Submarine cable lightering device
By designing the submarine cable transit device and using an electronically controlled lifting translation mechanism and traction machine, the problems of long construction cycle and high cost of traditional cable laying ships are solved, and the effect of reducing the number of ship dynamic demobilization and reducing energy consumption is achieved, which has improved the Connection efficiency and equipment safety.
Patent Information
- Application Number
- CN202411230181.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-04
AI Technical Summary
Traditional cable-padded ships have a long construction cycle and high cost, which is mainly due to the need for multiple tugboats to work together, resulting in high cost of ship dispatch and demobilization.
A submarine cable transmigration device is designed, including a range cable cable carrier and a submarine barge, using an electronically controlled lifting and translation mechanism and a traction machine to reduce the number of ship dynamic demobilization through the connection method, adjust the transmission height of the submarine cable, and automatically adjust the Translate to ensure stability of the output position and store the plywood when idle to improve space utilization.
It has achieved the reduction of ship dynamic demobilization times, reduced engineering costs, reduced resistance and energy consumption during the connection process, improved connection efficiency, and improved equipment safety and durability.
Smart Images

Figure CN119093229A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of submarine cable connection, in particular to a submarine cable transfer device. Background Art
[0002] In the submarine cable laying construction of offshore wind power projects, the working process of the cable laying ship is generally as follows: the cable laying ship loads the cable at the submarine cable factory → lays and transports the submarine cable to the wind farm → lays and constructs the submarine cable → demobilizes after the operation is completed. In some larger wind farms, in order to ensure the construction period, three operation surfaces are generally divided (that is, three cable laying ships are required to work together), generally equipped with one main output cable operation ship and two interval cable operation ships. Most cable laying ships have no power of their own, and tugboats are also required for ship navigation. In this way, three tugboats are required to complete the towing task of the three cable laying ships from the submarine cable factory to the wind farm, resulting in high ship dispatch and demobilization costs. Summary of the invention
[0003] The technical problem to be solved by the present invention is that the traditional cable laying ship has a long construction period and high cost.
[0004] The technical solution adopted by the present invention to solve its technical problems is: a submarine cable transfer device, including an interval cable laying ship and a transferred ship, the upper surface of the interval cable laying ship is equipped with a first rotating cable storage pool for storing submarine cables, a first cable pool arc-shaped bracket, a first 5T traction machine, a first output arc-shaped bracket and a first 10T traction machine, the upper surface of the transferred ship is equipped with a second rotating cable storage pool for receiving submarine cables, a second cable pool arc-shaped bracket, a second 5T traction machine, a second output arc-shaped bracket and a second 10T traction machine, the upper surface of the interval cable laying ship is equipped with an electrically controlled lifting and translation mechanism at the position of the first 10T traction machine, and the first 10T traction machine is movably assembled with the electrically controlled lifting and translation mechanism through an internal mounting seat.
[0005] The upper surface of the interval cable laying ship is equipped with a first fixed frame for installing a first cable pool arc-shaped bracket, a first 5T traction machine, and a first output arc-shaped bracket.
[0006] The upper surface of the barge is equipped with a second fixed frame for installing a second cable pool arc bracket, a second 5T tractor, and a second output arc bracket.
[0007] A first longitudinal material guide frame is installed on the upper surface of the interval cable laying ship between the first output arc bracket and the first 10T traction machine.
[0008] A second longitudinal material guide frame is installed on the upper surface of the ship being transferred, between the second output arc bracket and the second 10T tractor.
[0009] A sunken installation groove is provided on the upper surface of the interval cable laying ship at the position of the electric-controlled lifting and translation mechanism, and an embedded guide frame is fixedly installed inside the sunken installation groove.
[0010] The inner side of the embedded guide frame is provided with a side guide groove, and the electric-controlled lifting and translation mechanism is inserted into the side guide groove through the side guide column on the outer side and is slidably assembled with the embedded guide frame.
[0011] The electrically controlled lifting and translation mechanism comprises a transverse assembly frame with side guide columns on the outside, two translation guide rods installed on the upper end of the transverse assembly frame through two side frames, an electrically controlled translation screw rod installed on the lower end of the transverse assembly frame through two side frames, and an electrically controlled lifting support rod fixedly installed inside the side guide columns.
