Building construction investigation sampling device
By designing a combination device of auger drill rod, mud and water output pipe and sludge storage cylinder, the problems of inaccurate soil backfill and environmental pollution during construction surveys are solved, efficient backfill of soil and water resource recycling are achieved, and construction safety and environment are ensured. Protect.
Patent Information
- Application Number
- CN202411189128.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing construction survey and drilling operations, the soil is inaccurate and prone to clogging, resulting in reblocking of the drill holes and secondary settlement, posing safety hazards, and the backfilling process is highly polluted to the environment.
A construction survey and sampling device was designed, including auger drill rod, mud water output pipe, sewage extrusion pipe and sludge storage cylinder. The effective backfill and storage of soil is achieved through spiral conveying fan blades and electromagnetic suction cups, and the soil moisture content is reduced. And circulate mud and water through a water pump.
It realizes efficient backfilling of soil, avoids drilling blockage and secondary settlement, ensures construction safety, reduces environmental pollution, and improves water resource utilization efficiency.
Smart Images

Figure CN119102211A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological drilling, and more specifically, to a construction survey and sampling device. Background Art
[0002] Sampling for construction survey is an important part of the construction process, which involves sampling and testing of construction materials, geological conditions, etc. Through sampling, possible problems and hidden dangers in construction materials or geological conditions can be discovered, and timely measures can be taken to deal with them to ensure construction safety and project quality.
[0003] When investigating the geological conditions of the construction site, in order to find out the actual distribution of the underground soil layers at the construction site, it is necessary to drill and sample the geological soil layers. The usual practice is to use a drill rod to drill directly into the predetermined depth in the stratum, and output the soil samples of the corresponding soil layers while drilling the borehole. The drilled soil samples are then imported into different sample storage tubes for storage, and the marking information is done (in order to distinguish soil layers of different depths and different batches) to facilitate sampling, observation, analysis and transfer.
[0004] After the existing construction survey and drilling operations, the backfilling of soil relies on manual use of tools to push the soil into the hole. The backfilled soil does not correspond to the drilled soil, which is not only time-consuming and labor-intensive, but also increases the amount of manual labor. In addition, due to the mismatch between the backfilled soil and the soil at the drilling location, the different soil qualities of soil at different depths (the deep soil becomes loose when it is drilled out), and the influence of the diameter of the drilling hole (in order to reduce damage to the environment, the drilling hole is generally not very large), it is easy to form a blockage in the middle of the borehole, and the drilled soil cannot be completely backfilled (the remaining soil is discarded or accumulated in the surrounding environment of the borehole, affecting the surrounding environment); and as time goes by, the holes that are blocked during the backfilling process, the backfilled soil will gradually sink under the action of the soil's own gravity, resulting in secondary settlement, causing the landfill hole to reappear, posing a safety hazard. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention aims to provide a construction survey sampling device.
[0006] To solve the above technical problems, the present invention is achieved through the following technical solutions:
[0007] The present invention is a construction survey and sampling device, comprising a base and a frame fixed on the base, wherein a supporting bottom plate is arranged on one side of the base, a lifting frame is arranged on the frame, a drilling rig is installed on the lifting frame, a spiral drill rod is connected to the power output end of the drilling rig, a material receiving hopper is installed on the base and at a position located inside the frame, a mud and water output pipe is installed at the output end of the bottom of the material receiving hopper, and a sewage extrusion pipe is installed at the output end of the mud and water output pipe.
[0008] A load-bearing plate is rotatably connected to the support bottom plate, a discharge trough is fixed to the top of the load-bearing plate through a lifting rod, a connecting bucket is installed at one end of the discharge trough close to the base, a through hole cooperating with the sewage extrusion pipe is opened at the bottom of one side of the connecting bucket, a telescopic push rod with a telescopic end extending to the inside of the connecting bucket is penetrated at the bottom of the other side of the connecting bucket, and a plurality of sludge storage cylinders cooperating with the sewage extrusion pipe are arranged in the connecting bucket.
