Trial production management method and device
The unified trial production management method and device address inefficiencies by automating task allocation, budgeting, and quality planning, enhancing data traceability and sharing, thereby improving production efficiency and management.
Patent Information
- Application Number
- CN202411040227.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-10
AI Technical Summary
Traditional trial production processes face significant challenges due to large fluctuations in product quality, poor consistency, frequent modifications, inefficient manual data entry, and labor-intensive data management, leading to inefficiencies and increased risks.
A unified trial production management method and device that integrates data sharing and association confirmation, automates task allocation, budgeting, and quality planning, and provides real-time production information, using a digital system to manage the entire life cycle of trial production.
This approach reduces labor requirements, enhances data traceability and verification, improves production efficiency, and facilitates data sharing, resulting in improved management and reduced costs.
Smart Images

Figure CN119106841A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a trial production management method and device. Background Art
[0002] Compared with the industrialized mass production model, the traditional trial production business has significant differences and limitations. The trial production business has large fluctuations in product quality and poor consistency due to the limited number of samples, frequent modifications, and the need to improve the process flow. In addition, the material and product information in the trial production process relies on manual entry, which is not only inefficient, but also easily leads to a disconnect between the design and production status, increasing the risk of inconsistent data. The query of material out-of-stock information and the verification of design and production data consume a lot of manpower and material resources, which seriously affects work efficiency. Summary of the invention
[0003] The purpose of the embodiments of the present application is to provide a trial production management method and device, which can realize unified management of trial production, reduce labor requirements, and realize sharing and association confirmation of all data, thereby significantly improving the production efficiency and management level of the trial production business.
[0004] The first aspect of the present application provides a trial production management method, comprising:
[0005] Receive trial production applications;
[0006] When the trial production application passes the trial production review, task allocation is performed according to the trial production application to obtain a task allocation result;
[0007] When the task allocation result passes the reliability manufacturing review, budget establishment is performed according to the task allocation result to obtain a budget establishment result;
[0008] Determine the trial production process, trial production storage plan and quality planning based on the budget project approval results;
[0009] Carry out trial production according to the trial production process, the trial production storage plan and the quality planning to obtain trial production samples;
[0010] Performing trial production quality analysis on the trial production samples to obtain trial production quality analysis results;
[0011] A trial production quality report is generated according to the trial production quality analysis results.
[0012] In the above implementation process, this method can realize the full life cycle management of trial production, thereby reducing manual intervention and improving the overall efficiency and effectiveness of trial production; at the same time, it can also make various information and results related to trial production easier to trace, facilitate data verification and sharing, and improve the convenience of trial production query and analysis.
[0013] Further, the trial production is implemented according to the trial production process, the trial production storage plan and the quality planning to obtain the trial production sample, including:
[0014] Obtain the qualification information and trial production schedule data of the corresponding trial production personnel;
[0015] Determine the trial production plan according to the trial production plan, the trial production process, the trial production storage plan, the qualification information and the trial production scheduling data;
[0016] According to the trial production plan, trial production samples are produced to obtain trial production samples.
[0017] Furthermore, the trial sample is provided with an identification label, and the identification label includes the sample name, sample number, sample sending unit, contact person, contact number and sample status.
[0018] Furthermore, the method further comprises:
[0019] Determine material requirement information according to the trial production plan;
[0020] When trial production of samples is carried out according to the trial production plan, production information is obtained in real time; wherein the production information at least includes trial production status, personnel work status, load status, material shortage information and production status information;
[0021] The production information is output.
[0022] Furthermore, the trial production application at least includes trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type at least includes one or more of prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality inspection.
[0023] Furthermore, after allocating tasks according to the trial production application and obtaining task allocation results, the method further includes:
[0024] Conducting a reliability manufacturing review on the trial production application and obtaining a review result;
[0025] Determine whether the company has the capability to undertake trial production based on the evaluation results;
[0026] If yes, determine that the task allocation result passes the reliability manufacturing review, and execute the budget establishment according to the task allocation result to obtain the budget establishment result.
[0027] Furthermore, after generating the trial production quality report according to the trial production quality analysis result, the method further includes:
[0028] Receive a trial production query application; wherein the trial production query application includes one or more of application query, planning query, approval query, task allocation query, warehousing and logistics query, quality tracking query and trial production query;
[0029] Perform data query according to the trial production query application to obtain query results;
[0030] The query result is output.