[0012] The internal mounting seat is slidably assembled with the two translation guide rods by being sleeved on the two translation guide rods through the upper guide slider, and the internal mounting seat is threadedly assembled with the electric control translation screw rod through the internal thread guide block at the bottom end, and the upper surface of the horizontal assembly frame is bolted with an upper closed cover plate.
[0013] The internal mounting seat is symmetrically mounted with two lateral extrusion arms via a lateral bracket, and a pressure control module for controlling the forward and reverse rotation of the electric-controlled translation screw is mounted on the inner contact surface of the lateral extrusion arm.
[0014] The beneficial effects of the present invention are:
[0015] (1) A submarine cable transfer device of the present invention uses a transfer method to transfer the submarine cable, which can reduce the number of ship movements and reduce engineering costs;
[0016] (2) The transmission height of the submarine cable is adjusted by lifting and lowering during the entire connection process, thereby effectively reducing the resistance during the connection process and reducing energy consumption;
[0017] (3) The first 10T tractor is assembled with an electric-controlled lifting and translation mechanism through an internal mounting seat, which can not only control the height, but also automatically adjust the translation when the hull deviates, thereby ensuring the stability of the output position and the docking efficiency;
[0018] (4) The entire electrically controlled lifting and translation mechanism adopts an embedded lifting design, which can be lowered and stored when not in use, thereby greatly increasing the surface space of the splint and greatly improving space utilization;
[0019] (5) The electric control mechanisms on the electric lifting and translation mechanisms all adopt a hidden design, which greatly improves safety and durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0021] Figure 1 It is a structural schematic diagram of the first connection mode in the present invention.
[0022] Figure 2 It is a structural schematic diagram of the assembly end of the electrically controlled lifting and translation mechanism of the present invention.
[0023] Figure 3 It is a side view of the electrically controlled lifting and translation mechanism of the present invention.
[0024] Figure 4 It is a structural schematic diagram of the second connection mode in the present invention. DETAILED DESCRIPTION
[0025] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] Figure 1 , Figure 2 and Figure 3 A submarine cable transfer device shown in the figure comprises an interval cable laying vessel 1 and a transferred ship 2, wherein a first rotating cable storage pool 3 for storing submarine cables, a first cable pool arc-shaped bracket 4, a first 5T tractor 5, a first output arc-shaped bracket 6 and a first 10T tractor 7 are installed on the upper surface of the interval cable laying vessel 1, a second rotating cable storage pool 8 for receiving submarine cables, a second cable pool arc-shaped bracket 9, a second 5T tractor 10, a second output arc-shaped bracket 11 and a second 10T tractor 12 are installed on the upper surface of the transferred ship 2, an electrically-controlled lifting and translation mechanism 13 is installed on the upper surface of the interval cable laying vessel 1 at the position of the first 10T tractor 7, and the first 10T tractor 7 is movably assembled with the electrically-controlled lifting and translation mechanism 13 through an internal mounting seat 14.
[0028] The upper surface of the interval cable laying vessel 1 is equipped with a first fixed frame 15 for installing the first cable pool arc-shaped bracket 4, the first 5T traction machine 5, and the first output arc-shaped bracket 6.
[0029] The upper surface of the barge 2 is equipped with a second fixed frame 16 for installing the second cable pool arc bracket 9, the second 5T tractor 10, and the second output arc bracket 11.
[0030] A first longitudinal material guide frame 17 is installed on the upper surface of the interval cable laying ship 1 between the first output arc bracket 6 and the first 10T traction machine 7.
[0031] A second longitudinal material guiding frame 18 is installed on the upper surface of the barge 2 between the second output arc bracket 11 and the second 10T tractor 12 .
[0032] A sunken installation groove is provided on the upper surface of the interval cable laying vessel 1 at the position of the electrically controlled lifting and translation mechanism 13, and an embedded guide frame 19 is fixedly mounted inside the sunken installation groove.
[0033] A side guide groove is provided on the inner side of the embedded guide frame 19 , and the electric-controlled lifting and translation mechanism 13 is inserted into the side guide groove through the side guide column 20 on the outer side and slidably assembled with the embedded guide frame 19 .
[0034] The electrically-controlled lifting and translation mechanism 13 includes a transverse assembly frame 131 with side guide columns 20 on the outside, two translation guide rods 132 installed on the upper end of the transverse assembly frame 131 through two side frames, an electrically-controlled translation screw rod 133 installed on the lower end of the transverse assembly frame 131 through two side frames, and an electrically-controlled lifting support rod 134 fixedly installed inside the side guide columns 20.
