Bus intelligent power transmission method and system

Through the monitoring system adjusting the operation sequence of the side switches based on the database priority information, ground tool operation and status verification are carried out, which solves the problems of low efficiency and risk of misoperation of bus power transmission of 220kV and above, and achieves high efficiency and safety of intelligent power transmission.

CN119093517APending Publication Date: 2024-12-06SANXIA JINSHAJIANG YUNCHUAN HYDROPOWER DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411033961.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing busbar power transmission operation efficiency of 220kV and above is low, involves multiple steps and is prone to missed or misoperated, and has the problem of frequent communication.

Method used

The monitoring system receives scheduling instructions, adjusts the operation sequence of the edge switches according to the priority information in the database, performs ground tool operation and status verification, ensures the normal state of the equipment, and realizes intelligent power transmission of the bus.

Benefits of technology

It reduces the communication between remote centralized control and on-site, improves operation efficiency, reduces the risk of misoperation, and improves the intelligence and automation level of power plants and substations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093517A_ABST
    Figure CN119093517A_ABST
Patent Text Reader

Abstract

The invention discloses a bus intelligent power transmission method and system, and relates to the technical field of power grids, and the method comprises the steps: receiving a scheduling instruction by the system, carrying out bus scheduling state conversion, adjusting the operation sequence of a side switch according to priority information in a database, and carrying out grounding switch operation and state verification; a bus charging test is carried out to check the bus charging condition, after it is confirmed that bus charging is normal, remaining side switches are closed according to priority information in the database, and bus operation state conversion is completed; and confirming the state of the equipment, monitoring the operation state of the equipment to ensure that all the equipment is in a set normal working state, and completing intelligent power transmission of the bus. According to the invention, remote centralized control and on-site communication are reduced, the working efficiency is improved, the manual operation amount and the operation risk of operators are reduced, and the intelligence and automation levels of a power plant and a transformer substation are improved; intelligent power transmission can be carried out without changing the equipment structure of the existing plant station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grids, and in particular to a busbar intelligent power transmission method and system. Background Art

[0002] At present, hydropower plants, thermal power plants and substations carry out maintenance work on 220kV and above buses at a certain frequency every year according to the maintenance plan. After the maintenance work is completed, the bus needs to be powered on. The power transmission operation of 220kV and above buses is mostly carried out by remote monitoring of the centralized control center and the cooperation of on-site operators of power plants and substations. Bus power transmission involves all switches on the bus, so there are many steps to operate, and more information needs to be communicated and transmitted at the remote site, which is inefficient. At the same time, it also involves the operation of protection and stability secondary equipment, and it is easy to miss the operation steps and there is a risk of misoperation.

[0003] The process of busbar power transmission of 220kV and above is mainly divided into three parts: busbar maintenance to cold standby, busbar cold standby to hot standby, and busbar hot standby to operation. Each state requires the centralized control remote and on-site verification of the equipment status before the next equipment state conversion can be carried out. Therefore, through the status of each switch, knife switch, and ground knife collected by the LCU on the computer monitoring system, the status of the safe and stable secondary equipment and dispatch instructions are called from the database, and a set of sequential control operation procedures specifically for busbar power transmission of 220kV and above are designed to achieve safe, reliable, efficient and intelligent power transmission. Summary of the invention

[0004] In view of the problems existing in the existing bus intelligent power transmission method, the present invention is proposed. Therefore, the problem to be solved by the present invention is how to provide a bus intelligent power transmission method and system.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] In the first aspect, the present invention provides a bus intelligent power transmission method, which includes: the system receives a dispatch instruction to perform a bus dispatch state conversion, adjusts the side switch operation order according to the priority information in the database, and performs ground switch operation and state verification; performs a bus charging test to check the bus charging status, and after confirming that the bus charging is normal, closes the remaining side switches according to the priority information in the database to complete the bus operation state conversion; performs equipment status confirmation, monitors the equipment operation status to ensure that all equipment is in the set normal working state, and completes the bus intelligent power transmission.

[0007] As a preferred solution of the bus intelligent power transmission method described in the present invention, the bus scheduling state conversion includes sequentially performing bus maintenance to cold standby, bus cold standby to hot standby and bus hot standby to operation.

