Intelligent building operation and maintenance method and platform, storage medium and electronic equipment
By intelligently analyzing inspection results and related projects, and automatically matching the operation and maintenance plan, the accuracy and efficiency of manually judging abnormal situations in the traditional building operation and maintenance model is solved, and the full automation and intelligence of building operation and maintenance management is realized, and the improvement of the Accuracy and efficiency of operation and maintenance processing.
Patent Information
- Application Number
- CN202411040665.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional building operation and maintenance model relies on manual inspection and empirical judgment, resulting in inaccurate handling of abnormal situations, low efficiency and poor accuracy.
By obtaining the inspection results of the construction project, generating inspection reports, conducting intelligent analysis and judgment of abnormalities, determining the warning level based on the abnormal related projects, and generating work orders to be operated and maintained based on the warning level matching the operation and maintenance plan to realize the construction operation and maintenance management process Fully automated and intelligent.
It improves the accuracy and efficiency of operation and maintenance handling of abnormal situations, avoids the limitations of manual experience, and ensures the rationality and accuracy of operation and maintenance solutions.
Smart Images

Figure CN119090480A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent operation and maintenance technology, and specifically to an intelligent building operation and maintenance method, platform, storage medium and electronic equipment. Background Art
[0002] In modern urban construction, smart building systems, as a key technology to improve building energy efficiency, safety and user comfort, have become an important part of urban development. Smart buildings achieve automation and intelligence in building management by integrating automation systems, information and communication technologies, etc.
[0003] The operation and maintenance of smart buildings usually rely on the collaborative work of building automation systems and information management systems. These systems can monitor various physical and environmental parameters of the building and ensure the normal operation of equipment and systems through regular inspections. In the traditional building operation and maintenance model, manual inspections are usually used to read business data, and then the operation and maintenance personnel judge whether there are abnormalities based on experience and dispatch operations and maintenance orders. However, the process of manual inspections and judgment of abnormalities is greatly affected by subjective factors, resulting in inaccurate operation and maintenance handling of abnormal situations. Summary of the invention
[0004] The present application provides a smart building operation and maintenance method, platform, storage medium and electronic equipment, which can improve the accuracy of operation and maintenance processing of abnormal situations.
[0005] In a first aspect, the present application provides a smart building operation and maintenance method, the method comprising: Obtaining inspection results corresponding to each inspection item in the construction project, and generating an inspection report for the construction project based on each inspection result; Analyze the inspection report to obtain an analysis result, and when there is abnormal business data in the analysis result, obtain the abnormal inspection item corresponding to the abnormal business data; Determine the warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item; Generate a maintenance work order corresponding to the abnormal inspection item based on the warning level; A target operation and maintenance worker corresponding to the operation and maintenance work order is determined among the workers to be dispatched, and the operation and maintenance work order is dispatched to a terminal of the target operation and maintenance worker.
[0006] By adopting the above technical solution, an inspection report is generated by obtaining the inspection results, the report is intelligently analyzed to determine the abnormalities, and the warning level of the abnormalities is determined based on the related items of the abnormalities. Then, the operation and maintenance plan is matched according to the warning level to generate an operation and maintenance work order, and finally the work order is dispatched to the target operation and maintenance worker, thereby realizing the full automation and intelligence of the building operation and maintenance management process. Compared with the existing traditional operation and maintenance model that relies on manual reading of data and experience judgment, this application can automatically match the best historical operation and maintenance plan instead of simply relying on experience, ensuring the rationality of the operation and maintenance plan, thereby improving the accuracy of operation and maintenance processing of abnormal situations.
[0007] Optionally, the obtaining inspection results corresponding to each inspection item in the construction project, and generating an inspection report for the construction project based on each inspection result, includes: Obtaining business data of each inspection subsystem in the construction project, performing data cleaning on each of the business data, and obtaining inspection results corresponding to each inspection item, wherein each of the inspection subsystems corresponds to one inspection item; Retrieving the recent historical data corresponding to each of the inspection items in the project database, and predicting the normal business data range of each of the inspection items based on the recent historical data; The normal business data range of the inspection project and the inspection result are matched to a preset inspection report template to obtain the inspection report of the construction project.
[0008] By adopting the above technical solution, the original business data of each inspection subsystem is obtained, and the standardized inspection results are obtained after data cleaning and denoising. At the same time, the system can actively retrieve recent historical data from the project database and intelligently predict the normal business data range of each inspection project based on historical data. The predicted normal business data range and the actual inspection results obtained after cleaning are matched to the preset report template, and finally the overall inspection report of the construction project is formed, realizing the automation and intelligence of obtaining inspection results and generating inspection reports, without relying on subjective experience, and improving inspection efficiency and report quality.
[0009] Optionally, it is characterized in that the analyzing the inspection report to obtain the analysis result includes: Compare each business data in the inspection report with the corresponding normal business data range; When there is abnormal business data that exceeds the corresponding normal business data range, determining that the analysis result is abnormal; When all the business data do not contain abnormal business data that exceeds the corresponding normal business data range, the analysis result is determined to be normal.
[0010] By adopting the above technical solution, each business data in the inspection report is automatically compared with the corresponding normal business data range. If any business data exceeds the normal range, the existence of an abnormal situation can be quickly and accurately determined. Conversely, if all business data are within the normal range, the status can be determined to be normal. Intelligent analysis of inspection reports based on range matching and automatic identification of anomalies are realized without relying on manual experience, which simplifies the abnormality judgment process and makes the results more accurate.