[0031] A second aspect of the present application provides a trial production management device, the trial production management device comprising:
[0032] A first receiving unit, used for receiving a trial production application;
[0033] A task allocation unit is used to allocate tasks according to the trial production application when the trial production application passes the trial production review, and obtain a task allocation result;
[0034] A project establishment unit, used for performing budget establishment according to the task allocation result when the task allocation result passes the reliability manufacturing review, and obtaining a budget establishment result;
[0035] A determination unit, used to determine the trial production process, trial production storage plan and quality planning according to the budget project establishment result;
[0036] An implementation unit, used to implement trial production according to the trial production process, the trial production storage plan and the quality planning, and obtain trial production samples;
[0037] An analysis unit, used to perform trial production quality analysis on the trial production sample to obtain a trial production quality analysis result;
[0038] A report generating unit is used to generate a trial production quality report according to the trial production quality analysis result.
[0039] Furthermore, the implementation unit includes:
[0040] The acquisition subunit is used to obtain the qualification information and trial production schedule data of the corresponding trial production personnel;
[0041] A determination subunit, configured to determine the trial production plan according to the trial production plan, the trial production process, the trial production storage plan, the qualification information and the trial production scheduling data;
[0042] The production subunit is used to produce trial samples according to the trial production plan to obtain trial samples.
[0043] Furthermore, the trial sample is provided with an identification label, and the identification label includes the sample name, sample number, sample sending unit, contact person, contact number and sample status.
[0044] Furthermore, the trial production management device also includes:
[0045] A second determining unit, used to determine material requirement information according to the trial production plan;
[0046] An acquisition unit, used to acquire production information in real time when trial production of sample parts is carried out according to the trial production plan; wherein the production information at least includes trial production status, personnel working status, load status, material shortage information and production status information;
[0047] The first output unit is used to output the production information.
[0048] Furthermore, the trial production application at least includes trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type at least includes one or more of prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality inspection.
[0049] Furthermore, the trial production management device also includes:
[0050] A review unit, configured to perform a reliability manufacturing review on the trial-production application after the task allocation unit allocates tasks according to the trial-production application and obtains a review result;
[0051] A judging unit, used to judge whether the enterprise has the ability to undertake trial production according to the review result;
[0052] The third determination unit is used to determine whether the task allocation result has passed the reliability manufacturing review when the ability to undertake trial production is available, and to execute the budget establishment according to the task allocation result to obtain the budget establishment result.
[0053] Furthermore, the trial production management device also includes:
[0054] A second receiving unit is used to receive a trial production query application after the report generating unit generates the trial production quality report according to the trial production quality analysis result; wherein the trial production query application includes one or more of application query, planning query, approval query, task allocation query, warehousing and logistics query, quality tracking query and trial production query;
[0055] A query unit, used to perform data query according to the trial production query application and obtain query results;
[0056] The second output unit is used to output the query result.
[0057] A third aspect of the present application provides an electronic device, including a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the trial production management method described in any one of the first aspects of the present application.
[0058] A fourth aspect of the present application provides a computer-readable storage medium storing computer program instructions, wherein when the computer program instructions are read and executed by a processor, the trial production management method described in any one of the first aspect of the present application is executed.
[0059] The beneficial effects of the present application are as follows: the method and device can achieve unified management of trial production, reduce labor requirements, and realize sharing and association confirmation of all data, thereby significantly improving the production efficiency and management level of the trial production business. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0061] Figure 1 A flowchart of a trial production management method provided in an embodiment of the present application;
[0062] Figure 2 A schematic diagram of functional modules of a trial production management system using a trial production management method provided in an embodiment of the present application;
[0063] Figure 3 A flowchart of another trial production management method provided in an embodiment of the present application;
[0064] Figure 4 A schematic diagram of an example process of a trial production management method provided in an embodiment of the present application;
[0065] Figure 5 A schematic diagram of the structure of a trial production management device provided in an embodiment of the present application;
[0066] Figure 6 A schematic diagram of the structure of another trial production management device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0067] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.
[0068] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0069] Example 1
[0070] Please see Figure 1 , Figure 1 A flowchart of a trial production management method provided in this embodiment. The trial production management method includes:
[0071] S101. Receive trial production application.
[0072] In this embodiment, the trial production application includes at least the trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type includes at least one or more of the following: prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality inspection.
