Steel surface hot-dip galvanizing equipment for steel structure machining
By using electric lifting rods and mixing motors in hot-dip galvanizing equipment to drive the lifting and lowering movement of the pendant and chassis parts in zinc liquid, the problems of low galvanizing efficiency and blind spots of traditional equipment are solved, and more efficient zinc liquid and steel materials are achieved Contact improves galvanizing efficiency and quality.
Patent Information
- Application Number
- CN202411187473.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2044-08-28
AI Technical Summary
Traditional hot-dip galvanizing equipment has problems such as slow contact speed between zinc liquid and steel, low galvanization efficiency and low production efficiency. It is difficult to achieve comprehensive galvanization treatment on the surface of the steel, and there are blind spots in galvanizing.
A steel surface hot-dip galvanizing equipment for steel structure processing is designed, using electric lifting rods and mixing motors to drive the suspension barrel and chassis parts to lift and lower the zinc liquid, and accelerate the flow of zinc liquid through spiral inclined ports and direct perforations, increasing the The contact area and speed of zinc liquid and steel are used to eliminate contact blind spots by using stirring power to improve galvanizing efficiency.
It effectively improves the contact speed and area between zinc liquid and steel, eliminates galvanized dead corners, significantly improves the production efficiency of galvanized surface of steel, and protects the blades and chassis parts through elastic structure to prevent steel shaking and damage to the galvanized layer. Improved galvanizing quality.
Smart Images

Figure CN119121098A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel surface treatment, in particular to a steel surface hot-dip galvanizing device for steel structure processing. Background Art
[0002] Hot-dip galvanizing is a process widely used for anti-corrosion treatment of steel surfaces. It forms a dense zinc layer on the surface of the steel by immersing the cleaned steel in molten zinc liquid, thereby achieving the effect of anti-corrosion and extending the service life. Due to its strong coating adhesion and good anti-corrosion effect, this process is widely used in construction, transportation, energy and other fields; however, traditional hot-dip galvanizing equipment and processes have many problems, including: the zinc liquid and the steel are relatively static, the fluidity between the two is relatively small, and the steel is stacked in a container, which leads to a large number of obstructed areas on the surface of the steel, resulting in the steel surface cannot be fully galvanized, and there are certain galvanizing dead angles. At the same time, the contact speed between the zinc liquid and the steel surface is relatively slow, which leads to the galvanizing efficiency of the steel surface cannot be improved, thereby affecting the production efficiency of galvanizing steel. Summary of the invention
[0003] In order to solve the above technical problems, the present invention is implemented through the following technical solutions: a steel surface hot-dip galvanizing equipment for steel structure processing, comprising a box body, a hanger is fixedly installed on the inner top of the box body, an inlet and outlet pipe body is installed through the left side of the front end of the box body, and the inlet and outlet pipe body is used for the steel to enter and exit the inside of the box body, a ventilation assembly is installed on the side wall plate of the box body, and the ventilation assembly is used to ventilate the inside of the box body, a hanging barrel is installed inside the box body and below the hanger, a hot-dip galvanizing tank is installed directly below the hanging barrel, an attached bucket is installed on the outer surface of the hot-dip galvanizing tank and near the top, and the inlet and outlet pipe body passes through the box body. It is longitudinally aligned with the attached bucket body to facilitate the removal of the galvanized steel. A screw is installed on the side of the hanger away from the top plate of the box body. The right end of the screw passes through the hanger and is connected to the first servo motor. The screw is rotatably installed with the hanger through the first servo motor. An electric lifting rod 1 and an electric lifting rod 2 are installed side by side on the screw. The electric lifting rod 1 is installed in a left-right symmetrical shape relative to the electric lifting rod 2, and the number of electric lifting rods 1 is , and spline heads are installed on flanges of the electric lifting rod 1 and the electric lifting rod 2. The spline heads are threadedly installed with the screw, and a stirring motor is installed on the flange of the telescopic end of the electric lifting rod 2;
[0004] A movable door is hinged on one side of the surface of the hanging barrel, a chassis is installed at the bottom of the hanging barrel, a spiral bevel is opened on the top of the chassis in a circular array, and the spiral bevel is opened counterclockwise on the chassis, and a straight through hole is opened on the top of the chassis in a circular array. The connection design between the straight through hole and the spiral bevel not only facilitates the rapid passage of zinc liquid and speeds up the progress of zinc liquid entering the inside of the hanging barrel, but also facilitates most of the zinc liquid to be taken out of the hot-dip galvanizing tank when the hanging barrel is lifted up after the subsequent galvanizing operation. The zinc liquid is quickly leached out, reducing the residual amount of zinc liquid; the straight through hole passes through the chassis part and is opened in the middle of the spiral bevel and is connected to the spiral bevel; the top of the chassis part is fixedly installed with convex spheres in a circular array, and the convex spheres are installed around the spiral bevel; the spiral bevel and the straight through hole and the edges of the chassis part are all installed with chamfered parts. Through the setting of the chamfered parts, the sharp edges and corners of the top of the chassis part where the hole is opened can be eliminated, the hidden danger of the chassis part scratching the steel surface can be eliminated, and the hidden danger of damage to the steel before and after galvanizing can be reduced.
[0005] Preferably, the hanger is located on the first servo motor and is wrapped with a protective box on all sides, which is used to isolate and protect the first servo motor. A middle straight rail is fixedly installed in the middle of the side of the hanger facing the spline head. The straight rail runs through the middle of the top of the spline head, and the spline head is slidably installed with the hanger through the straight rail.