[0009] A lifting column is fixed on the load-bearing plate at the bottom of the other end of the discharge trough, and a first telescopic rod is fixed on the top of the lifting column. An electromagnetic suction cup that cooperates with the sludge storage cylinder is hinged at the telescopic end of the first telescopic rod facing the discharge trough, and an L-shaped connecting rod is fixed on the electromagnetic suction cup. A second telescopic rod is hinged on the first telescopic rod, and one end of the second telescopic rod away from the first telescopic rod is hinged to the L-shaped connecting rod.
[0010] As a preferred technical solution of the present invention, an avoidance hole cooperating with the spiral drill rod is opened on the base, a guide tube cooperating with the spiral drill rod passes through the center of the receiving hopper, the bottom end of the guide tube extends to the top of the base, and the inner diameter of the avoidance hole is greater than or equal to the inner diameter of the guide tube.
[0011] As a preferred technical solution of the present invention, a bottom section of the mud and water output pipe connected to the sewage extrusion pipe is arranged horizontally, and a first motor is installed on the outer surface of the mud and water output pipe. The output shaft end of the first motor passes through the mud and water output pipe and extends to the inside of the mud and water output pipe, and a spiral conveying fan blade is installed at one end of the first motor output shaft located inside the mud and water output pipe.
[0012] As a preferred technical solution of the present invention, the sewage extrusion pipe includes an inner frame tube connected to a mud and water output pipe by bolts, a plurality of filter press plates are installed on the inner frame tube, a plurality of mounting grooves matching the filter press plates are opened on the inner frame tube, an upper guide cover and a lower guide cover are sleeved on the outside of the inner frame tube and fixedly connected by bolts, a drainage groove connected to the inner cavity of the lower guide cover is installed on the outer circular surface of the lower guide cover, the output end of the drainage groove is connected to a water receiving box through a guide pipe, the water receiving box is installed on a base, a water pump is installed on the top of the water receiving box, and a water inlet end of the water pump is installed with a pumping pipe connected to the inner cavity of the water receiving box.
[0013] As a preferred technical solution of the present invention, a support ring is fixed on the top of the support base plate, a bearing is installed on the top of the support ring, and the top end is fixedly connected to the bottom of the load-bearing plate. A second motor is installed on the top of the support base plate and inside the support ring, and the output shaft end of the second motor is fixedly connected to the load-bearing plate.
[0014] As a preferred technical solution of the present invention, an arc-shaped slide rail is fixed on the top of the support base plate, an arc-shaped guide rail coaxial with the arc-shaped slide rail is installed on the side of the support base plate close to the base through bolts, and an arc-shaped slide groove cooperating with the arc-shaped slide rail and the arc-shaped guide rail is installed at the bottom of the load-bearing plate.
[0015] As a preferred technical solution of the present invention, the sludge storage cylinder includes a cylinder body that cooperates with the through hole, one end of the cylinder body is open, and the other end of the cylinder body is fixed with an annular adsorption seat that cooperates with the electromagnetic suction cup, one end of the cylinder body on which the annular adsorption seat is installed is fixed with an air pipe that runs through the cylinder body, and one end of the air pipe located inside the cylinder body is fixed with an air bag connected to the air pipe, and one end of the air bag away from the air pipe is fixed with a push plate that cooperates with the inner cavity of the cylinder, a rubber sealing ring is installed on the outer circular surface of the open end of the cylinder body, and an observation glass window is provided on the outer circular surface of the cylinder.
[0016] As a preferred technical solution of the present invention, a drive box is installed on the top of the frame, and lifting screws connected to the lifting frame transmission are vertically penetrated through the four corners of the drive box, and a driven sprocket is fixed to one end of the lifting screw located inside the drive box. A transmission shaft is installed in the drive box and between two adjacent driven sprockets, and a first sprocket and a second sprocket are sequentially installed on the transmission shaft from bottom to top.
