Energy storage participated power grid frequency emergency control method and device under wind power low voltage ride through
By obtaining power system data and emergency control resources online, and using energy storage optimization model generation strategies, the problem of poor flexibility in control measures during low voltage crossing of wind power is solved, and the frequency stability and safety of the power system are improved.
Patent Information
- Application Number
- CN202411098161.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-09
AI Technical Summary
When the existing technology faces low voltage crossing of wind power, the control measures are poorly flexible and costly, and cannot effectively maintain the stability of the power grid frequency, resulting in insufficient system regulation capabilities, which may cause a series of chain problems and increase the risk of frequency safety and stability.
By obtaining the online operation data of the power system and real-time emergency control resource pool, we can determine whether the preset startup emergency control conditions are met, and use the energy storage output allocation optimization model to generate an online emergency control optimization strategy, coordinate the support capabilities of energy storage, and optimize the power system. Frequency response characteristics avoid low-frequency load reduction or transient high-frequency problems.
The system frequency response characteristics of the power system are significantly optimized, effectively respond to low voltage crossing faults, ensure the stable operation of the power system, reduce the cost of emergency control, and improve frequency stability.
Smart Images

Figure CN119093400A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power systems, and in particular to a method and device for energy storage participating in emergency control of grid frequency under low voltage ride-through of wind power. Background Art
[0002] With the increasing penetration of renewable energy sources like wind power, a large number of conventional units have been replaced, significantly reducing system inertia. The low interference immunity of renewable energy sources has also significantly impacted the safe and stable operation of power systems. For example, a large number of wind turbines have experienced low voltage ride-through, causing a rapid drop in power system frequency at extremely low inertia levels, which in turn can trigger system disconnection. Therefore, there is an urgent need to study the potential grid security and stability issues associated with renewable energy ride-through and their control measures.
[0003] Related technologies primarily focus on the operational characteristics and impacts of wind turbine fault ride-through. For example, an improvement scheme has been proposed to enhance the wind turbine's low voltage ride-through capability by adding auxiliary equipment such as crowbar circuits and chopper resistors to the inverter.
[0004] However, the low voltage ride-through solutions in related technologies are limited by the limited support capacity of new energy units. They emphasize the support of new energy itself, which makes it impossible to cope with the frequency stability problems caused by low voltage ride-through. The control measures are inflexible and the control cost is too high. When large-scale wind power low voltage ride-through brings large short-term power shocks, the system regulation capacity is insufficient to maintain the stability of the grid frequency, and may cause a series of chain problems, aggravating the frequency safety and stability problem, which needs to be solved urgently. Summary of the Invention
[0005] The present application provides a method and device for energy storage participating in emergency control of grid frequency under low voltage ride-through of wind power, so as to solve the problem that the low voltage ride-through solution in the related art is limited by the limited support capacity of new energy units, and emphasizes the support of new energy itself, resulting in an inability to cope with the frequency stability problem caused by low voltage ride-through. The control measures are inflexible and the control cost is too high. When large-scale wind power low voltage ride-through brings a large short-term power shock, the system regulation capability is insufficient to maintain the stability of the grid frequency, and may cause a series of chain problems, aggravating the frequency safety and stability problem.
[0006] The first aspect of the present application provides a method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through, comprising the following steps: obtaining online operation data of the power system, a real-time emergency control resource pool, and a real-time estimated emergency control quantity under anticipated fault conditions; in the event of a fault in the power system, determining whether the power system meets preset emergency control start-up conditions; if the power system meets the preset emergency control start-up conditions, inputting the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output distribution optimization model based on the online operation data, generating an online emergency control optimization strategy by solving the energy storage output distribution optimization model, and controlling the power system to execute the online emergency control optimization strategy.
[0007] Optionally, in one embodiment of the present application, in the event of a fault in the power system, determining whether the power system meets preset startup emergency control conditions includes: obtaining active power characteristic curves of different wind farms under low voltage ride-through based on the online operation data; performing equivalent fitting processing on the active power characteristic curve to obtain a system equivalent short-time power impact curve, and inputting information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain an estimated system frequency minimum point of the power system; and determining that the power system meets the preset startup emergency control conditions when the estimated system frequency minimum point triggers the action of the low-frequency load reduction device.
[0008] Optionally, in one embodiment of the present application, before the real-time emergency control resource pool and the real-time estimated emergency control quantity are input into a pre-established energy storage output allocation optimization model, it also includes: optimizing the emergency control power of the energy storage of the power system based on the target demand of the lowest frequency point of the system to obtain an optimized emergency control power; establishing an emergency control resource optimization allocation mathematical model based on the optimized emergency control power to optimize the energy storage output allocation optimization model according to the emergency control resource optimization allocation mathematical model.
[0009] Optionally, in one embodiment of the present application, the constraints of the emergency control resource optimization allocation mathematical model include power balance constraints, emergency control total amount equality constraints, energy storage adjustment range constraints, and node bus frequency inequality constraints.
[0010] Optionally, in one embodiment of the present application, the function of the target requirement of the lowest frequency point of the system is:
[0011] max(F1(p1)+F2(p2)+......+F n (p n )-n*F(0))
[0012] Among them, p1, p2, ..., p n Indicates the output of each energy storage, F i (p i ) represents the improvement effect at the lowest point of the system frequency, F(0) represents the lowest point when the energy storage is not working, and n represents the amount of energy storage.
[0013] The second aspect of the present application provides an energy storage device for participating in grid frequency emergency control under wind power low voltage ride-through, including: an acquisition module for acquiring online operation data of the power system, a real-time emergency control resource pool and a real-time estimated emergency control quantity under expected fault conditions; a judgment module for judging whether the power system meets the preset emergency control start-up conditions when a fault occurs in the power system; a control module for inputting the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output distribution optimization model based on the online operation data when the power system meets the preset emergency control start-up conditions, generating an online emergency control optimization strategy by solving the energy storage output distribution optimization model, and controlling the power system to execute the online emergency control optimization strategy.
[0014] Optionally, in one embodiment of the present application, the judgment module includes: an acquisition unit, used to obtain the active power characteristic curves of different wind farms under low voltage ride-through based on the online operation data; a processing unit, used to perform equivalent fitting processing on the active power characteristic curve to obtain a system equivalent short-time power impact curve, and input the information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain the estimated system frequency minimum point of the power system; a judgment unit, used to determine that the power system meets the preset start-up emergency control conditions when the low-frequency load reduction device is triggered at the estimated system frequency minimum point.
