Petroleum drilling machine traveling block system, height detection method, storage medium and controller

Through the number of rotation rings of the drum and the visual detection device, combined with the transmission distance coefficient and compensation coefficient, the height of the oil drilling rig is accurately measured, which solves the problem of height mismatch in the existing technology, and realizes high-precision judgment and collision of the car position prevent.

CN119102590APending Publication Date: 2024-12-10HUNAN SANY PETROLEUM TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411228924.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

When the suspension weight of the existing oil drilling rig system changes, the calculated height and actual height do not match, resulting in the inability to correctly judge the position of the car, which may cause collisions.

Method used

The expansion and contraction length of the rope is determined by the number of rotation rings of the roller, the calculated height of the car is calculated based on the transmission distance coefficient, and the compensation coefficient is obtained to determine the actual height. The visual detection device is used to identify the top height of the lower coupling to accurately measure the position of the car system. .

Benefits of technology

High-precision measurement of the height of the car is realized, ensuring the correct position judgment of the car system, avoiding collisions, and the measurement method is simple and real-time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119102590A_ABST
    Figure CN119102590A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of drilling machine control, and discloses a petroleum drilling machine traveling block system, a height detection method, a storage medium and a controller. The height detection method for the traveling block of the petroleum drilling machine comprises the following steps that after the petroleum drilling machine starts to work, the telescopic length of a rope is determined according to the number of rotation turns of a roller; according to the telescopic length and the transmission distance coefficient of the rope, the calculated height of the traveling block system is obtained; acquiring a compensation coefficient of the traveling block system; and determining the actual height of the traveling block system according to the calculated height and the compensation coefficient. According to the height detection method for the traveling block system of the petroleum drilling machine, the actual height of the traveling block is determined according to the compensation coefficient, the measurement precision is high, the height can be obtained only through rotation of the roller, and the measurement mode is simple.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drilling rig control, and in particular to a traveling carriage system of an oil drilling rig, a height detection method, a storage medium and a controller. Background Art

[0002] In the oil rig system, it is necessary to prevent the traveling block from colliding with other components. Often when using a mechanical anti-collision structure, it is also necessary to determine the position of the traveling block through calculation, so as to achieve anti-collision control.

[0003] In the prior art, the change in wire rope length is calibrated by detecting the rotation of the drum, thereby creating a corresponding relationship with the change in height of the traveling block. However, in the existing height judgment, the calibration value of the previous test is often used for matching. Once the suspended weight on the traveling block changes, the calculated height and the actual height will not match, and the correct position cannot be obtained. Summary of the invention

[0004] The main purpose of the present invention is to provide a traveling carriage system for an oil drilling rig and a height detection method, a storage medium and a controller, aiming to solve the problem.

[0005] To achieve the above object, the present invention provides a method for detecting the height of a traveling carriage system of an oil drilling rig, characterized in that the traveling carriage system of the oil drilling rig comprises a drum, a rope wound around the drum, and a traveling carriage system connected to the rope, and the method for detecting the height of the traveling carriage of the oil drilling rig comprises the following steps:

[0006] After the oil drilling rig starts working, the telescopic length of the rope is determined according to the number of rotations of the drum;

[0007] According to the telescopic length and the transmission distance coefficient of the rope, the calculated height of the traveling carriage system is obtained;

[0008] Obtaining a compensation coefficient of the traveling block system;

[0009] The actual height of the traveling block is determined according to the calculated height and the compensation coefficient.

[0010] In one embodiment, determining the telescopic length of the rope according to the number of rotations of the drum includes:

[0011] obtaining the overall height of the drum and the rope, the rope diameter of the rope, and the number of stacked layers of the rope;

[0012] Obtaining the actual diameter of the drum according to the overall height, the rope diameter and the number of stacked layers;

[0013] The telescopic length of the rope is determined according to the actual diameter and the number of rotations.

[0014] In one embodiment, obtaining the compensation coefficient includes:

[0015] Obtaining the current load of the traveling carriage system and the test load during the test;

[0016] Obtaining a load factor of the rope according to the current load and the test load;

[0017] Obtaining the elastic variation coefficient of the rope;

[0018] The compensation coefficient is obtained according to the elastic variation coefficient and the load system.