[0006] Preferably, a crescent-shaped filter bucket is embedded and installed on the inner side of the attached bucket body and on a side close to the hot-dip galvanizing tank, and filter holes are provided on the side of the attached bucket body close to the hot-dip galvanizing tank and on the surface of the crescent-shaped filter bucket. The filter holes are used to filter and guide the zinc liquid parts into the hot-dip galvanizing tank, the outer diameter of the hanging tube is equal to the inner radius of the hot-dip galvanizing tank, and the transverse axis length and longitudinal width of the attached bucket body are both larger than the outer diameter of the hanging tube.
[0007] Preferably, a hanging block is fixedly installed on the top of the hanging barrel in a centrally symmetrical shape, and the top of the hanging block is installed on the telescopic end flange of an electric lifting rod. The hanging barrel is lifted and installed with the hanger through the cooperation of the electric lifting rod and the hanging block. A sliding sleeve is installed on the middle part of the top of the chassis part, and a latch rod is inserted on the other side of the movable door away from the hinged side of the hanging barrel. The movable door is assembled with the hanging barrel through the latch rod.
[0008] Preferably, a card cavity is opened in a circular array at the bottom of the hanging barrel, and a tension spring is connected to the bottom of the hanging barrel in a circular array, and the tension spring and the card cavity are spaced apart at the bottom of the hanging barrel, and the card cavity opened at the bottom of the hanging barrel and the installed tension spring are wrapped with a corrugated hose.
[0009] Preferably, the top side of the chassis member is connected to a clamp rod in a circular array, and the clamp rod is telescopically installed with the hanging barrel through a clamping cavity, and the end of the tension spring away from the hanging barrel is connected to the chassis member, and the corrugated hose is respectively assembled with the clamp rod and the tension spring, and the top of the corrugated hose is connected to the hanging barrel, and the bottom of the corrugated hose is connected to the chassis member, and the chassis member is elastically installed with the hanging barrel through the tension spring and the clamp rod. The corrugated hose is used to block waste slag outside the clamp rod and the tension spring, to ensure the normal use of the clamp rod and the tension spring, and to ensure that the hanging barrel undergoes vertical elastic movement with the chassis member through the installation relationship between the above-mentioned structures.
[0010] Preferably, the bottom side of the hot-dip galvanizing tank is connected with legs in a circular array, and the legs are inserted into the bottom plate of the box body, a right-angle frame is bolted on the outer surface of the hot-dip galvanizing tank and on one side close to the attached bucket body, and the right-angle frame is installed directly below the attached bucket body through the hot-dip galvanizing tank to provide support for the bottom of the attached bucket body, a hydraulic push rod is installed in the middle of the bottom of the hot-dip galvanizing tank, a piston disc is installed in the middle of the inner side of the hot-dip galvanizing tank, the telescopic end of the hydraulic push rod passes through the hot-dip galvanizing tank and is connected to the piston disc, and the piston disc is installed by the hydraulic push rod and the hot-dip galvanizing tank for lifting.
[0011] Preferably, the bottom of the piston disc is connected to a guide plug rod in a circular array, and the guide plug rod passes through the hot-dip galvanizing tank and the support leg insertion, and the guide plug rod is used to cooperate with the hydraulic push rod to assist in guiding the smooth lifting and lowering movement of the piston disc inside the hot-dip galvanizing tank.
[0012] Preferably, a waste pipe is connected to the outer surface of the hot-dip galvanizing tank and the side away from the right-angle frame, a feed pipe is installed just above the waste pipe, and the feed pipe is fixedly connected to the hot-dip galvanizing tank, a semicircular spring piece is embedded and installed on the inner surface of the hot-dip galvanizing tank and the side close to the right-angle frame, the semicircular spring piece is made of elastic material as a whole, has deformation and rebound performance, and both ends of the semicircular spring piece away from the right-angle frame are hinged to the hot-dip galvanizing tank, the semicircular spring piece is rotatably connected to the middle of one side of the right-angle frame with a worm, and the worm penetrates the hot-dip galvanizing tank and is threadedly installed with the right-angle frame, a second servo motor is fixedly installed on the right-angle frame, and a worm gear is installed on the output end pin of the second servo motor, the worm gear is meshed with the worm, and the semicircular spring piece is scraped and installed on the top of the piston disk through the worm gear on the second servo motor and the worm on the right-angle frame.
[0013] Preferably, the output end of the stirring motor is connected to a long rod shaft through a coupling, a paddle is installed with a pin on the long rod shaft, the paddle is installed on the bottom of the chassis through the long rod shaft, and the paddle is rotatably installed with the chassis through the long rod shaft, a sliding sleeve and the stirring motor, a gasket spring is connected to the bottom of the sliding sleeve, and the gasket spring is mounted on the long rod shaft through the sliding sleeve.
[0014] The present invention provides a steel surface hot-dip galvanizing device for steel structure processing, which has the following beneficial effects:
[0015] 1. The hot-dip galvanizing equipment for steel surface processed by the steel structure, after the electric lifting rod 2 is activated to drive the paddle to return to the initial position, the electric lifting rod 1 and the electric lifting rod 2 are activated to drive the hanging barrel and the chassis to slowly descend and slowly sink into the zinc liquid. During this period, the zinc liquid will simultaneously pass through the spiral bevel and the straight through hole, as well as the annular gap between the hanging barrel and the chassis, enter the inner side of the hanging barrel and the chassis, and contact with the steel. After the zinc liquid has submerged all the steel surfaces, the stirring motor can be activated again to drive The paddles rotate counterclockwise in the zinc liquid to stir it, driving the zinc liquid to flow counterclockwise inside the hot-dip galvanizing tank. The power of the counterclockwise flow is used to push the zinc liquid that enters the inside of the suspension tube and chassis through the spiral bevel and straight through holes, thereby improving the fluidity between the zinc liquid and the steel, increasing the contact area between the zinc liquid and the steel, eliminating the contact dead angle between the zinc liquid and the steel, and accelerating the contact speed between the zinc liquid and the steel surface, thereby improving the efficiency of the equipment in galvanizing the steel surface, thereby improving the equipment's production efficiency in galvanizing steel.