[0073] S102. When the trial production application passes the trial production review, task allocation is performed according to the trial production application to obtain a task allocation result.
[0074] S103. When the task allocation result passes the reliability manufacturing review, a budget project is established based on the task allocation result to obtain a budget project establishment result.
[0075] S104. Determine the trial production process, trial production storage plan and quality planning based on the budget project results.
[0076] S105. Carry out trial production according to the trial production process, trial production storage plan and quality planning to obtain trial production samples.
[0077] S106. Perform trial production quality analysis on the trial production samples to obtain trial production quality analysis results.
[0078] S107. Generate a trial production quality report based on the trial production quality analysis results.
[0079] In this embodiment, the method is applied to a large-scale automated trial production management system that can link the entire life cycle of trial production of new energy vehicle parts. Compared with the existing trial production management system, the system has more functional modules and can realize online process management.
[0080] In this embodiment, the system also supports the registration of various types of trial production application related information, including but not limited to trial production requirements, commission information, sample information, trial production project information, trial production requirements, testing requirements, etc. In this way, full data sharing and association confirmation can be achieved, truly realizing full life cycle management.
[0081] Please see Figure 2 , Figure 2 The following is a schematic diagram showing the functional modules of the trial production management system using the present method. Figure 2 It can be seen that the system is a unified digital system management platform covering various trial production types and various trial production fields. It can realize the integrated control of the trial production process, unify the data standard management system, realize structured parameter management, realize the standardization of the trial production test management process, visualize and refine the process, connect the whole process, integrate all elements, and visualize all data. It can be connected and integrated with peripheral systems, and collect data from various systems to realize intelligent judgment, decision-making, and execution of experiments, and data-driven business; thereby realizing the comprehensive digitization and intelligence of the center's trial production test field.
[0082] In addition, the system also supports the review of trial production application information to confirm whether the trial production capability is available and whether there are ready-made samples (integrated with WMS system). It can be seen that when this method is applied, the review of trial production application can be completed based on the review function of the above system, and then the trial production process can be carried out.
[0083] In this embodiment, the execution subject of the method may be a computing device such as a computer or a server, and no limitation is made in this embodiment.
[0084] In this embodiment, the execution subject of the method may also be a smart device such as a smart phone, a tablet computer, etc., which is not limited in this embodiment.
[0085] It can be seen that the implementation of the trial production management method described in this embodiment can achieve unified management of trial production, reduce labor requirements, and realize sharing and association confirmation of all data, thereby significantly improving the production efficiency and management level of the trial production business.
[0086] Example 2
[0087] Please see Figure 3 , Figure 3 A flowchart of a trial production management method provided in this embodiment. The trial production management method includes:
[0088] S201. Receive trial production application.
[0089] In this embodiment, the trial production application includes at least the trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type includes at least one or more of the following: prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality inspection.
[0090] S202. When the trial production application passes the trial production review, task allocation is performed according to the trial production application to obtain a task allocation result.
[0091] In this embodiment, the method can determine whether to delegate internal trial production based on the internal laboratory capacity, internal laboratory arrangement, etc. When it is not suitable for internal trial delegation or part of it needs to be outsourced, the corresponding task will be outsourced.
[0092] S203. Conduct a reliability manufacturing review on the trial production application and obtain the review results.
[0093] In this embodiment, the reliability manufacturing review is used to review whether the trial production can be successfully completed normally, which may include whether the capability meets the standard, whether the time permits, whether other conditions are complete, etc.
[0094] As an optional implementation method, a reliability manufacturing review is conducted on the trial production application to obtain the review results, including:
[0095] When the task assignment result is internal trial production, a reliability manufacturing review is conducted on the trial production application based on the internal laboratory capabilities to obtain the review result; or
[0096] When the task assignment result is outsourcing trial production, evaluation, selection and reliability manufacturing review are carried out based on the supplier's capabilities to obtain the review result.
[0097] In this embodiment, outsourcing trial production includes partial outsourcing trial production.
[0098] S204: Determine whether the company has the capability to undertake trial production based on the review results. If yes, execute step S205; if no, end this process.
[0099] S205. Budget establishment is performed according to the task allocation result to obtain the budget establishment result.
[0100] As an optional implementation, the method further includes:
[0101] When the task allocation result is outsourcing trial production, the associated orders of the outsourcing trial production contract are issued based on the budget project establishment result.