[0017] As a preferred technical solution of the present invention, a driving motor is installed in the driving box, a driving sprocket is fixed to the output shaft end of the driving motor, the driving sprocket is connected to the first sprocket through a first transmission chain, the second sprocket is connected to the driven sprocket through a second transmission chain, and a tensioning wheel meshing with the second transmission chain is installed at the top of the driving box and between the driven sprocket and the second sprocket.
[0018] The advantages of the present invention are:
[0019] 1. The present invention inputs the drilled soil into different sludge storage cylinders and stores them in sequence according to the sampling depth, which is convenient for observing the samples taken for investigation and sampling. After the investigation and sampling and testing operations are completed, the sludge storage cylinder storing the drilled soil is hoisted and operated above the borehole, and the soil is backfilled into the borehole in the form of a compressed mud column, so as to restore the soil at the drilling position to the maximum extent, effectively avoid the problem of borehole blockage caused by backfilling of loose soil, and ensure the structural strength of the backfilled soil to avoid secondary settlement after backfilling.
[0020] 2. The present invention pours mud-water mixture into the sewage extrusion pipe through the mud-water output pipe, filters the mud and mud-water in the sewage extrusion pipe, reduces the water content of the mud to reduce the impact on the mud, facilitates the storage of mud of different depths in the sludge storage cylinder, and avoids the pollution of the environment caused by the diffusion of mud and water with the output of the mud. At the same time, the filtered mud and water are input into the water receiving box, and the mud and water are pumped out again under the action of the water pump for lubrication and cooling of the drill bit drilling, so that the mud and water can be recycled and the consumption of water resources during drilling is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The present invention is a schematic structural diagram of a construction survey and sampling device.
[0022] Figure 2 It is a structural schematic diagram of another viewing angle of the present invention.
[0023] Figure 3 It is a left view of the present invention.
[0024] Figure 4 For the present invention Figure 3 Schematic diagram of the cross-sectional structure at AA in the middle.
[0025] Figure 5 It is a schematic diagram of the structure of the supporting bottom plate, discharge chute, connecting bucket and sludge storage cylinder.
[0026] Figure 6 for Figure 5 Schematic diagram of the cross-sectional structure.
[0027] Figure 7 Schematic diagram of the structure of the sewage extrusion pipe.
[0028] Figure 8 It is a structural schematic diagram of part of the sewage extrusion pipe structure.
[0029] Fig. 9 for Figure 8 Schematic diagram of the cross-section structure.
[0030] Fig.10 for Figure 8 Schematic diagram of the structure in vertical section.
[0031] Fig.11 It is a structural diagram of the inner frame tube and the installation groove.
[0032] Fig.12 It is a structural diagram of the base, frame and internal structure of the drive box.
[0033] Fig.13 for Fig.12 main view.
[0034] Fig.14 for Fig.13 Schematic diagram of the cross-sectional structure at BB in the middle.
[0035] Fig.15 for Fig.13 Schematic diagram of the cross-sectional structure at CC in the middle.
[0036] Fig.16 This is a schematic diagram of the structure of the sludge storage cylinder.
[0037] Fig.17 This is a schematic diagram of the structure of the sludge storage cylinder from another perspective.
[0038] Fig.18 This is a schematic diagram of the cross-sectional structure of the sludge storage cylinder.