[0016] 2. The hot-dip galvanizing equipment for the steel surface of the steel structure processing, by activating the electric lifting rod 2, performs periodic telescopic movement within the effective elastic range of the gasket spring, drives the blades on the long rod shaft to repeatedly squeeze the gasket spring, and uses the gasket spring to gently push the chassis part, so that periodic lifting and lowering movement occurs between the chassis part and the hanging barrel, so that the steel can move up and down in the vertical direction relative to the zinc liquid, further increasing the contact area between the steel and the zinc liquid, further expanding the fluidity between the zinc liquid and the steel, further eliminating the dead angle of steel galvanizing, and also accelerating the galvanizing process of the steel.
[0017] 3. The hot-dip galvanizing equipment for steel surface processed by the steel structure, through the blades with the help of the gasket spring, drives the chassis and the hanging barrel to move up and down in the vertical position, while using the gasket spring as an elastic buffer, avoiding the direct effect of the weight carried by the chassis on the blades, and protecting the normal use of the blades; at the same time, using the clamp rod on the chassis and the tension spring connected to the chassis, the chassis is made to perform elastic lifting and lowering movements in a small range in the vertical direction relative to the bottom of the hanging barrel, without shaking out the steel, and can guide part of the waste slag generated during the galvanizing of the steel into the hot-dip galvanizing tank through the spiral bevel, straight through hole and the annular gap between the chassis and the hanging barrel, so as to avoid the production of waste slag and affect the overall galvanizing effect of the steel, prevent the waste slag from blocking the surface of the steel over a large area, prevent the appearance of galvanized holes on the surface of the steel, and improve the galvanizing quality of the steel surface.
[0018] 4. The hot-dip galvanizing equipment for the steel surface of the steel structure processing can use the corrugated hose installed in a surrounding shape around the tension spring and the clamp rod to protect the above two structures to prevent waste slag from adhering to or clogging the tension spring and the clamp rod. It also prevents unnecessary adhesion and waste of zinc liquid on the surface of the tension spring and the clamp rod, and avoids unnecessary cost waste caused by zinc liquid entering the clamp cavity. While saving production costs, it can also ensure smooth up and down bouncing between the chassis and the suspension tube.
[0019] 5. The hot-dip galvanizing equipment for steel surface processed by the steel structure can use several convex spheres installed on the top of the chassis to place the steel on the top of the chassis, provide a horizontal support plane composed of points, lift the steel from the top of the chassis to move the height, and facilitate the contact between the zinc liquid and the bottom of the steel through the spiral bevel and the straight hole during the immersion of the steel in the zinc liquid, so as to avoid blocking the entrance of the zinc liquid from the bottom of the chassis to the top of the chassis. At the same time, it also eliminates the fitting contact phenomenon between the top of the chassis and the bottom of the steel, reduces the area of the steel surface blocked, and increases the effective area of the steel surface galvanized. At the same time, when the steel is taken out later, the frictionless characteristics of the curved surface of the convex sphere can be used to facilitate the sliding and removal of the steel on the top of the chassis. Whether it is direct grabbing or pushing the steel out from the inside of the hanging tube, it can reduce the wear risk of the chassis on the steel and avoid the risk of scratching and damaging the galvanized layer on the steel surface by the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the external structure of a steel surface hot-dip galvanizing device for steel structure processing of the present invention;
[0021] Figure 2 It is a schematic diagram of the internal structure of the box of the present invention;
[0022] Figure 3 It is a structural schematic diagram of the hanger of the present invention;
[0023] Figure 4 It is a schematic diagram of the assembly structure of the hot-dip galvanizing tank and the attached bucket body of the present invention;
[0024] Figure 5 It is a schematic diagram of the internal structure of the hot-dip galvanizing tank of the present invention;
[0025] Figure 6 It is a structural schematic diagram of the hanging tube of the present invention;
[0026] Figure 7 It is a schematic diagram of the assembly structure of the suspension tube and the chassis of the present invention;
[0027] Figure 8 It is a schematic diagram of the bottom structure of the chassis member of the present invention;
[0028] Fig. 9 It is a schematic diagram of the bottom structure when the hanging tube and the movable door of the present invention are assembled;
[0029] Fig.10 It is a schematic diagram of the assembly structure of the stirring motor and the chassis of the present invention;
[0030] Fig.11 It is a schematic diagram of the partial structure of the chassis component of the present invention;
[0031] Fig.12 It is a schematic diagram of the partial assembly structure of the blade of the present invention through the gasket spring and the chassis component.
