are optimized, and the problem of non-optimization of silt dam design caused by relying on empirical methods in the existing technology is solved, and scientific site selection and cost estimation are achieved. Improved flood control efficiency.

CN119090148APending Publication Date: 2024-12-06XIAN UNIV OF TECH +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411271915.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Most of the existing silt dam site selection and design process rely on empirical methods, which leads to the possibility that the target small watershed plan may not be optimal, and lacks scientific site selection and cost estimates, making it difficult to consider flood control benefits in the early stage of planning.

Method used

Using a multi-objective optimization site selection method based on hydrological and hydrodynamic coupling model, the investment and construction cost and production of silt dams are calculated through DEM topography analysis, hydrological model construction, hydrodynamic model simulation and response surface agent model, combined with a multi-objective optimization algorithm. Operational benefits and flood control optimization benefits, optimize the location and scale of silt dams.

Benefits of technology

It provides a scientific and reliable silt dam site selection scheme that can quickly simulate the impact and cost-effectiveness of flood evolution in the basin, save on field survey costs, and provide policy makers with feasible solution reference.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0005038968750000031
    Figure BDA0005038968750000031
  • Figure BDA0005038968750000032
    Figure BDA0005038968750000032
  • Figure BDA0005038968750000081
    Figure BDA0005038968750000081
Patent Text Reader

Abstract

The invention provides a site selection method for a silt dam based on a hydrological and hydrodynamic coupling model, which integrates multiple frontier scientific technologies, including a geographic information system, a hydrological model, a hydrodynamic model, an agent model and a multi-objective optimization algorithm, and draws up a set of method flow suitable for site selection of silt dam construction in a loess plateau area. Various kinds of cost of field survey of a large number of workers can be saved in the initial stage of drainage basin silt dam planning, and the construction cost of the silt dam can be estimated to a certain degree. Based on a hydrological and hydrodynamic coupling model, the site selection and construction condition of the silt dam in the drainage basin is generalized by a terrain modification method, and the influence on the flood routing of the drainage basin after the construction of the silt dam, the construction scheme cost of the silt dam and the production and operation benefits after the construction of the silt dam can be quickly simulated; and a relatively scientific proposing scheme benefit can be provided for a decision maker and is used as a reference for judging whether the scheme is feasible or not.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of silt dam site selection, and in particular to a method for multi-objective optimization site selection of a basin silt dam based on a hydrological and hydrodynamic coupling model. Background Art

[0002] Warping dams are a unique and key water and soil conservation engineering measure on the Loess Plateau. They have played a significant role in many fields, including but not limited to soil and water loss control, flood control and disaster reduction, ecological environment improvement, agricultural economic development, etc., especially in reducing sedimentation in the lower reaches of the Yellow River. Warping dams have played the most direct and effective role. In the planning and design stage of the silt dam, it is necessary to focus on the cost of its construction and the production and operation benefits after completion, which are also the key contents of the silt dam design report. The early silt dams had a certain risk of leakage and dam collapse when storing water, so their flood control benefits were generally not considered in the initial planning stage. However, with the development of new materials and the development of low-cost and high-performance dam materials, the strength of the dam body has been improved, allowing the silt dam to allow water to be stored to a certain extent, playing a certain role in intercepting and storing floods, and to a certain extent reducing the downstream flood control pressure, and even water storage irrigation and other production benefits.

[0003] With the continuous development of science and technology, many practical hydrological models and hydrodynamic models have emerged. Through numerical simulation, the hydrological and hydrodynamic parameters of various regions in the basin under different silt dam design conditions can be calculated, providing a more scientific basis for the benefit evaluation of silt dams. In addition, the development of GIS, remote sensing and other technologies has enabled the scale and reservoir capacity of the proposed silt dam to be quickly analyzed only through the DEM of the basin in the early stage of basin silt dam planning, which can save a lot of time for field surveys. At present, most of the actual silt dam site selection and design processes still use empirical methods. This method relies on the practical experience of experts, presets the site selection points, and then discusses and scores them by experts to determine the final site selection and plan. The process is complicated, and the final design plan may not be the best for the target small watershed. Summary of the invention

[0004] In order to solve the problems existing in the prior art, the present invention proposes a silt dam site selection method based on a hydrological and hydrodynamic coupling model, which can quickly obtain the impact of different silt dam construction schemes on the evolution of basin floods, the cost of the silt dam construction scheme, and the production and operation benefits after the silt dam construction, and can provide a reliable and scientific site selection plan in the early stage of basin silt dam construction planning.