[0015] Optionally, in one embodiment of the present application, it also includes: a first optimization module, which is used to optimize the emergency control power of the energy storage of the power system based on the target demand of the lowest frequency point of the system before inputting the real-time emergency control resource pool and the real-time estimated emergency control quantity into the pre-established energy storage output distribution optimization model to obtain the optimized emergency control power; a second optimization module, which is used to establish an emergency control resource optimization allocation mathematical model based on the optimized emergency control power, so as to optimize the energy storage output distribution optimization model according to the emergency control resource optimization allocation mathematical model.
[0016] Optionally, in one embodiment of the present application, the constraints of the emergency control resource optimization allocation mathematical model include power balance constraints, emergency control total amount equality constraints, energy storage adjustment range constraints, and node bus frequency inequality constraints.
[0017] Optionally, in one embodiment of the present application, the function of the target requirement of the lowest frequency point of the system is:
[0018] max(F1(p1)+F2(p2)+......+F n (p n )-n*F(0))
[0019] Among them, p1, p2, ..., p n Indicates the output of each energy storage, F i (p i ) represents the improvement effect at the lowest point of the system frequency, F(0) represents the lowest point when the energy storage is not working, and n represents the amount of energy storage.
[0020] The third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored on the memory and executable on the processor, wherein the processor executes the program to implement the method for energy storage to participate in emergency control of grid frequency under low voltage ride-through of wind power as described in the above embodiment.
[0021] The fourth aspect of the present application provides a computer-readable storage medium, which stores a computer program. When the program is executed by a processor, it implements the above-mentioned method for energy storage to participate in the emergency control of grid frequency under low voltage ride-through of wind power.
[0022] The fifth aspect of the present application provides a computer program product, including a computer program, which, when executed, is used to implement the above-mentioned method for energy storage to participate in emergency control of grid frequency under wind power low voltage ride-through.
[0023] The embodiment of the present application can generate an online emergency control optimization strategy in the event of a low voltage ride-through fault in the power system based on the operating data of the power system, the real-time emergency control resource pool, and the real-time estimated emergency control quantity under the expected fault conditions. This achieves the integration of energy storage into the frequency emergency control method under the low voltage ride-through fault of the power system, giving full play to its dynamic active power support performance. By coordinating and allocating the support capacity of each energy storage, the system frequency response characteristics of the power system are significantly optimized, effectively avoiding the triggering of low-frequency load reduction actions or the occurrence of transient high-frequency problems. It can respond to low voltage ride-through faults in the power system in a timely manner and ensure the stable operation of the power system. This solves the problem that the low voltage ride-through solution in the related art is limited by the limited support capacity of new energy units, emphasizes the support of new energy itself, and is unable to cope with the frequency stability problem caused by low voltage ride-through. The control measures are inflexible and the control cost is too high. When large-scale wind power low voltage ride-through brings a large short-term power shock, the system regulation capacity is insufficient to maintain the stability of the grid frequency, and a series of chain problems may be caused, aggravating the frequency safety and stability problem.
[0024] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0026] Figure 1 This is a flow chart of a method for energy storage to participate in grid frequency emergency control during wind power low voltage ride-through according to an embodiment of the present application;
[0027] Figure 2 This is a flow chart of a method for energy storage participating in grid frequency emergency control according to one embodiment of the present application;
[0028] Figure 3 This is a schematic diagram of a 39-node system structure according to an embodiment of the present application;
[0029] Figure 4 This is a schematic diagram of energy storage emergency power support output simulation according to one embodiment of the present application;
[0030] Figure 5 This is a schematic diagram showing a comparison of system frequency deviations under emergency control according to an embodiment of the present application;
[0031] Figure 6 This is a schematic diagram comparing the improvement effects of energy storage under emergency control at different access locations according to an embodiment of the present application;
[0032] Figure 7This is a schematic diagram of the fitting effect of the BUS2 energy storage-frequency minimum point characteristic curve in one embodiment of the present application;
[0033] Figure 8 This is a schematic diagram of the lowest frequency point of each node under two energy storage output allocation schemes according to an embodiment of the present application;
[0034] Figure 9 This is a schematic diagram of the minimum emergency control amount under two energy storage output allocation schemes according to an embodiment of the present application;
[0035] Figure 10 This is a structural diagram of a device for participating in emergency control of grid frequency under wind power low voltage ride-through according to an embodiment of the present application;
[0036] Figure 11 Schematic diagram of the structure of an electronic device according to an embodiment of the present application.
[0037] Reference numerals:
[0038] 10-Energy storage participating in grid frequency emergency control during wind power low voltage ride-through: 100-acquisition module, 200-judgment module and 300-control module; 1101-memory, 1102-processor and 1103-communication interface. DETAILED DESCRIPTION
[0039] The following describes in detail embodiments of the present application, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0040] The following describes, with reference to the accompanying drawings, a method and apparatus for energy storage participating in emergency control of grid frequency during wind power low voltage ride-through according to an embodiment of the present application. In view of the fact that the low voltage ride-through solutions in the related technologies mentioned in the above background technology are limited by the limited support capacity of new energy units, and they emphasize the support of new energy themselves, resulting in an inability to cope with the frequency stability problems caused by low voltage ride-through. The control measures are inflexible and the control cost is too high. When large-scale wind power low voltage ride-through brings a large short-term power shock, the system regulation capacity is insufficient to maintain grid frequency stability, and a series of chain problems may occur, aggravating the problem of frequency safety and stability. The present application provides a method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through. In this method, an online emergency control optimization strategy can be generated in the event of a low voltage ride-through fault in the power system based on the operating data of the power system, the real-time emergency control resource pool, and the real-time estimated emergency control quantity under expected fault conditions. This realizes the addition of energy storage to the frequency emergency control method under low voltage ride-through fault of the power system, giving full play to its dynamic active support performance. By coordinating and allocating the support capacity of each energy storage, the system frequency response characteristics of the power system are significantly optimized, effectively avoiding the triggering of low frequency load reduction action or the occurrence of transient high frequency problems, and timely responding to low voltage ride-through faults in the power system to ensure the stable operation of the power system. This solves the problem that the low voltage ride-through solution in related technologies is limited by the limited supporting capacity of new energy units, and emphasizes the support of new energy itself, which leads to the inability to cope with the frequency stability problem caused by low voltage ride-through. The control measures are inflexible and the control cost is too high. When large-scale wind power low voltage ride-through brings a large short-term power impact, the system regulation capability is insufficient to maintain the stability of the grid frequency, and may cause a series of chain problems, aggravating frequency safety and stability issues.
[0041] Before explaining the method for energy storage to participate in emergency control of grid frequency under wind power low voltage ride-through in the embodiment of the present application, the energy storage involved in the embodiment of the present application is first explained.