[0032] In the figure: 1, box body; 2, hanger; 3, hanging tube; 4, hot-dip galvanizing tank; 5, bucket body; 6, electric lifting rod 1; 7, electric lifting rod 2; 8, spline head; 9, first servo motor; 10, screw rod; 11, stirring motor; 12, inlet and outlet pipe body; 13, ventilation assembly; 21, straight rail; 31, movable door; 32, chassis; 33, hanging block; 34, sliding sleeve; 35, latch rod; 301, card cavity; 302, tension spring; 303, corrugated soft Tube; 321, chuck rod; 322, spiral bevel; 323, straight through hole; 324, convex sphere; 325, rounded portion; 41, support leg; 42, right-angle frame; 43, hydraulic push rod; 44, piston plate; 45, guide plug rod; 46, waste pipe; 47, feed pipe; 48, semicircular spring; 49, worm; 410, second servo motor; 411, worm gear; 51, crescent filter bucket; 111, long rod shaft; 112, paddle; 113, gasket spring. DETAILED DESCRIPTION
[0033] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0034] The first embodiment, as Figures 1 to 12As shown, the present invention provides a technical solution: a steel surface hot-dip galvanizing equipment for steel structure processing, comprising a box body 1, a hanger 2 is fixedly installed on the inner top of the box body 1, an inlet and outlet pipe body 12 is installed through the left side of the front end of the box body 1, and the inlet and outlet pipe body 12 is used for the steel to enter and exit the inner side of the box body 1, a ventilation assembly 13 is installed on the side wall plate of the box body 1, and the ventilation assembly 13 is used to ventilate the inner side of the box body 1, a hanging tube 3 is installed on the inner side of the box body 1 and below the hanger 2, a hot-dip galvanizing tank 4 is installed directly below the hanging tube 3, an attached bucket body 5 is installed on the outer surface of the hot-dip galvanizing tank 4 and near the top, and the inlet and outlet pipe body 12 passes through the box body 1 and the attached bucket body 5 Longitudinal alignment is convenient for taking out the galvanized steel. A screw 10 is installed on the side of the hanger 2 away from the top plate of the box body 1. The right end of the screw 10 passes through the hanger 2 and is connected to the first servo motor 9. The screw 10 is rotatably installed with the hanger 2 through the first servo motor 9. An electric lifting rod 16 and an electric lifting rod 27 are installed side by side on the screw 10. The electric lifting rod 16 is installed in a left-right symmetrical shape relative to the electric lifting rod 27, and the number of the electric lifting rods 16 is , and the electric lifting rods 16 and the electric lifting rods 27 are flange-mounted with spline heads 8, and the spline heads 8 are threadedly installed with the screw 10. A stirring motor 11 is flange-mounted on the telescopic end of the electric lifting rod 27;
[0035] A movable door 31 is hinged on one side of the surface of the hanging tube 3, and a chassis part 32 is installed at the bottom of the hanging tube 3. A spiral bevel 322 is opened on the top of the chassis part 32 in a circular array, and the spiral bevel 322 is opened counterclockwise on the chassis part 32. A straight through hole 323 is opened on the top of the chassis part 32 in a circular array. The straight through hole 323 penetrates the chassis part 32 and is opened in the middle of the spiral bevel 322 and is connected with the spiral bevel 322. A convex sphere 324 is fixedly installed on the top of the chassis part 32 in a circular array, and the convex sphere 324 is installed around the spiral bevel 322. Chamfered portions 325 are installed at the edges where the spiral bevel 322, the straight through hole 323 and the chassis part 32 penetrate.
[0036] The hanger 2 is located on the first servo motor 9 and is wrapped with a protection box on all sides. The protection box is used to isolate and protect the first servo motor 9. A middle straight rail 21 is fixedly installed in the middle of the side of the hanger 2 facing the spline head 8. The straight rail 21 runs through the middle of the top of the spline head 8. The spline head 8 is slidably installed with the hanger 2 through the straight rail 21. The top of the spline head 8 is fit and limited to the bottom of the hanger 2 through the straight rail 21 to prevent the hanging tube 3 suspended under the hanger 2 by the electric lifting rod 1 6 and the electric lifting rod 2 7 from shaking left and right.
[0037] A hanging block 33 is fixedly installed on the top of the hanging cylinder 3 in a centrally symmetrical shape, and the top of the hanging block 33 is installed on the telescopic end flange of the electric lifting rod 6. The hanging cylinder 3 is lifted and installed with the hanger 2 through the cooperation of the electric lifting rod 6 and the hanging block 33. A sliding sleeve 34 is installed on the middle part of the top of the chassis part 32. A latch rod 35 is inserted on the other side of the movable door 31 away from the hinged connection with the hanging cylinder 3. The movable door 31 is assembled with the hanging cylinder 3 through the latch rod 35.
[0038] A card cavity 301 is opened in a circular array at the bottom of the hanging tube 3, and a tension spring 302 is connected to the bottom of the hanging tube 3 in a circular array. The tension spring 302 and the card cavity 301 are spaced apart at the bottom of the hanging tube 3, and the card cavity 301 opened at the bottom of the hanging tube 3 and the installed tension spring 302 are wrapped with a corrugated hose 303 all around.
[0039] The top side of the chassis part 32 is connected with a clamp rod 321 in a circular array shape. The clamp rod 321 is telescopically installed with the hanging tube 3 through the clamping cavity 301. The end of the tension spring 302 away from the hanging tube 3 is connected to the chassis part 32. The corrugated hose 303 is respectively assembled with the clamp rod 321 and the tension spring 302, and the top of the corrugated hose 303 is connected to the hanging tube 3, and the bottom of the corrugated hose 303 is connected to the chassis part 32. The chassis part 32 is elastically installed with the hanging tube 3 through the tension spring 302 and the clamp rod 321. The corrugated hose 303 is used to block waste slag outside the clamp rod 321 and the tension spring 302, to ensure the normal use of the clamp rod 321 and the tension spring 302, and to ensure that the hanging tube 3 undergoes vertical elastic movement with the chassis part 32 through the installation relationship between the above structures.
[0040] The bottom side of the hot-dip galvanizing tank 4 is connected with a support leg 41 in a circular array, and the support leg 41 is inserted into the bottom plate of the box body 1. A right-angle frame 42 is bolted on the outer surface of the hot-dip galvanizing tank 4 and on one side close to the attached bucket body 5, and the right-angle frame 42 is installed directly below the attached bucket body 5 through the hot-dip galvanizing tank 4 to provide support for the bottom of the attached bucket body 5. A hydraulic push rod 43 is installed in the middle of the bottom of the hot-dip galvanizing tank 4, and a piston disc 44 is installed in the middle of the inner side of the hot-dip galvanizing tank 4. The telescopic end of the hydraulic push rod 43 passes through the hot-dip galvanizing tank 4 and is connected to the piston disc 44. The piston disc 44 is installed by the hydraulic push rod 43 and the hot-dip galvanizing tank 4.