[0039] In the attached figure: 1, base; 2, frame; 3, support bottom plate; 4, lifting frame; 5, drilling rig; 6, auger rod; 7, receiving hopper; 8, mud and water output pipe;
[0040] 9. Sewage extrusion pipe; 901. Inner frame pipe; 902. Filter press plate; 903. Mounting groove; 904. Upper guide cover; 905. Lower guide cover; 906. Drainage groove; 907. Diversion pipe; 908. Water receiving box; 909. Water pump; 910. Pumping pipe;
[0041] 10. Load-bearing plate; 11. Lifting rod; 12. Discharge chute; 13. Connecting bucket; 14. Through hole;
[0042] 15. Sludge storage cylinder; 1501. Cylinder body; 1502. Annular adsorption seat; 1503. Air pipe; 1504. Air bag; 1505. Push plate; 1506. Rubber sealing ring; 1507. Observation glass window;
[0043] 16. Lifting column; 17. First telescopic rod; 18. Electromagnetic suction cup; 19. L-shaped connecting rod;
[0044] 20. second telescopic rod; 21. avoidance hole; 22. guide tube; 23. first motor; 24. spiral conveying blade; 25. support ring; 26. bearing; 27. second motor; 28. arc-shaped slide rail; 29. arc-shaped guide rail;
[0045] 30. Arc slide; 31. Drive box; 32. Lifting screw; 33. Driven sprocket; 34. First sprocket; 35. Second sprocket; 36. Drive motor; 37. Active sprocket; 38. First transmission chain; 39. Second transmission chain; 40. Tensioner; 41. Telescopic push rod. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] Example 1: Please refer to Figure 1-18 Structural schematic diagram, the present invention provides the following technical solutions:
[0048] Specifically, it refers to a construction survey sampling device, including a base 1 and a frame 2 fixed on the base 1, a supporting bottom plate 3 is arranged on one side of the base 1, a lifting frame 4 is arranged on the frame 2, a drilling rig 5 is installed on the lifting frame 4, the power output end of the drilling rig 5 is connected with a spiral drill rod 6, a material receiving hopper 7 is installed on the base 1 and located inside the frame 2, a mud and water output pipe 8 is installed at the bottom output end of the material receiving hopper 7, and a sewage extrusion pipe 9 is installed at the output end of the mud and water output pipe 8; the bottom section of the mud and water output pipe 8 connected to the sewage extrusion pipe 9 is arranged horizontally, a first motor 23 is installed on the outer surface of the mud and water output pipe 8, the output shaft end of the first motor 23 passes through the mud and water output pipe 8 and extends to the inside of the mud and water output pipe 8, and a spiral conveying fan blade 24 is installed at one end of the output shaft of the first motor 23 located inside the mud and water output pipe 8. The spiral conveying blades 24 driven by the first motor 23 transport the mud in the mud and water output pipe 8 to the sewage extrusion pipe 9, so as to prevent the mud from accumulating and clogging the mud and water output pipe 8. At the same time, it provides extrusion force for the transportation of the mud, and provides extrusion force when the sewage extrusion pipe 9 extrude and filters the mud, which is beneficial to the sewage extrusion pipe 9 to discharge the mud water in the mud.
[0049] A load-bearing plate 10 is rotatably connected to the support base plate 3, and a discharge trough 12 is fixed to the top of the load-bearing plate 10 through a lifting rod 11. A connecting bucket 13 is installed at one end of the discharge trough 12 close to the base 1. A through hole 14 cooperating with the sewage extrusion pipe 9 is opened at the bottom of one side of the connecting bucket 13, and a telescopic push rod 41 with a telescopic end extending to the inside of the connecting bucket 13 is penetrated at the bottom of the other side of the connecting bucket 13. A plurality of sludge storage cylinders 15 cooperating with the sewage extrusion pipe 9 are arranged in the connecting bucket 13; in addition, an air pump is provided to provide sufficient air to the sludge storage cylinder 15. The sludge storage cylinder 15 is used to store the soil output from the borehole. The inner aperture of the sludge storage cylinder 15 is smaller than the inner aperture of the borehole, and the soil output from the edge falls back into the borehole smoothly.