[0042] For power grids with high wind power penetration, short-circuit faults can easily trigger a large number of wind turbines to enter low voltage ride-through (LVRT), causing a severe drop in system frequency and a shortage of system emergency control resources. Energy storage, however, serves as a key technology supporting the large-scale integration and utilization of new energy sources and a high-quality emergency control resource within the system. When a large-scale LVRT event occurs, energy storage stations will also experience LVRT. Similar to the output characteristics of doubly-fed wind turbines, as the grid connection point voltage recovers, energy storage can achieve power output. Its specific output characteristics are as follows: After a certain communication delay, the energy storage device receives the corresponding signal and begins to increase power. The increased power increases linearly over time. After reaching full response, it can be considered a constant active source for a period of time.
[0043] Based on this, in view of the poor frequency characteristics of the grid with high wind power penetration, after the system suffers a serious disturbance, specific control measures and means are needed to ensure that the system does not collapse and returns to normal as quickly as possible to maintain the integrity and reliability of the system. This application can incorporate energy storage stations into the grid frequency emergency control.
[0044] Specifically, Figure 1 This is a flow chart of a method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through provided in an embodiment of the present application.
[0045] like Figure 1 As shown, the method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through includes the following steps:
[0046] In step S101 , online operation data of the power system, a real-time emergency control resource pool, and real-time estimated emergency control quantities under anticipated fault conditions are obtained.
[0047] It can be understood that the real-time emergency control resource pool and the real-time estimated emergency control quantity under expected fault conditions can be understood as periodically refreshing the available control quantities of each energy storage in the power system used for emergency control based on certain set rules, so as to obtain the real-time emergency control resource pool; further, based on certain safety guidelines, periodically conducting electromechanical transient simulation calculations online, that is, the real-time estimated emergency control quantity required after the expected low voltage ride-through fault of large-scale wind power can be calculated.
[0048] In some embodiments, the criterion for initiating emergency control is often based on whether the system frequency deviation reaches a specific value. When emergency control is required, corresponding control measures are implemented from the corresponding offline control strategy table. However, if a specific value is still used as the initiation criterion for transient low-frequency systems in large-scale wind power low-voltage ride-through, problems such as setting the specific value too high, causing the emergency control strategy to malfunction, or setting the trigger value too low, missing the optimal control time and resulting in a control effect that fails to meet safety and stability requirements.
[0049] Based on this, in order to clarify and formulate the starting criteria for subsequent control strategies, the embodiment of the present application can quantitatively analyze the system frequency response under large-scale wind power low voltage crossing, and formulate the starting criteria for the emergency control strategy in combination with the wind turbine low voltage crossing related information in the online operation data. Since short-term power shocks require very precise energy storage emergency control strategies, the traditional model of formulating emergency control strategies based on offline conservative methods is very likely to cause excessive energy storage control and bring about chain high-frequency problems, and it is extremely difficult to determine the conservative method for large-scale wind power low voltage crossing caused by short-circuit faults. Therefore, the embodiment of the present application can obtain online data of the power system to analyze the wind power low voltage crossing fault characteristics for pre-decision, and use this information to preliminarily estimate the energy storage emergency control amount, and then perform iterative corrections on this basis, so as to optimize and improve the control effect of the emergency control strategy.
[0050] Furthermore, considering that in an actual power grid, the node location of the energy storage station has been determined during the early grid planning, and is also subject to the upper limit of the active support capacity due to the node flow constraints and the operating characteristics of the station itself, the estimated emergency control amount requires the joint action of distributed energy storage power stations across the entire network to achieve emergency frequency control. Therefore, the embodiment of the present application can also obtain a real-time emergency control resource pool to ensure that when the emergency control amount is certain, the coordinated allocation of various emergency control resources can achieve the best emergency control effect.
[0051] Step S102: When a power system failure occurs, it is determined whether the power system meets a preset emergency control start-up condition.
[0052] In some embodiments, when a power system fault occurs, the fault is sometimes relatively minor and there is no need to initiate emergency control. Therefore, before implementing energy storage to participate in grid frequency emergency control under wind power low voltage ride-through, it is necessary to first determine whether the power system meets certain emergency control initiation conditions. Emergency control will only be initiated when the power system meets certain emergency control initiation conditions.
[0053] Next, the process of determining whether the power system meets the preset emergency control start-up conditions in the embodiment of the present application is further explained.
[0054] Optionally, in one embodiment of the present application, in the event of a power system failure, determining whether the power system meets preset emergency control start-up conditions includes: obtaining active power characteristic curves of different wind farms under low voltage ride-through based on online operation data; performing equivalent fitting processing on the active power characteristic curve to obtain a system equivalent short-time power impact curve, and inputting information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain an estimated system frequency minimum point of the power system; and determining that the power system meets the preset emergency control start-up conditions when the estimated system frequency minimum point triggers the action of the low-frequency load reduction device.
[0055] Based on the relevant descriptions of other embodiments, it can be understood that before implementing energy storage to participate in grid frequency emergency control under wind power low voltage ride-through, it is necessary to first determine whether the power system meets certain emergency control startup conditions. Emergency control will only be started when the power system meets certain emergency control startup conditions.
[0056] Specifically, the embodiment of the present application can first obtain the active power characteristic curves of different wind farms under low voltage ride-through based on online operation data, that is, obtain information such as short-term impact power, low voltage ride-through duration and low voltage ride-through recovery time of different wind farms. For the differences in active curves under different wind turbine low voltage ride-through strategies, a segmented correction method is used to perform equivalent fitting to obtain the system equivalent short-term power impact curve.
[0057] For example, when there is unbalanced active power in the power system, the electromagnetic power output by the generator changes in response to the unbalanced active power, causing the overall active power distribution of the power system to change. Among them, the power impact caused by the wind turbine low-voltage ride-through can be approximated as a two-stage process, one is the step response in the low-voltage ride-through area; the other is the ramp response in the recovery area. Since the voltage at the grid connection point of each wind turbine is different after the actual power system fault, the low voltage ride-through control strategy adopted is also different. Each wind turbine uses the same active power recovery rate. The active power recovery process at the power system level is also a piecewise linear process. Its final recovery time depends on the wind turbine with the deepest active power drop. The short-term power impact of the entire network can be fitted by the segmented correction method to obtain the system equivalent short-term power impact curve.
[0058] Furthermore, with the increase in wind power penetration, if the goal is to maximize reactive current injection (under low voltage ride-through control, when the voltage drop reaches a certain level, the entire converter capacity will be used to provide reactive current) when the voltage drop is relatively low, a large amount of active power will be lost without adjusting the active current control strategy. Once the active power shortage (the imbalance between supply and demand of active power in the power system, that is, the actual active power consumed is greater than the active power that the system can provide, it can also be understood as the difference between the actual active power required and the active power that can be supplied. When the power demand exceeds the power supply, a active power shortage will occur) exceeds the maximum tolerance of the system, it will trigger the low-frequency load reduction device, causing the system frequency to collapse.
