Intelligent communication migration management system based on edge computing
Through an intelligent communication migration management system based on edge computing, the resource bottlenecks in the power grid communication network are identified and the resource migration path is optimized, and the complexity of resource management and fault handling in the power grid communication system is solved, and resource utilization and system stability are improved .
Patent Information
- Application Number
- CN202411190237.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-06
AI Technical Summary
The existing power grid communication systems have resource usage bottlenecks and complex topological structures in resource management and fault handling, resulting in resource waste and system stability reduction, making it difficult to discover and solve the problem of resource migration paths in a timely manner.
Adopt an intelligent communication migration management system based on edge computing, including resource monitoring module, network optimization module and migration execution module. By collecting resource usage data of the power grid communication network, identifying resource bottlenecks, and performing network configuration optimization calculations to determine resource migration paths. To optimize resource utilization.
It has achieved timely detection of performance bottlenecks, optimized resource utilization, improved the overall performance and stability of the power grid communication network, enhanced the adaptability and flexibility of the network, and ensured that the power grid communication network maintains stable and efficient operation in the face of emergencies.
Smart Images

Figure CN119094349A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of communication migration management and relates to an intelligent communication migration management system based on edge computing. Background Art
[0002] With the continuous expansion of the scale of power grids and the continuous increase in electricity demand, the complexity and importance of power grid communication systems are also increasing. Existing power grid communication systems have many problems in resource management and fault handling, especially in terms of resource usage bottlenecks and fault points, which are difficult to find and solve in time, resulting in waste of communication resources and reduced system stability. Therefore, there is an urgent need for a management system that can intelligently monitor and optimize power grid communication resources to improve resource utilization and system stability.
[0003] Current technologies have some drawbacks and defects in the analysis and management of resource migration paths in power grid communication networks. First, the topological structure of power grid communication networks is complex, and the optimization calculation of resource migration paths requires high computing power. Second, the selection of resource migration paths needs to consider multiple factors, such as bandwidth capacity, latency, and reliability of the paths, and current technologies make it difficult to achieve comprehensive evaluation and comprehensive optimization of these factors. Summary of the invention
[0004] In view of the above problems existing in the prior art, the present invention provides an intelligent communication migration management system based on edge computing to solve the above technical problems.
[0005] In order to achieve the above purpose and other purposes, the technical solution adopted by the present invention is as follows:
[0006] A first aspect of the present invention provides an intelligent communication migration management system based on edge computing, the system comprising a resource monitoring module, a network optimization module and a migration execution module, wherein the above modules are connected by wired and / or wireless connections to achieve data transmission between the modules;
[0007] The resource monitoring module is responsible for collecting resource usage data of each link node in the power grid communication network and determining whether there is a resource bottleneck in the power grid communication network based on a preset threshold;
[0008] The network optimization module, if a resource bottleneck point is identified in the power grid communication network, performs optimization calculation of the network configuration according to the data provided by the resource monitoring module, and determines the resource migration path of the power grid communication network;
[0009] The migration execution module is responsible for executing the dynamic migration of faulty link nodes in the power grid communication network according to the resource migration path provided by the network optimization module.
[0010] Exemplarily, the resource usage data of each link node in the power grid communication network in the resource monitoring module is bandwidth usage, delay and packet loss rate.
[0011] Exemplarily, the resource monitoring module determines whether there is a resource bottleneck in the power grid communication network, and the specific judgment logic includes the following steps:
[0012] The resource usage data of each link node in the power grid communication network are compared with the preset threshold value. If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold value, it is determined that there is a resource bottleneck point in the power grid communication network. If the resource usage data of each link node in the power grid communication network is less than its corresponding preset threshold value, it is determined that there is no resource bottleneck point in the power grid communication network.