[0008] As a preferred scheme of the bus intelligent power transmission method described in the present invention, the bus maintenance and conversion to cold standby includes the following steps: the monitoring system collects the protection input signal to confirm whether the protection is successfully put into operation, and all side switch protections and bus protections are put into operation; the monitoring system issues a dispatching command to pull open the bus ground switch and the ground switches on both sides of all side switches, and the ground switch operations are performed in sequence according to the priority order; the switch station fault recording device operation status, the synchronous phasor acquisition device operation status, the side switch line reclosing mode handle status, the side switch maintenance handle status and the safety device side switch with line operation closing pressure plate status in the database are called; if the database device status all meets the set status, the bus maintenance and conversion to cold standby are completed, and the bus scheduling status conversion is continued to perform the bus cold standby to hot standby operation; the set status includes that the fault recording device is operating normally, the synchronous phasor acquisition device is operating normally, the side switch line reclosing mode handle has been switched to single heavy, the side switch maintenance handle has been switched to normal, and the safety device side switch with line operation closing pressure plate has been put into operation.

[0009] As a preferred scheme of the bus intelligent power transmission method described in the present invention, the bus cold standby to hot standby operation includes: the monitoring system issues a dispatching instruction to close all side switches, and the side switches are merged in the order of priority in the order of power side switches first and load side switches, and the bus hot standby operation is continued after the merger; the bus hot standby operation is switched to hot standby operation includes the monitoring system issues a dispatching instruction to close the first string of side switches without pressure and check whether the bus is charged normally, and after confirming that the bus is charged normally, the remaining side switches are closed in sequence at the same time.

[0010] As a preferred solution of the bus intelligent power transmission method described in the present invention, the ground switch operation and status verification includes the following steps: during system preparation, the database is called to determine whether there is a bus power transmission instruction in the database. If there is a bus power transmission instruction in the database, the bus scheduling state is converted; the bus maintenance is converted to cold standby operation, and the database is called to determine whether there is a dispatching instruction in the database to issue to the bus. If there is a dispatching instruction in the database, the bus maintenance is converted to cold standby, and the monitoring system collects the input signals of all side switch protections and bus protections to determine whether all side switches and bus protections have been put into operation; if all side switches and bus protections have been put into operation, the dispatching instructions are continued to be issued through the monitoring system to open the bus ground switch. The busbar ground switch collects the busbar ground switch open position action signal and closing position reset signal to determine whether all the signals have been collected; if all the equipment states are normal, the busbar cold standby to hot standby operation is performed, and the database is called to determine whether there is a busbar cold standby to hot standby dispatching instruction in the database; when the busbar cold standby to hot standby dispatching instruction exists in the database, the monitoring system issues a dispatching instruction to close the switches of all the side switches in turn, collects the closing action and opening position reset signals of the switches of all the side switches, and determines whether all the switch signals of the side switches have been collected; if there is a closing action signal of the switch or the opening position reset signal is not collected, the closing of the remaining switch switches is stopped, the busbar power supply process is ended, the busbar dispatching state conversion is exited and the Line alarm; if the signals of the two knife switches of all side switches are collected, the closing action and opening reset conditions of the side switch knife switches are met, the bus hot standby transfer operation is performed, and the database is called to determine whether there is a bus hot standby transfer operation scheduling instruction in the database; the sequence priority of the side switches in the database is called, and the default sequence of side switch operations is to close the first string of side switches first. If there is a special instruction switch priority, the switch with the highest priority in the database is closed, and the first string of side switches is closed without pressure to charge the bus, and the closing action signal and opening reset signal of the first string of side switches are collected to determine whether the two signals of the first string of side switches are both collected; if the signal of the first string of side switches exists but is not collected, the bus power supply process is terminated. , exit the bus dispatching state conversion and issue an alarm; if both signals of the first string side switches are collected, the monitoring system remotely issues a dispatching command to close the remaining side switches synchronously, collect the closing action and opening reset signals of all side switches, collect the closing action and opening reset signals of all side switches, and determine whether both signals of all side switches are collected; if there is a closing action signal or an opening reset signal of the knife switch that has not been collected, stop closing the knife switches of the remaining side switches, then end the bus power supply process, exit the bus dispatching state conversion and issue an alarm; if both signals of all side switches are collected, the closing action and opening reset conditions of the side switches are met, the bus dispatching state conversion process is ended, and the bus power supply is normal.