[0011] Optionally, before determining the warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection item of the abnormal inspection item, the method further includes: Obtaining the importance level of each inspection item; Determine the cross-correlation degree between each of the inspection items and other inspection items, and determine the correlation score between each of the inspection items and other inspection items based on the cross-correlation degree and the importance level; Based on the importance level of each inspection item and its correlation with other inspection items, a project relationship diagram corresponding to the building project is constructed.
[0012] By adopting the above technical solution, the importance level of each inspection item is obtained, and the cross-correlation between items is determined. The correlation score between projects is calculated based on the importance level and correlation, and then the overall project relationship diagram of the construction project is constructed, which can intuitively reflect the degree of correlation between projects and provide important support for the subsequent determination of the warning level of abnormal projects.
[0013] Optionally, the determining, based on the abnormal business data and the associated inspection items of the abnormal inspection items, a warning level corresponding to the abnormal inspection item includes: In the item relationship diagram, the inspection items whose correlation scores with the abnormal inspection items are greater than a first correlation threshold are taken as correlated inspection items; Determine the target importance level of the abnormal inspection item and the target correlation score between the abnormal inspection item and the correlated inspection item; Calculating the deviation between the abnormal business data and the normal business data range; The warning level corresponding to the abnormal inspection item is determined based on the target importance level, the target relevance score and the deviation degree.
[0014] By adopting the above technical solution, by identifying the related projects with high correlation with the abnormal projects in the project relationship diagram, the target importance level and target correlation score of the abnormal projects can be determined. At the same time, the deviation degree of the abnormal business data is calculated. Based on the three dimensions of target importance level, target correlation score and deviation degree, the abnormal projects can be analyzed from multiple angles to accurately determine their warning levels. At the same time, attention can be paid to the abnormal projects themselves and other projects related to them, so that the judgment is more comprehensive. The warning level finally obtained can accurately reflect the severity of the abnormality.
[0015] Optionally, determining the warning level corresponding to the abnormal inspection item based on the target importance level, the target relevance score and the deviation degree includes: Determine whether the target importance level is high, and if the target importance level is high, determine the warning level as level one warning; If the target importance level is not high, determining whether the target relevance score is greater than a second relevance threshold, and whether the deviation degree is greater than a deviation threshold; If the target correlation score is greater than the second correlation threshold, and the deviation is greater than the deviation threshold, the warning level is determined to be a level 2 warning; If the target correlation score is not greater than the second correlation threshold, and / or the deviation is not greater than the deviation threshold, the warning level is determined to be a level three warning.
[0016] By adopting the above technical solution, a hierarchical warning mechanism is introduced. According to the severity of the abnormal situation, the levels are divided, which can more accurately reflect the priority and urgency of the abnormality. At the same time, the judgment rules are unified and clear, no longer simply relying on experience, and the subjectivity is reduced. The hierarchical warning provides a basis for the subsequent determination of the operation and maintenance plan.
[0017] Optionally, generating a maintenance work order corresponding to the abnormal inspection item based on the warning level includes: Determine the abnormality type based on the abnormal business data, and search the historical operation and maintenance solution library for the historical operation and maintenance solution with the same abnormality type and warning level; Using the historical operation and maintenance plan as the target operation and maintenance plan corresponding to the abnormal inspection item, the target operation and maintenance plan including the requirements for operation and maintenance personnel; Generate a maintenance work order based on the target maintenance plan and the maintenance personnel requirements.
[0018] By adopting the above technical solution, the abnormal business data is analyzed to determine the abnormal type, which is used as a query keyword to find matching solutions in the historical operation and maintenance solution library. The historical operation and maintenance solution obtained by the query is used as the target operation and maintenance solution for the abnormal project, which includes the required operation and maintenance personnel requirements. Based on the target solution and personnel requirements, the operation and maintenance work order is finally formed. By intelligently matching the operation and maintenance solution and automatically forming the work order, the automation of work order generation is realized, avoiding the limitations of manual experience, ensuring the accuracy of the operation and maintenance solution and the quality of the work order, and providing support for the subsequent work order distribution.
[0019] In a second aspect of the present application, a smart building operation and maintenance platform is provided, the platform comprising: An inspection report generation module is used to obtain the inspection results corresponding to each inspection item in the construction project, and generate an inspection report for the construction project based on each inspection result; An abnormal item determination module is used to analyze the inspection report to obtain an analysis result, and when abnormal business data exists in the analysis result, obtain the abnormal inspection item corresponding to the abnormal business data; An early warning level determination module, used to determine the early warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item; An operation and maintenance work order generation module, used to generate an operation and maintenance work order corresponding to the abnormal inspection item based on the warning level; The operation and maintenance work order dispatching module is used to determine the target operation and maintenance worker corresponding to the operation and maintenance work order among the workers to be dispatched, and dispatch the operation and maintenance work order to the terminal of the target operation and maintenance worker.
[0020] In a third aspect of the present application, a computer storage medium is provided, wherein the computer storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor and executing the above method steps.
[0021] In a fourth aspect of the present application, an electronic device is provided, comprising: a processor and a memory; wherein the memory stores a computer program, and the computer program is suitable for being loaded by the processor and executing the above-mentioned method steps.