[0005] The present invention is achieved through the following technical solutions:

[0006] A method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model includes:

[0007] S1, based on the DEM of the target watershed, terrain characteristics analysis is performed to obtain the river network and sub-watershed division results of the target watershed, as well as the dam crest length, sediment retention capacity and siltation area of ​​the proposed silt dam;

[0008] S2, based on the sub-basin division results of S1, a hydrological model of the target basin is constructed, and the design flood process of the target basin is calculated according to the hydrological model;

[0009] S3, taking the design flood process of the target basin as the boundary condition, construct the hydrodynamic model of the target basin;

[0010] S4, in the hydrodynamic model of the target watershed, generalizing the construction of silt dams of various silt dam construction schemes by modifying the terrain, performing watershed flood simulation, calculating the flood peaks at the outlet of the target watershed under the various silt dam construction schemes, and constructing a response surface proxy model according to the flood peaks at the outlet of the target watershed;

[0011] S5. Construct a multi-objective optimization model for the siting and scale of the silt dam in the target watershed. The multi-objective optimization model includes three optimization objectives: investment and construction cost, production and operation benefit, and flood control optimization benefit. The investment and construction cost and production and operation benefit are obtained according to the dam crest length, sediment retention capacity and siltation area of ​​the silt dam. The flood control optimization benefit is obtained according to the hydrodynamic model and the response surface proxy model. The multi-objective optimization model is solved to obtain the optimization results of the siting and scale of the silt dam.

[0012] Preferably, S1 is specifically as follows: based on the DEM of the target watershed, depression filling analysis, slope analysis, and flow analysis are performed, and the best river network of the target watershed is extracted using the river network density method, and sub-watershed division is performed according to the best river network to obtain the sub-watershed division result; according to the distance S between the silt dam and the outlet position of the target watershed and the dam body height H, a terrain analysis method is adopted to extract and analyze the terrain characteristic parameters, and a mathematical model of the dam crest length L, the sediment retention capacity V, and the silt area A is constructed according to the terrain characteristic parameters.

[0013] Preferably, S2 is specifically as follows: based on the sub-basin division result of S1, combined with the digital elevation data, soil type data and land use type data of the target basin, the underlying surface parameters of the hydrological model are determined, and the calibration is completed with the rainfall data to obtain the hydrological model; taking the designed rainstorm as the rainfall condition, the designed flood process of the target basin is calculated according to the hydrological model.

[0014] Preferably, in S3, the hydrodynamic model is a one-dimensional hydrodynamic model or a two-dimensional hydrodynamic model.

[0015] Preferably, when the hydrodynamic model is a two-dimensional hydrodynamic model, S3 specifically comprises: based on the digital elevation data of the target watershed, determining the roughness value of each area with different land use types, determining the optimal calculation grid size through grid independence analysis, and using the design flood process of the target watershed calculated by the hydrological model as the boundary condition to construct the hydrodynamic model of the target watershed.

[0016] Preferably, S3 also includes performing a water balance analysis on the hydrodynamic model to verify the feasibility and applicability of the hydrodynamic model.

[0017] Preferably, in S5, the location and scale of the silt dam in the target watershed are respectively the distance S between the silt dam and the outlet position of the target watershed and the height H of the dam body.

[0018] Preferably, in S5, the multi-objective optimization model is:

[0019]

[0020] Among them, C represents the investment and construction cost of the silt dam;

[0021] Q R It represents the flood control optimization benefit, that is, the flood peak reduction degree at the outlet of the target basin after the target basin is equipped with a check dam;

[0022] R represents the production and operation benefits of the silt dam after its completion.

[0023] Furthermore, the benefits of flood control optimization are as follows:

[0024]

[0025] Where:

[0026] Q0 represents the flood peak at the outlet of the target basin calculated by the hydrodynamic model when no silt dam is built, m 3 / s;

[0027] Q i represents the target basin outlet flood peak obtained by the response surface proxy model under a certain silt dam layout condition, m 3 / s, represented by the distance S between the silt dam and the outlet of the target basin and the height H of the dam body through a mathematical model:

[0028] Preferably, the NSGA-II algorithm is used to solve the multi-objective optimization model.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] The present invention integrates a number of cutting-edge scientific technologies, including geographic information systems, hydrological models, hydrodynamic models, proxy models and multi-objective optimization algorithms, and formulates a set of methods and processes suitable for the site selection of silt dam construction in the Loess Plateau region, which can save a large number of various costs of field surveys by staff in the early stages of basin silt dam planning, and can make a certain estimate of the cost of silt dam construction. Based on the hydrological and hydrodynamic coupling model, the site selection and construction of silt dams in the basin are generalized by modifying the terrain, and the impact of silt dam construction on the evolution of basin floods, the cost of silt dam construction plans and the production and operation benefits after silt dam construction can be quickly simulated, which can provide decision makers with a more scientific benefit of the proposed plan and serve as a reference for whether the plan is feasible. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 It is the first step in realizing the multi-objective optimization site selection of the silt dam in the basin in the present invention, and is a technical roadmap for preprocessing the basin terrain and analyzing the terrain characteristics.

[0033] Figure 2 It is the technical roadmap for the second to fifth steps of realizing the multi-objective optimization site selection of the watershed silt dam in the present invention.

[0034] Figure 3 It is the DEM map of the target watershed in the embodiment of the present invention.

[0035] Figure 4 It is the result of extracting the river network under different area threshold conditions using the river network density method; in the figure, (1)~(28) correspond to the results of extracting the river network under different area threshold conditions, and (1)~(28) correspond to the serial numbers 1~28 in Table 1 respectively.

[0036] Figure 5 It is the result of river network extraction and sub-basin division of the final target basin in the embodiment.

[0037] Figure 6 It is the land use type of the target watershed in the embodiment.

[0038] Figure 7 Schematic diagram of boundary conditions of the hydrodynamic model in the embodiment.

[0039] Figure 8Schematic diagram of the calculation results of hydrodynamic inundation of the target basin in the embodiment; (a) schematic diagram of water depth once in 100 years; (b) schematic diagram of water depth once in 50 years; (c) schematic diagram of flow velocity once in 100 years; (d) schematic diagram of flow velocity once in 50 years.

[0040] Fig. 9 Schematic diagram of generalizing the construction of a silt dam by modifying the terrain in a hydrodynamic model in an embodiment; (a) original DEM; (b) adding a silt dam; (c) dam height setting; (d) dam top width setting; (e) dam slope setting.

[0041] Fig.10 It is the Pareto frontier of the multi-objective optimization model for the location and scale of the silt dam in the target basin in the embodiment; (a) the Pareto frontier of the three optimization objectives; (b) investment and construction cost ~ production and operation benefits; (c) investment and construction cost ~ flood control optimization benefits; (d) production and operation benefits ~ flood control optimization benefits. DETAILED DESCRIPTION

[0042] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0043] It should be noted that the process equipment or devices not specifically specified in the following embodiments are all conventional equipment or devices in the art.

[0044] It should be noted that the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices. Moreover, unless otherwise specified, the numbering of each method step is only a convenient tool for identifying each method step, and is not intended to limit the order of arrangement of each method step or to define the scope of the present invention. Changes or adjustments in their relative relationships should also be regarded as the scope of the present invention without substantially changing the technical content.

[0045] The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model of the present invention comprises the following steps:

[0046] Step 1: Analyze the terrain characteristics of the target watershed based on the DEM (Digital Elevation Model) of the target watershed.

[0047] It can be analyzed and extracted through GIS software. The main steps are as follows: Figure 1 As shown, it includes: based on DEM, through filling analysis, slope analysis, flow analysis and other calculations, and then using the river network density method to select the river network extraction area threshold suitable for the target basin, using different thresholds to extract the best river network of the target basin, and completing the sub-basin division. On this basis, the main channel of the basin is extracted, and the key information of the location and scale of the proposed dam is extracted based on the distance from the basin outlet and the design height of the silt dam, including the dam crest length L, the sediment retention capacity V, and the silt area A. After completing this step, the key basic data and fitting functions for subsequent analysis are obtained as follows:

[0048] (1) Extract the optimal area threshold of the river network and the sub-basin division results under this condition;

[0049] (2) Main river channel / channel in the target basin;

[0050] (3) The response surface model of the proposed dam crest length L, sediment retention capacity V, and siltation area A is shown in Equation 1:

[0051]

[0052] Where: F(x) is the objective function, and the objective functions involved in the present invention are the dam volume V, the sediment storage capacity V, and the siltation area A; x1 and x2 are design variables, and the variables involved in the present invention are the distance S between the siltation dam and the basin outlet and the dam height H; a0, a1, a2, a 11 、a 22 、a 12 、a 111 、a 222 、a 112 、a 122 They are all polynomial coefficients and can be directly obtained by the least squares method when the response surface methodology is used to construct the mathematical model.