[0050] A lifting column 16 is fixed on the load-bearing plate 10, and the lifting column 16 is located on the load-bearing plate 10 at the bottom of the other end of the discharge trough 12. A first telescopic rod 17 is fixed on the top of the lifting column 16. The telescopic end of the first telescopic rod 17 facing the discharge trough 12 is hinged with an electromagnetic suction cup 18 that cooperates with the sludge storage cylinder 15, and an L-shaped connecting rod 19 is fixed on the electromagnetic suction cup 18. A second telescopic rod 20 is hinged on the first telescopic rod 17, and one end of the second telescopic rod 20 away from the first telescopic rod 17 is hinged to the L-shaped connecting rod 19.
[0051] An avoidance hole 21 cooperating with the auger rod 6 is opened on the base 1, and a guide tube 22 cooperating with the auger rod 6 passes through the center of the hopper 7. The bottom end of the guide tube 22 extends to the top of the base 1, and the bottom end of the guide tube 22 is sleeved with a rubber sealing sleeve whose bottom end is tightly pressed against the base 1. The inner diameter of the avoidance hole 21 is greater than or equal to the inner diameter of the guide tube 22.
[0052] A support ring 25 is fixed on the top of the support base plate 3, a bearing 26 whose top end is fixedly connected to the bottom of the bearing plate 10 is installed on the top of the support ring 25, a second motor 27 is installed on the top of the support base plate 3 and inside the support ring 25, and the output shaft end of the second motor 27 is fixedly connected to the bearing plate 10. An arc-shaped slide rail 28 is fixed on the top of the support base plate 3, an arc-shaped guide rail 29 coaxial with the arc-shaped slide rail 28 is installed on the side of the support base plate 3 close to the base 1 through bolts, and an arc-shaped slide groove 30 cooperating with the arc-shaped slide rail 28 and the arc-shaped guide rail 29 is installed at the bottom of the bearing plate 10.
[0053] A driving box 31 is installed on the top of the frame 2. A lifting screw 32 connected to the lifting frame 4 is vertically penetrated at the four corners of the driving box 31. A driven sprocket 33 is fixed to one end of the lifting screw 32 located inside the driving box 31. A transmission shaft is installed in the driving box 31 and located between two adjacent driven sprockets 33. A first sprocket 34 and a second sprocket 35 are installed on the transmission shaft from bottom to top. A driving motor 36 is installed in the driving box 31. A driving sprocket 37 is fixed to the output shaft end of the driving motor 36. The driving sprocket 37 is connected to the first sprocket 34 through a first transmission chain 38. The second sprocket 35 is connected to the driven sprocket 33 through a second transmission chain 39. A tensioning wheel 40 meshing with the second transmission chain 39 is installed at the top of the driving box 31 and located between the driven sprocket 33 and the second sprocket 35.
[0054] The working principle of the geological and mineral exploration drilling equipment provided by the present invention is as follows:
[0055] Working principle: The driving structure in the driving box 31 drives the lifting screw 32 to rotate, so that the lifting frame 4 moves downward, so that the spiral drill rod 6 passes through the guide tube 22 and contacts the ground where the hole needs to be drilled, and then the drilling machine 5 is started to drive the spiral drill rod 6 to rotate, and the drilling operation begins (while drilling, the lifting frame 4 slowly moves downward to a certain depth to drill soil at different depths). The soil produced by the drilling is output upward along the guide tube 22 under the drive of the spiral drill rod 6 until it falls into the receiving hopper 7, and then is input into the sewage extrusion pipe 9 through the mud and water output pipe 8. After the sewage extrusion pipe 9 discharges part of the mud and water (discharge), the mud and water are discharged from the sewage extrusion pipe 9. The sludge storage cylinder 15 is used to remove a large amount of water mixed in the soil during drilling, which is convenient for later observation of the drilled soil) and then input into the sludge storage cylinder 15 (at this time, one end of the telescopic push rod 41 is pressed against the sludge storage cylinder 15, so that the open end of the sludge storage cylinder 15 is in contact with the open end of the sewage extrusion pipe 9). After a sufficient amount of soil is input (the telescopic push rod 41 releases the squeezing of the sludge storage cylinder 15), the sludge storage cylinder 15 filled with soil is removed, and the empty sludge storage cylinder 15 in the connecting bucket 13 automatically falls down, and then, one end of the telescopic push rod 41 is pressed against the sludge storage cylinder 15 again, and the soil is stored reciprocatingly in sequence.