[0022] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: By obtaining the inspection results to generate an inspection report, intelligently analyzing the report to determine anomalies, and determining the warning level of the anomaly based on the associated items of the anomaly, the operation and maintenance plan is matched according to the warning level to generate an operation and maintenance work order, and finally the work order is dispatched to the target operation and maintenance worker, achieving full automation and intelligence of the building operation and maintenance management process. Compared with the existing traditional operation and maintenance model that relies on manual reading of data and experience judgment, this application can automatically match the best historical operation and maintenance plan instead of simply relying on experience, ensuring the rationality of the operation and maintenance plan, thereby improving the accuracy of operation and maintenance processing of abnormal situations. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a flowchart of a smart building operation and maintenance method provided by an embodiment of the present application; Figure 2 It is a module schematic diagram of a smart building operation and maintenance platform provided in an embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.
[0024] Description of reference numerals: 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION
[0025] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0026] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.
[0027] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.
[0028] The following will provide a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0029] The embodiments of the present application can be applied but not limited to any large-scale building complex or park that integrates multiple intelligent subsystems. For example, a large commercial complex integrates multiple subsystems, such as heating, cooling, ventilation, water supply and drainage, electricity, security, and parking systems. The normal operation of these subsystems is crucial to the operation of the entire complex. The technical solution provided by this application can monitor each subsystem in real time, quickly detect anomalies and assign operation and maintenance personnel to deal with them in a timely manner, so as to ensure the smooth operation of the complex.
[0030] Please refer to Figure 1 , a flowchart of a smart building operation and maintenance method is proposed. The method can be implemented by a computer program, can be implemented by a single-chip microcomputer, or can be run on a smart building operation and maintenance platform. The computer program can be integrated into the operation and maintenance platform, or can be run as an independent tool application. Specifically, the method includes steps 10 to 50, and the above steps are as follows: Step 10: Obtain the inspection results corresponding to each inspection item in the construction project, and generate an inspection report for the construction project based on each inspection result.
[0031] In the present embodiment, the construction project refers to a large-scale building complex or park that integrates multiple intelligent subsystems. The inspection result refers to the real-time operation data of each intelligent subsystem, and each subsystem will generate business data reflecting its operation status.
[0032] Specifically, traditional building operation and maintenance often rely on manual regular inspections of each subsystem to obtain limited operation data samples, and then manually determine whether there are abnormalities based on the limited data. This approach is inefficient and inaccurate. This solution automatically obtains all real-time operation data of each intelligent subsystem in the building project through networking or on-site collection. These subsystems include but are not limited to heating, cooling, ventilation, water supply and drainage, electricity, security, etc. Each subsystem corresponds to a "patrol project". For these original operation data, data cleaning is performed to remove abnormal values, fill missing values, etc., and the inspection results corresponding to each inspection project are obtained. Secondly, the recent historical operation data of each inspection project is retrieved from the project database, and the normal operating data range of each inspection project is predicted through big data analysis, machine learning and other technologies as the basis for abnormal judgment. Finally, the normal operating data range of each inspection project and the real-time inspection result data obtained this time are automatically matched and filled into the preset inspection report template, thereby generating a complete building project inspection report.
[0033] Based on the above embodiment, as an optional embodiment, the step of obtaining the inspection results corresponding to each inspection item in the construction project and generating an inspection report for the construction project based on each inspection result may also include the following steps: Step 101: Obtain the business data of each inspection subsystem in the construction project, perform data cleaning on each business data, and obtain the inspection results corresponding to each inspection project. Each inspection subsystem corresponds to an inspection project.
[0034] Specifically, smart buildings usually integrate multiple subsystems, such as heating systems, cooling systems, ventilation systems, power systems, water supply and drainage systems, and security systems. Each subsystem will generate a large amount of real-time business data reflecting its operating status during operation, such as pipe pressure and temperature of the heating system, power consumption, voltage and current of the power system, etc. Data can be collected and uploaded through various sensor terminals deployed on site; operation data can also be obtained from the subsystem control center through networking; and some data can be supplemented by manual transcription and other methods. After obtaining the original business data, due to the existence of data missing, outliers, noise and other problems, the business data needs to be cleaned. The specific steps of cleaning include removing outliers, interpolating missing values, eliminating noise, etc., to ensure the integrity and accuracy of the data. Data cleaning can be achieved based on statistical methods, machine learning algorithms and other technologies. After data cleaning, the "inspection result" data corresponding to each inspection subsystem is obtained, which will reflect the real-time operating status of each subsystem.
[0035] Step 102: Retrieve the recent historical data corresponding to each inspection project from the project database, and predict the normal business data range of each inspection project based on the recent historical data.
[0036] Specifically, after obtaining the real-time "inspection results" data of each inspection project, in order to determine whether these real-time data are abnormal, a normal value range is required as a reference benchmark. Since different inspection projects correspond to different subsystems, their normal operating data ranges are often different. Since a large amount of historical operation data of each inspection project in the past period of time (such as the last 3 months) has been stored in the database of the construction project. These historical data reflect the data distribution pattern of each subsystem under normal circumstances. For each inspection project, the recent historical data of the project can be retrieved from the database. Then, based on these historical data, the normal business data range of the inspection project can be automatically predicted and learned through the algorithm model using technologies such as big data analysis and machine learning. For example, statistical methods can be used to calculate the mean and standard deviation of the historical data of the project, and the mean plus or minus 3 standard deviations can be used as the upper and lower limits of the normal range; machine learning models such as regression algorithms and clustering algorithms can also be used to fit and estimate the range of historical data.