[0013] Exemplarily, the resource migration path of the power grid communication network is determined, and the specific determination process is as follows:
[0014] If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold, the link node where the resource bottleneck point is located is marked as a faulty link node;
[0015] Obtain the total number of link nodes in the power grid communication network, thereby obtaining the bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network, and mark them as B i , L i , P i , where i is the number of each other link node, i = 1, 2, ... r, r is the total number of link nodes;
[0016] The bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network are normalized to obtain the processed bandwidth utilization rate, delay and packet loss rate B′ of the faulty link node and other link nodes in the power grid communication network. i , L′ i , P i ′;
[0017] Set the weights of bandwidth utilization, delay and packet loss rate in the power grid communication network and denote them as ω B ,ω L ,ω P , and ω B +ω L +ω P =1;
[0018] Comprehensively calculate the cost of the faulty link node and other link nodes in the power grid communication network, and determine the best migration target link node corresponding to the faulty link node in the power grid communication network;
[0019] Each migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network is obtained, and the cost is calculated to obtain the target migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network.
[0020] Exemplarily, the bandwidth usage rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network after processing are obtained, and the specific setting logic is:
[0021] From the bandwidth utilization rates of the faulty link node and other link nodes in the power grid communication network, select the maximum bandwidth utilization rate B among other link nodes. max and minimum bandwidth usage B min ;
[0022] The bandwidth utilization ratio of the faulty link node and other link nodes in the processed power grid communication network is obtained through normalization processing.
[0023] According to the calculation method of the bandwidth utilization rate of the faulty link node and other link nodes in the processed power grid communication network, the delay L′ between the faulty link node and other link nodes in the processed power grid communication network is obtained by similar analysis. i and packet loss rate P i ′.
[0024] Exemplarily, the weights of bandwidth utilization, delay and packet loss rate in the power grid communication network are set, and the specific processing process is as follows:
[0025] Obtain the bandwidth usage rate B′ of the faulty link node and other link nodes in the processed power grid communication network i , and obtain the bandwidth usage probability distribution of the faulty link node and other link nodes in the power grid communication network
[0026] Similarly, the delay probability distribution between the faulty link node and other link nodes in the power grid communication network is calculated: And the packet loss probability distribution
[0027] Further calculations are performed to obtain the information entropy of bandwidth utilization in the power grid communication network: Delayed Information Entropy and the information entropy of packet loss rate
[0028] The weight of bandwidth utilization in the power grid communication network is obtained from this analysis Delayed Weight and the weight of the packet loss rate
[0029] Exemplarily, the cost of the faulty link node and other link nodes in the power grid communication network is comprehensively calculated, and the specific calculation formula is as follows:
[0030] C i =B′ i ×ω B +L′ i ×ω L +P′ i ×ω P , C i is the cost between the faulty link node and the i-th other link node in the power grid communication network.
[0031] Exemplarily, the best migration target link node corresponding to the faulty link node in the power grid communication network is determined, and the specific determination process is as follows:
[0032] Obtain the remaining bandwidth of each other link node in the power grid communication network B i 总 is the total bandwidth of the i-th other link nodes in the power grid communication network;
[0033] Based on the packet loss rate of each other link node in the power grid communication network, the reliability coefficient F of each other link node in the power grid communication network is calculated. i =1-P i ;
[0034] Calculate the comprehensive score of each other link node in the power grid communication network Among them, L min is the minimum delay among other link nodes in the power grid communication network, is the maximum remaining bandwidth in other link nodes of the power grid communication network, F max is the maximum reliability factor among other link nodes in the power grid communication network;
[0035] The comprehensive scores of other link nodes in the power grid communication network are arranged in descending order, and the other link nodes ranked first in the comprehensive score are selected as the best migration target link nodes corresponding to the faulty link nodes in the power grid communication network.
[0036] Exemplarily, the target migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network is obtained, and the specific acquisition logic includes the following steps:
[0037] Using computing software to obtain each migration path of the best migration target link node corresponding to the fault link node in the power grid communication network;
[0038] The migration paths of the best migration target link node corresponding to the faulty link node in the power grid communication network are divided, thereby obtaining the cost of each link node in each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and adding them together to obtain the cost of each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and arranging them in ascending order, and selecting the migration path ranked first as the target migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network.