[0035] The internal mounting seat 14 is slidably assembled with the two translation guide rods 132 by being sleeved on the two translation guide rods 132 through the upper guide slider 141. The internal mounting seat 14 is threadedly assembled with the electric control translation screw rod 133 through the internal thread guide block 142 at the bottom end. The upper surface of the horizontal assembly frame 131 is bolted with an upper closed cover plate 21.
[0036] In order to facilitate the monitoring of the relative positions of the interval cable laying vessel 1 and the transferred ship 2, the internal mounting seat 14 is symmetrically installed with two lateral extrusion arms 22 through lateral brackets, and the inner contact surface of the lateral extrusion arm 22 is installed with a pressure control module 23 for controlling the forward and reverse rotation of the electric-controlled translation screw 133.
[0037] Control method: When the two ships deviate, the submarine cable or steel rope will be squeezed onto the pressure control module 23 on the lateral squeezing arm 22 on one side. At this time, the pressure control module 23 will control the electric control translation screw 133 to rotate, thereby controlling the translation position of the internal mounting seat 14, so that the submarine cable or steel rope is finally adjusted between the two lateral squeezing arms 22. Only when the pressure control module 23 is squeezed will the electric control screw 133 be automatically controlled to rotate. Pressure control modules 23 at different positions control the forward and reverse rotation of the electric control screw 133 respectively.
[0038] like Figure 1 As shown, connection method 1:
[0039] A self-propelled interval cable laying vessel 1 with a large cable-carrying rotating cable storage pool is used to go to the submarine cable factory to load all the submarine cables for the entire wind farm and transport them to the wind farm. At the ship anchorage near the wind farm, the submarine cables carried by the interval cable laying vessel 1 are transferred to the corresponding transferred ship 2.
[0040] Generally, the submarine cable output route of the operation line of the interval cable laying vessel 1 is the first rotating cable storage pool 3 → the first cable storage pool arc-shaped bracket 4 → two first 5T tractors 5 → the first output arc-shaped bracket 6 → the first 10T tractor 7.
[0041] Adjust the first 10T tractor 7 and the second 10T tractor 12 of the interval cable laying ship 1 and the barge ship 2 to corresponding positions, arrange a 5T winch at an appropriate position next to the second rotating cable storage pool 8, and the wire rope route passes through in this order: second rotating cable storage pool 8→two second 5T tractors 10 of the barge ship→second output arc bracket 11→second 10T tractor 12→first 10T tractor 7→first output arc bracket 6→two first 5T tractors 5→first cable storage pool arc bracket 4→connecting submarine cable.
[0042] The winch is controlled to retract the steel wire until the submarine cable is pulled from the arc-shaped bracket 4 of the first cable storage pool to the position of the two second 5T traction machines 10.
[0043] Then all the traction machines of the two ships are started, the winch traction is removed, and all the traction machines pull the submarine cable to the second rotating cable storage pool 8 and fix it.
[0044] The relative speeds of the first rotary cable storage pool 3, the first 5T tractor 5, the first 10T tractor 7, the second rotary cable storage pool 8, the second 5T tractor 10 and the second 10T tractor 12 are controlled until the submarine cable transfer is completed.
[0045] like Figure 4 As shown, connection method 2:
[0046] A self-propelled interval cable laying vessel 1 with a large cable-carrying rotating cable storage pool is used to go to the submarine cable factory to load all the submarine cables for the entire wind farm and transport them to the wind farm. At the ship anchorage near the wind farm, the submarine cables carried by the interval cable laying vessel 1 are transferred to the corresponding transferred ship 2.
[0047] Generally, the submarine cable output route of the operation line of the interval cable laying vessel 1 is the first rotating cable storage pool 3 → the first cable storage pool arc-shaped bracket 4 → two first 5T tractors 5 → the first output arc-shaped bracket 6 → the first 10T tractor 7.
[0048] The output route of the operation line of the transshipped ship 2 is changed to a fixed cable storage pool → a back-twist frame → a third output arc bracket → a third 10T tractor.
[0049] Adjust the 10T tractors of the two ships to the corresponding positions, arrange a 5T winch at an appropriate position next to the fixed cable storage pool, and the wire rope route passes through in this order: fixed cable storage pool → retracting wheel → third 10T tractor → first 10T tractor 7 → first output arc-shaped bracket 6 → two first 5T tractors 5 of the barge → first cable storage pool arc-shaped bracket 4 → connect the submarine cable.
