Creeping formwork system
By adopting the design of single-climbing cone anchoring and adjustable bolts in the climbing mold system, the problem of fitting difficulties in curved tower column construction is solved, and the construction of curved tower column concrete with high safety and strong adaptability is achieved.
Patent Information
- Application Number
- CN202411375292.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2044-09-29
AI Technical Summary
When constructing curved tower columns, the existing climbing system is difficult to fit the curved surface effectively, resulting in gaps and structural risks. Especially when the curved surface changes, the fixed adjustment space of the double climbing cone is small and cannot adapt to the arc structure.
The crawler anchoring seat with a single crawler cone is combined with adjustable bolts and curved support to ensure the tight connection between the seat and the concrete surface. The crawler track is realized through the non-fixed joint seat body and support feet. Adjust the inclination to adapt to surface changes.
It improves construction safety and adaptability, avoids the emergence of voids, ensures the stable connection of curved tower columns, and enhances the stability and applicability of the mold climbing system.
Smart Images

Figure CN119121789A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tower column construction, and in particular to a climbing formwork system. Background Art
[0002] With the development of bridges, various special-shaped towers have also increased. The towers in this project are space curved special-shaped tower structures. In order to construct the towers, climbing formwork technology is required. For space curved towers, how to ensure that the climbing formwork fits the curved surface during the upward climbing process is a problem that needs to be solved. The climbing formwork anchoring device in the conventional climbing formwork system usually has double climbing cones on both sides, which can only be applied to the case where the tower shape is flat. If it is used on a curved tower, the distance between the climbing cones and the concrete on both sides is difficult to control and gaps will occur. If the curved surface is constantly changing, the different arc lengths make it impossible for the climbing cone to anchor, and the fixed adjustment space of the double climbing cones is small. For curved structures, gaps are likely to appear between the base plate and the concrete, which poses a structural risk. Summary of the invention
[0003] The purpose of the present application is to provide a climbing formwork system that can be adapted to the concrete construction of curved tower columns and has high construction safety.
[0004] In order to achieve the above objectives, this application provides the following technical solutions: A climbing formwork system comprises a climbing frame anchoring mount, a climbing formwork track and a climbing formwork frame, wherein the climbing frame anchoring mount is anchored on a concrete surface, the climbing frame anchoring mount comprises a mount body, a climbing cone and a supporting foot, the climbing cone passes through the mount body to anchor the mount body on a tower column surface, the supporting foot is arranged at the bottom of the mount body, the climbing formwork track is arranged between the climbing frame anchoring mount and the climbing formwork frame, and the climbing formwork frame climbs along the length direction of the climbing formwork track.
[0005] It is further configured that an upper reversing box, a lower reversing box and a hydraulic cylinder are provided on the climbing formwork track, and two ends of the hydraulic cylinder are respectively connected to the upper reversing box and the lower reversing box.
[0006] It is further configured that: when the climbing formwork track climbs relative to the climbing frame anchoring mount, the climbing formwork frame body is hung on the mount body of the climbing frame anchoring mount, and the climbing formwork track is connected to the climbing frame anchoring mount through an upper reversing box or a lower reversing box; When the climbing formwork frame climbs along the climbing formwork track, the climbing formwork track is fixed to the climbing frame anchor bracket, and the climbing formwork frame is connected to the upper reversing box or the lower reversing box of the climbing formwork track. It is further arranged that the upper reversing box and the lower reversing box are respectively provided with locking tongues which are connected and fixed to the climbing frame anchor bracket, the climbing formwork track and the climbing formwork frame.
[0007] Further configuration: the bracket body and the support foot are both provided with adjustable bolts that abut against the concrete surface, one adjustable bolt is provided on the top of the bracket body, and one adjustable bolt is provided at each of the lateral ends of the support foot.
[0008] It is further configured that the adjustable bolt includes an adjusting screw and an abutment joint, the adjusting screw is threadedly connected to threaded holes opened on the hanger body and the support seat, and the abutment joint is arranged at the end of the adjusting screw to abut against the concrete surface.