[0059] Based on this, embodiments of the present application can input information about the system's equivalent short-term power surge curve into a pre-established system frequency response model. This model can then be used to calculate an estimated system frequency minimum point. By determining whether the system frequency minimum point reaches the low-frequency load shedding device's action setting without applying emergency control, it can be determined whether certain emergency control initiation conditions are met, i.e., whether subsequent emergency control strategies need to be initiated. If the system frequency minimum point triggers the low-frequency load shedding device, energy storage emergency control is applied to the system frequency response model.
[0060] The wind turbine active power recovery rate in the low voltage ride-through zone is positively correlated with the lowest system frequency point; that is, the greater the active power recovery rate, the higher the lowest frequency point. The lowest frequency point caused by wind turbine low voltage ride-through occurs after the power system fault is cleared, during the active power recovery phase. In the recovery zone after the grid connection point is restored, the low voltage ride-through control strategy can increase the wind turbine active power recovery rate to accelerate system frequency recovery.
[0061] The frequency response model (System Frequency Response, SFR) can analyze the frequency response characteristics of the power system under disturbance. Due to its simple structure and convenient implementation, the SFR model has been widely used in the field of power system frequency stability research. It can effectively predict key dynamic performance indicators such as the lowest frequency point and change rate of the system after being subjected to active disturbance, and provide guidance for the operation and control of the power system. The basic principle of this model is to equate the frequency change process of the power system to the speed change process of a synchronous generator equipped with a speed regulator and a reheat turbine. In the embodiment of the present application, in order to simplify the input and output results in the frequency response model, the frequency regulation capability of the wind turbine and the nonlinear links in the speed regulation system are ignored, that is, the system frequency response model.
[0062] In step S103, if the power system meets the preset emergency control start-up conditions, the real-time emergency control resource pool and the real-time estimated emergency control quantity are input into a pre-established energy storage output distribution optimization model based on the online operation data. The online emergency control optimization strategy is generated by solving the energy storage output distribution optimization model, and the power system is controlled to execute the online emergency control optimization strategy.
[0063] It can be understood that the energy storage output allocation optimization model here can be understood as a related model for coordinating the allocation of various emergency control resources under a certain emergency control amount, so as to optimize the emergency control effect and solve the extreme value problem of the optimal allocation conditions of the emergency support active power.
[0064] During actual implementation, after determining that the power system meets certain conditions for initiating emergency control, embodiments of the present application can input the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output allocation optimization model. This model is then solved to generate an online emergency control optimization strategy, resulting in output adjustment instructions for each energy storage unit. These output adjustment instructions are then sent to the power system's stabilization and control system, which in turn controls each energy storage unit to execute the online emergency control optimization strategy according to the output adjustment instructions.
[0065] There are many methods available for solving the energy storage output distribution optimization model. In the embodiment of the present application, the particle swarm optimization algorithm can be used for solving the problem, but is not limited to it.
[0066] The Particle Swarm Optimization (PSO) algorithm leverages the position information of excellent particles to perform a parallel search within the space of feasible solutions. It also leverages probabilistic transition rules as the internal working mechanism of the swarm, eliminating the need for derivative information. In the PSO algorithm, all particles in the swarm search for the optimal solution in the search space. Each particle represents a potential solution to the target problem, and its information is influenced by its own historical best experience and the global best experience. The quality of each particle is evaluated by calculating a cost function. During the iterative search process, all particles learn from the optimal particle in the swarm, randomly perturbing parameters during the learning process to ultimately determine the position information of the next generation of particles.
[0067] Simply put, in the particle swarm algorithm, particles represent the answer to the problem to be solved. In each iteration, the particles update themselves by tracking two "extreme values." After finding these two optimal values, the particles continuously update their speed and position and perform iterative calculations to ultimately find the optimal solution. The update formula can be expressed as follows:
[0068] Assume that there are m particles in n-dimensional space, x i=x i1 ,x i2 ,......,x in Denote the i-th particle, using p i =p i1 ,p i2 ,......,p in represents the optimal solution of the i-th particle, p g =p g1 ,p g2 ,......,p gn represents the global optimal solution. The movement direction of each particle is the vector sum of the directions of the individual optimal solution and the global optimal solution. represents the flying speed of the i-th particle at the k-th iteration. At the k+1-th iteration, the speed and position of the particle can be expressed as:
[0069]
[0070] Among them, 1≤i≤m, 1≤d≤n, c1, c2 are learning factors, whose values are positive numbers, r1, r2 are random numbers in the range of [0, 1], and ω is the inertia weight, which can affect the search ability of the algorithm.
[0071] It’s important to note that the accuracy of the solution obtained by the particle swarm algorithm is not necessarily proportional to the number of iterations and the size of the particle swarm. That is, a larger number of iterations and a larger particle swarm size do not necessarily result in a more accurate solution. This is directly related to the random solution used for initialization of particles, which significantly affects the accuracy of the solution and the iteration speed.
[0072] Furthermore, when solving the energy storage output optimization allocation model, the embodiment of the present application can also first obtain initial high-quality particles by comparing the energy storage-frequency sensitivity function, and then iteratively solve the optimal particles on this basis to improve the solution effect of the algorithm.
[0073] Optionally, in one embodiment of the present application, before inputting the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output allocation optimization model, the method further includes: optimizing the emergency control power of the energy storage of the power system based on the target demand at the lowest point of the system frequency to obtain an optimized emergency control power; establishing an emergency control resource optimization allocation mathematical model based on the optimized emergency control power, so as to optimize the energy storage output allocation optimization model according to the emergency control resource optimization allocation mathematical model. The function of the target demand at the lowest point of the system frequency can be expressed as:
[0074] max(F1(p1)+F2(p2)+......+F n (p n )-n*F(0))
[0075] Among them, p1, p2, ..., p n Indicates the output of each energy storage, F i (p i ) represents the improvement effect at the lowest point of the system frequency, F(0) represents the lowest point when the energy storage is not working, and n represents the amount of energy storage.
[0076] Based on the relevant descriptions of other embodiments, it can be understood that in an actual power grid, the node locations of energy storage stations have been determined during the early grid planning. The estimated emergency control amount requires the joint action of distributed energy storage power stations across the entire network to achieve emergency frequency control. Therefore, when the emergency control amount is certain, it is extremely important to optimize the emergency control effect through the coordinated allocation of various emergency control resources.
[0077] Based on this, embodiments of the present application can, but are not limited to, target the system frequency at its lowest point, i.e., achieving the best boost effect or minimizing the amount of emergency control, with the emergency control power of each energy storage power station within the system as the optimization target, thereby obtaining an optimized emergency control power. Based on the optimized emergency control power, a mathematical model for optimizing the allocation of emergency control resources is established, and the energy storage output allocation optimization model is optimized based on this mathematical model, thereby improving the online emergency control optimization strategy.