[0037] Step 103: Match the normal business data range of the inspection project and the inspection results to a preset inspection report template to obtain an inspection report for the construction project.
[0038] Specifically, the traditional practice is for operation and maintenance personnel to manually create and fill out inspection reports, which is not only time-consuming and labor-intensive, but also prone to human errors and omissions. A standardized electronic inspection report template file is pre-set in the system, for example, in the form of Excel or other tables. The template includes a fixed framework and format for the report, such as common fields such as title, time, and personnel, as well as data filling areas corresponding to each inspection item. The template is automatically called to automatically match and fill the corresponding areas of the template with the normal business data range and real-time inspection result data of each inspection item. Taking the heating inspection project as an example, the data area of the template will automatically fill in the real-time data such as the pipeline pressure and temperature of this heating system, as well as the normal range values of these parameters.
[0039] Step 20: Analyze the inspection report to obtain analysis results. When there is abnormal business data in the analysis results, obtain abnormal inspection items corresponding to the abnormal business data.
[0040] Specifically, each business data in the inspection report is automatically traversed and compared with the corresponding normal business data range predicted previously. Once a business data is found to exceed the normal range of the project, the data is automatically determined to be abnormal business data. Taking the heating system as an example, assuming that the normal range of its pipeline pressure is 5-8bar, and the real-time collected pressure value is 10bar, it will be automatically identified as an abnormal value. Similarly, for other inspection items, if any real-time business data exceeds the corresponding normal business range, the analysis result will be determined to be abnormal. When there is any abnormal business data, the system will determine the inspection item corresponding to the abnormal data as an abnormal inspection item. For example, in the above example, the heating pressure is abnormal, and the heating inspection item will be confirmed as an abnormal inspection item. If all business data are within the corresponding normal business data range, the analysis result shows that the entire building project is operating normally. As long as any abnormality is found, the abnormality handling process will be triggered.
[0041] Based on the above embodiment, as an optional embodiment, a smart building operation and maintenance method also includes a process of constructing a project relationship diagram, and the specific process is as follows: Specifically, for each inspection item, an importance level attribute is pre-set to characterize the importance of the item in the entire building project. For example, the importance level of core systems such as power supply and refrigeration is higher, while the importance level of non-critical systems is lower. Secondly, the system needs to analyze the cross-correlation between the inspection items. There is a close correlation between some subsystems. Once one of them is abnormal, it may affect or cause the other system to be abnormal. For example, the heating and power supply systems have a high correlation. Based on the analyzed cross-correlation and combined with the importance level of each item, a correlation score between the items can be calculated. A weighted algorithm model can be designed, which takes the cross-correlation and importance level as input and outputs the correlation score between the items. The algorithm can be a simple weighted average or a complex nonlinear model, and the specific weights can be adjusted according to the actual situation. For example, for heating system A and cooling system B, assuming that the cross-correlation between the two is 0.7 (high), the importance level of A is 0.9 (high), and the importance level of B is 0.6 (medium). Through the weighted algorithm, the correlation score between A and B can be calculated to be 0.73. Finally, all inspection items are taken as nodes and the associated points are taken as the weights of the edges to construct a project relationship diagram corresponding to the entire construction project, which can clearly reflect the relationship between the subsystems. By constructing such a relationship diagram, once an abnormal inspection item occurs, the importance of the abnormal item in the entire project and the possible impact on other projects can be viewed in the diagram. Therefore, a reasonable warning level can be comprehensively judged based on abnormal business data and other related inspection items.
[0042] Step 30: Based on the abnormal business data and the associated inspection items of the abnormal inspection items, determine the warning level corresponding to the abnormal inspection items.
[0043] Related inspection items refer to other inspection items that have a certain correlation with abnormal inspection items. Since the subsystems are mutually related and influence each other, once a subsystem is abnormal, it is likely to affect and cause abnormalities in other subsystems related to it.
[0044] The warning level refers to the level assessment of the severity of the abnormal situation after comprehensive analysis of abnormal business data, abnormal inspection items and related inspection items. In the embodiment of the present application, the warning level is divided into level 1 warning, level 2 warning and level 3 warning. The lower the level, the higher the severity of the warning.
[0045] Specifically, a preliminary assessment is made on the abnormal degree of the abnormal inspection item itself, combined with the specific numerical deviation degree of the abnormal business data. For example, if the pressure value of the heating pipe is 15bar, and the normal range is 5-8bar, it is a serious deviation from the normal level. At this time, the preliminary abnormal level of the abnormal inspection item can be determined as a higher level. However, it is not enough to only consider the abnormal inspection item itself. Due to the complex interrelationships and influences between subsystems, the abnormality of a certain system may trigger abnormalities in other systems, thereby causing the overall abnormal scope and impact to expand. Therefore, it is also necessary to analyze the degree of correlation between the abnormal inspection item and other inspection items. Through the project relationship diagram constructed previously, the correlation score between each inspection item is obtained, which reflects the severity of the abnormal mutual influence between the two items. Comprehensively considering the abnormal degree of the abnormal item itself and other items related to it, determine the warning level corresponding to the abnormal situation. The higher the warning level, the wider the impact of the anomaly and the more serious the consequences, requiring more resources and more urgent measures.