[0041] The bottom of the piston disc 44 is connected to a guide plug rod 45 in a circular array, and the guide plug rod 45 passes through the hot-dip galvanizing tank 4 and is inserted into the support leg 41. The guide plug rod 45 is used to cooperate with the hydraulic push rod 43 to assist in guiding the smooth lifting movement of the piston disc 44 inside the hot-dip galvanizing tank 4.
[0042] The output end of the stirring motor 11 is connected to a long rod shaft 111 through a coupling, and a paddle 112 is installed on the long rod shaft 111 with a pin. The paddle 112 is installed on the bottom of the chassis 32 through the long rod shaft 111, and the paddle 112 is rotatably installed with the chassis 32 through the long rod shaft 111, the sliding sleeve 34 and the stirring motor 11. A gasket spring 113 is connected to the bottom of the sliding sleeve 34, and the gasket spring 113 is mounted on the long rod shaft 111 through the sliding sleeve 34.
[0043] When in use, the initial position of the hanging barrel 3 is: it is hoisted in the middle part just above the attached bucket body 5; the piston disc 44 is fitted on the inner bottom plate of the hot-dip galvanizing tank 4, the semicircular spring piece 48 is embedded in the inner wall of the hot-dip galvanizing tank 4, and the waste pipe 46 is in a closed state; a proper amount of zinc liquid is transported to the inside of the hot-dip galvanizing tank 4 through the feed pipe 47; at this time, the latch rod 35 is pulled out to open the movable door 31, and the steel is neatly placed inside the hanging barrel 3 through the feed and discharge pipe body 12, and then the movable door 31 is closed, so that the movable door 31 and the hanging barrel 3 form a complete cylindrical closed structure, and then the latch rod 35 is re-inserted on the other side of the movable door 31 and the hanging barrel 3 that is not hinged, and the movable door 31 is locked on the hanging barrel 3; then the first servo motor 9 is activated to drive the screw rod 10 to rotate counterclockwise on the hanger 2, so that the spline head 8 is guided straight along the straight rail 21 by the electric The lifting rod 1 6 and the electric lifting rod 2 7 jointly drive the hanging barrel 3 to translate toward the right end close to the first servo motor 9 until the hanging barrel 3 is moved to the top of the hot-dip galvanizing tank 4, and then the electric lifting rod 1 6 and the electric lifting rod 2 7 are activated and extended at the same time to lower the hanging barrel 3 to the inside of the hot-dip galvanizing tank 4, so that the steel is completely immersed in the molten zinc liquid, and a dense zinc layer is formed on the surface of the steel. After the galvanizing of the steel is completed, the electric lifting rod 1 6 and the electric lifting rod 2 7 are activated to rise at the same time, and the same operating steps as above are used for the return operation, and the return operation of the hanging barrel 3 is adjusted to the initial position, that is, the hanging barrel 3 is hoisted by the hanger 2 just above the attached bucket 5, and the galvanized steel can be taken out at this time, so as to continue to repeat the above operation, and the next batch of steel is galvanized, and the galvanizing operation is cyclically operated to realize the galvanizing of the surface of large quantities of steel.
[0044] Among them, when the return stroke of the hanging barrel 3 is adjusted to the initial position, at this time, the electric lifting rod 27 is activated to retract, driving the long rod shaft 111 connected to the bottom of the stirring motor 11, and the paddle blade 112 on the long rod shaft 111 is vertically contracted upward to vertically squeeze the gasket spring 113 at the bottom of the sliding sleeve 34, and elastically collide with the bottom of the chassis part 32, so that the chassis part 32 and the hanging barrel 3 shake up and down in the vertical direction, and the zinc liquid remaining on the hanging barrel 3 and the chassis part 32 is quickly shaken off into the attached bucket body 5, so as to avoid the zinc liquid from being spilled outside the hot-dip galvanizing tank 4 or the attached bucket body 5 along with the removal of the steel, and to avoid the zinc liquid from contaminating the inner side of the box body 1 and causing unnecessary cleaning work.
[0045] At the same time, this shaking action can also be used to shake the remaining waste slag into the attached bucket 5, and the attached bucket 5 can be used to separately collect and store the waste slag, thereby reducing the total amount of waste slag accumulated inside the hot-dip galvanizing tank 4 and eliminating the interference of some waste slag on the steel during the galvanizing process inside the hot-dip galvanizing tank 4.
[0046] The electric lifting rod 1 6 and the electric lifting rod 2 7 are activated at the same time. Before the hanging barrel 3 is lowered into the hot-dip galvanizing tank 4 for galvanizing, the electric lifting rod 2 7 can be activated alone to drive the paddle 112 installed on the long rod shaft 111 to pre-enter the zinc liquid inside the hot-dip galvanizing tank 4, so that the paddle 112 comes to the middle of the zinc liquid, and then the stirring motor 11 is activated to drive the paddle 112 on the long rod shaft 111 to rotate clockwise in the zinc liquid to stir the zinc liquid evenly, so that all the components in the zinc liquid can be evenly distributed in the hot-dip galvanizing tank 4, and the zinc liquid for galvanizing the steel surface is pre-treated to be evenly stirred, so that the galvanizing quality of the steel surface is guaranteed.