[0078] For example, without considering overshoot, the greater the emergency control amount, the better the effect of improving the lowest frequency point. That is, there is a certain coupling relationship between the energy storage emergency output and the lowest frequency point of the system. Based on this, the embodiment of the present application can obtain a fitting function of the energy storage-lowest frequency point through polynomial fitting, and define an energy storage-lowest frequency point characteristic curve under system emergency control. The fitting function of the energy storage-lowest frequency point can be expressed as follows:
[0079] F=a n p n +a n-1 p n-1 +…+a0
[0080] Among them, F is the lowest point of the system frequency, a n is the corresponding coefficient of the nth-order polynomial, and p is the energy storage output.
[0081] Specifically, the decision variables of the mathematical model for optimal allocation of emergency control resources, i.e., the output of each energy storage, can be expressed as follows:
[0082] x=(p1,p2,......,p n ).
[0083] If the optimal frequency characteristic is used as the expression of the objective function, the objective function of the energy storage output allocation optimization model under frequency emergency control when the improvement effect is optimal at the lowest point of the system frequency can be expressed as:
[0084] max(F1(p1)+F2(p2)+......+F n (p n )-n*F(0))
[0085] Additionally, the embodiments of the present application also consider whether it is possible to achieve emergency frequency control by minimizing the control cost, i.e., taking the minimum emergency control amount, through the optimal emergency control resource coordination scheme, i.e., the minimum control amount optimization tuning problem. When the goal is to minimize the emergency control amount, the objective function can be expressed as:
[0086] min(p1+p2+......+p n ).
[0087] Optionally, in one embodiment of the present application, the constraints of the mathematical model for optimal allocation of emergency control resources include power balance constraints, emergency control total amount equality constraints, energy storage regulation range constraints, and node bus frequency inequality constraints.
[0088] During actual implementation, the energy storage output allocation optimization model in the embodiments of the present application is subject to various practical constraints, including but not limited to system power balance constraints, emergency control total amount equality constraints, energy storage regulation range constraints, and node bus frequency inequality constraints.
[0089] (1) The power balance constraint can be expressed as follows:
[0090]
[0091] Among them, P i , Q i is the active power and reactive power of node i, U i 、U i and θ ij are the voltage amplitudes of nodes i and j and the phase angle difference between the two nodes, G ij 、B ij are the conductance and susceptance between nodes i and j.
[0092] (2) Emergency control total quantity constraint
[0093] If the optimization objective function is to optimize the system frequency characteristics, that is, to constrain the total amount of emergency control, the equality constraint can be expressed as follows:
[0094]
[0095] Among them, constant is the given emergency control quantity.
[0096] (3) Energy storage station regulation range constraints
[0097] The active power output of the balancing node and the reactive power regulation capability of the wind farm are continuous variables with limited ranges. Therefore, the inequality constraints corresponding to the above two variables can be expressed as follows:
[0098] P cmin ≤P c ≤P cmax ,
[0099] Among them, P cmin 、P cmax are the minimum and maximum active output of the energy storage station node respectively.
[0100] (4) Bus frequency constraints at each node
[0101] The lowest frequency point of each node is limited by the protection range of the under-frequency load reduction device, so the inequality constraints corresponding to the above two variables can be expressed as follows:
[0102] f jnad ≥f res
[0103] Among them, f res The minimum frequency allowed under safety constraints, in the embodiment of the present application, can be but is not limited to 49.0 Hz according to the triggering frequency of low-frequency load reduction action; f jnad It is the lowest frequency point of any node in the entire network.
[0104] (5) Energy storage rated power inequality constraint
[0105] The rated power of each energy storage unit is also taken into consideration when formulating the optimal allocation plan. The amount of distributed measures cannot exceed its upper limit, which can be expressed as follows:
[0106] p imax ≥p i ≥0
[0107] Among them, p imax It is the maximum active output that can be adjusted by the energy storage at the node.
[0108] The present application is described and verified in detail below using a specific embodiment.
[0109] Figure 2 This is a flow chart of a method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through according to an embodiment of the present application. Figure 2 As shown:
[0110] Step S201, start.
[0111] Step S202: It is detected that a predicted fault has occurred at a specific point in the power system.
[0112] Step S203: read the periodically updated simulation data and update the emergency control amount to obtain a real-time estimated emergency control amount.
[0113] Step S204: determining constraint boundary conditions based on actual power grid data.
[0114] Step S205: Read the energy storage-frequency characteristic curve to determine the station priority.
[0115] Step S206: inputting into the output distribution optimization model for solution.
[0116] Step S207: Generate an online emergency control optimization strategy, distribute energy storage, and perform electromagnetic transient simulation.
[0117] Step S208: read simulation data and calculate fitness.
[0118] Step S209: Perform natural selection to replace terminal particles according to priority.
[0119] Step S210: retain high-quality particles and copy them to the next generation to generate a new allocation plan.
[0120] Step S211: Perform electromagnetic transient simulation on the updated solution.
[0121] Step S212: Calculate the updated fitness function and update the global optimal position of the particle.
[0122] Step S213 , detecting whether the lowest frequency point of each node is higher than 49.0 Hz. If the lowest frequency point of each node is not higher than 49.0 Hz, returning to step S209 .
[0123] Step S214: When the lowest frequency point of each node is higher than 49.0 Hz, output the optimized decision variables.
[0124] Step S215 : issuing instruction values to each energy storage device according to the optimized decision variables.
[0125] Step S216, end.
[0126] Furthermore, the embodiments of the present application can also verify this method.
[0127] For example, Figure 3 This is a structural diagram of a 39-node simulation system according to an embodiment of the present application, as shown in FIG. Figure 3As shown in the figure, nodes 32, 35, and 38 are connected to the wind farm. During the low voltage ride-through period, a specified power percentage is used for control. The low voltage ride-through power is 30% of the normal active power. During the low voltage ride-through recovery phase, nodes 32 and 38 are restored at a rate of 30℅ rated power per second. During the low voltage ride-through recovery phase, node 35 is restored at a rate of 50% rated power per second. The other parameters remain unchanged.
[0128] The energy storage station can be connected to BUS2 at the node (location) but is not limited thereto. The response time of the emergency control of the energy storage station is set to 0.1s after the fault is cleared, and the emergency control is exited at 3s. Figure 4 This is a simulation diagram of the energy storage emergency power support output according to one embodiment of the present application. Figure 4 As shown in the figure, the frequency response of the system is simulated and calculated when the energy storage emergency power is increased to 50MW, 100MW, 150MW, and 200MW.