[0009] Further configuration: the climbing cone includes an embedded plate, a high-strength screw, a cone and a stress bolt, the embedded plate, the high-strength screw and the cone are all pre-embedded in concrete, one end of the high-strength screw is connected to the embedded plate, and the other end thereof is threadedly connected to the cone, the stress bolt passes through the through hole of the hanger body and is inserted into the other end of the cone opposite to the high-strength screw.
[0010] It is further arranged that: the embedded plate, high-strength screw and cone of the climbing cone pre-embedded in the concrete are arranged in multiple groups along the vertical direction of the concrete.
[0011] It is further configured that the mount body is non-fixedly connected to the support foot, a connection groove is provided on one side of the support foot, and a hook groove structure which can be embedded in the connection groove is formed at the bottom of the mount body.
[0012] It is further configured that: an arc surface support is provided on the hanger body, and the arc surface support includes arc-shaped support plates provided on both sides of the hanger body along the vertical direction thereof.
[0013] Compared with the prior art, the solution of this application has the following advantages: The climbing formwork system of the present application adopts a climbing frame anchor bracket anchored by a single climbing cone, reducing the gap between the bracket and the concrete surface caused by the use of multiple climbing cones for fixing, thereby being able to adapt to the curvature changes of the concrete surface of the tower column and ensuring the safety of the construction process, and the single climbing cone anchoring has a wide adjustable range and strong adaptability; in addition, the climbing frame anchor bracket is also provided with adjustable bolts to enhance the supporting stability of the climbing frame anchor bracket, the climbing formwork track and the concrete surface, and the bracket body and the supporting foot of the climbing frame anchor bracket are non-fixedly connected and separable, the bracket body and the supporting foot can be combined to form a whole, and can also be separated from each other and respectively connected to different positions of the climbing formwork track, so that the inclination of the climbing formwork track can be adjusted by adjusting the adjustable bolts on the bracket body and the supporting foot in combination with the distance between the bracket body and the supporting foot to adapt to the curved tower column structure and ensure the stability of the connection between the bracket of the present application and any curved surface.
[0014] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which: Figure 1 This is a structural schematic diagram of an embodiment of the climbing frame anchor bracket of the present application; Figure 2 This is a schematic diagram of the structure of the bracket body in the climbing frame anchor bracket of this application; Figure 3 This is a structural schematic diagram of an embodiment of the climbing formwork device of the present application.
[0016] In the figure, 1. Climbing frame anchor bracket; 11. Bracket body; 111. Through hole; 112. Hook groove structure; 113. Arc support; 12. Support foot; 121. Connecting groove; 13. Adjustable bolt; 131. Adjusting screw; 132. Abutment; 14. Climbing cone; 141. Embedded plate; 142. High-strength screw; 143. Cone; 144. Load-bearing bolt; 2. Climbing formwork track; 21. Upper reversing box; 22. Lower reversing box; 23. Hydraulic cylinder. DETAILED DESCRIPTION
[0017] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.
[0018] Those skilled in the art will appreciate that, unless specifically stated, the "said" and "the" used herein may also include plural forms. It should be further understood that the term "including" used in the specification of the present application refers to the presence of the features, parts and / or components, but does not exclude the implementation of other features, parts, components and / or their combinations supported by the technical field. The term "and / or" used herein refers to at least one of the items defined by the term, for example, "A and / or B" can be implemented as "A", or as "B", or as "A and B".
[0019] In the description of the present application, the directions or positional relationships indicated by words such as "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the exemplary directions or positional relationships shown in the accompanying drawings. They are for the convenience of describing or simplifying the description of the embodiments of the present application, and do not indicate or imply that the referred device or component must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present application.
[0020] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0021] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0022] In the description of this specification, specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. To make the purpose, technical solution and advantages of this application clearer, the implementation mode of this application will be further described in detail below in conjunction with the accompanying drawings.