[0053] Step 2: Construct a distributed or semi-distributed hydrological model for the target basin. Based on the sub-basin division results in step 1, combine digital elevation data, soil type data, and land use type data to preliminarily determine the key parameters of the underlying surface of the hydrological model. Use rainfall data as input conditions, and use rainfall data or other methods to calculate the results to complete the calibration of the hydrological model. Finally, determine the underlying surface parameters of the hydrological model. After determining the feasibility of the hydrological model, you can use the designed rainstorm data as input conditions to calculate the design flood process for each sub-basin and the outlet location of the target basin. After completing this step, the key basic data and models for subsequent analysis are obtained as follows:

[0054] (1) Hydrological model applicable to the target watershed;

[0055] (2) The design flood process of the target basin, including the flood peaks and flood flow processes at the outlet of the target basin and the outlets of each sub-basin.

[0056] Step three: Construct a one-dimensional or two-dimensional hydrodynamic model of the target basin. Both the one-dimensional hydrodynamic model and the two-dimensional hydrodynamic model can simulate the evolution of basin floods. The one-dimensional hydrodynamic model has the advantage of fast calculation speed, while the two-dimensional hydrodynamic model simulation is more comprehensive than the one-dimensional hydrodynamic model in terms of result output and can reflect the flood inundation situation. Taking the two-dimensional hydrodynamic model as an example, based on digital elevation data, the roughness value of each region is determined by land use type, and the optimal calculation grid size is determined by grid independence analysis. The flood flow process at the outlet of each sub-basin calculated by the hydrological model in step two is used as the boundary condition to carry out the hydrodynamic numerical simulation calculation of the basin flood, and then complete the calibration and water balance analysis to verify the feasibility and applicability of the model. After completing this step, the key basic data and models for subsequent analysis are obtained as follows:

[0057] (1) A two-dimensional hydrodynamic model suitable for the target watershed;

[0058] (2) Under the design flood conditions, the flood inundation conditions of the target basin (flood depth, flood velocity, flood duration, etc.) and the flow process and water volume process at the outlet of the target basin.

[0059] Step 4: Construct a response surface proxy model based on silt dams to improve the flood control capacity of the basin. In the constructed two-dimensional hydrodynamic model, the construction of silt dams in various schemes is generalized by modifying the terrain. After the calculation is completed, the impact of various silt dam site selection and scale schemes on the flood process at the basin outlet is analyzed, and a response surface proxy model is constructed. After completing this step, the key basic data and models for subsequent analysis are obtained as follows:

[0060] (1) The impact of silt dams of different locations and sizes on flood discharge in the basin;

[0061] (2) Response surface proxy model for flood control capacity optimization when silt dam is used as a way to improve the flood control capacity of the basin. The mathematical model constructed by this method is the same as that of Formula 1.

[0062] Step 5: Construct a multi-objective optimization model for the site selection of silt dams. Select the location and scale of the dam as decision factors, select the investment and construction cost of the silt dam, production and operation benefits, and flood control optimization benefits as optimization goals, determine the constraints according to the specifications and the terrain characteristics of the target basin, construct a multi-objective optimization model, use a multi-objective optimization algorithm to solve, obtain the optimal solution set, and analyze and select it. See the schematic diagram of the technical route from step 2 to step 5 for details. Figure 2 , and finally the multi-objective optimization model and optimization results are as follows:

[0063]

[0064] Where:

[0065] C, represents the investment and construction cost of the silt dam, which can be obtained by generalizing the dam body into a tetrahedron to calculate the volume and multiplying it by the unit price of the volume;

[0066] Q R , indicating the degree of optimization of the flood control capacity of the target basin. The present invention uses the flood peak at the outlet of the target basin as the evaluation index, which indicates the degree of flood peak reduction;

[0067] R represents the production and operation benefits of the silt dam after its completion, such as the initial water storage and irrigation benefits R G , the benefits of planting on silted land in the later period Z wait.

[0068] The optimization model is solved by using a multi-objective optimization algorithm and setting an appropriate population size. After solving the model, a series of silt dam site selection and scale solution sets that comprehensively consider the above three optimization objectives can be obtained, as well as the optimization target value corresponding to each scheme.