[0129] Figure 5 This is a schematic diagram showing the comparison of system frequency deviations under emergency control according to an embodiment of the present application. Figure 5 As shown by Figure 5 Simulation results show that when energy storage is used to increase power during an emergency, the lowest system frequency significantly increases. This effect becomes more pronounced as the emergency power increases. With 200MW of emergency power, the lowest system frequency reaches 49.0Hz, the set value for the low-frequency load shedding device, ensuring system frequency stability. After emergency control ends, the system frequency gradually recovers as the wind turbines' active power recovers, without causing high-frequency fluctuations during the recovery process. These simulation results demonstrate the effectiveness of energy storage in emergency frequency control.
[0130] It is possible but not limited to selecting energy storage at five nodes, namely BUS6, BUS10, BUS19, BUS23, and BUS25, in the power system, setting the emergency support power to 200MW, and verifying the differences in the emergency control effects of energy storage at different nodes through simulation. Figure 6 This is a schematic diagram comparing the improvement effects of different energy storage access locations under emergency control according to an embodiment of the present application. Figure 6 As shown by Figure 6 The simulation results show that the frequency-boosting effect of the same emergency control amount from energy storage at different nodes varies significantly. For example, at 200MW output, BUS2 reduces the system frequency to a minimum of 49.0Hz, reaching the threshold for the low-frequency load shedding device. Emergency control at BUS10 reduces the system frequency to a minimum of nearly 49.1Hz. Even after emergency control at random node 6 of BUS25, the system frequency still remains below 49.0Hz. These simulation results confirm the necessity of selecting the optimal node for energy storage configuration.
[0131] The corresponding simulation data can be input into Matlab software for polynomial fitting, but not limited to, and the number of times can be selected as but not limited to 3. The fitting effect diagram of the BUS2 energy storage output-frequency lowest point characteristic curve is shown in the figure below. Figure 7 As shown, the absolute value of the error is approximately 0.
[0132] To select the optimal node, we can, but are not limited to, perform a pre-calculated accident set for all 39 nodes in the system. The average incremental rate of energy storage consumption at each node is calculated, and the results are shown in Table 1. The calculations indicate that BUS23 is the optimal node for connecting energy storage. From the perspective of active power distribution, the system's active power deficit is caused by wind turbine low voltage ride-through. BUS23 is electrically close to the two wind farms, placing it at the center of active power fluctuations. BUS22 and BUS21, which share similar characteristics, also demonstrate significant improvement in the system's lowest frequency point.
[0133] Table 1 shows the comparison results of the slight increase rate of energy storage consumption at different nodes, which can be expressed as follows:
[0134] Table 1
[0135] Configure Node Average equal consumption slight increase rate Configure Node Average equal consumption slight increase rate 1 0.00141 20 0.00157 2 0.00157 21 0.00159 3 0.00149 22 0.00160 4 0.00142 23 0.00161 5 0.00139 24 0.00139 6 0.00156 25 0.00135 7 0.00143 26 0.00157 8 0.00155 27 0.00151 9 0.00145 28 0.00153 10 0.00159 29 0.00153 11 0.00156 30 0.00140 12 0.00157 31 0.00136 13 0.00152 32 0.00143 14 0.00137 33 0.00145 15 0.00138 34 0.00140 16 0.00140 35 0.00144 17 0.00147 36 0.00142 18 0.00150 37 0.00139 19 0.00151 38 0.00147 none none 39 0.00138
[0136] In order to verify the optimization effect and effectiveness of the emergency control strategy of the embodiment of the present application, the simulation results can also be used as raw data, and the energy storage access nodes in the system are set. The rated power of each energy storage station in the power grid is shown in Table 2. No power is generated during steady-state operation, and the above simulation example is still used for analysis.
[0137] Table 2 shows the access nodes and rated power of energy storage stations within the power grid, which can be expressed as follows:
[0138] Table 2
[0139] Access Node Rated power / MW BUS2 25 BUS6 25 BUS10 25 BUS16 25 BUS19 25 BUS20 25 BUS22 25 BUS23 25 BUS25 25 BUS29 25
[0140] The node locations of each energy storage station have been determined, and the node energy storage-frequency minimum point curve is read. In order to verify the effectiveness of the optimized allocation strategy, the required fixed control cost is obtained based on the data of the expected fault concentration, and the minimum frequency point of each node under the energy storage output allocation scheme is simulated and calculated.
[0141] Option 1: Even distribution, that is, evenly distributing the determined emergency control quantity to the energy storage functions connected to the entire network.
[0142] Option 2: Optimization allocation, that is, inputting the determined emergency control quantity into the optimization model to obtain the output allocation method of each energy storage.
[0143] The total emergency control capacity is estimated to be 190MW, which is input into the optimization allocation model and solved using the improved particle swarm algorithm.
[0144] Table 3 shows the system frequency characteristics under different energy storage output allocation schemes, which can be expressed as follows:
[0145] Table 3
[0146] Reference indicators Solution 1 Option 2 Number of buses with frequency exceeding the limit 4 0 Lowest point of inertia center frequency 49.004 49.053
[0147] Figure 8 This is a schematic diagram of the lowest frequency point of each node under two energy storage output distribution schemes according to an embodiment of the present application. Figure 8 It can be seen that:
[0148] (1) In the case of even distribution of control quantity as shown in Scheme 1, the control quantity is evenly distributed, and the inertia center frequency is above the limit under emergency control. However, some nodes cannot meet the minimum frequency drop safety constraint value, and there are still frequency limit-exceeding nodes.
[0149] (2) The optimized allocation scheme proposed in the embodiment of the present application, namely Scheme 2, coordinates and allocates the supporting capacity of each energy storage, maximizes the use of the highly sensitive compensation energy storage and takes into account the frequency distribution characteristics of the system. After emergency control, it ensures that the frequency of each bus meets the safety and stability constraints, and has the best effect on improving the lowest point of the system frequency under large-scale low voltage crossing of wind power. This shows that the scheme proposed in this project can significantly optimize the system frequency response characteristics and effectively avoid triggering low-frequency load reduction actions or transient high-frequency problems.
[0150] Still taking the minimum control quantity as the objective function, through continuous iteration of the improved particle swarm algorithm, the minimum emergency control quantity required to ensure that the frequency of each node of the system does not trigger the low-frequency load reduction device under the current working conditions is obtained through optimization and solution, and compared with the minimum emergency control quantity required by the average distribution. Figure 9 This is a schematic diagram showing the comparison of the minimum emergency control amount under two energy storage output allocation schemes according to an embodiment of the present application. Figure 9 As shown in the figure, the minimum emergency control amount solved by optimizing the output model will be lower than the minimum emergency control amount of average distribution, which reduces the emergency control cost.
