A water metering method and system based on hydropower fusion terminal
By adopting water metering methods based on water-electric fusion terminals in agricultural irrigation systems, the problem of insufficient accuracy of traditional water metering methods in complex scenarios is solved, and higher water metering accuracy is achieved.
Patent Information
- Application Number
- CN202411612489.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2044-11-13
AI Technical Summary
Traditional agricultural irrigation water measurement methods are difficult to ensure the accuracy of measurement in complex scenarios, and are greatly affected by power stability and water level changes.
The water metering method based on the water-electrical fusion terminal is adopted to determine the initial electric water decomposition coefficient by obtaining the irrigation method, power supply voltage, well water level and electricity consumption of the irrigation area, and correct it according to the current period of power supply voltage and well water level, and then calculate it Water usage.
It improves the accuracy of agricultural irrigation water measurement in complex scenarios and can more accurately reflect the actual water consumption during irrigation.
Smart Images

Figure CN119124301B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of agricultural irrigation equipment, and in particular to a water metering method and system based on a hydropower fusion terminal. Background Art
[0002] In modern agricultural irrigation systems, accurate water measurement is essential to improve irrigation efficiency, save water resources, and achieve sustainable agricultural development. However, traditional water measurement methods often rely on mechanical water meters or simple electronic flow meters, which often have difficulty ensuring measurement accuracy in the face of complex irrigation environments, such as power stability issues and water level changes.
[0003] Fluctuations in the power supply voltage will directly affect the efficiency of the water pump, thereby changing the amount of water corresponding to the unit power consumption. In the case of unstable power, the traditional water metering method cannot adjust the power-to-water coefficient in real time, resulting in deviations in the metering results. The drop in the water level of a well or reservoir affects the water absorption capacity and working efficiency of the water pump. Under different water level conditions, the amount of water pumped for the same power consumption may be different, resulting in inaccurate metering results. Summary of the invention
[0004] The present invention provides a water metering method and system based on a hydropower fusion terminal, which can realize metering operations in complex scenarios during agricultural irrigation through the hydropower fusion terminal, and improve the accuracy of agricultural irrigation water metering in complex scenarios.
[0005] In a first aspect, the present invention provides a water metering method based on a hydropower fusion terminal, the method comprising: obtaining the irrigation method of the irrigation area where the hydropower fusion terminal is located, the power supply voltage, well water level and power consumption detected by the hydropower fusion terminal in the current period; determining the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process based on the irrigation method of the irrigation area where the hydropower fusion terminal is located; correcting the initial electricity-to-water coefficient based on the power supply voltage and well water level in the current period to obtain the corrected electricity-to-water coefficient for the current period; and determining the water consumption in the current period based on the power consumption and the corrected electricity-to-water coefficient.
[0006] In a possible implementation, the irrigation method includes the irrigation type and the crop area of each irrigation type; the irrigation types include drip irrigation, sprinkler irrigation and flood irrigation; accordingly, based on the irrigation method of the irrigation area where the hydropower fusion terminal is located, the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process is determined, including: based on the irrigation type, querying the database to obtain the standard electricity-to-water coefficient corresponding to each irrigation type; based on the crop area of each irrigation type, calculating the weight coefficient corresponding to each irrigation type; based on the standard electricity-to-water coefficient and the weight coefficient corresponding to each irrigation type, performing weighted summation to obtain the initial electricity-to-water coefficient.
[0007] In one possible implementation, the initial electricity-to-water coefficient is corrected based on the power supply voltage and the water level of the well in the current time period to obtain the corrected electricity-to-water coefficient of the current time period, including: calculating the voltage deviation rate of the current time period based on the power supply voltage and the rated voltage of the water pump; determining the voltage correction factor of the current time period based on the voltage deviation rate and the mapping relationship between the voltage deviation rate and the voltage correction factor; determining the water level correction factor of the current time period based on the water level of the well and the mapping relationship between the water level interval and the water level correction factor; and correcting the initial electricity-to-water coefficient based on the voltage correction factor and the water level correction factor of the current time period to obtain the corrected electricity-to-water coefficient of the current time period.