[0046] Based on the above embodiment, as an optional embodiment, the step of determining the warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item may also include the following steps: Step 301: In the project relationship diagram, inspection items whose correlation scores with abnormal inspection items are greater than a first correlation threshold are taken as correlated inspection items.
[0047] In the constructed project relationship diagram, a first correlation threshold is set, and the projects with correlation scores greater than the threshold are regarded as related inspection projects that need to be focused on. The setting of the first correlation threshold needs to take into account the risk of abnormal diffusion and resource utilization efficiency. If the threshold is too high, too few related projects will be included, and important impacts may be missed; if the threshold is too low, too many projects will be included, and resource allocation will be too dispersed. The threshold can be adjusted according to the actual situation of the building and combined with historical operation and maintenance data.
[0048] Specifically, after discovering an abnormal inspection project A, the system will search for the correlation scores between A and other projects in the project relationship diagram. For any other project B, if the correlation score between A and B exceeds the first correlation threshold, B will be determined as an associated inspection project of A and needs to be included in the abnormal impact assessment scope. For example, if the first correlation threshold is 0.6, if the correlation score between A and B is 0.8, and the correlation score between A and C is 0.4, then B will be regarded as an associated project of A, and C will be excluded.
[0049] Step 302: Determine the target importance level of the abnormal inspection item and the target correlation score between the abnormal inspection item and the correlated inspection items.
[0050] Specifically, it is necessary to determine the target importance level for the abnormal inspection item itself. The target importance level reflects the degree to which the importance of the abnormal item is expected to be increased under the abnormal situation. Since an importance level attribute is pre-set for each inspection item, the target importance level corresponding to the abnormal inspection item can be directly retrieved. Secondly, it is also necessary to determine the target correlation score between the abnormal inspection item and each related inspection item. The target correlation score is used to characterize the degree of correlation between the abnormal item and the related item. The higher the target correlation score, the more serious the abnormal situation. You can refer to the normal correlation score between each item in the project relationship diagram constructed earlier, combined with the warning level, to obtain the target correlation score between the abnormal inspection item and the related inspection item.
[0051] Step 303: Calculate the deviation between the abnormal business data and the normal business data range.
[0052] Specifically, when determining the warning level of abnormal situations, in addition to considering the abnormal items themselves and their related items, it is also necessary to evaluate the degree to which the abnormal data deviates from the normal range, that is, the degree of deviation between the abnormal business data and the normal business data range. The size of the deviation directly reflects the severity of the abnormality and is an important basis for judging the warning level. First, it is necessary to clarify the value range of normal business data for each inspection item. Based on a large amount of historical operation data, statistical methods can be used to determine the normal value range of each indicator, such as the mean plus or minus three standard deviations. For newly built systems or systems lacking sufficient historical data, a reasonable normal range can also be set based on design standards or expert experience. When it is found that the real-time business data of a certain inspection item exceeds the normal range, it is determined to be abnormal data. It is necessary to calculate the degree of deviation between the abnormal data value and the normal range. For the deviation calculation method, the following methods can be used: for a one-sided interval, calculate the actual difference between the abnormal data and the interval boundary value; for a two-sided interval, calculate the actual difference between the abnormal data and the interval center value; for an asymmetric distribution interval, the difference between the abnormal value and the interval boundary / center value can be converted into an equivalent standard deviation multiple, etc.
[0053] Step 304: Determine the warning level corresponding to the abnormal inspection item based on the target importance level, target relevance score and deviation degree.
[0054] Specifically, the target importance level of abnormal inspection items, the target correlation score between abnormal items and related items, and the deviation degree of abnormal business data from the normal range. These three indicators respectively reflect the impact of abnormal situations on the importance of the system, the risk of abnormal spread, and the degree to which abnormal data deviates from the normal level.
[0055] The classification of warning levels first needs to consider the target importance level of the abnormal inspection project. If the target importance level is temporarily raised to the highest level, it means that the importance of the project itself has been recognized by the core of the system and has a serious impact on the overall situation. At this time, there is no need to consider other factors and it is directly judged as a level 1 warning. The highest level emergency response mechanism needs to be activated immediately.
[0056] If the target importance level is not at the highest level, it is necessary to further combine the two factors of target correlation score and deviation for comprehensive analysis. First, it is necessary to set a second correlation threshold and a deviation threshold as a reference for the early warning level division. The second correlation threshold is used to characterize the critical degree of the abnormal chain reaction risk of associated projects. If the target correlation score of the abnormal project with a related project exceeds the threshold, it means that the risk of the associated project being affected by the abnormality is high and needs to be included in the scope of key attention. The deviation threshold is used to characterize the critical degree of abnormal data deviation. If the deviation of abnormal data from the normal range exceeds the threshold, it means that the abnormal deviation is already serious and needs to be given sufficient attention.