[0151] According to the method for energy storage to participate in grid frequency emergency control during wind power low voltage ride-through (LVRT) proposed in the embodiments of the present application, an online emergency control optimization strategy can be generated in the event of a LVRT fault in the power system based on the power system's operating data, a real-time emergency control resource pool, and real-time estimated emergency control quantities under anticipated fault conditions. This allows energy storage to be incorporated into the frequency emergency control method during LVRT, leveraging its dynamic active power support capabilities. By coordinating and allocating the support capabilities of various energy storage units, the system frequency response characteristics of the power system are significantly optimized, effectively avoiding the triggering of low-frequency load shedding or the occurrence of transient high-frequency problems. This allows for timely response to LVRT faults in the power system and ensures stable operation of the power system. This addresses the issues of LVRT solutions in related technologies being limited by the limited support capabilities of renewable energy units, emphasizing the support of renewable energy units themselves, and thus failing to address frequency stability issues caused by LVRT. The control measures are inflexible and costly, and when large-scale wind power LVRT causes large short-term power surges, the system's regulation capacity is insufficient to maintain grid frequency stability, potentially causing a series of chain reactions and exacerbating frequency safety and stability issues.
[0152] Next, a device for participating in grid frequency emergency control under wind power low voltage ride-through with energy storage will be described with reference to the accompanying drawings according to an embodiment of the present application.
[0153] Figure 10 It is a structural diagram of the device for emergency control of grid frequency in which energy storage participates in wind power low voltage ride-through in an embodiment of the present application.
[0154] like Figure 10 As shown, the device 10 for participating in grid frequency emergency control with energy storage during wind power low voltage ride-through includes: an acquisition module 100 , a judgment module 200 and a control module 300 .
[0155] The acquisition module 100 is used to obtain online operation data of the power system, a real-time emergency control resource pool, and real-time estimated emergency control quantities under expected fault conditions;
[0156] The judgment module 200 is used to judge whether the power system meets the preset emergency control start-up conditions in the event of a power system failure;
[0157] The control module 300 is used to input the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output distribution optimization model based on online operating data when the power system meets the preset emergency control startup conditions, generate an online emergency control optimization strategy by solving the energy storage output distribution optimization model, and control the power system to execute the online emergency control optimization strategy.
[0158] Optionally, in one embodiment of the present application, the judgment module 200 includes: an acquisition unit, a processing unit and a judgment unit.
[0159] The acquisition unit is used to obtain active power characteristic curves of different wind farms under low voltage ride-through based on online operation data.
[0160] The processing unit is used to perform equivalent fitting processing on the active power characteristic curve to obtain the system equivalent short-time power impact curve, and input the information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain the estimated system frequency minimum point of the power system.
[0161] The judgment unit is used to determine that the power system needs to start emergency control measures when the low-frequency load reduction device is triggered when the system frequency is estimated to be at its lowest point.
[0162] Optionally, in one embodiment of the present application, it further includes: a first optimization module and a second optimization module.
[0163] The first optimization module is configured to optimize the emergency control power of the energy storage of the power system based on the target demand at the lowest system frequency point before inputting the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output allocation optimization model to obtain the optimized emergency control power.
[0164] The second optimization module is used to establish an emergency control resource optimization allocation mathematical model based on the optimized emergency control power, so as to optimize the energy storage output allocation optimization model according to the emergency control resource optimization allocation mathematical model.
[0165] Optionally, in one embodiment of the present application, the constraints of the mathematical model for optimal allocation of emergency control resources include power balance constraints, emergency control total amount equality constraints, energy storage regulation range constraints, and node bus frequency inequality constraints.
[0166] Optionally, in one embodiment of the present application, the function of the target requirement of the lowest system frequency point can be expressed as:
[0167] max(F1(p1)+F2(p2)+......+F n (p n )-n*F(0))
[0168] Among them, p1, p2, ..., p n Indicates the output of each energy storage, F i (p i ) represents the improvement effect at the lowest point of the system frequency, F(0) represents the lowest point when the energy storage is not working, and n represents the amount of energy storage.
[0169] It should be noted that the aforementioned explanation of the embodiment of the method for energy storage participating in the emergency control of grid frequency during wind power low voltage ride-through is also applicable to the device for energy storage participating in the emergency control of grid frequency during wind power low voltage ride-through in this embodiment, and will not be repeated here.
[0170] According to the device for using energy storage in grid frequency emergency control during wind power low voltage ride-through (LVRT) proposed in the embodiments of the present application, an online emergency control optimization strategy can be generated in the event of a LVRT fault in the power system based on the power system's operating data, a real-time emergency control resource pool, and real-time estimated emergency control quantities under anticipated fault conditions. This allows energy storage to be incorporated into the frequency emergency control method for the power system during LVRT, leveraging its dynamic active power support capabilities. By coordinating and allocating the support capabilities of various energy storage units, the system frequency response characteristics of the power system are significantly optimized, effectively avoiding the triggering of low-frequency load shedding or the occurrence of transient high-frequency problems. This allows for timely response to LVRT faults in the power system and ensures stable operation of the power system. This addresses the issues of LVRT solutions in related technologies being limited by the limited support capabilities of renewable energy units, emphasizing the support of renewable energy units themselves, and thus being unable to address frequency stability issues caused by LVRT. The control measures are inflexible and costly. When large-scale wind power LVRT causes large short-term power surges, the system's regulation capacity is insufficient to maintain grid frequency stability, potentially causing a series of chain reactions and exacerbating frequency safety and stability issues.
[0171] Figure 11 This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:
[0172] A memory 1101 , a processor 1102 , and a computer program stored in the memory 1101 and executable on the processor 1102 .
[0173] When the processor 1102 executes the program, the method for energy storage to participate in grid frequency emergency control under wind power low voltage ride-through provided in the above embodiment is implemented.
[0174] Furthermore, the electronic device further includes:
[0175] The communication interface 1103 is used for communication between the memory 1101 and the processor 1102 .
[0176] The memory 1101 is used to store computer programs that can be run on the processor 1102 .
[0177] The memory 1101 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.
[0178] If the memory 1101, processor 1102, and communication interface 1103 are implemented independently, the communication interface 1103, memory 1101, and processor 1102 can be interconnected via a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 11 Only one thick line is used in the diagram, but this does not mean that there is only one bus or one type of bus.
[0179] Optionally, in a specific implementation, if the memory 1101, the processor 1102 and the communication interface 1103 are integrated on a chip, the memory 1101, the processor 1102 and the communication interface 1103 can communicate with each other through an internal interface.
[0180] The processor 1102 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application.
[0181] An embodiment of the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-mentioned method for energy storage to participate in emergency control of grid frequency under wind power low voltage ride-through.
[0182] An embodiment of the present application also provides a computer program product, including a computer program, which can run computer instructions. When the computer instructions are executed by a processor, the method for energy storage to participate in emergency control of grid frequency under wind power low voltage ride-through provided in the embodiment of the present application is implemented.