[0047] Then, the stirring motor 11 is turned off, and the electric lifting rod 27 is activated to drive the paddle 112 back to the initial position. At the same time, the electric lifting rod 16 and the electric lifting rod 27 are activated to drive the hanging barrel 3 and the chassis 32 to slowly descend and slowly sink into the zinc liquid. During this period, the zinc liquid will simultaneously pass through the spiral bevel 322 and the straight through hole 323, as well as the annular gap between the hanging barrel 3 and the chassis 32, enter the inner side of the hanging barrel 3 and the chassis 32, and contact with the steel. After the zinc liquid has submerged all the steel surfaces, the stirring motor 11 can be activated again to drive The paddle 112 rotates counterclockwise and stirs in the zinc liquid to drive the zinc liquid to flow counterclockwise inside the hot-dip galvanizing tank 4. The power of the counterclockwise flow is used to push the zinc liquid entering the inside of the hanging tube 3 and the chassis 32 through the spiral bevel 322 and the straight through hole 323, thereby improving the fluidity between the zinc liquid and the steel, increasing the contact area between the zinc liquid and the steel, eliminating the contact dead angle between the zinc liquid and the steel, and accelerating the contact speed between the zinc liquid and the steel surface, thereby improving the efficiency of the equipment in galvanizing the steel surface, thereby improving the production efficiency of the equipment in galvanizing the steel.
[0048] During this period, the electric lifting rod 27 can be activated to perform periodic telescopic movement within the effective elastic range of the gasket spring 113, driving the paddle 112 on the long rod shaft 111 to repeatedly squeeze the gasket spring 113, and the gasket spring 113 is used to gently push the chassis part 32, so that periodic lifting and lowering movement occurs between the chassis part 32 and the hanging tube 3, so that the steel can move up and down in the vertical direction relative to the zinc liquid, further increasing the contact area between the steel and the zinc liquid, further expanding the fluidity between the zinc liquid and the steel, further eliminating the blind spots of steel galvanizing, and also accelerating the galvanizing process of the steel.
[0049] Among them, when the paddle 112 drives the chassis 32 and the hanging tube 3 to move up and down in the vertical direction with the help of the gasket spring 113, the gasket spring 113 is used as an elastic buffer to avoid the direct effect of the weight carried by the chassis 32 on the paddle 112, thereby protecting the normal use of the paddle 112; at the same time, the clamping rod 321 on the chassis 32 and the tension spring 302 connected to the chassis 32 are used to make the chassis 32 relative to the bottom of the hanging tube 3 to perform elastic lifting and lowering movements in a small range in the vertical direction, without shaking out the steel, and at the same time, part of the waste slag generated during the galvanizing of the steel can be guided into the hot-dip galvanizing tank 4 through the spiral bevel 322, the straight through hole 323 and the annular gap between the chassis 32 and the hanging tube 3, so as to avoid the production of waste slag and affect the overall galvanizing effect of the steel, prevent the waste slag from blocking the surface of the steel over a large area, prevent the appearance of galvanizing holes on the surface of the steel, and improve the galvanizing quality of the steel surface.
[0050] During this period, the corrugated hose 303 installed in a surrounding shape around the tension spring 302 and the clamp rod 321 can be used to protect the above two structures to prevent waste slag from adhering to or clogging the tension spring 302 and the clamp rod 321, and also prevent unnecessary attachment and waste of zinc liquid on the surface of the tension spring 302 and the clamp rod 321, and avoid unnecessary cost waste caused by zinc liquid entering the clamp cavity 301, saving production costs while ensuring smooth up and down bouncing movement between the chassis 32 and the suspension tube 3.
[0051] The convex spheres 324 installed on the top of the chassis 32 can be used to provide a horizontal support plane composed of points for placing the steel on the top of the chassis 32, so that the steel can be lifted from the top of the chassis 32 to move the height, so that the zinc liquid can contact the bottom of the steel through the spiral bevel 322 and the straight through hole 323 when the steel is immersed in the zinc liquid, thereby avoiding blocking the entrance of the zinc liquid from the bottom of the chassis 32 to the top of the chassis 32, and also eliminating the chassis 32 The fitting contact phenomenon between the top and the bottom of the steel reduces the area of the steel surface that is blocked and increases the effective area of the steel surface that is galvanized. At the same time, when the steel is taken out later, the frictionless characteristic of the curved surface of the convex sphere 324 can be utilized to facilitate the sliding and removal of the steel on the top of the chassis part 32. Whether directly grabbing or pushing the steel out from the inside of the hanging tube 3, the hidden danger of wear of the chassis part 32 on the steel can be reduced, and the hidden danger of scratching and damaging the galvanized layer on the surface of the steel by the equipment can be avoided.
[0052] The second embodiment is based on the first embodiment. Figure 4As shown, a crescent-shaped filter bucket 51 is embedded and installed on the inner side of the attached bucket body 5 and close to the hot-dip galvanizing tank 4. Filter holes are provided on the side of the attached bucket body 5 close to the hot-dip galvanizing tank 4 and on the surface of the crescent-shaped filter bucket 51 for filtering the zinc liquid collected on the inner side of the attached bucket body 5. The filter holes are used to filter and guide the zinc liquid into the hot-dip galvanizing tank 4. The outer diameter of the hanging barrel 3 is equal to the inner radius of the hot-dip galvanizing tank 4, which is convenient for the hanging barrel 3 to move in a small range inside the hot-dip galvanizing tank 4, providing an effective activity space for the full contact between the zinc liquid and the steel. The transverse axis length and longitudinal width of the attached bucket body 5 are both larger than the outer diameter of the hanging barrel 3, so as to avoid the zinc liquid from leaking outside the attached bucket body 5 during the process of draining.
[0053] When in use, the attached bucket body 5 can also be used as a horizontal extension and expansion of the receiving space of the hot-dip galvanizing tank 4, providing an independent static drainage area for the steel after galvanizing, and can shake off the zinc liquid remaining on the steel, the hanging tube 3 and the chassis 32, and can also shake off part of the waste slag generated during galvanizing into the attached bucket body 5 and collect it separately, and can be recycled and reused through the double filtering effect of the crescent-shaped filter bucket 51 and the contact part of the attached bucket body 5 and the hot-dip galvanizing tank 4, and directly redirect this part of the zinc liquid back into the hot-dip galvanizing tank 4 through the attached bucket body 5, avoiding unnecessary loss of zinc liquid, and at the same time, under the thrust of the zinc liquid flowing into the hot-dip galvanizing tank 4, the attached bucket body 5 is helped to collect the waste slag to the inner side of the crescent-shaped filter bucket 51, so that the waste slag can be taken out from the attached bucket body 5 in a unified manner later, which is convenient for the quick treatment of this part of the waste slag.