[0011] As a preferred scheme of the bus intelligent power transmission method described in the present invention, the judgment of whether all side switches and bus protections have been put into operation includes, if all side switches and bus protections are not put into operation, terminating the bus power transmission process, exiting the bus dispatching state conversion and issuing an alarm; if all side switches and bus protections are put into operation, continuing to issue a dispatching instruction through the monitoring system to open the bus earth switch, collecting the bus earth switch open position action signal and the closed position reset signal, and judging whether all the signals have been collected.

[0012] As a preferred solution of the bus intelligent power transmission method described in the present invention, the judgment of whether all signals are collected includes: if the bus earth knife open position action signal and the closed position reset signal are not collected, the bus power transmission is terminated, the bus dispatching state conversion is exited and an alarm is issued; if the bus earth knife open position action signal and the closed position reset signal are both collected, the bus earth knife open position action and closed position reset collection conditions are met, and the monitoring system continues to issue a dispatching instruction to open the earth knives on both sides of all side switches, and collect the earth knife open position action and closed position reset signals of all side switches; if there is an earth knife When the closed reset signal or the open action signal is not collected, stop pulling open the two side earth switches of the remaining side switches, end the bus power supply process, exit the bus dispatching state conversion and issue an alarm; if the two signals of the earth switches of all side switches are collected, continue to collect the fault recording operation status, synchronous phasor operation status, switch mode handle position status, and safety secondary equipment status confirmation, call the data in the database to determine whether the equipment status is normal. If the equipment status is abnormal, end the bus power supply process, exit the bus dispatching state conversion and issue an alarm.

[0013] In the second aspect, the present invention provides a bus intelligent power transmission system, which includes: a conversion module, which is used for the system to receive dispatch instructions to perform bus dispatch state conversion, adjust the side switch operation sequence according to the priority information in the database, and perform ground switch operation and state verification; a testing module, which is used to perform a bus charging test to check the bus charging status, and after confirming that the bus charging is normal, close the remaining side switches according to the priority information in the database to complete the bus operation state conversion; a monitoring module, which is used to confirm the equipment status, monitor the equipment operation status to ensure that all equipment is in the set normal working state, and complete the bus intelligent power transmission.

[0014] In a third aspect, the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the processor executes the computer program, the steps of the bus intelligent power transmission method are implemented.

[0015] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, the steps of the bus intelligent power transmission method are implemented.

[0016] The beneficial effects of the present invention are as follows: automatic judgment is made through the monitoring system, and after the process conditions are met, the monitoring system automatically issues commands and monitors each step of the process, thereby reducing the communication between remote centralized control and the site and improving work efficiency; the busbar power transmission step-by-step operation steps are streamlined, and the process sequence control is achieved through the monitoring system, thereby reducing the manual operation amount and operation risks of operators and avoiding misoperation; the intelligence and automation level of power plants and substations is improved; there is no need to change the equipment structure of existing plants and substations, and only the equipment status collected by the existing monitoring system needs to be used to perform intelligent power transmission through the sequence control operation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 The figure is a flow chart of the bus intelligent power transmission method.

[0019] Figure 2 This is a specific flow chart of the busbar intelligent power transmission method. DETAILED DESCRIPTION

[0020] In order to make the above-mentioned purposes, features and advantages of the present invention more understandable, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0021] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0022] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0023] Example 1

[0024] Reference Figure 1, which is the first embodiment of the present invention, and provides a bus intelligent power transmission method, comprising:

[0025] S1: The system receives the dispatching instruction to convert the busbar dispatching state, adjusts the side switch operation sequence according to the priority information in the database, and performs ground switch operation and state verification;

[0026] Specifically, the system receives dispatching instructions to switch the busbar dispatching status, confirms the input status of all protection devices (side switch protection and busbar protection), and ensures that all protection devices are in the correct working state. According to the priority information in the database, the side switch operation sequence is automatically or manually adjusted, the ground knife operation and status verification are performed, and the busbar ground knife and the ground knife on both sides of the side switch are remotely operated in turn, and the status changes of the ground knife are monitored at the same time to ensure the success of each step of the operation.

[0027] The busbar power transmission can be divided into three steps according to the dispatching requirements: busbar maintenance to cold standby, busbar cold standby to hot standby, busbar hot standby to operation. From the first string to the fifth string, the side switches are numbered 1, 2, 3, 4, and 5. The default side switch operation order priority is 1, 2, 3, 4, and 5. The priority of the switch decreases in sequence. The priority of the switch can be automatically read in the process. The priority of the 5 switches can be manually adjusted and set in the database according to the dispatching instructions.