[0019] In one embodiment, the elastic variation coefficient of the rope is obtained by the following steps:

[0020] After the oil rig test begins, determining the test telescopic length of the rope according to the test rotation number of the drum;

[0021] According to the test telescopic length and the transmission distance coefficient of the rope, the test calculated height of the traveling carriage system is obtained;

[0022] Obtaining the actual test height of the traveling carriage system;

[0023] The elastic variation coefficient of the rope is determined according to the test calculated height and the test actual height.

[0024] In one embodiment, the traveling block system includes a traveling block, a lower coupling and an elevator arranged in sequence from top to bottom;

[0025] The step of obtaining the actual test height of the traveling carriage system comprises:

[0026] Obtaining the coupling length and the elevator length of the lower coupling and the elevator respectively;

[0027] identifying the top height of the lower coupling;

[0028] The bottom end height of the traveling block system is determined according to the top end height, the coupling length and the elevator length, and the bottom end height is used as the actual test height.

[0029] In one embodiment, the oil rig traveling system includes a visual detection device;

[0030] The step of identifying the top height of the lower coupling comprises:

[0031] The top height of the lower coupling is obtained by the visual detection device.

[0032] The present invention also provides a storage medium, on which is stored a height detection program for an oil rig traveling system. When the height detection program for an oil rig traveling system is executed by a processor, the height detection method for an oil rig traveling system as described in any one of the above items is implemented.

[0033] The present invention also provides a controller, which includes a memory and a processor, and a height detection program for an oil rig waving system stored in the memory and run on the processor, wherein the height detection program for the oil rig waving system is configured to implement the steps of a height detection method for an oil rig waving system as described in any one of the above.

[0034] The present invention also provides a petroleum drilling rig traveling system, comprising:

[0035] roller;

[0036] a rope, one end of which is wound around the drum;

[0037] a traveling carriage system connected to the other end of the rope; and

[0038] A controller, wherein the controller is the controller according to claim 8.

[0039] In one embodiment, the traveling block system includes a traveling block, a lower coupling and an elevator arranged in sequence from top to bottom;

[0040] The oil drilling rig traveling system also includes a visual detection device for detecting the top height of the lower coupling.

[0041] The present invention provides a method for detecting the height of a traveling carriage system of an oil drilling rig. After the oil drilling rig starts working, the extended or retracted length of the rope is calculated according to the number of rotations of the drum. Due to the winding method between the rope and the traveling carriage system, a conversion amount will be generated when the extension length of the rope drives the traveling carriage system to move. Therefore, according to the transmission distance coefficient of the rope, the calculated height of the traveling carriage system after following the activity can be converted. At this time, the calculated height is only an ideal situation in which the rope is not deformed. Therefore, it is also necessary to obtain the compensation coefficient of the traveling carriage system. According to the compensation coefficient, the actual height of the traveling carriage is determined. The measurement accuracy is high, the height can be obtained only by rotating the drum, and the measurement method is simple. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a flowchart of a method for detecting the height of a traveling carriage system of an oil drilling rig provided by an embodiment of the present invention.

[0043] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0046] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0047] In the oil rig system, it is necessary to prevent the traveling block from colliding with other components. Often when using a mechanical anti-collision structure, it is also necessary to determine the position of the traveling block through calculation, so as to achieve anti-collision control.

[0048] In the prior art, the change in wire rope length is calibrated by detecting the rotation of the drum, thereby creating a corresponding relationship with the change in height of the traveling block. However, in the existing height judgment, the calibration value of the previous test is often used for matching. Once the suspended weight on the traveling block changes, the calculated height and the actual height will not match, and the correct position cannot be obtained.

[0049] The invention provides a traveling carriage system of an oil drilling rig, comprising a drum, a rope, a traveling carriage system and a controller; one end of the rope is wound around the drum; and the traveling carriage system is connected to the other end of the rope.

[0050] In the height detection method of the traveling carriage system of the oil drilling rig provided by the present invention, the extended or retracted length of the rope is calculated according to the number of rotations of the drum, and the calculated height of the traveling carriage system after following the activity is calculated. At this time, the calculated height is only an ideal situation in which the rope is not deformed. Therefore, it is also necessary to obtain the compensation coefficient of the traveling carriage system and determine the actual height of the traveling carriage based on the compensation coefficient.

[0051] It should be noted that, in this embodiment, the number of rotations of the drum is determined by an encoder.