[0056] The sludge storage cylinder 15 storing sample soil is stored in sequence according to the sampling depth. According to the different sampling depths, the soil in the sludge storage cylinder 15 is observed through the observation glass window 1507 opened on the outer surface of the cylinder 1501, and the corresponding soil sample is taken out through the opening at one end of the cylinder 1501 for testing.
[0057] After the drilling survey is completed, when the borehole needs to be backfilled, the second motor 27 drives the load-bearing plate 10 to rotate, so that the end of the discharge chute 12 is away from the connecting bucket 13 and close to the receiving bucket 7, and the electromagnetic suction cup 18 is controlled to absorb the sludge storage cylinder 15 filled with soil (when the electromagnetic suction cup 18 absorbs the sludge storage cylinder 15, the sludge storage cylinder 15 is connected to the external air pump), and the sludge storage cylinder 15 filled with soil is lifted by the joint action of the electromagnetic suction cup 18, the lifting column 16, and the first telescopic rod 17. The first telescopic rod 17 is extended, so that the vertically suspended sludge storage barrel 15 moves to the top of the guide pipe 22 (at this time, the lifting column 16 drives the first telescopic rod 17 to rise, and the second telescopic rod 20 drives the electromagnetic suction cup 18 to rotate around the telescopic end of the first telescopic rod 17, and the first telescopic rod 17 is extended synchronously, so that the sludge storage barrel 15 is vertically erected and kept coaxial with the guide pipe 22 as much as possible), and air is blown into the sludge storage barrel 15 through an external air pump, so that the sludge storage barrel 15 outputs the internal soil, thereby realizing the backfilling of the borehole reciprocatingly.
[0058] Embodiment 2: Based on the specific embodiment 1, the difference of this embodiment is that:
[0059] like Figure 1 , 4 As shown in 7-11, the sewage extrusion pipe 9 includes an inner frame pipe 901 connected to the mud and water output pipe 8 through bolts, and a plurality of filter press plates 902 are installed on the inner frame pipe 901. The filter press plates 902 are composed of a fixed frame with a mounting groove 903 and a filter cloth. The filter cloth is filled in the fixed frame to form a filter layer. The filter cloth is made of the same material as the plate and frame type sludge dewatering machine, which can effectively separate the mud from the mud and water. The inner frame pipe 901 is provided with a plurality of mounting grooves 903 that match the filter press plates 902. The outer sleeve of the frame pipe 901 is provided with an upper guide cover 904 and a lower guide cover 905 which are fixedly connected by bolts. A drainage groove 906 which is connected to the inner cavity of the lower guide cover 905 is installed on the outer circumferential surface of the lower guide cover 905. The output end of the drainage groove 906 is connected to a water receiving box 908 through a guide pipe 907. The water receiving box 908 is installed on the base 1. A water pump 909 is installed on the top of the water receiving box 908. A water pump 910 which is connected to the inner cavity of the water receiving box 908 is installed at the water inlet end of the water pump 909. The muddy water separated by the filter press plate 902 enters the drainage groove 906 on the lower guide cover 905, and flows into the water receiving box 908 through the guide pipe 907. The filtered muddy water entering the water receiving box 908 is then pumped out by the water pump 909 through the water pump pipe 910 for use during drilling, thereby reducing the waste of water resources and reducing the pollution to the surrounding environment of drilling.