[0028] All side switch protections are activated, and busbar protection is activated. Whether the side switch protection and busbar protection are activated successfully is confirmed by collecting the protection activation signal through the monitoring system.

[0029] The monitoring system remotely issues an order to open the busbar ground switch.

[0030] The monitoring system remotely issues an order to pull open the grounding switches on both sides of all side switches. The grounding switch operation order is first No. 1 grounding switch and then No. 2 grounding switch. The default order priority of the side switch operation is 1, 2, 3, 4, 5 switches in descending order, but in the database, the priority of the 5 switches can be manually adjusted according to the scheduling instructions. When pulling open the grounding switches on both sides of all side switches, the order priority of the database switches is called first. If there is no special requirement, the default order of the side switch operation is 1, 2, 3, 4, 5.

[0031] Call the switch station fault recording device operation status, synchronous phasor acquisition device operation status, side switch line reclosing mode handle status, side switch maintenance handle status, and safety device side switch line operation closing pressure plate status in the database. If the database device status meets the set status, execute the next step. Normally set equipment status: fault recording device operates normally; synchronous phasor acquisition device operates normally; side switch line reclosing mode handle has been switched to "single heavy"; side switch maintenance handle has been switched to "normal"; safety device side switch line operation closing pressure plate has been put into operation.

[0032] The monitoring system remotely issues a command to close all the side switches. In the order of power side switch first and load side switch second, take 1M as an example, close side switch No. 2 first and then side switch No. 1. The switch priority is the same as step 1. The default side switch operation sequence priority is 1, 2, 3, 4, 5. The priority of the switches decreases in sequence. However, in the database, the priority of the 5 switches can be manually adjusted according to the scheduling instructions. When closing all the side switches, the database switch sequence priority is called first. If there is no special requirement, the default side switch operation sequence is 1, 2, 3, 4, 5.

[0033] The monitoring system remotely issues a command to close the first string of side switches without voltage to check whether the busbar is charged normally. The default priority of the side switch operation is 1, 2, 3, 4, and 5 switches in descending order, but the priority of the five switches can be manually adjusted and set in the database according to the dispatching instructions. When executing the side switch closing instruction, the order priority of the dispatching instruction switch in the database is called first. If there is a priority, the side switch with the highest priority is closed. If there is no special requirement, the side switch of the first string is closed by default;

[0034] The monitoring system remotely issues commands to close the remaining side switches in sequence. When closing the side switch command, the priority order of the dispatching command switch in the database is first called. If there is no special requirement, the remaining switches are closed in sequence according to the default switch priority order.

[0035] S1.1: The system is preparing, calling the database to determine whether there is a bus power transmission instruction in the database. If there is a bus power transmission instruction in the database, enter S1.2;

[0036] S1.2: Busbar maintenance to cold standby operation, call the database, and enter S1.3 when there is a dispatch order for busbar maintenance to cold standby in the database;

[0037] S1.3: The monitoring system collects the input signals of all side switch protection and busbar protection. If it is determined that all side switches and busbar protection are input, it will enter S1.4. Otherwise, the process will alarm and exit.

[0038] S1.4: The monitoring system remotely issues a command to pull the busbar ground switch open, and collects the busbar ground switch open position action signal and closed position reset signal. If both signals are collected, the condition is met and enter S1.5, otherwise the process alarms and exits;

[0039] S1.5: The monitoring system remotely issues a command to pull open the grounding knives on both sides of all side switches. The order of grounding knives operation is first No. 1 and then No. 2. The open position action and closed position reset signals of the grounding knives of all side switches are collected. When both signals of the grounding knives of all side switches are collected, the condition is met and enter S1.6. When the closed position reset signal of a grounding knives or the open position action signal is not collected when executing S1.5, the grounding knives on both sides of the remaining side switches are stopped, and the process alarms and exits. When executing S1.5, the order priority of the side switch grounding knives in the database is called first. The default order priority of the side switch operation is 1, 2, 3, 4, and 5 switches in descending order.