[0052] Furthermore, the traveling block system includes a traveling block, a lower coupling and an elevator which are arranged in sequence from top to bottom; the oil drilling rig traveling block system also includes a visual detection device for detecting the top height of the lower coupling. In this embodiment, the visual detection device detects the position of the lower coupling, and then the position of the lowest point of the traveling block system can be obtained by subtracting the height of the lower coupling and the height of the elevator, so as to judge whether the traveling block system will cause a collision.

[0053] In this embodiment, the visual detection device is a camera.

[0054] The controller includes a memory, a processor, and a height detection program of the oil rig traveling system stored in the memory. The processor executes the height detection program of the oil rig traveling system to implement the following method for detecting the height of the oil rig traveling system:

[0055] After the oil drilling rig starts working, the telescopic length of the rope is determined according to the number of rotations of the drum;

[0056] According to the telescopic length and the transmission distance coefficient of the rope, the calculated height of the traveling carriage system is obtained;

[0057] Obtaining a compensation coefficient of the traveling block system;

[0058] The actual height of the traveling block is determined according to the calculated height and the compensation coefficient.

[0059] Optionally, determining the telescopic length of the rope according to the number of rotations of the drum includes:

[0060] obtaining the overall height of the drum and the rope, the rope diameter of the rope, and the number of stacked layers of the rope;

[0061] Obtaining the actual diameter of the drum according to the overall height, the rope diameter and the number of stacked layers;

[0062] The telescopic length of the rope is determined according to the actual diameter and the number of rotations.

[0063] Optionally, the obtaining the compensation coefficient includes:

[0064] Obtaining the current load of the traveling carriage system and the test load during the test;

[0065] Obtaining a load factor of the rope according to the current load and the test load;

[0066] Obtaining the elastic variation coefficient of the rope;

[0067] The compensation coefficient is obtained according to the elastic variation coefficient and the load system.

[0068] Optionally, the elastic variation coefficient of the rope is obtained by the following steps:

[0069] After the oil rig test begins, determining the test telescopic length of the rope according to the test rotation number of the drum;

[0070] According to the test telescopic length and the transmission distance coefficient of the rope, the test calculated height of the traveling carriage system is obtained;

[0071] Obtaining the actual test height of the traveling carriage system;

[0072] The elastic variation coefficient of the rope is determined according to the test calculated height and the test actual height.

[0073] Optionally, the traveling block system includes a traveling block, a lower coupling and an elevator arranged in sequence from top to bottom;

[0074] The step of obtaining the actual test height of the traveling carriage system comprises:

[0075] Obtaining the coupling length and the elevator length of the lower coupling and the elevator respectively;

[0076] identifying the top height of the lower coupling;

[0077] The bottom end height of the traveling block system is determined according to the top end height, the coupling length and the elevator length, and the bottom end height is used as the actual height.

[0078] Optionally, the oil rig traveling system includes a visual detection device;

[0079] The step of identifying the top height of the lower coupling comprises:

[0080] The top height of the lower coupling is obtained by the visual detection device.

[0081] According to the above oil rig traveling block system, please refer to Figure 1 The present invention also provides a method for detecting the height of a traveling carriage system of an oil drilling rig, the method comprising the following steps:

[0082] S10, after the oil drilling rig starts working, determining the telescopic length of the rope according to the number of rotations of the drum;

[0083] The rope is wound around the drum, and the rope can be released or reeled in by rotating the drum, thereby changing the telescopic length of the rope, thereby controlling the traveling vehicle system on the rope.

[0084] S20, obtaining a calculated height of the traveling carriage system according to the telescopic length and the transmission distance coefficient of the rope;

[0085] The telescopic length of the rope and the height calibration of the traveling carriage system are calculated. The height of the traveling carriage system can be accurately calculated by only obtaining the telescopic length of the rope.

[0086] S30, obtaining a compensation coefficient of the traveling block system;

[0087] S40, determining the actual height of the traveling carriage system according to the calculated height and the compensation coefficient.

[0088] The present invention provides a method for detecting the height of a traveling carriage system of an oil drilling rig. After the oil drilling rig starts working, the extended or retracted length of the rope is calculated according to the number of rotations of the drum. Due to the winding method between the rope and the traveling carriage system, a conversion amount will be generated when the extension and contraction length of the rope drives the traveling carriage system to move. Therefore, according to the transmission distance coefficient of the rope, the calculated height of the traveling carriage system after following the activity can be calculated. At this time, the calculated height is only an ideal situation in which the rope is not deformed. Therefore, it is also necessary to obtain the compensation coefficient of the traveling carriage system and determine the actual height of the traveling carriage according to the compensation coefficient.