[0039] As described above, the intelligent communication migration management system based on edge computing provided by the present invention has at least the following beneficial effects:
[0040] The edge computing-based intelligent communication migration management system provided by the present invention includes a resource monitoring module, a network optimization module and a migration execution module. It collects resource usage data of each link node in the power grid communication network and determines whether there is a resource bottleneck in the power grid communication network according to a preset threshold. If a resource bottleneck is identified in the power grid communication network, the network configuration is optimized and calculated according to the data provided by the resource monitoring module to determine the resource migration path of the power grid communication network. This allows network managers to promptly discover performance bottlenecks in the network, such as when the bandwidth usage of a certain link approaches or exceeds its capacity, which may cause an increase in data transmission delays or packet loss rates, affecting the stable operation and reliability of the power grid. By monitoring these key data, network administrators can take preventive measures before resource bottlenecks occur, such as avoiding potential problems by adjusting routing strategies, increasing bandwidth, or reconfiguring network resources.
[0041] In addition, after identifying the resource bottleneck, the network configuration is optimized and calculated based on the data provided by the resource monitoring module, and the resource migration path of the power grid communication network is determined, which can ensure the optimal configuration of the power grid communication network and improve the efficiency of resource utilization. This not only helps to improve the overall performance of the power grid communication network, but also enhances the adaptability and elasticity of the network, so that the power grid communication network can maintain stable and efficient operation in the face of emergencies or changing load conditions, which is especially important for critical infrastructure such as the power grid that requires high reliability and high security. Therefore, this data-driven resource bottleneck identification and resource migration path optimization is not only beneficial, but also necessary for the stable and reliable operation of modern power grid communication networks. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0043] Figure 1 It is a schematic diagram of the connection of each step of the method of the present invention.
[0044] Figure 2 It is a schematic diagram of the structure of the device shown in the present invention. DETAILED DESCRIPTION
[0045] The above contents in combination with the implementation of the present invention are merely examples and explanations of the concept of the present invention. The technical personnel in the relevant technical field may make various modifications or supplements to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the claims, they shall all fall within the protection scope of the present invention.
[0046] Example 1
[0047] See also Figure 1 As shown, an intelligent communication migration management system based on edge computing includes a resource monitoring module, a network optimization module and a migration execution module. The above modules are connected by wired and / or wireless connections to achieve data transmission between the modules;
[0048] The resource monitoring module is responsible for collecting resource usage data of each link node in the power grid communication network and determining whether there is a resource bottleneck in the power grid communication network based on a preset threshold;
[0049] On the basis of the above-mentioned embodiment, the resource usage data of each link node in the power grid communication network in the resource monitoring module is bandwidth usage rate, delay and packet loss rate.
[0050]
[0051] On the basis of the above embodiment, the resource monitoring module determines whether there is a resource bottleneck in the power grid communication network. The specific judgment logic includes the following steps:
[0052] The resource usage data of each link node in the power grid communication network are compared with the preset threshold value. If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold value, it is determined that there is a resource bottleneck point in the power grid communication network. If the resource usage data of each link node in the power grid communication network is less than its corresponding preset threshold value, it is determined that there is no resource bottleneck point in the power grid communication network.
[0053] The network optimization module, if a resource bottleneck point is identified in the power grid communication network, performs optimization calculation of the network configuration according to the data provided by the resource monitoring module, and determines the resource migration path of the power grid communication network;
[0054] Based on the above embodiment, the resource migration path of the power grid communication network is determined, and the specific determination process is as follows:
[0055] If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold, the link node where the resource bottleneck point is located is marked as a faulty link node;
[0056] Obtain the total number of link nodes in the power grid communication network, thereby obtaining the bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network, and mark them as B i , L i , P i , where i is the number of each other link node, i = 1, 2, ... r, r is the total number of link nodes;
[0057] The bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network are normalized to obtain the processed bandwidth utilization rate, delay and packet loss rate B′ of the faulty link node and other link nodes in the power grid communication network. i , L′ i , P i ′;
[0058] Set the weights of bandwidth utilization, delay and packet loss rate in the power grid communication network and denote them as ω B ,ω L ,ω P , and ω B +ω L +ω P =1;
[0059] Comprehensively calculate the cost of the faulty link node and other link nodes in the power grid communication network, and determine the best migration target link node corresponding to the faulty link node in the power grid communication network;
[0060] Each migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network is obtained, and the cost is calculated to obtain the target migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network.