[0040] S1.6: Confirmation of the fault recording operation status, synchronous phasor operation status, switch mode handle position status, and safety secondary equipment status. Call the data in the database to determine whether the equipment status is normal. If the equipment status is normal, enter S1.7, otherwise the process alarms and exits; the database sets the equipment status normally: the fault recording device operates normally, the synchronous phasor acquisition device operates normally; the side switch line reclosing mode handle has been switched to "single reclosing"; the side switch maintenance handle has been switched to "normal"; the safety device side switch with line operation closing pressure plate has been put into operation.

[0041] S1.7: Bus cold standby to hot standby operation, call the database, and enter S1.8 when there is a dispatch in the database that issues a bus cold standby to hot standby dispatch instruction;

[0042] S1.8: The monitoring system remotely issues a command to close the switches of all side switches in sequence, first closing switch No. 2 and then switch No. 1, collecting the closing action and opening reset signals of all side switch switches. If both signals of the two switches of all side switches are collected, the condition is met to enter S1.9. When S1.8 is executed, if the closing action signal or opening reset signal of a switch is not collected, the closing of the remaining side switches will stop, and the process will alarm and exit. When executing S1.8, the order priority of the side switches in the database is called first. The default order priority of the side switch operation is 1, 2, 3, 4, 5, and the priorities of the switches decrease in sequence;

[0043] S1.9: Busbar hot standby switching operation, call the database, and enter S1.10 when there is a dispatch in the database that issues a busbar hot standby switching operation dispatch instruction;

[0044] S1.10: Close a side switch without pressure to charge the busbar. When executing S1.10, first call the order priority of the side switches in the database. The default order of side switch operation is to close the first string side switch first. If there is a special command switch priority, close the switch with the highest priority in the database. If not, the monitoring system will remotely issue a command to close the first string side switch without pressure, collect the closing action signal and the opening reset signal of the first string side switch, and if both signals are collected, the condition is met and enter S1.11, otherwise the process will alarm and exit;

[0045] S1.11: The monitoring system remotely issues an order to close the remaining side switches synchronously, and collects the closing action and opening reset signals of all side switches. If both signals of all side switches are collected, the condition is met to enter S1.12. When S1.11 is executed, if the closing signal or opening signal of a switch is not collected, the closing of the remaining side switches will stop, and the process will alarm and exit. When executing S1.11, the sequence priority of the side switches in the database is first called. The default sequence priority of the side switch operation is 1, 2, 3, 4, 5, and the priority of the switches decreases in sequence. If there is no special instruction, the remaining switches are closed in the order of the switch priority;

[0046] S1.12: The process ends, the busbar operation status conversion is completed, and the busbar power supply is normal.

[0047] S2: Perform bus charging test to check the bus charging status. After confirming that the bus charging is normal, close the remaining side switches according to the priority information in the database to complete the bus operation state conversion;

[0048] Specifically, in the cold standby state of the bus, all side switches are closed automatically in the order from the power supply side to the load side according to the switch priority in the database. Perform a bus charging test, close the side switch with the highest priority without pressure, check the bus charging status and confirm whether the bus charging is normal. After confirming that the bus charging is normal, close the remaining side switches at the same time according to the priority information in the database to complete the operation state conversion of the bus.

[0049] S3: Confirm the equipment status, monitor the equipment's operating status to ensure that all equipment is in the set normal working state, and complete the busbar intelligent power transmission.

[0050] Specifically, during the whole process, the operating status of key equipment such as fault recorders and synchronous phasor measurement units is continuously monitored to ensure that all equipment is in the set normal working state, the equipment status is confirmed, and the bus intelligent power transmission is completed. The set status includes the normal operation of the fault recorder, the normal operation of the synchronous phasor acquisition device, the side switch line reclosing mode handle has been switched to single reclosing, the side switch maintenance handle has been switched to normal, and the side switch with line operation closing pressure plate of the stability device has been put into operation.

[0051] Furthermore, the present embodiment also provides a bus intelligent power transmission system, including: a conversion module, which is used for the system to receive dispatching instructions to perform bus dispatching state conversion, adjust the side switch operation sequence according to the priority information in the database, and perform ground switch operation and state verification; a testing module, which is used to perform bus charging test to check the bus charging status, and after confirming that the bus charging is normal, close the remaining side switches according to the priority information in the database to complete the bus operation state conversion; a monitoring module, which is used to confirm the equipment status, monitor the equipment operation status to ensure that all equipment is in the set normal working state, and complete the bus intelligent power transmission.