[0057] When the target correlation score and deviation degree of the abnormal item exceed their respective thresholds, it indicates that the impact of the abnormal situation is large and the degree of abnormality is also serious. At this time, it is determined to be a second-level warning and the corresponding emergency plan needs to be activated. On the contrary, if the target correlation score is not greater than the second correlation threshold, and / or the deviation degree is not greater than the deviation threshold, the warning level is determined to be a third-level warning. You can first continuously monitor the development trend of data abnormalities and decide whether further treatment measures are needed if necessary.
[0058] Step 40: Generate a maintenance work order corresponding to the abnormal inspection item based on the warning level.
[0059] Specifically, the system needs to preset a variety of different types of work order templates, corresponding to different warning levels and abnormal situations. The work order corresponding to the first-level warning will be the highest-level and most urgent emergency processing template; the second-level warning corresponds to the medium-level processing template; the third-level warning corresponds to the regular maintenance template. Each work order template needs to pre-define all the processing steps that need to be executed under the abnormal situation, the types and quantities of resources to be deployed, the on-site operation methods, the processing and approval process, and other standardized contents. The design of these contents requires the integration of a large amount of expert experience and best practices. When an actual abnormality occurs and its warning level has been determined, the system will automatically select the corresponding work order template and fill in the specific data of the abnormal situation into the template, such as the time of abnormal occurrence, abnormal project details, real-time data curves, etc., so as to generate a formally executable maintenance work order.
[0060] Based on the above embodiment, as an optional embodiment, the step of generating a maintenance work order corresponding to the abnormal inspection item based on the warning level further includes: Step 401: Determine the abnormality type based on the abnormal business data, and search the historical operation and maintenance solution library for the historical operation and maintenance solution with the same abnormality type and warning level.
[0061] Specifically, according to the real-time business data of the abnormal inspection items, determine what specific type the abnormality belongs to. The abnormal type can cover a variety of situations such as equipment failure, resource shortage, and operating parameter deviation. The basis for determining the abnormal type mainly comes from the comparison results of the current data and the normal mode. For example, if the pipeline pressure data of the heating system continues to be low and the temperature data also shows a downward trend, then the abnormal type can be determined to be insufficient heating capacity; if it is found that the power consumption of the chilled water system has increased sharply, the abnormal type may be reduced equipment efficiency, etc. Search in the historical operation and maintenance solution library to see if there are historical cases with the same or highly similar abnormal types and warning levels as the current ones. The historical solution library is a collection of solutions summarized and formed in the long-term cumulative operation and maintenance practice, covering successful handling experiences in various abnormal situations. Each historical case needs to record detailed information such as the background environment in which the abnormality occurred, specific characterization characteristics, measures taken, and implementation effect evaluation. When searching, it is necessary to match the two dimensions of abnormal type and warning level at the same time, so as to find the closest reference historical operation and maintenance solution.
[0062] Step 402: Use the historical operation and maintenance plan as the target operation and maintenance plan corresponding to the abnormal inspection project, and the target operation and maintenance plan includes the requirements for operation and maintenance personnel.
[0063] Specifically, the benefit of converting historical success cases into target operation and maintenance plans is that it can maximize the use of existing experience summaries and avoid the complex process of formulating plans from scratch, thereby greatly shortening the response time and improving the timeliness of exception handling. The target operation and maintenance plan needs to include all the operations required to handle exceptions, mainly including but not limited to: operation and maintenance operation steps, material requirements, operation and maintenance personnel requirements, safety protection, etc. Among them, the requirements for operation and maintenance personnel are particularly critical, because a qualified team of personnel is ultimately required to implement the target plan. Therefore, it is necessary to comprehensively evaluate the specific standards such as the number, professional ability, and operation experience of the operation and maintenance personnel to be deployed based on the complexity and urgency of the abnormal situation. For example, the first-level warning abnormality usually requires the most senior emergency response team to be on site, and its personnel requirements are the most stringent; the second-level abnormality can appropriately reduce the requirements and dispatch more regular maintenance personnel; the third-level warning can be handled by daily inspection personnel.
[0064] Step 403: Generate a maintenance work order based on the target maintenance plan and the maintenance personnel's requirements.
[0065] Specifically, the work order for operation and maintenance serves as an instruction and voucher for exception handling, and its content directly determines the standard specifications for subsequent actual operation and maintenance operations. Therefore, the work order for operation and maintenance needs to fully and comprehensively present the various requirements and key points in the target operation and maintenance plan to ensure that there are no omissions or deviations during execution. The work order for operation and maintenance includes but is not limited to: exception summary, operation requirements, personnel arrangements, approval process, time nodes, etc. The process of generating the work order for operation and maintenance is actually to digitize and structure the content of the target operation and maintenance plan, so that each link of the operation and maintenance operation has clear and executable instructions.
[0066] Step 50: Determine the target operation and maintenance worker corresponding to the operation and maintenance work order from among the workers to be dispatched, and dispatch the operation and maintenance work order to the terminal of the target operation and maintenance worker.
[0067] Specifically, it is necessary to screen out qualified worker candidates from all existing workers waiting to be dispatched according to the maintenance personnel requirements previously set in the maintenance work order. The worker database waiting to be dispatched is a centrally managed worker information database, which records in detail all qualification information of each worker, such as professional field, skill level, work experience, and qualification certificate. For the matching worker candidates, the system will automatically conduct a secondary screening to determine which people currently have the conditions and ability to execute the work instructions based on the current worker schedule and location information. After excluding the workers who are resting or performing other tasks, the remaining ones are the target maintenance workers for this instruction. In order to ensure that the target workers receive the instructions in a timely and efficient manner, the system will intelligently select the best time and method for delivering the work order. The work order information can be delivered to their mobile terminal devices through cloud push. After receiving the work order, the terminal workers will receive sound and light prompts to ensure that they can notice the new instructions in time. The work order content integrates all necessary information such as abnormal details, work process, safety protection requirements, etc., and the workers can check and execute them on site.