[0060] Embodiment 3: Based on the specific embodiment 2, the difference of this embodiment is that:
[0061] like Figure 1 , 4 As shown in 16-18, the sludge storage cylinder 15 includes a cylinder 1501 that cooperates with the through hole 14, one end of the cylinder 1501 is open, and the other end of the cylinder 1501 is fixed with an annular adsorption seat 1502 that cooperates with the electromagnetic suction cup 18, and one end of the cylinder 1501 on which the annular adsorption seat 1502 is installed is fixed with an air pipe 1503 that penetrates the cylinder 1501. After the annular adsorption seat 1502 is adsorbed by the electromagnetic suction cup 18, the air pipe 1503 is connected to an external air pump, and the air pipe 1503 is connected to the external air pump. An air bag 1504 connected to the trachea 1503 is fixed at one end of the cylinder 1501, and a push plate 1505 matching the inner cavity of the cylinder 1501 is fixed at one end of the air bag 1504 away from the trachea 1503. A rubber seal ring 1506 is installed on the outer circumference of the open end of the cylinder 1501, and an observation glass window 1507 is provided on the outer circumference of the cylinder 1501. The rubber seal ring 1506 ensures the airtightness of the connection when connected with the inner frame tube 901. The state of the soil input into the cylinder 1501 is observed through the observation glass window 1507. When the cylinder 1501 is lifted and the internal soil needs to be discharged, the external air pump inputs air into the air bag 1504 through the trachea 1503, and the air bag 1504 expands and pushes the push plate 1505 to move. Under the action of the push plate 1505, the soil is pushed out of the cylinder 1501.
[0062] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. A construction survey sampling device, comprising a base (1) and a frame (2) fixed on the base (1), wherein a supporting bottom plate (3) is arranged on one side of the base (1), a lifting frame (4) is arranged on the frame (2), a drilling machine (5) is installed on the lifting frame (4), and a spiral drill rod (6) is connected to the power output end of the drilling machine (5), characterized in that: A material receiving hopper (7) is installed on the base (1) and at a position inside the frame (2); a muddy water output pipe (8) is installed at the output end of the bottom of the material receiving hopper (7); and a sewage extrusion pipe (9) is installed at the output end of the muddy water output pipe (8); A load-bearing plate (10) is rotatably connected to the support bottom plate (3), a discharge trough (12) is fixed to the top of the load-bearing plate (10) via a lifting rod (11), a connecting bucket (13) is installed at one end of the discharge trough (12) close to the base (1), a through hole (14) cooperating with the sewage extrusion pipe (9) is provided at the bottom of one side of the connecting bucket (13), a telescopic push rod (41) with a telescopic end extending to the inside of the connecting bucket (13) is penetrated at the bottom of the other side of the connecting bucket (13), and a plurality of sludge storage cylinders (15) cooperating with the sewage extrusion pipe (9) are arranged in the connecting bucket (13); A lifting column (16) is fixed on the load-bearing plate (10), a first telescopic rod (17) is fixed on the top of the lifting column (16), an electromagnetic suction cup (18) cooperating with the sludge storage cylinder (15) is hingedly connected to the telescopic end of the first telescopic rod (17) facing the discharge chute (12), an L-shaped connecting rod (19) is fixed to the electromagnetic suction cup (18), a second telescopic rod (20) is hingedly connected to the first telescopic rod (17), and one end of the second telescopic rod (20) away from the first telescopic rod (17) is hingedly connected to the L-shaped connecting rod (19).
2. A construction survey sampling device according to claim 1, characterized in that: The base (1) is provided with an avoidance hole (21) that cooperates with the auger rod (6); a guide tube (22) that cooperates with the auger rod (6) passes through the center of the receiving hopper (7); the bottom end of the guide tube (22) extends to the top of the base (1); and the inner diameter of the avoidance hole (21) is greater than or equal to the inner diameter of the guide tube (22).
3. A construction survey sampling device according to claim 1, characterized in that: A bottom section of the muddy water output pipe (8) connected to the sewage extrusion pipe (9) is arranged horizontally, and a first motor (23) is installed on the outer surface of the muddy water output pipe (8). The output shaft end of the first motor (23) passes through the muddy water output pipe (8) and extends into the muddy water output pipe (8). A spiral conveying blade (24) is installed at one end of the output shaft of the first motor (23) located inside the muddy water output pipe (8).