[0052] This embodiment also provides a computer device, which is applicable to the case of a bus intelligent power transmission method, including: a memory and a processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement all or part of the steps of the method described in the embodiment of the present invention as proposed in the above embodiment.

[0053] This embodiment also provides a storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the method in any optional implementation of the above embodiment is executed. Wherein, the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk.

[0054] The storage medium proposed in this embodiment and the data storage method proposed in the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be found in the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.

[0055] Example 2

[0056] Referring to Table 1, which is the second embodiment of the present invention, this embodiment provides a bus intelligent power transmission method. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0057] Table 1 Technical characteristics comparison table

[0058]

[0059] From the above, it can be seen that this method automatically collects the status of each switch, knife switch, and earth knife and the protection input status through the monitoring system for automatic judgment. After the process conditions are met, the monitoring system automatically issues commands and monitors each step of the process, reducing the communication between remote centralized control and the site and improving work efficiency; the busbar power transmission step-by-step operation steps are streamlined, and the process sequence control is realized through the monitoring system, which reduces the manual operation amount and operation risk of the operating personnel and avoids misoperation; intelligent power transmission can improve the intelligence and automation level of power plants and substations; there is no need to change the equipment structure of existing plants and stations, only the equipment status collected by the existing monitoring system needs to be used to perform intelligent power transmission through the sequence control operation process.

[0060] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A busbar intelligent power transmission method, characterized in that: include, The system receives the dispatching instruction to convert the busbar dispatching status, adjusts the side switch operation sequence according to the priority information in the database, and performs ground switch operation and status verification; Perform bus charging test to check bus charging status. After confirming that the bus charging is normal, close the remaining side switches according to the priority information in the database to complete the bus operation status conversion; Confirm the equipment status, monitor the equipment's operating status to ensure that all equipment is in the set normal working state, and complete the busbar intelligent power transmission.

2. The busbar intelligent power transmission method according to claim 1, characterized in that: The busbar dispatching state conversion includes sequentially converting the busbar from maintenance to cold standby, converting the busbar from cold standby to hot standby, and converting the busbar from hot standby to operation.

3. The bus intelligent power transmission method according to claim 2, characterized in that: The busbar maintenance and switching to cold standby comprises the following steps: The monitoring system collects protection input signals to confirm whether the protection is successfully input, and all side switch protections and busbar protections are input; The monitoring system issues a dispatching command to pull out the busbar grounding switch and the grounding switches on both sides of all side switches, and operates the grounding switches in order of priority; Call the operating status of the switch station fault recording device, the operating status of the synchronous phasor acquisition device, the side switch line reclosing mode handle status, the side switch maintenance handle status and the side switch line operation closing pressure plate status of the safety device in the database; If the database equipment status meets the set status, the bus maintenance is completed and the cold standby is switched, and the bus dispatch status conversion is continued, and the bus cold standby is switched to hot standby; The set status includes the fault recording device operating normally, the synchronous phasor acquisition device operating normally, the side switch line reclosing mode handle has been switched to single reclosing, the side switch maintenance handle has been switched to normal, and the safety device side switch line operation closing pressure plate has been put into operation.

4. The busbar intelligent power transmission method according to claim 3, characterized in that: The bus cold standby to hot standby operation includes the monitoring system sending a dispatching instruction to close all the side switches, merging the side switches in the order of priority in the order of power side switches first and load side switches later, and continuing the bus hot standby to run operation after the merging is completed; The bus hot standby switching operation includes the monitoring system issuing a dispatching command to close the first string side switch without pressure and checking whether the bus is charged normally. After confirming that the bus is charged normally, the remaining side switches are closed in sequence at the same time.