[0102] S206. Determine the trial production process, trial production storage plan and quality planning based on the budget project results.
[0103] S207. Obtain qualification information and trial production schedule data of corresponding trial production personnel.
[0104] S208. Determine the trial production plan based on the trial production plan, trial production process, trial production storage plan, qualification information and trial production scheduling data.
[0105] In this embodiment, the trial sample is provided with an identification label, which includes the sample name, sample number, sample delivery unit, contact person, contact number and sample status.
[0106] S209. Determine material requirement information based on the trial production plan.
[0107] S210. When trial-production samples are produced according to the trial-production plan, production information is obtained in real time.
[0108] In this embodiment, the production information at least includes trial production status, personnel work status, load status, material shortage information and production status information.
[0109] S211. Output production information.
[0110] S212. Produce trial samples according to the trial production plan to obtain trial samples.
[0111] S213. Conduct trial production quality analysis on the trial production samples to obtain trial production quality analysis results.
[0112] S214. Generate a trial production quality report based on the trial production quality analysis results.
[0113] As an optional implementation, the method further includes:
[0114] Receive trial production inquiry applications; where the trial production inquiry applications include one or more of application inquiry, planning inquiry, approval inquiry, task allocation inquiry, warehousing and logistics inquiry, quality tracking inquiry and trial production inquiry;
[0115] Conduct data query according to the trial production query application and obtain the query results;
[0116] Output the query results.
[0117] In this embodiment, the trial samples have exclusive QR code labels, and the entire trial sample management system uses QR code labels to enter information. Among them, since the QR code not only contains a lot of information, but also is easy to query and enter, the use of QR code can greatly improve the entry efficiency of the sample manager.
[0118] In this embodiment, due to the high sensitivity of the trial production data, the system needs to collect multiple key system data to ensure the security of the host, application, data, and account. Therefore, the entire test management system is set with a very high security level (all built in accordance with the second-level protection standard). At the same time, the server of the entire trial production management system has a complete backup and recovery mechanism, which can fully guarantee the security, consistency, and integrity of database data backup and recovery. It can be seen that the trial production management system has a high security and can meet the confidentiality requirements of trial production data.
[0119] Please see Figure 4 , Figure 4 The example flow diagram of a trial production management method is shown, which can realize the digital transformation of the entire process of the trial production, so as to complete the application, planning, approval, task allocation, warehousing and logistics management, quality tracking and trial production query of the test project online, making the entire process visual and traceable. At the same time, the closed-loop management of the trial production process throughout the life cycle can not only cover all trial production needs, but also realize the functions of full data sharing and automatic generation of trial production quality reports, thereby greatly improving the work efficiency of the trial production process and reducing the trial production cost.
[0120] In this embodiment, the execution subject of the method may be a computing device such as a computer or a server, and no limitation is made in this embodiment.
[0121] In this embodiment, the execution subject of the method may also be a smart device such as a smart phone, a tablet computer, etc., which is not limited in this embodiment.
[0122] It can be seen that the implementation of the trial production management method described in the present embodiment can carry out production management from many aspects, such as trial production planning, trial production preparation, trial production management, trial production sample management and trial production process tracking and registration, trial production process data and information management, trial production plan review and planning, trial production internal arrangement or partial outsourcing trial production judgment, outsourcing test supplier capability assessment and selection, outsourcing trial production contract related orders, trial production data management and upload, trial production offline inspection report automatic generation, after-sales quality issues tracking and management, etc., so that the trial production process is more convenient to trace, and its data is more convenient to verify and share, thereby greatly improving the efficiency of trial production and reducing labor costs.
[0123] On the other hand, this method can also achieve the connection between the trial production system and the financial reimbursement system, so that the data of the procurement system and the quality problem management system can be shared, thereby improving the work efficiency of the trial production process, reducing the occurrence of process errors, and saving time for verifying data.