[0008] In one possible implementation, based on the power supply voltage and the well water level in the current time period, the initial electricity-to-water coefficient is corrected to obtain the corrected electricity-to-water coefficient for the current time period, including: calculating the voltage deviation rate for the current time period based on the power supply voltage and the rated voltage of the water pump; calculating the water supply distance between the well water point and the water supply point based on the well water level; the water supply point is the highest point in the water supply pipeline of the water pump; determining each correction coefficient of the comprehensive correction model based on the voltage deviation rate and the water supply distance for the current time period; determining the comprehensive correction coefficient based on each correction coefficient and the preset comprehensive correction model; and correcting the initial electricity-to-water coefficient based on the comprehensive correction coefficient to obtain the corrected electricity-to-water coefficient for the current time period.
[0009] In a possible implementation, based on the power supply voltage and well water level in the current time period, the initial electricity-to-water coefficient is corrected to obtain the corrected electricity-to-water coefficient in the current time period, and the method also includes: obtaining the flow data of the water supply pipeline in the historical period, the voltage data, water level data and electricity consumption data detected by the hydropower fusion terminal; constructing a comprehensive correction model based on the rated parameters of the water pump; splitting the flow data, voltage data, water level data and electricity consumption data to determine the water supply flow, power supply voltage, well water level and electricity consumption in each time period; classifying each time period based on the power supply voltage and well water level to obtain multiple types of time periods; wherein the power supply voltage and well water level in the same type of time period are the same; performing data fitting based on the water consumption, power supply voltage, well water level and electricity consumption in multiple time periods of each type, and the comprehensive correction model to obtain the correction coefficient corresponding to each type.
[0010] In one possible implementation, a comprehensive correction model is constructed based on the rated parameters of the water pump, including: constructing an efficiency model based on the relationship between the water pump efficiency and the power supply voltage and the water level of the well; constructing a flow model based on the efficiency model and the relationship between the water pump efficiency and the water pump flow; constructing an electricity consumption model based on the relationship between the water pump power and the power supply voltage and the water level of the well, and the relationship between electricity consumption and the water pump power; constructing an electricity-to-water coefficient model based on the flow model and the electricity consumption model; and constructing a comprehensive correction model based on the electricity-to-water coefficient model and the initial electricity-to-water coefficient.
[0011] In one possible implementation, a method for identifying an irrigation method in an irrigation area where a hydropower fusion terminal is located includes: obtaining first soil moisture data of each sub-area before irrigation of the irrigation area, and setting an irrigation time for the irrigation area; obtaining second soil moisture of each sub-area after irrigation of the irrigation area, and water consumption and electricity consumption within the set time; calculating the soil moisture difference before and after irrigation of each sub-area based on the first soil moisture and the second soil moisture; determining the irrigation type of each sub-area based on the soil moisture difference before and after irrigation of each sub-area, water consumption and electricity consumption, the area of the irrigation area, and a preset identification model; and determining the irrigation method of the irrigation area based on the irrigation type of each sub-area and the crop area of each sub-area.
[0012] In a possible implementation, before determining the irrigation type of each sub-area based on the soil moisture difference before and after irrigation of each sub-area, the water consumption and electricity consumption, the area of the irrigation area, and a preset recognition model, it also includes: obtaining the soil moisture difference, water consumption and electricity consumption of multiple irrigation areas after irrigation for a set period of time, the area of each irrigation area, and the irrigation method of each irrigation area; calculating the average water consumption and average electricity consumption of each irrigation area based on the water consumption and electricity consumption and the area of each irrigation area; generating training samples with the area of each irrigation area, soil moisture difference, water consumption, electricity consumption, average water consumption and average electricity consumption as multiple input features and the irrigation method of each irrigation area as an output feature; and performing neural network training based on the training samples to obtain a preset recognition model.
[0013] In one possible implementation, the method also includes: calculating the water consumption corresponding to each irrigation type based on the water consumption of the irrigation area, the crop area of each irrigation type, and the water use efficiency of each irrigation type; generating feedback information based on the water consumption of the irrigation area, the irrigation method, the corrected electricity-to-water coefficient, and the water consumption corresponding to each irrigation type; and sending the feedback information to the hydropower system platform to visualize the irrigation situation of the irrigation area.