[0069] Example

[0070] The target basin for the proposed silt dam construction is located in northern Shaanxi, with an area of ​​16.4km 2 .

[0071] Step 1: DEM of the target watershed Figure 3 As shown, the present invention adopts the river network density method to select the river network extraction area threshold suitable for the target basin. The river network extraction results using different thresholds are shown in Tables 1 and Figure 4 Finally, 0.2km is selected in this embodiment. 2 As the river network extraction area threshold, the final river network extraction results and sub-basin division results of the target basin are shown in Figure 4 and Table 1. The total length of the extracted river network is 27.13 km, the number of sub-basins is 49, and the final results are shown in Figure 5 .

[0072] The distance S from the outlet of the target basin and the height H of the dam are the main parameters for the site selection and scale of the dam. A certain terrain analysis method is adopted to extract and analyze the terrain characteristic parameters. The extraction results of this embodiment are shown in Table 2. The extraction results are then fitted with the response surface to obtain the mathematical model of the dam crest length L, sediment retention capacity V, and siltation area A of the proposed dam. The fitting order can be determined according to the actual basin conditions. If the terrain trend changes slightly, the second order can be used. If the terrain trend changes significantly, the third order or even the fourth order can be used. In this embodiment, the third order is used. The results are shown in formulas (3), (4), and (5).

[0073] Table 1 Calculation results of river network density method

[0074]

[0075] Table 2. Results of terrain feature parameter extraction

[0076]

[0077]

[0078]

[0079]

[0080] Step 2: Construct a semi-distributed hydrological model of the target watershed, based on the sub-basin division results in step 1, combined with the digital elevation data, soil type data, and land use type data of the target watershed (see Figure 6 ), determine the underlying surface parameters of the model, and after completing the calibration with the measured rainfall data, use the design rainstorm in the local hydrological manual as the rainfall condition to calculate the design flood peak and flood process. Then compare and analyze the results with the inference formula method (Table 3). It can be found that the maximum relative error of the calculation results of the two is 7.99%, which is within the applicable range. Therefore, it shows that the hydrological model has a certain applicability in the simulation of runoff generation and confluence in the target basin, and the sub-basin flood peak results calculated by the hydrological model (Table 4) can be used for subsequent hydrodynamic model calculations.

[0081] Table 3 Design flood peak calculated by hydrological model

[0082]

[0083] Table 4 Calculation results of sub-basin flood peaks

[0084]

[0085]

[0086] Step 3: Using the sub-basin flood peak calculation results of the hydrological model as boundary conditions, a total of 49 inlet boundary conditions are set, which are set at the upstream boundary of each sub-basin, and the outlet boundary conditions are set at the outlet of the entire target basin, see Figure 7. Then, the grid independence analysis of the hydrodynamic model was carried out. Taking the 100-year design flood as the boundary condition, a total of 5 grid scales were set for numerical simulation. The peak flow at the outlet of the target basin under various working conditions was extracted as the observation index. The peak result of the smallest grid size was used as a reference to calculate the error percentage of the peak flow at the outlet of the target basin under other grid sizes. The calculation results are shown in Table 5. It was finally determined that when the grid size is 8*8m, ​​the calculation results tend to be stable and will not introduce excessive calculation costs. Then, the roughness and other parameters in the hydrodynamic model are calibrated based on the actual flood water level or flooding range to ensure the accuracy of the model simulation in the target basin. After completing the above steps, the flooding situation of the basin under various design flood conditions can be calculated, which can provide a reference for basin flood control planning. The results are shown in Table 5. Figure 8 .

[0087] Table 5 Grid independence analysis table

[0088]

[0089] The peak flood at the target basin outlet is calculated to be 115.59 m under the design flood condition of 100-year return period in Table 5. 3 / s, slightly lower than the calculation result of the hydrological model. This is because the hydrodynamic model focuses more on the process of water flow movement and flood evolution than the hydrological model, and has more detailed requirements for the river channel morphology and basin topography. The local potholes and small silt dams in the basin will have a certain peak-cutting effect on the flood.

[0090] The rationality analysis of the hydrodynamic model is then carried out, and the results are shown in Table 6. It can be seen from the table that the relative errors of water balance in each flood return period are all less than 1%, which are all within a reasonable range. Therefore, it is believed that the calculation results of this model are reliable. Moreover, in the subsequent flood control optimization calculation, the present invention will use the flood peak calculation results of the hydrodynamic model as the basic comparison parameters for flood control optimization.