[0089] Furthermore, S10 includes:

[0090] S11, obtaining the overall height of the drum and the rope, the rope diameter of the rope, and the number of stacked layers of the rope;

[0091] The rope is wound around the drum, and the ropes are stacked and wound around the drum. Since the length needs to be determined based on the rotation of the drum, the diameter of the drum needs to be obtained.

[0092] S12, obtaining the actual diameter of the drum according to the overall height, the rope diameter and the number of stacked layers;

[0093] Among them, the height occupied by the telescopic device is obtained by the rope diameter and the number of stacking layers, and then the actual diameter of the drum is obtained by subtracting the occupied height from the overall height. Only the overall height needs to be measured, and the measurement method is simple.

[0094] S13. Determine the telescopic length of the rope according to the actual diameter and the number of rotations.

[0095] According to the actual diameter, the circumference of the drum can be calculated, and according to the corresponding rotation relationship, the extension and contraction length of the rope during the rotation of the drum can be calculated. The calculation method is simple, and the length of the rope can be obtained only according to the number of rotations, which is convenient for obtaining the length change of the rope in real time.

[0096] It should be noted that step S20 calculates the calculated height of the traveling carriage system according to the telescopic length, obtains the displacement distance of the traveling carriage system relative to the initial position according to the rope length of the rope, and then obtains the calculated height; wherein, the method of obtaining the calculated height through the telescopic length of the telescope already exists in the prior art and will not be repeated here.

[0097] On the other hand, step S30 includes:

[0098] S31, obtaining the current load of the traveling carriage system and the test load during the test;

[0099] Among them, since the rope will undergo elastic deformation, it is necessary to obtain the deformation under different loads according to different loads. A test is first performed, and the test load during the test is used as a basis to compare the current load with the test load, so as to determine the load factor of the rope in proportion.

[0100] S32, obtaining a load factor of the rope according to the current load and the test load;

[0101] S33, obtaining the elastic variation coefficient of the rope;

[0102] The rope itself has a certain elastic variation coefficient. When a load is pulled, elastic deformation will occur. The difference between theory and practice needs to be taken into account. Therefore, the actual elastic variation coefficient needs to be obtained.

[0103] S34. Obtain the compensation coefficient according to the elastic variation coefficient and the load system.

[0104] In this embodiment, the compensation system is comprehensively acquired based on the elastic variation coefficient and the load system, so as to compensate the calculated height according to the compensation coefficient to determine the actual height of the traveling block system.

[0105] Furthermore, the elastic variation coefficient of the rope is obtained by the following steps:

[0106] S331, after the oil rig test starts, determining the test telescopic length of the rope according to the test rotation number of the drum;

[0107] During the test, the length of the rope is also determined by the number of rotations. The expansion and contraction change of the rope can be determined by measuring the rotation of the drum, and the detection method is simple.

[0108] S332, obtaining a test calculation height of the traveling carriage system according to the test telescopic length and the transmission distance coefficient of the rope;

[0109] The telescopic length of the rope and the height calibration of the traveling carriage system are calculated. The height of the traveling carriage system can be accurately calculated by only obtaining the telescopic length of the rope.

[0110] S333, obtaining the actual test height of the traveling carriage system;

[0111] S334. Determine the elastic variation coefficient of the rope according to the test calculated height and the test actual height.

[0112] In the present application, the actual test height of the traveling car system is obtained, and the elastic variation coefficient of the rope is calculated based on the comparison between the test calculated height and the actual test height, and the law satisfied by the normal deformation of the rope under the test conditions is determined, so as to obtain the elastic variation coefficient.

[0113] In this application, step S333 includes:

[0114] S3331, respectively obtaining the coupling length and the elevator length of the lower coupling and the elevator;

[0115] Since the traveling block system includes a traveling block, a lower coupling and an elevator which are arranged in sequence from top to bottom, the elevator is actually the lowest point of the traveling block system. In order to ensure that no collision occurs at the lowest point, it is necessary to obtain the lengths of the lower coupling and the elevator so as to calculate the lowest point.

[0116] S3332, identifying the top height of the lower coupling;

[0117] Among them, what is identified is the top height of the lower coupling, that is, the lower end of the traveling block. It is easy to identify here, and there is an obvious staggered seam for identification. At the same time, it is only necessary to eliminate the influence of the lower coupling and the hanging card, and there is less error interference.