[0014] In the second aspect, an embodiment of the present invention provides a water metering device based on a hydropower fusion terminal, which includes: a communication module, used to obtain the irrigation method of the irrigation area where the hydropower fusion terminal is located, and the power supply voltage, well water level and power consumption detected by the hydropower fusion terminal in the current period; a processing module, used to determine the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process based on the irrigation method of the irrigation area where the hydropower fusion terminal is located; based on the power supply voltage and well water level in the current period, correct the initial electricity-to-water coefficient to obtain the corrected electricity-to-water coefficient for the current period; based on the power consumption and the corrected electricity-to-water coefficient, determine the water consumption in the current period.
[0015] In a third aspect, an embodiment of the present invention provides a water metering system based on a hydro-electric fusion terminal, the water metering system includes a hydro-electric fusion terminal, the hydro-electric fusion terminal includes a memory and a processor, the memory stores a computer program, and the processor is used to call and run the computer program stored in the memory to perform the steps of the method described in the first aspect and any possible implementation method of the first aspect.
[0016] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and wherein when the computer program is executed by a processor, the steps of the method described in the first aspect and any possible implementation method of the first aspect are implemented.
[0017] The present invention provides a water metering method and system based on a hydropower fusion terminal. The present invention determines the initial electricity-to-water coefficient by the irrigation method of the area where the hydropower fusion terminal is located, and corrects the initial electricity-to-water coefficient based on the power supply voltage and well water level of the current period to obtain the corrected electricity-to-water coefficient, and then realizes the metering of water consumption in the current period based on the power consumption and the corrected electricity-to-water coefficient. Since the influence of the irrigation method, power supply voltage and well water level on the electricity-to-water coefficient is fully considered in the metering process, and the electricity-to-water coefficient is corrected, the irrigation water metering using the electricity-to-water coefficient is more accurate, the metering operation of complex scenes during agricultural irrigation is realized, and the accuracy of agricultural irrigation water metering in complex scenes is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 It is a flow chart of a water metering method based on a hydropower fusion terminal provided by an embodiment of the present invention;
[0020] Figure 2 It is a structural schematic diagram of a water metering device based on a hydropower fusion terminal provided by an embodiment of the present invention;
[0021] Figure 3 It is a structural schematic diagram of a hydropower fusion terminal provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0022] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0023] In the description of the present invention, unless otherwise specified, " / " means "or", for example, A / B can mean A or B. "And / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, "at least one" and "plurality" refer to two or more. The words "first", "second", etc. do not limit the quantity and execution order, and the words "first", "second", etc. do not limit them to be different.
[0024] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a concrete way for easy understanding.
[0025] In addition, the terms "including" and "having" and any variations thereof mentioned in the description of this application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or modules is not limited to the listed steps or modules, but may optionally include other steps or modules that are not listed, or may optionally include other steps or modules that are inherent to these processes, methods, products or devices.
[0026] In order to make the purpose, technical solutions and advantages of the present invention more clear, the following will be described through specific embodiments in conjunction with the accompanying drawings of the present invention.
[0027] As described in the background art, due to the influence of power stability and water level fluctuations, water metering in agricultural irrigation has the problem of low accuracy.
[0028] To solve this technical problem, Figure 1 As shown, an embodiment of the present invention provides a water metering method based on a hydroelectric fusion terminal. The method includes steps S101-S104.
[0029] S101. Obtain the irrigation method of the irrigation area where the hydropower integration terminal is located, and the power supply voltage, well water level and power consumption detected by the hydropower integration terminal in the current period.
[0030] In some embodiments, the irrigation method includes irrigation types and crop areas of each irrigation type; the irrigation types include drip irrigation, sprinkler irrigation, and flood irrigation.
[0031] For example, the embodiment of the present invention can directly obtain the irrigation method according to the irrigation type and crop area of the irrigation area input by the user. Alternatively, the embodiment of the present invention can also set the irrigation time for the irrigation area, and calculate the irrigation method of the irrigation area based on the soil moisture difference before and after irrigation, water consumption and electricity consumption.
[0032] Illustratively, the embodiment of the present invention may periodically detect the power supply voltage and the water level of the well to determine the power supply voltage and the water level of the well in the current period.
[0033] S102. Determine an initial electricity-to-water conversion coefficient of the hydropower fusion terminal in a water metering process based on the irrigation method of the irrigation area where the hydropower fusion terminal is located.