[0068] See also Figure 2 , is a module diagram of a smart building operation and maintenance platform provided in an embodiment of the present application, the smart building operation and maintenance platform may include: an inspection report generation module, an abnormal item determination module, an early warning level determination module, an operation and maintenance work order generation module and an operation and maintenance work order distribution module, wherein: An inspection report generation module is used to obtain the inspection results corresponding to each inspection item in the construction project, and generate an inspection report for the construction project based on each inspection result; An abnormal item determination module is used to analyze the inspection report to obtain an analysis result, and when abnormal business data exists in the analysis result, obtain the abnormal inspection item corresponding to the abnormal business data; An early warning level determination module, used to determine the early warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item; An operation and maintenance work order generation module, used to generate an operation and maintenance work order corresponding to the abnormal inspection item based on the warning level; The operation and maintenance work order dispatching module is used to determine the target operation and maintenance worker corresponding to the operation and maintenance work order among the workers to be dispatched, and dispatch the operation and maintenance work order to the terminal of the target operation and maintenance worker.
[0069] Optionally, the inspection report generation module is also used to obtain business data of each inspection subsystem in the construction project, perform data cleansing on each of the business data, and obtain inspection results corresponding to each inspection item, each of the inspection subsystems corresponds to an inspection item; retrieve recent historical data corresponding to each of the inspection items in the project database, and predict the normal business data range of each of the inspection items based on the recent historical data; match the normal business data range of the inspection items and the inspection results to a preset inspection report template to obtain an inspection report on the construction project.
[0070] Optionally, the abnormal item determination module is also used to compare each business data in the inspection report with the corresponding normal business data range; when there is any abnormal business data that exceeds the corresponding normal business data range, the analysis result is determined to be abnormal; when all the business data do not have abnormal business data that exceeds the corresponding normal business data range, the analysis result is determined to be normal.
[0071] Optionally, a smart building operation and maintenance platform also includes a project map construction module, which is used to obtain the importance level of each inspection item; determine the cross-correlation between each inspection item and other inspection items, and determine the correlation score between each inspection item and other inspection items based on the cross-correlation and the importance level; based on the importance level of each inspection item and the correlation score with other inspection items, construct a project relationship map corresponding to the building project.
[0072] Optionally, the warning level determination module is also used to, in the project relationship diagram, identify the inspection items whose correlation scores with the abnormal inspection items are greater than a first correlation threshold as associated inspection items; determine the target importance level of the abnormal inspection items, and the target correlation score between the abnormal inspection items and the associated inspection items; calculate the deviation between the abnormal business data and the normal business data range; and determine the warning level corresponding to the abnormal inspection item based on the target importance level, the target correlation score and the deviation.
[0073] Optionally, the warning level determination module is also used to determine whether the target importance level is high. If the target importance level is high, the warning level is determined to be a first-level warning; if the target importance level is not high, it is determined whether the target correlation score is greater than a second correlation threshold, and whether the deviation is greater than a deviation threshold; if the target correlation score is greater than the second correlation threshold, and the deviation is greater than the deviation threshold, the warning level is determined to be a second-level warning; if the target correlation score is not greater than the second association threshold, and / or the deviation is not greater than the deviation threshold, the warning level is determined to be a third-level warning.
[0074] Optionally, the operation and maintenance work order generation module is also used to determine the abnormality type based on the abnormal business data, and query the historical operation and maintenance plan library for the same historical operation and maintenance plan as the abnormality type and the warning level; use the historical operation and maintenance plan as the target operation and maintenance plan corresponding to the abnormal inspection item, and the target operation and maintenance plan includes the requirements of the operation and maintenance personnel; and generate an operation and maintenance work order based on the target operation and maintenance plan and the requirements of the operation and maintenance personnel.
[0075] It should be noted that: when the platform provided in the above embodiment realizes its functions, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the platform and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
[0076] An embodiment of the present application also provides a computer storage medium, which can store multiple instructions. The instructions are suitable for being loaded by a processor and executing a smart building operation and maintenance method of the above embodiment. The specific execution process can be found in the specific description of the above embodiment, which will not be repeated here.
[0077] Please refer to Figure 3 The application also discloses an electronic device. Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .
[0078] The communication bus 302 is used to realize the connection and communication between these components.
[0079] The user interface 303 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.
[0080] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0081] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.
[0082] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally also be at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 , the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program of a smart building operation and maintenance method.
[0083] exist Figure 3 In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program storing a smart building operation and maintenance method in the memory 305. When executed by one or more processors 301, the electronic device 300 executes one or more of the methods described in the above embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited to the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.