[0124] Example 3
[0125] Please see Figure 5 , Figure 5 This is a schematic diagram of the structure of a trial production management device provided in this embodiment. Figure 5 As shown, the trial production management device includes:
[0126] The first receiving unit 310 is used to receive a trial production application;
[0127] The task allocation unit 320 is used to allocate tasks according to the trial production application when the trial production application passes the trial production review, and obtain the task allocation result;
[0128] The project establishment unit 330 is used to perform budget establishment according to the task allocation result when the task allocation result passes the reliability manufacturing review, and obtain the budget establishment result;
[0129] The determination unit 340 is used to determine the trial production process, trial production storage plan and quality planning according to the budget project establishment result;
[0130] An implementation unit 350 is used to implement trial production according to the trial production process, trial production storage plan and quality planning to obtain trial production samples;
[0131] The analysis unit 360 is used to perform trial production quality analysis on the trial production sample to obtain the trial production quality analysis result;
[0132] The report generating unit 370 is used to generate a trial production quality report according to the trial production quality analysis result.
[0133] In this embodiment, the explanation of the trial production management device can refer to the description in Example 1 or Example 2, and will not be further elaborated in this embodiment.
[0134] It can be seen that the implementation of the trial production management device described in this embodiment can achieve unified management of trial production, reduce labor requirements, and realize sharing and association confirmation of all data, thereby significantly improving the production efficiency and management level of the trial business.
[0135] Example 4
[0136] Please see Figure 6 , Figure 6 This is a schematic diagram of the structure of a trial production management device provided in this embodiment. Figure 6 As shown, the trial production management device includes:
[0137] The first receiving unit 310 is used to receive a trial production application;
[0138] The task allocation unit 320 is used to allocate tasks according to the trial production application when the trial production application passes the trial production review, and obtain the task allocation result;
[0139] The project establishment unit 330 is used to perform budget establishment according to the task allocation result when the task allocation result passes the reliability manufacturing review, and obtain the budget establishment result;
[0140] The determination unit 340 is used to determine the trial production process, trial production storage plan and quality planning according to the budget project establishment result;
[0141] An implementation unit 350 is used to implement trial production according to the trial production process, trial production storage plan and quality planning to obtain trial production samples;
[0142] The analysis unit 360 is used to perform trial production quality analysis on the trial production sample to obtain the trial production quality analysis result;
[0143] The report generating unit 370 is used to generate a trial production quality report according to the trial production quality analysis result.
[0144] As an optional implementation, the implementation unit 350 includes:
[0145] The acquisition subunit 351 is used to acquire the qualification information and trial production schedule data of the corresponding trial production personnel;
[0146] The determination subunit 352 is used to determine the trial production plan according to the trial production plan, trial production process, trial production storage plan, qualification information and trial production scheduling data;
[0147] The production subunit 353 is used to produce trial samples according to the trial production plan to obtain trial samples.
[0148] In this embodiment, the trial sample is provided with an identification label, which includes the sample name, sample number, sample delivery unit, contact person, contact number and sample status.
[0149] As an optional implementation, the trial production management device further includes:
[0150] The second determining unit 380 is used to determine the material requirement information according to the trial production plan;
[0151] The acquisition unit 390 is used to acquire production information in real time when the trial production sample is produced according to the trial production plan; wherein the production information at least includes the trial production situation, the working status of the personnel, the load situation, the material shortage information and the production status information;
[0152] The first output unit 400 is used to output production information.
[0153] In this embodiment, the trial production application includes at least the trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type includes at least one or more of the following: prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality inspection.
[0154] As an optional implementation, the trial production management device further includes:
[0155] The review unit 410 is used for performing a reliability manufacturing review on the trial production application after the task allocation unit 320 allocates tasks according to the trial production application and obtains the task allocation result;
[0156] A judging unit 420, used to judge whether the enterprise has the capability to undertake the trial production according to the review result;
[0157] The third determination unit 430 is used to determine whether the task allocation result has passed the reliability manufacturing review when the ability to undertake trial production is available, and trigger the project establishment unit 330 to execute budget establishment according to the task allocation result to obtain the budget establishment result.
[0158] As an optional implementation, the trial production management device further includes:
[0159] The second receiving unit 440 is used to receive a trial production query application after the report generating unit 370 generates a trial production quality report according to the trial production quality analysis result; wherein the trial production query application includes one or more of application query, planning query, approval query, task allocation query, warehousing and logistics query, quality tracking query and trial production query;
[0160] A query unit 450 is used to query data according to the trial production query application and obtain query results;
[0161] The second output unit 460 is used to output the query result.
[0162] In this embodiment, the explanation of the trial production management device can refer to the description in Example 1 or Example 2, and will not be further elaborated in this embodiment.