[0091] Table 6 Water balance analysis table under various design flood conditions

[0092]

[0093] Step 4: Use the method of modifying the terrain to generalize the construction of the silt dam in the target basin, see Fig. 9 The hydrodynamic model constructed in step 3 (the grid is locally encrypted at the location where the silt dam is to be built) is used to simulate the basin flood, and the working conditions of various silt dam construction schemes are calculated. The flood peak at the outlet of the target basin is used as the observation indicator to analyze the impact of the silt dam on the evolution of floods in the target basin and the improvement of the basin's flood control capacity under different schemes. The results are shown in Table 7.

[0094] Table 7 Calculation results of flood peak at the outlet of the target basin under various silt dam site selection and scale schemes (m3 / s)

[0095]

[0096]

[0097] According to the calculation results in Table 7, a response surface proxy model is constructed, and the fitting order is selected according to the actual impact situation. In the embodiment of the present invention, the third order is selected. The response surface proxy model finally obtained fits the training data well, the model is not overfitted, and has good prediction ability on unknown data and good generalization ability. The fitting result is shown in formula (6).

[0098]

[0099] Step 5: construct a multi-objective optimization model for the site selection of the silt dam in the target basin. The multi-objective optimization model in the present invention has three optimization objectives, namely, investment and construction cost C, production and operation benefit R, and flood control optimization benefit Q. R , the optimization model is shown in formula (7).

[0100]

[0101] In this embodiment, the expression of the investment and construction cost of the silt dam with the distance S between the silt dam and the target basin outlet and the dam height H as decision factors is shown in formula (8).

[0102]

[0103] In this embodiment, the flood peak at the outlet of the target basin is used as the observation comparison index, and the flood peak reduction degree at the outlet of the target basin after the silt dam is configured is used as the flood control optimization benefit of the silt dam, and the expression is shown in formula (9).

[0104]

[0105] Where:

[0106] Q R , flood peak reduction degree, %;

[0107] Q0, the flood peak at the target basin outlet calculated by the hydrodynamic model when no silt dam is deployed, m 3 / s;

[0108] Q i , the target basin outlet flood peak obtained by the response surface proxy model under a certain silt dam layout condition, m 3 / s, that is, formula (6).

[0109] In this embodiment, the production and operation benefits of the silt dam are determined by the distance S from the basin outlet and the dam height H. In this embodiment, the benefits are divided into the benefits of sediment interception and irrigation and the benefits of silt planting. The benefits of sediment interception and irrigation can be directly calculated using the reservoir capacity V, while the benefits of silt planting can be directly calculated using the silt area. The sum of the two represents the benefits generated by the production and operation of the silt dam, and the expression is shown in formula (10).

[0110]

[0111] Then, a multi-objective optimization algorithm is used to solve the above optimization model. In this embodiment, the NSGA-II algorithm is used for solving. The main setting parameters are as follows: the population size is 200, the maximum number of iterations is 2000, and the convergence conditions are two aspects: the maximum allowable Pareto percentage is 70% and the convergence stability percentage is 2%. As long as any one of the two convergence conditions is met, the iteration can be terminated.

[0112] Finally, the optimization result of this embodiment is calculated, and the Pareto frontier of the multi-objective optimization configuration model of the silt dam site selection and scale is drawn based on it, see Fig.10 As can be seen from the figure, when the construction investment cost is at a low level, such as less than 500,000, the impact on flood control optimization benefits and production and operation benefits is greater, while at a high level, such as more than 3 million, the impact on the two benefits tends to be stable. In addition, it is found that when the investment and construction cost increases by about 500,000, the flood control optimization benefit can be increased by 10%, and the production and operation benefits generated will increase by about 700,000.

[0113] In order to verify the accuracy of the Pareto solution set, three points of interest were randomly selected from the Pareto solution set, and the predicted values ​​of the optimization scheme were compared with the true values ​​of the numerical simulation. The results are shown in Table 8. It can be found that the relative errors between the predicted values ​​and the true values ​​of the investment and construction costs, production and operation benefits, and flood control optimization benefits are all less than 15%, indicating that the Pareto solution set of this multi-objective optimization has certain practicality in the site selection and scale design of the silt dam in the target basin.