[0023] Regarding the problem that the double climbing cone bracket structure currently used cannot fit the tower column surface, thus affecting the stability of the climbing formwork, please refer to Figures 1 to 3 The present application provides a climbing frame anchor bracket 1, which has high safety and strong applicability. It can not only be installed on conventional straight concrete surfaces, but also is suitable for installation on curved concrete surfaces.
[0024] The climbing frame anchor bracket 1 of the present application includes a bracket body 11, a climbing cone 14 and a supporting foot 12. The bracket body 11 is used to hang and fix the guide rails and the frame of the climbing formwork system. The climbing cone 14 passes through the bracket body 11 and is used to anchor the bracket body 11 on the concrete surface. The supporting foot 12 is arranged at the bottom of the bracket body 11. The supporting foot 12 is non-fixedly connected to the bracket body 11, and the supporting foot 12 is also connected to the guide rails in the climbing formwork system. The bracket body 11 and the supporting foot 12 are both provided with adjustable bolts 13 for resisting against the concrete surface.
[0025] Specifically, the mount body 11 and the support foot 12 are both provided with threaded holes for installing the adjustable screw, and the adjustable bolt 13 includes an adjusting screw 131 and an abutment 132. The adjusting screw 131 is threadedly connected in the threaded hole, and the abutment 132 is used to abut against the concrete surface of the tower column. The maximum outer diameter of the abutment 132 is larger than the aperture of the threaded hole to limit the adjustable bolt 13 from the end of the adjusting screw 131 where the abutment 132 is set to be separated from the threaded hole. The adjustable bolt 13 adjusts the support distance between the mount body 11 and the support foot 12 and the concrete surface by rotating its adjusting screw 131. In this embodiment, at least three adjustable bolts 13 are provided, specifically, one adjustable bolt 13 is provided at the top of the mount body 11, and one adjustable bolt 13 is provided at each of the lateral ends of the support foot 12, and the three adjustable bolts 13 are not in the same straight line, so that the three-point support of the climbing frame anchor mount 1 of the present application on the concrete surface is achieved through the three adjustable bolts 13, ensuring the stability of the mount connected to any curved surface.
[0026] In addition, the mount body 11 is provided with an arc surface support 113, which includes an arc support plate provided on both sides of the mount body 11 along its vertical direction. The arc support plate fits with the concrete surface, thereby increasing the fitting area between the mount body 11 and the concrete surface to ensure close contact between the mount and the concrete surface and improve the stability of the connection between the mount and any arc surface.
[0027] Furthermore, the arc-shaped support plate is preferably made of channel steel, and is connected to the mount body 11 via the groove edge of the channel steel, so as to improve the connection stability between the arc-shaped support plate and the mount body 11 .
[0028] The mount body 11 is provided with a through hole 111 in the middle thereof for the climbing cone 14 to pass through. The climbing cone 14 includes an embedded plate 141, a high-strength screw 142, a cone 143 and a stress bolt 144. The embedded plate 141, the high-strength screw 142 and the cone 143 are all pre-embedded in the tower column concrete. One end of the high-strength screw 142 is fixed to the embedded plate 141, and the other end thereof is threadedly connected to the cone 143. The stress bolt 144 is located outside the tower column concrete. The stress bolt 144 passes through the through hole 111 of the mount body 11 and is inserted into the other end of the cone 143 opposite to the high-strength screw 142, so as to anchor the mount body 11 to the concrete surface through the climbing cone 14.