[0054] The third embodiment is based on the first and second embodiments. Figure 5 As shown, a waste pipe 46 is connected to the outer surface of the hot-dip galvanizing tank 4 and the side away from the right angle frame 42, a feed pipe 47 is installed just above the waste pipe 46, and the feed pipe 47 is fixedly connected to the hot-dip galvanizing tank 4, and a semicircular spring piece 48 is embedded and installed on the inner surface of the hot-dip galvanizing tank 4 and the side close to the right angle frame 42. The semicircular spring piece 48 is made of elastic material as a whole and has deformation and rebound performance, and both ends of the semicircular spring piece 48 away from the right angle frame 42 are hinged to the hot-dip galvanizing tank 4, and the semicircular spring piece 48 is fixedly connected to the hot-dip galvanizing tank 4. The sheet 48 is connected to a worm 49 for rotation toward the middle of one side of the right-angle frame 42, and the worm 49 penetrates the hot-dip galvanizing tank 4 and is threadedly installed with the right-angle frame 42. A second servo motor 410 is fixedly installed on the right-angle frame 42, and a worm gear 411 is installed on the output end pin of the second servo motor 410. The worm gear 411 is meshed with the worm 49. The semicircular spring sheet 48 is scraped and installed on the top of the piston disc 44 through the worm gear 411 on the second servo motor 410 and the worm 49 on the right-angle frame 42.
[0055] When the equipment is shut down, the zinc liquid in the hot-dip galvanizing tank 4 can be left to stand for a period of time, the clean upper zinc liquid can be extracted, and then the hydraulic push rod 43 is activated to drive the piston plate 44 to rise, so that the top of the piston plate 44 rises to the position on the same plane as the bottom of the semicircular spring piece 48 under the vertical guidance of the guide plug rod 45, as shown in FIG. Figure 5 As shown; then the waste pipe 46 is opened to release the remaining liquid and collect it for processing, and then the second servo motor 410 is activated, and the meshing transmission of the worm wheel 411 and the worm 49 is used to drive the worm 49 to extend into the inside of the hot-dip galvanizing tank 4 under the guidance of the right-angle frame 42, and the semicircular spring piece 48 embedded in the inner wall of the hot-dip galvanizing tank 4 is pushed, and the semicircular spring piece 48 is used as a scraper to collect the waste residue remaining on the piston plate 44 to the vicinity of the waste pipe 46, so as to help the operator The staff assists in collecting and processing the waste residue inside the hot-dip galvanizing tank 4, speeds up the efficiency of cleaning the hot-dip galvanizing tank 4, and also lifts the waste residue at the bottom of the inside of the hot-dip galvanizing tank 4 to the height position in the middle of the inside of the hot-dip galvanizing tank 4, which saves half of the cleaning operation space for the operator, and lifts and collects the waste residue near the waste pipe 46 for convenient discharge, thereby realizing the functional characteristics of the equipment that can be easily cleaned, saving the cleaning and maintenance time of the equipment, and improving the practicality and self-cleaning efficiency of the equipment.
[0056] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.
Claims
1. A steel surface hot-dip galvanizing equipment for steel structure processing, comprising a box (1), a hanger (2) is fixedly installed on the inner top of the box (1), an inlet and outlet pipe (12) is installed through the left side of the front end of the box (1), and a ventilation assembly (13) is installed on the side wall plate of the box (1), characterized in that: A hanging tube (3) is installed inside the box (1) and below the hanger (2); a hot-dip galvanizing tank (4) is installed directly below the hanging tube (3); an attached bucket (5) is installed on the outer surface of the hot-dip galvanizing tank (4) near the top; an inlet and outlet pipe (12) is longitudinally aligned with the attached bucket (5) through the box (1); a screw rod (10) is installed on the side of the hanger (2) facing away from the top plate of the box (1); the right end of the screw rod (10) passes through the hanger (2) and is connected to a first servo motor (9); the screw rod (10) is driven by the first servo motor (9) to rotate. The motor (9) is rotatably mounted on the hanger (2); an electric lifting rod (6) and an electric lifting rod (7) are mounted side by side on the screw rod (10); the electric lifting rod (6) is mounted in a left-right symmetrical manner relative to the electric lifting rod (7); and the number of the electric lifting rods (6) is , and a spline head (8) is flange-mounted on both the electric lifting rod (6) and the electric lifting rod (7); the spline head (8) is threadedly mounted on the screw rod (10); and a stirring motor (11) is flange-mounted on the telescopic end of the electric lifting rod (7); A movable door (31) is hingedly connected to one side of the surface of the hanging tube (3), and a chassis (32) is installed at the bottom of the hanging tube (3). The top of the chassis (32) is provided with a spiral bevel (322) in a circular array, and the spiral bevel (322) is opened on the chassis (32) in a counterclockwise direction. The top of the chassis (32) is provided with a straight through hole (323) in a circular array, and the straight through hole (323) passes through the chassis (32) and is opened in the middle of the spiral bevel (322) and is connected to the spiral bevel (322). The top of the chassis (32) is fixedly provided with a convex sphere (324) in a circular array, and the convex sphere (324) is installed around the spiral bevel (322), and the edges where the spiral bevel (322) and the straight through hole (323) pass through the chassis (32) are all provided with a chamfered portion (325).