5. The busbar intelligent power transmission method according to claim 4, characterized in that: The ground knife operation and status verification comprises the following steps: During system preparation, the database is called to determine whether there is a bus power transmission instruction in the database. If there is a bus power transmission instruction in the database, the bus dispatching state is converted; Perform busbar maintenance and cold standby operation, call the database to determine whether there is a dispatch instruction in the database to issue the busbar, if there is a dispatch instruction in the database, then perform busbar maintenance and cold standby, the monitoring system collects the input signals of all side switch protection and busbar protection, and determines whether all side switches and busbar protection have been put into operation; If all side switches and busbar protection have been put into operation, the monitoring system will continue to issue dispatching instructions to pull out the busbar earth switch, collect the busbar earth switch open position action signal and closed position reset signal, and determine whether all signals have been collected; If all equipment states are normal, the bus cold standby to hot standby operation is performed, and the database is called to determine whether there is a bus cold standby to hot standby scheduling instruction in the database; When the database contains a dispatch instruction for busbar cold standby to hot standby, the monitoring system issues a dispatch instruction to close the switches of all side switches in sequence, collects the closing action and opening reset signals of all side switch switches, and determines whether the switch signals of all side switches are collected; If the closing action signal of the knife switch exists or the opening reset signal is not collected, the knife switches of the remaining side switches will be stopped, the bus power supply process will be ended, the bus dispatching state conversion will be exited and an alarm will be issued; If the signals of the two switches of all the side switches are collected, the closing action and opening reset conditions of the side switch switches are met, and the bus hot standby switching operation is performed, and the database is called to determine whether there is a bus hot standby switching operation scheduling instruction in the database; The sequence priority of the side switches in the database is called. The default side switch operation sequence is to close the first string side switch first. If there is a special instruction switch priority, close the switch with the highest priority in the database, close the first string side switch without pressure to charge the bus, collect the closing action signal and the opening reset signal of the first string side switch, and determine whether both signals of the first string side switch are collected; If the signal of the first string side switch is not collected, the bus power transmission process is terminated, the bus dispatching state conversion is exited and an alarm is issued; If both signals of the first string side switch are collected, the monitoring system will remotely issue a dispatching command to close the remaining side switches synchronously, collect the closing action and opening reset signals of all side switches, and determine whether both signals of all side switches are collected; If the closing action signal of the knife switch exists or the opening reset signal is not collected, the knife switches of the remaining side switches will be stopped, the bus power supply process will be ended, the bus dispatching state conversion will be exited and an alarm will be issued; If both signals of all side switches are collected, the closing action and opening reset conditions of the side switches are met, the bus dispatching state conversion process is ended, and the bus power supply is normal.

6. The busbar intelligent power transmission method according to claim 5, characterized in that: The determination of whether all side switches and busbar protections have been put into operation includes: If all the side switches and busbar protection are not put into operation, the busbar power supply process will be terminated, the busbar dispatching state conversion will be exited and an alarm will be issued; If all side switches and busbar protection have been put into operation, the monitoring system will continue to issue dispatching instructions to open the busbar earth switch, collect the busbar earth switch open position action signal and closed position reset signal, and determine whether all signals have been collected.

7. The busbar intelligent power transmission method according to claim 6, characterized in that: The determining whether all signals are collected comprises: If the busbar earth switch open position action signal and the closed position reset signal are not collected, the busbar power supply is terminated, the busbar dispatching state conversion is exited and an alarm is issued; If both the busbar earth switch open position action signal and the closed position reset signal are collected, the busbar earth switch open position action and closed position reset collection conditions are met, and the monitoring system continues to issue dispatching instructions to pull open the earth switches on both sides of all side switches and collect the earth switch open position action and closed position reset signals of all side switches; If there is a closed reset signal of the ground switch or the open action signal is not collected, stop pulling open the ground switches on both sides of the remaining side switches, end the bus power supply process, exit the bus dispatching state conversion and issue an alarm; If both signals of all side switch grounding switches are collected, the fault recording operation status, synchronous phasor operation status, switch mode handle position status, and safety secondary equipment status confirmation are continued, and the data in the database are called to determine whether the equipment status is normal. If the equipment status is abnormal, the bus power supply process is terminated, the bus dispatching status conversion is exited, and an alarm is issued.

8. A bus intelligent power transmission system, based on the bus intelligent power transmission method according to any one of claims 1 to 7, characterized in that: include, The conversion module is used for the system to receive the dispatching instruction to convert the bus dispatching state, adjust the side switch operation sequence according to the priority information in the database, and perform ground switch operation and state verification; The test module is used to perform a bus charging test to check the bus charging status. After confirming that the bus charging is normal, the remaining side switches are closed according to the priority information in the database to complete the operation state conversion of the bus; The monitoring module is used to confirm the equipment status and monitor the operating status of the equipment to ensure that all equipment is in the set normal working state and complete the intelligent power transmission of the bus.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the bus intelligent power transmission method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the bus intelligent power transmission method according to any one of claims 1 to 7 are implemented.