[0084] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0085] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0086] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0087] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0088] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0089] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0090] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. A smart building operation and maintenance method, characterized in that: The method comprises: Obtaining inspection results corresponding to each inspection item in the construction project, and generating an inspection report for the construction project based on each inspection result; Analyze the inspection report to obtain an analysis result, and when there is abnormal business data in the analysis result, obtain the abnormal inspection item corresponding to the abnormal business data; Determine the warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item; Generate a maintenance work order corresponding to the abnormal inspection item based on the warning level; A target operation and maintenance worker corresponding to the operation and maintenance work order is determined among the workers to be dispatched, and the operation and maintenance work order is dispatched to a terminal of the target operation and maintenance worker.
2. The smart building operation and maintenance method according to claim 1, characterized in that: The obtaining of inspection results corresponding to each inspection item in the construction project, and generating an inspection report for the construction project based on each inspection result, includes: Obtaining business data of each inspection subsystem in the construction project, performing data cleaning on each of the business data, and obtaining inspection results corresponding to each inspection item, wherein each of the inspection subsystems corresponds to one inspection item; Retrieving the recent historical data corresponding to each of the inspection items in the project database, and predicting the normal business data range of each of the inspection items based on the recent historical data; The normal business data range of the inspection project and the inspection result are matched to a preset inspection report template to obtain the inspection report of the construction project.
3. The smart building operation and maintenance method according to claim 2, characterized in that: The inspection report is analyzed to obtain analysis results, including: Compare each business data in the inspection report with the corresponding normal business data range; When there is abnormal business data that exceeds the corresponding normal business data range, determining that the analysis result is abnormal; When all the business data do not contain abnormal business data that exceeds the corresponding normal business data range, the analysis result is determined to be normal.
4. The smart building operation and maintenance method according to claim 1, characterized in that: Before determining the warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection item of the abnormal inspection item, the method further includes: Obtaining the importance level of each inspection item; Determine the cross-correlation degree between each of the inspection items and other inspection items, and determine the correlation score between each of the inspection items and other inspection items based on the cross-correlation degree and the importance level; Based on the importance level of each inspection item and its correlation with other inspection items, a project relationship diagram corresponding to the building project is constructed.
5. The smart building operation and maintenance method according to claim 4, characterized in that: The determining, based on the abnormal business data and the associated inspection items of the abnormal inspection items, a warning level corresponding to the abnormal inspection items, comprises: In the item relationship diagram, the inspection items whose correlation scores with the abnormal inspection items are greater than a first correlation threshold are taken as correlated inspection items; Determine the target importance level of the abnormal inspection item and the target correlation score between the abnormal inspection item and the correlated inspection item; Calculating the deviation between the abnormal business data and the normal business data range; The warning level corresponding to the abnormal inspection item is determined based on the target importance level, the target relevance score and the deviation degree.
6. The smart building operation and maintenance method according to claim 5, characterized in that: The determining of the warning level corresponding to the abnormal inspection item based on the target importance level, the target relevance score and the deviation degree includes: Determine whether the target importance level is high, and if the target importance level is high, determine the warning level as level one warning; If the target importance level is not high, determining whether the target relevance score is greater than a second relevance threshold, and whether the deviation degree is greater than a deviation threshold; If the target correlation score is greater than the second correlation threshold, and the deviation is greater than the deviation threshold, the warning level is determined to be a level 2 warning; If the target correlation score is not greater than the second correlation threshold, and / or the deviation is not greater than the deviation threshold, the warning level is determined to be a level three warning.
7. The smart building operation and maintenance method according to claim 1, characterized in that: The generating of the maintenance work order corresponding to the abnormal inspection item based on the warning level includes: Determine the abnormality type based on the abnormal business data, and search the historical operation and maintenance solution library for the historical operation and maintenance solution with the same abnormality type and warning level; Using the historical operation and maintenance plan as the target operation and maintenance plan corresponding to the abnormal inspection item, the target operation and maintenance plan including the requirements for operation and maintenance personnel; Generate a maintenance work order based on the target maintenance plan and the maintenance personnel requirements.
8. A smart building operation and maintenance platform, characterized in that: The platform includes: An inspection report generation module is used to obtain the inspection results corresponding to each inspection item in the construction project, and generate an inspection report for the construction project based on each inspection result; An abnormal item determination module is used to analyze the inspection report to obtain an analysis result, and when abnormal business data exists in the analysis result, obtain the abnormal inspection item corresponding to the abnormal business data; An early warning level determination module, used to determine the early warning level corresponding to the abnormal inspection item based on the abnormal business data and the associated inspection items of the abnormal inspection item; An operation and maintenance work order generation module, used to generate an operation and maintenance work order corresponding to the abnormal inspection item based on the warning level; The operation and maintenance work order dispatching module is used to determine the target operation and maintenance worker corresponding to the operation and maintenance work order among the workers to be dispatched, and dispatch the operation and maintenance work order to the terminal of the target operation and maintenance worker.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-7.
Citation Information
Patent Citations
Early warning information generating and processing method of inspection system, and inspection system
CN105809330A
A method for establishing a multi-energy operation and maintenance system and a terminal device
CN109447287A
Intelligent inspection method, device and equipment and storage medium
CN114842568A
Intelligent routing inspection method, device and equipment for network element of core network and storage medium
CN116669082A
Cited By
Internet of Things equipment intelligent dynamic notification distribution method, device, equipment and medium
CN119294796A
Intelligent multi-dimensional automatic inspection operation and maintenance management method, device and equipment
CN120811874A