[0061] On the basis of the above embodiment, the bandwidth usage rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network after processing are obtained, and the specific setting logic is:
[0062] From the bandwidth utilization rates of the faulty link node and other link nodes in the power grid communication network, select the maximum bandwidth utilization rate B among other link nodes. max and minimum bandwidth usage B min ;
[0063] The bandwidth utilization ratio of the faulty link node and other link nodes in the processed power grid communication network is obtained through normalization processing.
[0064] According to the calculation method of the bandwidth utilization rate of the faulty link node and each other link node in the processed power grid communication network, the delay between the faulty link node and each other link node in the processed power grid communication network is obtained by similar analysis. and packet loss rate
[0065] L max and P max are the maximum delay and maximum packet loss rate in other link nodes of the power grid communication network respectively; L min and P min They are the minimum delay and minimum packet loss rate in other link nodes of the power grid communication network, respectively.
[0066] On the basis of the above embodiment, the weights of bandwidth utilization, delay and packet loss rate in the power grid communication network are set, and the specific processing process is as follows:
[0067] Obtain the bandwidth usage rate B′ of the faulty link node and other link nodes in the processed power grid communication network i , and obtain the bandwidth usage probability distribution of the faulty link node and other link nodes in the power grid communication network
[0068] Similarly, the delay probability distribution between the faulty link node and other link nodes in the power grid communication network is calculated: And the packet loss probability distribution
[0069] Further calculations are performed to obtain the information entropy of bandwidth utilization in the power grid communication network: Delayed Information Entropy and the information entropy of packet loss rate
[0070] The weight of bandwidth utilization in the power grid communication network is obtained from this analysis Delayed Weight and the weight of the packet loss rate
[0071] Based on the above embodiment, the cost of the faulty link node and other link nodes in the power grid communication network is comprehensively calculated, and the specific calculation formula is as follows:
[0072] C i =B′ i ×ω B +L′ i ×ω L +P′ i ×ω P , C i is the cost between the faulty link node and the i-th other link node in the power grid communication network.
[0073] On the basis of the above embodiment, the best migration target link node corresponding to the faulty link node in the power grid communication network is determined, and the specific determination process is as follows:
[0074] Obtain the remaining bandwidth of each other link node in the power grid communication network B i 总 is the total bandwidth of the i-th other link nodes in the power grid communication network;
[0075] Based on the packet loss rate of each other link node in the power grid communication network, the reliability coefficient F of each other link node in the power grid communication network is calculated. i =1-P i ;
[0076] Calculate the comprehensive score of each other link node in the power grid communication network Among them, L min is the minimum delay among other link nodes in the power grid communication network, is the maximum remaining bandwidth in other link nodes of the power grid communication network, F max is the maximum reliability factor among other link nodes in the power grid communication network;
[0077] The comprehensive scores of other link nodes in the power grid communication network are arranged in descending order, and the other link nodes ranked first in the comprehensive score are selected as the best migration target link nodes corresponding to the faulty link nodes in the power grid communication network.
[0078] in represents the ratio of the bandwidth of other link node i to the maximum bandwidth of other link nodes; represents the ratio of the delay of other link node i to the minimum delay of other link nodes; Represents the ratio of the reliability coefficient of other link node i to the maximum reliability coefficient of each other link node.
[0079] On the basis of the above embodiment, a target migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network is obtained, and the specific acquisition logic includes the following steps:
[0080] Using computing software to obtain each migration path of the best migration target link node corresponding to the fault link node in the power grid communication network;
[0081] The migration paths of the best migration target link node corresponding to the faulty link node in the power grid communication network are divided, thereby obtaining the cost of each link node in each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and adding them together to obtain the cost of each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and arranging them in ascending order, and selecting the migration path ranked first as the target migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network.
[0082] If it is assumed that each migration path from a faulty link node in the power grid communication network to the best migration target link node is ABD, then each link node in each migration path from a faulty link node in the power grid communication network to the best migration target link node can be divided into AB and BD in turn.