[0163] It can be seen that the implementation of the trial production management device described in this embodiment can achieve unified management of trial production, reduce labor requirements, and realize sharing and association confirmation of all data, thereby significantly improving the production efficiency and management level of the trial business.
[0164] An embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the trial production management method in Embodiment 1 or Embodiment 2 of the present application.
[0165] An embodiment of the present application provides a computer-readable storage medium storing computer program instructions. When the computer program instructions are read and executed by a processor, the trial production management method in Embodiment 1 or Embodiment 2 of the present application is executed.
[0166] In several embodiments provided in the present application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.
[0167] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
[0168] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0169] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0170] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0171] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
Claims
1. A trial production management method, characterized in that: include: Receive trial production applications; When the trial production application passes the trial production review, task allocation is performed according to the trial production application to obtain a task allocation result; When the task allocation result passes the reliability manufacturing review, budget establishment is performed according to the task allocation result to obtain a budget establishment result; Determine the trial production process, trial production storage plan and quality planning based on the budget project approval results; Carry out trial production according to the trial production process, the trial production storage plan and the quality planning to obtain trial production samples; Performing trial production quality analysis on the trial production samples to obtain trial production quality analysis results; A trial production quality report is generated according to the trial production quality analysis results.
2. The trial production management method according to claim 1, characterized in that: The trial production is implemented according to the trial production process, the trial production storage plan and the quality planning to obtain the trial production sample, including: Obtain the qualification information and trial production schedule data of the corresponding trial production personnel; Determine the trial production plan according to the trial production plan, the trial production process, the trial production storage plan, the qualification information and the trial production scheduling data; According to the trial production plan, trial production samples are produced to obtain trial production samples.
3. The trial production management method according to claim 2, characterized in that: The trial sample is provided with an identification label, which includes the sample name, sample number, sample sending unit, contact person, contact number and sample status.
4. The trial production management method according to claim 2, characterized in that: The method further comprises: Determine material requirement information according to the trial production plan; When trial production of samples is carried out according to the trial production plan, production information is obtained in real time; wherein the production information at least includes trial production status, personnel work status, load status, material shortage information and production status information; The production information is output.
5. The trial production management method according to claim 1, characterized in that: The trial production application at least includes the trial production type, trial production requirements, commissioning information, sample information, trial production project information, trial production requirements and testing requirements. The trial production type at least includes one or more of the following: prototype vehicle trial production and modification, component assembly trial production, component single unit trial production, disassembly analysis, rework, parts replacement, sample and assembly quality testing.
6. The trial production management method according to claim 1, characterized in that: After allocating tasks according to the trial production application and obtaining task allocation results, the method further includes: Conducting a reliability manufacturing review on the trial production application and obtaining a review result; Determine whether the company has the capability to undertake trial production based on the evaluation results; If yes, determine that the task allocation result passes the reliability manufacturing review, and execute the budget establishment according to the task allocation result to obtain the budget establishment result.
7. The trial production management method according to claim 1, characterized in that: After generating the trial production quality report according to the trial production quality analysis result, the method further includes: Receive a trial production query application; wherein the trial production query application includes one or more of application query, planning query, approval query, task allocation query, warehousing and logistics query, quality tracking query and trial production query; Perform data query according to the trial production query application to obtain query results; The query result is output.
8. A trial production management device, characterized in that: The trial production management device comprises: A first receiving unit, used for receiving a trial production application; A task allocation unit is used to allocate tasks according to the trial production application when the trial production application passes the trial production review, and obtain a task allocation result; A project establishment unit, used for performing budget establishment according to the task allocation result when the task allocation result passes the reliability manufacturing review, and obtaining a budget establishment result; A determination unit, used to determine the trial production process, trial production storage plan and quality planning according to the budget project establishment result; An implementation unit, used to implement trial production according to the trial production process, the trial production storage plan and the quality planning, and obtain trial production samples; An analysis unit, used to perform trial production quality analysis on the trial production sample to obtain a trial production quality analysis result; A report generating unit is used to generate a trial production quality report according to the trial production quality analysis result.
9. An electronic device, characterized in that: The electronic device includes a memory and a processor, the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the trial production management method according to any one of claims 1 to 7.
10. A readable storage medium, characterized in that: The readable storage medium stores computer program instructions, and when the computer program instructions are read and executed by a processor, the trial production management method according to any one of claims 1 to 7 is executed.