2. The hot-dip galvanizing equipment for steel surface of steel structure processing according to claim 1 is characterized in that: The hanger (2) is located on the first servo motor (9) and is surrounded by a protective box. A middle straight rail (21) is fixedly installed in the middle of one side of the hanger (2) facing the spline head (8). The straight rail (21) passes through the middle of the top of the spline head (8). The spline head (8) is slidably installed with the hanger (2) via the straight rail (21).
3. The hot-dip galvanizing equipment for steel surface of steel structure processing according to claim 2 is characterized in that: A crescent-shaped filter bucket (51) is embedded and installed on the inner side of the attached bucket body (5) and on a side close to the hot-dip galvanizing tank (4); filtering holes are provided on the side of the attached bucket body (5) close to the hot-dip galvanizing tank (4) and on the surface of the crescent-shaped filter bucket (51); the outer diameter of the hanging tube (3) is equal to the inner radius of the hot-dip galvanizing tank (4); and the transverse axial length and longitudinal width of the attached bucket body (5) are both greater than the outer diameter of the hanging tube (3).
4. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 3 is characterized in that: The top of the hanging tube (3) is fixedly mounted with a hanging block (33) in a centrally symmetrical shape, and the top of the hanging block (33) is mounted with a telescopic end flange of an electric lifting rod (6). The hanging tube (3) is lifted and mounted with the hanger (2) by cooperation with the electric lifting rod (6) and the hanging block (33). A sliding sleeve (34) is mounted at the middle of the top of the chassis (32). A latch rod (35) is inserted at the other side of the movable door (31) away from the hinged side of the hanging tube (3). The movable door (31) is assembled with the hanging tube (3) via the latch rod (35).
5. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 4, characterized in that: The bottom of the hanging barrel (3) is provided with a clamping cavity (301) in a circular array shape, and the bottom of the hanging barrel (3) is connected with a tension spring (302) in a circular array shape, and the tension spring (302) and the clamping cavity (301) are arranged at intervals at the bottom of the hanging barrel (3), and the clamping cavity (301) opened at the bottom of the hanging barrel (3) and the installed tension spring (302) are wrapped with a corrugated hose (303) on all sides.
6. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 5, characterized in that: The top side of the chassis component (32) is connected to a clamp rod (321) in a circular array shape. The clamp rod (321) is telescopically mounted with the hanging barrel (3) through a clamping cavity (301). The end of the tension spring (302) away from the hanging barrel (3) is connected to the chassis component (32). The corrugated hose (303) is respectively mounted with the clamp rod (321) and the tension spring (302). The top of the corrugated hose (303) is connected to the hanging barrel (3), and the bottom of the corrugated hose (303) is connected to the chassis component (32). The chassis component (32) is elastically mounted with the hanging barrel (3) through the tension spring (302) and the clamp rod (321).
7. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 6, characterized in that: The bottom side of the hot-dip galvanizing tank (4) is connected to a supporting leg (41) in a circular array shape, and the supporting leg (41) is inserted into the bottom plate of the box body (1). A right-angle frame (42) is bolted on the outer surface of the hot-dip galvanizing tank (4) and on one side close to the attached bucket body (5), and the right-angle frame (42) is installed directly below the attached bucket body (5) through the hot-dip galvanizing tank (4). A hydraulic push rod (43) is installed in the middle of the bottom of the hot-dip galvanizing tank (4).
8. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 7, characterized in that: A piston disc (44) is installed in the middle of the inner side of the hot-dip galvanizing tank (4), and the telescopic end of the hydraulic push rod (43) penetrates the hot-dip galvanizing tank (4) and is connected to the piston disc (44). The piston disc (44) is installed to be lifted and lowered with the hot-dip galvanizing tank (4) through the hydraulic push rod (43). The bottom of the piston disc (44) is connected to a guide plug rod (45) in a circular array shape, and the guide plug rod (45) penetrates the hot-dip galvanizing tank (4) and is inserted into the support leg (41).
9. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 8, characterized in that: A waste pipe (46) is connected to the outer surface of the hot-dip galvanizing tank (4) and the side away from the right angle frame (42); a feed pipe (47) is installed directly above the waste pipe (46), and the feed pipe (47) is fixedly connected to the hot-dip galvanizing tank (4); a semicircular spring piece (48) is embedded and installed on the inner surface of the hot-dip galvanizing tank (4) and the side close to the right angle frame (42); the semicircular spring piece (48) is made of elastic material as a whole, and the semicircular spring piece (48) is away from the right angle frame (4 2) are hinged to the hot-dip galvanizing tank (4), the semicircular spring piece (48) is rotatably connected to a worm (49) toward the middle of one side of the right-angle frame (42), and the worm (49) penetrates the hot-dip galvanizing tank (4) and is threadedly installed with the right-angle frame (42), a second servo motor (410) is fixedly installed on the right-angle frame (42), and a worm wheel (411) is installed on the output end pin of the second servo motor (410), and the worm wheel (411) is meshed with the worm (49).
10. The hot-dip galvanizing equipment for steel surface in steel structure processing according to claim 9, characterized in that: The output end of the stirring motor (11) is connected to a long rod shaft (111) via a coupling, a paddle (112) is installed on the long rod shaft (111) via a latch, the paddle (112) is installed on the bottom of a chassis (32) via the long rod shaft (111), and the paddle (112) is rotatably installed with the chassis (32) through the long rod shaft (111), a sliding sleeve (34) and the stirring motor (11), a gasket spring (113) is connected to the bottom of the sliding sleeve (34), and the gasket spring (113) is fitted on the long rod shaft (111) via the sliding sleeve (34).
Citation Information
Patent Citations
Hot-dip galvanizing device for electric iron accessories
CN115287568A
Electric power iron tower tower material zinc liquid purifier for hot -galvanize
CN208121177U
Control equipment for hot-dip galvanizing production line
CN219342253U
A steel hot dip galvanizing equipment
CN220999780U
A hot dip galvanizing equipment for small diameter thin wall pipes
CN220999791U