[0083] It should be added that the calculation software is used to obtain the migration paths of the best migration target link nodes corresponding to the faulty link nodes in the power grid communication network. The specific calculation software code is as follows:
[0084]
[0085]
[0086] Assume that the power grid communication network has four link nodes A, B, C, and D, where A is a faulty link node;
[0087]
[0088]
[0089] After normalization:
[0090] Link Node Bandwidth usage Delay Packet loss rate AB 0.25 0.00 0.25 BC 0.75 0.50 1.00 AC 0.50 0.25 0.50 CD 0.00 0.75 0.00 BD 1.00 1.00 0.75
[0091] The weights of bandwidth utilization, delay, and packet loss rate in the power grid communication network are set to 0.4, 0.3, and 0.3 respectively;
[0092] Calculate the cost:
[0093] Link Node cost AB 0.25*0.4+0.00*0.3+0.25*0.3=0.175 BC 0.75*0.4+0.50*0.3+1.00*0.3=0.75 AC 0.50*0.4+0.25*0.3+0.50*0.3=0.425 CD 0.00*0.4+0.75*0.3+0.00*0.3=0.225 BD 1.00*0.4+1.00*0.3+0.75*0.3=0.925
[0094] Assuming that the best migration target link node corresponding to the faulty link node in the power grid communication network is D, the migration paths from the faulty link node A to D are obtained, which are ABD and ACD respectively;
[0095] ABD: cost = 0.175 + 0.925 = 1.1
[0096] ACD: cost = 0.425 + 0.225 = 0.65
[0097] Therefore, path ACD is selected as the target migration path.
[0098] The migration execution module is responsible for executing the dynamic migration of faulty link nodes in the power grid communication network according to the resource migration path provided by the network optimization module.
[0099] Example 2
[0100] According to an exemplary embodiment, a communication migration management device based on big data includes: an electronic device and a computer-readable storage medium;
[0101] Figure 2 It is a structural diagram of a communication migration management device based on big data provided in an embodiment of the present application. The device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor to realize the above-mentioned intelligent communication migration management system based on edge computing.
[0102] The electronic device comprises a processor, a memory and a communication bus, wherein the memory stores a computer-readable program executable by the processor;
[0103] The communication bus realizes the connection and communication between the processor and the memory;
[0104] The processor implements the above-mentioned intelligent communication migration management system based on edge computing by calling the computer program stored in the memory and executing the computer readable program;
[0105] The computer-readable storage medium stores one or more programs. When executed on an electronic device, the one or more programs can be executed by one or more processors, providing a user input interface to implement the above-mentioned edge computing-based intelligent communication migration management system.
[0106] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0107] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.
[0108] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0109] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Intelligent communication migration management system based on edge computing, characterized in that: It includes a resource monitoring module, a network optimization module and a migration execution module, and the above modules are connected by wired and / or wireless connection to achieve data transmission between the modules; The resource monitoring module is responsible for collecting resource usage data of each link node in the power grid communication network and determining whether there is a resource bottleneck in the power grid communication network based on a preset threshold; The network optimization module, if a resource bottleneck point is identified in the power grid communication network, performs optimization calculation of the network configuration according to the data provided by the resource monitoring module, and determines the resource migration path of the power grid communication network; The migration execution module is responsible for executing the dynamic migration of faulty link nodes in the power grid communication network according to the resource migration path provided by the network optimization module.
2. The intelligent communication migration management system based on edge computing according to claim 1 is characterized in that: The resource usage data of each link node in the power grid communication network in the resource monitoring module are bandwidth utilization, delay and packet loss rate.
3. The intelligent communication migration management system based on edge computing according to claim 2 is characterized in that: The resource monitoring module determines whether there is a resource bottleneck in the power grid communication network. The specific judgment logic includes the following steps: The resource usage data of each link node in the power grid communication network are compared with the preset threshold value. If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold value, it is determined that there is a resource bottleneck point in the power grid communication network. If the resource usage data of each link node in the power grid communication network is less than its corresponding preset threshold value, it is determined that there is no resource bottleneck point in the power grid communication network.