[0029] In addition, the mounting body 11 and the support foot 12 of the present application are non-fixedly connected and can be relatively separated. The support foot 12 of the present embodiment is made of channel steel, that is, when the support foot 12 is installed, a connecting groove 121 is provided on the side of the support foot 12 close to the concrete surface. When the mounting body 11 is installed, a hook groove structure 112 that can be embedded in the connecting groove 121 is formed outward on the side of the bottom of the mounting body 11 that is away from the concrete. When the mounting body 11 and the support foot 12 are close to each other, the hook groove structure 112 at the bottom of the mounting body 11 can be embedded in the connecting groove 121 of the support foot 12, so that the two can be combined to form a whole; or, the mounting body 11 and the support foot 12 are separated from each other and respectively connected to different positions of the climbing formwork track 2, so that the inclination of the climbing formwork track 2 can be adjusted by adjusting the distance between the mounting body 11 and the support foot 12 through the adjustable bolts 13 on the mounting body 11 and the support foot 12, so as to adapt to the curved tower column structure and ensure the stability of the mounting body of the present application and any curved surface.
[0030] The climbing frame anchor bracket 1 of the present application uses only a single climbing cone 14 to anchor with the concrete structure, and cooperates with three adjustable bolts 13 to ensure the stability of the bracket and any curved surface. The single climbing cone anchoring structure used in the present application can better adapt to changes in any curved surface, avoid the problem of conventional bracket plates using multiple climbing cones, which leads to loose contact with the concrete surface, and the problem of the screw rod and the embedded parts of the climbing cone 14 not being screwed into place, which affects the stability of the climbing formwork system, ensures the safety of construction, and the single-point anchoring has a wide adjustable range and strong adaptability.
[0031] This application also relates to a climbing formwork system. Figure 3 , which includes a climbing frame anchor bracket 1, a climbing formwork track 2, a climbing formwork frame and a formwork structure, wherein the climbing formwork frame mainly provides an operating platform for construction personnel. The climbing formwork frame in this embodiment includes an upper frame and a lower frame, the upper frame is installed on the top of the lower frame, and the formwork structure is used as an outer formwork for pouring tower column concrete. It is installed on the top of the lower frame. The upper frame and the formwork structure are spaced apart. During the process of opening or closing the mold, the formwork structure moves relative to the climbing formwork frame to avoid affecting the construction of workers on the climbing formwork frame during the closing or opening of the mold, so that the workers can perform operations such as tower column steel bar binding during the closing or opening of the mold structure. The climbing frame anchor bracket is the climbing frame anchor bracket mentioned above, which includes a bracket body and a supporting foot. The bracket body and the supporting foot are provided with mounting grooves for the climbing formwork track 2 to pass through and cooperate with each other, so as to play a role in limiting and guiding the climbing of the climbing formwork track 2. The climbing formwork track 2 is provided with an upper reversing box 21 and a lower reversing box 22, and a hydraulic cylinder 23 is provided between the upper reversing box 21 and the lower reversing box 22.
[0032] Specifically, when the climbing formwork track 2 climbs relative to the climbing frame anchor bracket 1, the climbing formwork frame is hung on the bracket body 11 of the climbing frame anchor bracket 1, and the climbing formwork track 2 is connected to the bracket body 11 of the climbing frame anchor bracket 1 through its upper reversing box 21 or lower reversing box 22; and when the climbing formwork frame climbs along the climbing formwork track 2, the climbing formwork track 2 is fixed to the climbing frame anchor bracket 1, and the climbing formwork frame is connected to the upper reversing box 21 or lower reversing box 22 of the climbing formwork track 2, and the formwork structure moves with the climbing of the climbing formwork frame.
[0033] When the concrete of the tower column is poured through the formwork structure, multiple sets of embedded plates 141, high-strength screws 142 and cones 143 as climbing cone embedded parts can be pre-embedded along the vertical direction of the tower column for the climbing frame anchor bracket 1 to be anchored on the concrete surface of the tower column.