4. A construction survey sampling device according to claim 3, characterized in that: The sewage extrusion pipe (9) comprises an inner frame pipe (901) connected to the muddy water output pipe (8) by bolts, a plurality of filter press plates (902) are installed on the inner frame pipe (901), a plurality of mounting grooves (903) cooperating with the filter press plates (902) are provided on the inner frame pipe (901), an upper guide cover (904) and a lower guide cover (905) fixedly connected by bolts are sleeved on the outer side of the inner frame pipe (901), and the lower guide cover A drainage groove (906) is installed on the outer circumferential surface of the guide cover (905) and is connected to the inner cavity of the lower guide cover (905). The output end of the drainage groove (906) is connected to a water receiving box (908) through a guide pipe (907). The water receiving box (908) is installed on the base (1). A water pump (909) is installed on the top of the water receiving box (908). The water inlet end of the water pump (909) is installed with a water pumping pipe (910) connected to the inner cavity of the water receiving box (908).
5. A construction survey sampling device according to claim 1, characterized in that: A support ring (25) is fixed on the top of the support base plate (3); a bearing (26) is installed on the top of the support ring (25) and the top end is fixedly connected to the bottom of the load-bearing plate (10); a second motor (27) is installed on the top of the support base plate (3) and at a position inside the support ring (25); the output shaft end of the second motor (27) is fixedly connected to the load-bearing plate (10).
6. A construction survey sampling device according to claim 5, characterized in that: An arc-shaped slide rail (28) is fixed on the top of the support base plate (3); an arc-shaped guide rail (29) coaxial with the arc-shaped slide rail (28) is installed on one side of the support base plate (3) close to the base (1) through bolts; and an arc-shaped slide groove (30) cooperating with the arc-shaped slide rail (28) and the arc-shaped guide rail (29) is installed at the bottom of the load-bearing plate (10).
7. A construction survey sampling device according to claim 1, characterized in that: The sludge storage cylinder (15) comprises a cylinder (1501) matched with the through hole (14); one end of the cylinder (1501) is open; the other end of the cylinder (1501) is fixed with an annular adsorption seat (1502) matched with the electromagnetic suction cup (18); one end of the cylinder (1501) on which the annular adsorption seat (1502) is mounted is fixed with an air pipe (1503) passing through the cylinder (1501); the air pipe (1503) is located An air bag (1504) connected to the trachea (1503) is fixed at one end inside the cylinder (1501), and a push plate (1505) cooperating with the inner cavity of the cylinder (1501) is fixed at one end of the air bag (1504) away from the trachea (1503). A rubber sealing ring (1506) is installed on the outer circumferential surface of the open end of the cylinder (1501), and an observation glass window (1507) is provided on the outer circumferential surface of the cylinder (1501).
8. A construction survey sampling device according to claim 1, characterized in that: A driving box (31) is installed on the top of the frame (2); a lifting screw (32) connected to the lifting frame (4) in a transmission manner passes through the four corners of the driving box (31) in a vertical direction; a driven sprocket (33) is fixed to one end of the lifting screw (32) located inside the driving box (31); a transmission shaft is installed in the driving box (31) and located between two adjacent driven sprockets (33); and a first sprocket (34) and a second sprocket (35) are installed on the transmission shaft in sequence from bottom to top.
9. A construction survey sampling device according to claim 8, characterized in that: A driving motor (36) is installed in the driving box (31); a driving sprocket (37) is fixed to the output shaft end of the driving motor (36); the driving sprocket (37) is connected to the first sprocket (34) through a first transmission chain (38); the second sprocket (35) is connected to the driven sprocket (33) through a second transmission chain (39); and a tensioning wheel (40) meshing with the second transmission chain (39) is installed at the top of the driving box (31) and between the driven sprocket (33) and the second sprocket (35).