[0114] Table 8 Verification of multi-objective optimization solution set for silt dam site selection in target basin

[0115]

[0116]

[0117] The above contents are only for explaining the technical idea of ​​the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.

Claims

1. A method for site selection of silt dams based on hydrological and hydrodynamic coupling model. It is characterized in that include: S1, based on the DEM of the target basin, terrain characteristics analysis is performed to obtain the river network and sub-basin division results of the target basin, as well as the dam crest length, sediment retention capacity and siltation area of ​​the proposed silt dam; S2, based on the sub-basin division results of S1, a hydrological model of the target basin is constructed, and the design flood process of the target basin is calculated according to the hydrological model; S3, taking the design flood process of the target basin as the boundary condition, construct the hydrodynamic model of the target basin; S4, in the hydrodynamic model of the target watershed, generalizing the construction of silt dams of various silt dam construction schemes by modifying the terrain, performing watershed flood simulation, calculating the flood peaks at the outlet of the target watershed under the various silt dam construction schemes, and constructing a response surface proxy model according to the flood peaks at the outlet of the target watershed; S5. Construct a multi-objective optimization model for the siting and scale of the silt dam in the target watershed. The multi-objective optimization model includes three optimization objectives: investment and construction cost, production and operation benefit, and flood control optimization benefit. The investment and construction cost and production and operation benefit are obtained according to the dam crest length, sediment retention capacity and siltation area of ​​the silt dam. The flood control optimization benefit is obtained according to the hydrodynamic model and the response surface proxy model. The multi-objective optimization model is solved to obtain the optimization results of the siting and scale of the silt dam.

2. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that S1 is specifically as follows: based on the DEM of the target watershed, depression filling analysis, slope analysis, and flow analysis are carried out, and the river network density method is used to extract the optimal river network of the target watershed, and the sub-watershed division is carried out according to the optimal river network to obtain the sub-watershed division result; according to the distance S between the silt dam and the outlet of the target watershed and the dam height H, the terrain analysis method is adopted to extract and analyze the terrain characteristic parameters, and a mathematical model of the dam crest length L, the sediment retention capacity V, and the silt area A is constructed according to the terrain characteristic parameters.

3. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that S2 is specifically as follows: based on the sub-basin division results of S1, combined with the digital elevation data, soil type data and land use type data of the target basin, the underlying surface parameters of the hydrological model are determined, and the calibration is completed with the rainfall data to obtain the hydrological model; the design rainstorm is used as the rainfall condition, and the design flood process of the target basin is calculated according to the hydrological model.

4. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that In S3, the hydrodynamic model is a one-dimensional hydrodynamic model or a two-dimensional hydrodynamic model.

5. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that When the hydrodynamic model is a two-dimensional hydrodynamic model, S3 specifically comprises: based on the digital elevation data of the target watershed, determining the roughness value of each area of ​​different land use types, determining the optimal calculation grid size through grid independence analysis, and using the design flood process of the target watershed calculated by the hydrological model as the boundary condition to construct the hydrodynamic model of the target watershed.

6. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that S3 also includes water balance analysis of the hydrodynamic model to verify the feasibility and applicability of the hydrodynamic model.

7. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that In S5, the location and scale of the silt dam in the target watershed are respectively the distance S between the silt dam and the outlet of the target watershed and the height H of the dam body.

8. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that In S5, the multi-objective optimization model is: Among them, C represents the investment and construction cost of the silt dam; Q R It represents the flood control optimization benefit, that is, the flood peak reduction degree at the outlet of the target basin after the target basin is equipped with a check dam; R represents the production and operation benefits of the silt dam after its completion.

9. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 8, It is characterized in that The specific benefits of flood control optimization are: Where: Q 0 It represents the flood peak at the outlet of the target basin calculated by the hydrodynamic model when no silt dam is built, m 3 / s; Q i represents the target basin outlet flood peak obtained by the response surface proxy model under a certain silt dam layout condition, m 3 / s, represented by the distance S between the silt dam and the outlet of the target basin and the height H of the dam body through a mathematical model:

10. The method for selecting a silt dam site based on a hydrological and hydrodynamic coupling model according to claim 1, It is characterized in that The NSGA-II algorithm is used to solve the multi-objective optimization model.

Citation Information

Cited By

  • Full-process step-by-step optimization computer-aided silt dam system design method

    CN119475544A

  • A computer-aided design method for silt dam system with full-process step-by-step optimization

    CN119475544B