[0034] When the climbing formwork system of the present application is used for tower column concrete construction, the climbing formwork system is hung on the concrete surface of the lower tower column segment, and the upper tower column segment is cast through the formwork structure. The surface of the semi-finished upper tower column and the lower tower column are not on the same plane. First, the climbing frame anchor bracket 1 is anchored on the concrete surface of the upper tower column. The bracket body 11 of the climbing frame anchor bracket 1 is fixed to the concrete surface by a single climbing cone 14. The supporting foot 12 of the climbing frame anchor bracket 1 can be separated from its bracket body 11. According to the change of the curvature of the tower column surface, the distance of the supporting foot 12 on the climbing formwork track 2 relative to the bracket body 11 is adjusted, and the distance between the bracket and the tower column concrete surface is adjusted by the adjustable bolts 13 on the bracket body 11 and the supporting foot 12, so that the climbing frame anchor bracket can be adapted to the installation of any curved surface, ensuring that the climbing formwork track 2 can be stably supported on the non-planar tower column concrete surface.
[0035] At the same time, the climbing formwork frame is hung on the bracket body 11 anchored on the concrete surface of the tower column, and the two are non-fixedly connected. The climbing formwork track 2 passes through the climbing frame anchor bracket 1 to be installed on the concrete surface of the tower column. The climbing formwork track 2 can move relative to the bracket body 11, and the supporting foot 12 is fixed on the climbing formwork track 2. The upper reversing box 21, the lower reversing box 22 and the hydraulic cylinder 23 on the climbing formwork track 2 are located between the bracket body 11 and the supporting foot 12 of the climbing frame anchor bracket 1. The upper reversing box 21 and the lower reversing box 22 are provided with locking tongues that can be respectively connected and fixed to the climbing frame anchor bracket 1, the climbing formwork track 2 and the climbing formwork frame, so that the climbing formwork system of the present application can be realized by the reversal of the locking tongue and the telescopic operation of the hydraulic cylinder 23 to climb along the tower column.
[0036] When the climbing formwork system is climbing, the locking tongues of the upper reversing box 21 and the lower reversing box 22 are adjusted, the climbing formwork track 2 is relatively separated from the climbing formwork frame, the climbing formwork frame bears the load through the climbing frame anchoring bracket 1, and the hydraulic cylinder 23 is started to make the climbing formwork track 2 climb the wall relative to the climbing formwork frame. The supporting feet 12 on the climbing formwork track 2 approach the bracket body 11 as the climbing formwork track 2 climbs. At the same time, the top of the climbing formwork track 2 approaches the bracket body 11 installed on the concrete surface of the upper tower column. After the top of the climbing formwork track 2 is connected to the bracket body 11 located on the concrete surface of the upper tower column, the climbing of one stroke of the climbing formwork track 2 is completed.
[0037] Subsequently, the upper reversing box 21 on the climbing formwork track 2 is connected to the climbing formwork frame through its locking tongue, and the mounting seat body 11 arranged near the bottom of the climbing formwork track 2 is removed, and the hydraulic cylinder 23 is started to make the upper reversing box 21 and the lower reversing box 22 climb along the climbing formwork track 2, and at the same time drive the climbing formwork frame connected to the upper reversing box 21 to climb along the climbing formwork track 2, and wait for the upper reversing box 21 to move to abut against the mounting seat body 11 at the top of the climbing formwork track 2, and complete the lifting of the climbing formwork frame for one climbing formwork track 2 stroke.
[0038] The climbing formwork system of the present application completes the concrete construction of the tower column according to the climbing steps of the above-mentioned climbing formwork track 2 and the climbing formwork frame, wherein, since the climbing formwork track 2 is only fixed at a single point by the bracket body 11 during the climbing process, its bottom is supported on the concrete surface of the tower column by the adjustable bolts 13 of the supporting feet 12, so as to adjust the climbing formwork track 2 to adapt to the curvature changes of the concrete surface of the tower column, and can meet the climbing requirements of concrete surfaces with different curves.
[0039] In summary, the climbing formwork system of the present application adopts a single-point anchored climbing frame anchor bracket 1, which can be applied to the concrete surface of the tower column with constantly changing curvature, avoiding the problem of structural stress safety risks caused by the mismatch between the bracket and the concrete. The top of the climbing formwork track 2 is connected to the bracket body 11 anchored on the concrete surface of the tower column, and the supporting foot 12 is installed under the climbing formwork track 2 and can adapt to the arc changes of the spatial curved surface of the tower column through the adjustable bolts 13 on both sides thereof. It has a wide adjustable range, strong adaptability, and high safety. The climbing formwork system can smoothly pass the curvature change point of the tower column to complete the climbing.