[0050] The winch is controlled to retract the steel wire until the submarine cable is pulled from the first rotating cable storage pool 3 to the retracting wheel of the barge and then drooped to a fixed position in the fixed cable storage pool.
[0051] The relative speeds of the first rotary cable storage pool 3, the two first 5T tractors 5, the first 10T tractor 7, the third 10T tractor, and the retracting wheel are controlled until the submarine cable is transferred.
[0052] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A submarine cable transfer device, comprising a cable laying vessel (1) and a ship to be transferred (2), characterized in that: The upper surface of the cable laying vessel (1) is provided with a first rotating cable storage pool (3) for storing submarine cables, a first cable pool arc-shaped bracket (4), a first 5T tractor (5), a first output arc-shaped bracket (6) and a first 10T tractor (7); the upper surface of the barge (2) is provided with a second rotating cable storage pool (8) for receiving submarine cables, a second cable pool arc-shaped bracket (9), a second 5T tractor (10), a second output arc-shaped bracket (11) and a second 10T tractor (12); the upper surface of the cable laying vessel (1) is provided with an electrically controlled lifting and translation mechanism (13) at the position of the first 10T tractor (7); the first 10T tractor (7) is movably assembled with the electrically controlled lifting and translation mechanism (13) via an internal mounting seat (14).
2. A submarine cable transfer device according to claim 1, characterized in that: The upper surface of the interval cable laying vessel (1) is equipped with a first fixed frame (15) for installing a first cable pool arc bracket (4), a first 5T traction machine (5), and a first output arc bracket (6).
3. A submarine cable transfer device according to claim 1, characterized in that: The upper surface of the barge (2) is equipped with a second fixed frame (16) for installing a second cable pool arc bracket (9), a second 5T tractor (10), and a second output arc bracket (11).
4. A submarine cable transfer device according to claim 1, characterized in that: A first longitudinal material guide frame (17) is installed on the upper surface of the interval cable laying ship (1) between the first output arc bracket (6) and the first 10T traction machine (7).
5. A submarine cable transfer device according to claim 1, characterized in that: A second longitudinal material guide frame (18) is installed on the upper surface of the barge (2) between the second output arc bracket (11) and the second 10T tractor (12).
6. A submarine cable transfer device according to claim 1, characterized in that: A sunken installation groove is provided on the upper surface of the interval cable laying ship (1) at the position of the electrically controlled lifting and translation mechanism (13), and an embedded guide frame (19) is fixedly mounted inside the sunken installation groove.
7. A submarine cable transfer device according to claim 6, characterized in that: The inner side of the embedded guide frame (19) is provided with a side guide groove, and the electrically controlled lifting and translation mechanism (13) is inserted into the side guide groove through the side guide column (20) on the outer side to be slidably assembled with the embedded guide frame (19).
8. A submarine cable transfer device according to claim 7, characterized in that: The electrically controlled lifting and translation mechanism (13) comprises a transverse assembly frame (131) having a lateral guide column (20) on the outside, two translation guide rods (132) mounted on the upper end of the transverse assembly frame (131) via two side frames, an electrically controlled translation screw rod (133) mounted on the lower end of the transverse assembly frame (131) via two side frames, and an electrically controlled lifting support rod (134) fixedly mounted inside the lateral guide column (20).
9. A submarine cable transfer device according to claim 8, characterized in that: The internal mounting seat (14) is slidably assembled with the two translation guide rods (132) by sleeves of the upper guide slider (141), and the internal mounting seat (14) is threadedly assembled with the electric control translation screw rod (133) through the internal thread guide block (142) at the bottom end, and an upper closed cover plate (21) is fixed to the upper surface of the horizontal assembly frame (131) by bolts.
10. A submarine cable transfer device according to claim 8, characterized in that: The internal mounting seat (14) is symmetrically mounted with two lateral extrusion arms (22) via lateral brackets, and a pressure control module (23) for controlling the forward and reverse rotation of the electric-controlled translation screw (133) is mounted on the inner contact surface of the lateral extrusion arm (22).
Citation Information
Patent Citations
Device for monitoring laying stress of undersea cables of cable burying machine
CN102214905A
Long-distance intertidal zone landing construction process for submarine cable
CN113964736A
Submarine cable conveying device for submarine cable laying construction and maintenance