[0183] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art can combine and combine different embodiments or examples described in this specification and features of different embodiments or examples without contradiction.
[0184] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of technical features indicated. Thus, a feature specified as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of this application, "N" means at least two, for example, two, three, etc., unless otherwise specifically defined.
[0185] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing a custom logical function or process step, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may be performed in a different order than shown or discussed, including performing functions in a substantially simultaneous manner or in a reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present application pertain.
[0186] The logic and / or steps represented in the flowcharts or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing the logical functions, and can be embodied in any computer-readable medium for use by, or in conjunction with, an instruction execution system, apparatus, or device (e.g., a computer-based system, a system including a processor, or other system that can fetch and execute instructions from an instruction execution system, apparatus, or device). For purposes of this specification, a "computer-readable medium" can be any device that can contain, store, communicate, propagate, or transport a program for use by, or in conjunction with, an instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of computer-readable media include the following: an electrical connection with one or N wires (electronic devices), a portable computer disk cartridge (magnetic device), random access memory (RAM), read-only memory (ROM), erasable and programmable read-only memory (EPROM or flash memory), fiber optic devices, and a portable compact disc read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program can be obtained electronically by optically scanning the paper or other medium and then editing, interpreting or processing it in other suitable ways as necessary, and then storing it in a computer memory.
[0187] It should be understood that various parts of the present application can be implemented using hardware, software, firmware, or a combination thereof. In the above embodiment, the N steps or methods can be implemented using software or firmware stored in a memory and executed by a suitable instruction execution system. If implemented using hardware, as in another embodiment, it can be implemented using any one or a combination of the following technologies known in the art: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application-specific integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0188] Those skilled in the art will understand that all or part of the steps in the method of the above embodiment can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium. When the program is executed, it includes one or a combination of the steps of the method embodiment.
[0189] In addition, the functional units in the various embodiments of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into a module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0190] The storage medium mentioned above may be a read-only memory, a magnetic disk, or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present application. Persons skilled in the art may make changes, modifications, substitutions, and variations to the above embodiments within the scope of the present application.
Claims
1. A method for emergency control of grid frequency using energy storage during low voltage ride-through of wind power. It is characterized in that The following steps are involved: Obtain online operation data of the power system, real-time emergency control resource pool and real-time estimated emergency control quantity under expected fault conditions; In the event of a failure in the power system, determining whether the power system meets a preset emergency control start-up condition; If the power system meets the preset emergency control start-up conditions, the real-time emergency control resource pool and the real-time estimated emergency control quantity are input into a pre-established energy storage output allocation optimization model based on the online operation data, and an online emergency control optimization strategy is generated by solving the energy storage output allocation optimization model, and the power system is controlled to execute the online emergency control optimization strategy.
2. The method according to claim 1, It is characterized in that In the event of a failure in the power system, determining whether the power system meets a preset emergency control start-up condition includes: Based on the online operation data, active power characteristic curves of different wind farms under low voltage ride-through are obtained; Performing equivalent fitting processing on the active power characteristic curve to obtain a system equivalent short-time power impact curve, and inputting information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain an estimated system frequency minimum point of the power system; When the estimated system frequency minimum point triggers the action of the under-frequency load reduction device, it is determined that the power system meets the preset emergency control start-up condition.
3. The method according to claim 2, It is characterized in that Before the real-time emergency control resource pool and the real-time estimated emergency control quantity are input into the pre-established energy storage output allocation optimization model, the following steps are also included: Based on the target demand of the lowest frequency point of the system, the emergency control power of the energy storage of the power system is optimized to obtain the optimized emergency control power; An emergency control resource optimization allocation mathematical model is established based on the optimized emergency control power, so as to optimize the energy storage output allocation optimization model according to the emergency control resource optimization allocation mathematical model.
4. The method according to claim 3, It is characterized in that The constraint conditions of the mathematical model for optimizing allocation of emergency control resources include power balance constraint, emergency control total amount equality constraint, energy storage regulation range constraint, and node bus frequency inequality constraint.
5. The method according to claim 4, It is characterized in that The function of the target demand at the lowest frequency point of the system is: max(F 1 (p 1 )+F 2 (p 2 )+......+F n (p n )-n*F(0)) Among them, p 1 ,p 2 ,......,p n Indicates the output of each energy storage, F i (p i ) represents the improvement effect at the lowest point of the system frequency, F(0) represents the lowest point when the energy storage is not working, and n represents the amount of energy storage.
6. A device for emergency control of power grid frequency with energy storage during low voltage ride-through of wind power. It is characterized in that include: An acquisition module is used to acquire online operation data of the power system, a real-time emergency control resource pool, and real-time estimated emergency control quantities under anticipated fault conditions; A judgment module, used for judging whether the power system meets a preset emergency control start-up condition when a fault occurs in the power system; A control module is used to input the real-time emergency control resource pool and the real-time estimated emergency control quantity into a pre-established energy storage output allocation optimization model based on the online operation data when the power system meets the preset emergency control start-up conditions, generate an online emergency control optimization strategy by solving the energy storage output allocation optimization model, and control the power system to execute the online emergency control optimization strategy.
7. The device according to claim 6, It is characterized in that The judging module comprises: An acquisition unit, configured to acquire active power characteristic curves of different wind farms under low voltage ride-through based on the online operation data; A processing unit, configured to perform equivalent fitting processing on the active power characteristic curve to obtain a system equivalent short-time power impact curve, and input information of the system equivalent short-time power impact curve into a pre-established system frequency response model to obtain an estimated system frequency minimum point of the power system; The judging unit is used to judge that the power system meets the preset emergency control starting condition when the low-frequency load reduction device is triggered at the estimated system frequency minimum point.
8. An electronic device, It is characterized in that include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for energy storage to participate in emergency control of grid frequency under low voltage ride-through of wind power as described in any one of claims 1 to 5.
9. A computer-readable storage medium having a computer program stored thereon, It is characterized in that The program is executed by a processor to implement the method for energy storage to participate in emergency control of grid frequency under wind power low voltage ride-through as described in any one of claims 1-5.
10. A computer program product comprising a computer program, It is characterized in that When the computer program is executed, it is used to implement the method for energy storage participating in emergency control of grid frequency under wind power low voltage ride-through as described in any one of claims 1-5.
Citation Information
Patent Citations
Energy storage capacity quantitative evaluation method considering frequency support demand and low voltage ride through
CN114614504A
Power grid low-frequency load shedding online setting strategy considering wind-thermal cooperation
CN115879712A
Energy storage emergency control method based on model predictive control
CN116436028A
Electromagnetic transient equivalence method considering doubly-fed wind power plant voltage distribution characteristics and low voltage ride through control
CN116581751A
Energy storage emergency control optimal release strategy calculation method and device
CN117595224A