[0040] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A climbing formwork system, characterized in that: It includes a climbing frame anchoring mount, a climbing formwork track and a climbing formwork frame. The climbing frame anchoring mount is anchored on the concrete surface. The climbing frame anchoring mount includes a mount body, a climbing cone and a supporting foot. The climbing cone passes through the mount body to anchor the mount body on the tower column surface. The supporting foot is arranged at the bottom of the mount body. The climbing formwork track is arranged between the climbing frame anchoring mount and the climbing formwork frame. The climbing formwork frame climbs along the length direction of the climbing formwork track.
2. The climbing formwork system according to claim 1, characterized in that: An upper reversing box, a lower reversing box and a hydraulic cylinder are arranged on the climbing formwork track, and two ends of the hydraulic cylinder are respectively connected to the upper reversing box and the lower reversing box.
3. The climbing formwork system according to claim 2, characterized in that: When the climbing formwork track climbs relative to the climbing frame anchoring mount, the climbing formwork frame body is hung on the mount body of the climbing frame anchoring mount, and the climbing formwork track is connected to the climbing frame anchoring mount through an upper reversing box or a lower reversing box; When the climbing formwork frame climbs along the climbing formwork track, the climbing formwork track is fixed to the climbing frame anchor bracket, and the climbing formwork frame is connected to the upper reversing box or the lower reversing box of the climbing formwork track.
4. The climbing formwork system according to claim 3, characterized in that: The upper reversing box and the lower reversing box are respectively provided with locking tongues which are connected and fixed to the climbing frame anchoring bracket, the climbing formwork track and the climbing formwork frame body.
5. The climbing formwork system according to claim 1, characterized in that: The hanger body and the support foot are both provided with adjustable bolts that abut against the concrete surface. One adjustable bolt is arranged on the top of the hanger body, and one adjustable bolt is arranged at each of the lateral ends of the support foot.
6. The climbing formwork system according to claim 5, characterized in that: The adjustable bolt comprises an adjusting screw and an abutment joint. The adjusting screw is threadedly connected in threaded holes provided on the hanger body and the support seat. The abutment joint is provided at the end of the adjusting screw to abut against the concrete surface.
7. The climbing formwork system according to claim 1, characterized in that: The climbing cone includes an embedded plate, a high-strength screw, a cone and a stress bolt. The embedded plate, the high-strength screw and the cone are all pre-embedded in concrete. One end of the high-strength screw is connected to the embedded plate, and the other end is threaded in the cone. The stress bolt passes through the through hole of the hanger body and is inserted into the other end of the cone that is connected to the high-strength screw.
8. The climbing formwork system according to claim 7, characterized in that: The embedded plate, high-strength screw rod and cone body of the climbing cone pre-buried in the concrete are arranged in multiple groups along the vertical direction of the concrete.
9. The climbing formwork system according to claim 1, characterized in that: The hanging seat body is non-fixedly connected to the supporting foot, a connecting groove is provided on one side of the supporting foot, and a hook groove structure which can be embedded in the connecting groove is formed at the bottom of the hanging seat body.
10. The climbing formwork system according to claim 1, characterized in that: The hanging seat body is provided with an arc surface support, and the arc surface support comprises an arc support plate arranged on both sides of the hanging seat body along the vertical direction thereof.
Citation Information
Patent Citations
Automatic formwork climbing system and operation method thereof
CN113266145A
Wall attaching device and driving device for creeping formwork
CN115288024A
A suspension device and climbing formwork
CN218843732U
Climbing frame anchoring hanging seat
CN223118882U
Guide and fixing device for Gang-form Guide-rail Climbing System
KR102234335B1