4. The intelligent communication migration management system based on edge computing according to claim 1 is characterized in that: Determine the resource migration path of the power grid communication network. The specific determination process is as follows: If a resource usage data of a link node in the power grid communication network is greater than or equal to its corresponding preset threshold, the link node where the resource bottleneck point is located is marked as a faulty link node; Obtain the total number of link nodes in the power grid communication network, thereby obtaining the bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network, which are marked as B i , L i , P i , where i is the number of each other link node, i = 1, 2, ... r, r is the total number of link nodes; The bandwidth utilization rate, delay and packet loss rate of the faulty link node and other link nodes in the power grid communication network are normalized to obtain the processed bandwidth utilization rate, delay and packet loss rate B′ of the faulty link node and other link nodes in the power grid communication network. i , L′ i , P i ′; Set the weights of bandwidth utilization, delay and packet loss rate in the power grid communication network and denote them as ω B ,ω L ,ω P , and ω B +ω L +ω P =1; Comprehensively calculate the cost of the faulty link node and other link nodes in the power grid communication network, and determine the best migration target link node corresponding to the faulty link node in the power grid communication network; Each migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network is obtained, and the cost is calculated to obtain the target migration path corresponding to the best migration target link node of the faulty link node in the power grid communication network.
5. The intelligent communication migration management system based on edge computing according to claim 4 is characterized in that: The bandwidth usage, delay and packet loss rate of the faulty link node and other link nodes in the processed power grid communication network are obtained. The specific setting logic is: From the bandwidth utilization rates of the faulty link node and other link nodes in the power grid communication network, select the maximum bandwidth utilization rate B among other link nodes. max and minimum bandwidth usage B min ; The bandwidth utilization ratio of the faulty link node and other link nodes in the processed power grid communication network is obtained through normalization processing. According to the calculation method of the bandwidth utilization rate of the faulty link node and each other link node in the processed power grid communication network, the delay L′ between the faulty link node and each other link node in the processed power grid communication network is obtained by similar analysis. i and packet loss rate P i ′.
6. The intelligent communication migration management system based on edge computing according to claim 5 is characterized in that: Set the weights of bandwidth utilization, delay, and packet loss rate in the power grid communication network. The specific process is as follows: Obtain the bandwidth usage rate B′ of the faulty link node and other link nodes in the processed power grid communication network i , and obtain the bandwidth usage probability distribution of the faulty link node and other link nodes in the power grid communication network Similarly, the delay probability distribution between the faulty link node and other link nodes in the power grid communication network is calculated: And the packet loss probability distribution Further calculations are performed to obtain the information entropy of bandwidth utilization in the power grid communication network: Delayed Information Entropy and the information entropy of packet loss rate The weight of bandwidth utilization in the power grid communication network is obtained from this analysis Delayed Weight and the weight of the packet loss rate 7. The intelligent communication migration management system based on edge computing according to claim 6 is characterized in that: The cost of the faulty link node and other link nodes in the power grid communication network is calculated comprehensively. The specific calculation formula is as follows: C i =B′ i ×ω B +L′ i ×ω L +P′ i ×ω P , C i is the cost between the faulty link node and the i-th other link node in the power grid communication network.
8. The intelligent communication migration management system based on edge computing according to claim 7 is characterized in that: Determine the best migration target link node corresponding to the faulty link node in the power grid communication network. The specific determination process is as follows: Obtain the remaining bandwidth of each other link node in the power grid communication network is the total bandwidth of the i-th other link nodes in the power grid communication network; Based on the packet loss rate of each other link node in the power grid communication network, the reliability coefficient F of each other link node in the power grid communication network is calculated. i =1-P i ; Calculate the comprehensive score of each other link node in the power grid communication network Among them, L min is the minimum delay among other link nodes in the power grid communication network, is the maximum remaining bandwidth in other link nodes of the power grid communication network, F max is the maximum reliability factor among other link nodes in the power grid communication network; The comprehensive scores of other link nodes in the power grid communication network are arranged in descending order, and the other link nodes ranked first in the comprehensive score are selected as the best migration target link nodes corresponding to the faulty link nodes in the power grid communication network.
9. The intelligent communication migration management system based on edge computing according to claim 8, characterized in that: The target migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network is obtained. The specific acquisition logic includes the following steps: Using computing software to obtain each migration path of the best migration target link node corresponding to the fault link node in the power grid communication network; The migration paths of the best migration target link node corresponding to the faulty link node in the power grid communication network are divided, thereby obtaining the cost of each link node in each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and adding them together to obtain the cost of each migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network, and arranging them in ascending order, and selecting the migration path ranked first as the target migration path of the best migration target link node corresponding to the faulty link node in the power grid communication network.
Citation Information
Cited By
Edge computing-based dynamic optimization method for data storage path
WO2026213934A1