[0118] S3333. Determine the bottom end height of the traveling block system according to the top end height, the coupling length and the hanging card length, and use the bottom end height as the actual test height.

[0119] In this embodiment, the height of the lowest point of the traveling block system is obtained by subtracting the coupling length and the elevator length from the top height, and this is used as the actual height.

[0120] Specifically, in this embodiment, the identifying the top height of the lower coupling comprises:

[0121] The top height of the lower coupling is obtained by the visual detection device.

[0122] The height position is determined by visual recognition, which is simple to operate and mature in technology. It only requires image analysis and will not be elaborated here.

[0123] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for detecting the height of a traveling block system of an oil drilling rig, characterized in that: The oil drilling rig traveling carriage system comprises a drum, a rope wound around the drum, and a traveling carriage system connected to the rope. The oil drilling rig traveling carriage height detection method comprises the following steps: After the oil drilling rig starts working, the telescopic length of the rope is determined according to the number of rotations of the drum; According to the telescopic length and the transmission distance coefficient of the rope, the calculated height of the traveling carriage system is obtained; Obtaining a compensation coefficient of the traveling block system; The actual height of the traveling carriage system is determined according to the calculated height and the compensation coefficient.

2. The method for detecting the height of a traveling carriage system of an oil drilling rig according to claim 1, characterized in that: The step of determining the extension length of the rope according to the number of rotations of the drum comprises: obtaining the overall height of the drum and the rope, the rope diameter of the rope, and the number of stacked layers of the rope; Obtaining the actual diameter of the drum according to the overall height, the rope diameter and the number of stacked layers; The telescopic length of the rope is determined according to the actual diameter and the number of rotations.

3. The method for detecting the height of a traveling carriage system of an oil drilling rig according to claim 1, characterized in that: The obtaining of the compensation coefficient comprises: Obtaining the current load of the traveling carriage system and the test load during the test; Obtaining a load factor of the rope according to the current load and the test load; Obtaining the elastic variation coefficient of the rope; The compensation coefficient is obtained according to the elastic variation coefficient and the load system.

4. The method for detecting the height of a traveling carriage system of an oil drilling rig according to claim 3, characterized in that: The elastic variation coefficient of the rope is obtained by the following steps: After the oil rig test begins, determining the test telescopic length of the rope according to the test rotation number of the drum; According to the test telescopic length and the transmission distance coefficient of the rope, the test calculated height of the traveling carriage system is obtained; Obtaining the actual test height of the traveling carriage system; The elastic variation coefficient of the rope is determined according to the test calculated height and the test actual height.

5. The method for detecting the height of a traveling carriage system of an oil drilling rig according to claim 4, characterized in that: The traveling block system comprises a traveling block, a lower coupling and an elevator which are arranged in sequence from top to bottom; The step of obtaining the actual test height of the traveling carriage system comprises: Obtaining the coupling length and the elevator length of the lower coupling and the elevator respectively; identifying the top height of the lower coupling; The bottom end height of the traveling block system is determined according to the top end height, the coupling length and the elevator length, and the bottom end height is used as the actual test height.

6. The method for detecting the height of a traveling carriage system of an oil drilling rig according to claim 1, characterized in that: The oil drilling rig traveling system includes a visual detection device; The step of identifying the top height of the lower coupling comprises: The top height of the lower coupling is obtained by the visual detection device.

7. A storage medium, characterized in that: The storage medium stores a height detection program for the oil rig traveling system, and when the height detection program for the oil rig traveling system is executed by the processor, the height detection method for the oil rig traveling system as claimed in any one of claims 1 to 6 is implemented.

8. A controller, characterized in that: The controller includes a memory and a processor, and a height detection program for the oil rig waving system stored in the memory and executable on the processor, wherein the height detection program for the oil rig waving system is configured to implement the steps of the height detection method for the oil rig waving system as described in any one of claims 1 to 6.

9. A traveling block system for an oil drilling rig, characterized in that: include: roller; a rope, one end of which is wound around the drum; A traveling carriage system connected to the other end of the rope; as well as, A controller, wherein the controller is the controller according to claim 8.

10. The oil drilling rig traveling system according to claim 9, characterized in that: The traveling block system comprises a traveling block, a lower coupling and an elevator which are arranged in sequence from top to bottom; The oil drilling rig traveling system also includes a visual detection device for detecting the top height of the lower coupling.