[0034] In some embodiments, the electricity-to-water ratio is the ratio of water consumption to electricity consumption. In the embodiments of the present invention, the water consumption can be calculated by multiplying the electricity-to-water ratio by the electricity consumption.
[0035] In some embodiments, different irrigation methods correspond to different electricity-to-water coefficients. For example, drip irrigation, sprinkler irrigation, and flood irrigation correspond to different electricity-to-water coefficients.
[0036] As a possible implementation manner, the embodiment of the present invention may calculate the initial electricity-to-water coefficient based on steps S1021 - S1023 .
[0037] S1021. Based on the irrigation type, query the database to obtain the standard electricity-to-water coefficient corresponding to each irrigation type.
[0038] S1022. Calculate the weight coefficient corresponding to each irrigation type based on the crop area of each irrigation type.
[0039] Exemplarily, for any irrigation type, the embodiment of the present invention may first calculate the sum of the crop areas of each irrigation type, and determine the ratio of the crop area of the irrigation type to the sum of the crop areas of each irrigation type as the weight coefficient of the irrigation type.
[0040] S1023. Perform weighted summation based on the standard electricity-to-water coefficient and weight coefficient corresponding to each irrigation type to obtain an initial electricity-to-water coefficient.
[0041] S103. Based on the power supply voltage and the water level of the well in the current period, correct the initial electricity-to-water coefficient to obtain a corrected electricity-to-water coefficient in the current period.
[0042] As a possible implementation manner, step S103 can be specifically implemented as steps A1-A4.
[0043] A1. Based on the power supply voltage and the rated voltage of the water pump, calculate the voltage deviation rate of the current period.
[0044] Exemplarily, the embodiment of the present invention may calculate the difference between the supply voltage and the rated voltage, and determine the ratio of the difference to the rated voltage as the voltage deviation rate.
[0045] A2. Determine the voltage correction factor for the current period based on the voltage deviation rate and the mapping relationship between the voltage deviation rate and the voltage correction factor.
[0046] Exemplarily, in an embodiment of the present invention, the voltage deviation rate may be divided into intervals, and different voltage deviation rate intervals correspond to different voltage correction factors.
[0047] In some embodiments, the voltage correction factor is used to correct the effect of power supply voltage fluctuation on water metering in the electricity-to-water conversion coefficient.
[0048] A3. Based on the water level of the well and the mapping relationship between the water level interval and the water level correction factor, determine the water level correction factor for the current period.
[0049] In some embodiments, the water level correction factor is used to correct the effect of well water level fluctuation on water usage metering in the electricity-to-water conversion coefficient.
[0050] Illustratively, the embodiment of the present invention can divide the well into multiple intervals according to the change of the water level, and determine the water level correction factor of the current time period according to the current water level of the well and the water level correction factor corresponding to each interval.
[0051] A4. Based on the voltage correction factor and water level correction factor of the current period, the initial electricity-to-water coefficient is corrected to obtain the corrected electricity-to-water coefficient of the current period.
[0052] Exemplarily, the embodiment of the present invention can directly determine the initial electricity-to-water coefficient, the voltage correction factor and the water level correction factor as the corrected electricity-to-water coefficient.
[0053] As another example, the embodiment of the present invention may also calculate the corrected electricity-to-water coefficient according to the following formula.
[0054] ;
[0055] in, is the initial electric water deduction coefficient, is the voltage correction factor, is the water level correction factor.
[0056] It should be noted that the process of determining the correction factor is a data fitting process. Different data fitting processes lead to different calculation methods of the corrected electric water decomposition coefficient.
[0057] As another possible implementation manner, step S103 may also be specifically implemented as steps B1-B5.
[0058] B1. Based on the power supply voltage and the rated voltage of the water pump, calculate the voltage deviation rate of the current period.
[0059] B2. Based on the water level of the well, calculate the water supply distance between the water level point of the well and the water supply point.
[0060] In some embodiments, the water supply point is the highest point in the water supply pipeline of the water pump.
[0061] B3. Based on the voltage deviation rate in the current period and the water supply distance, determine the correction coefficients of the comprehensive correction model.
[0062] Among them, the comprehensive correction model is used to characterize the influence of power supply voltage and well water level on the electricity-to-water coefficient.
[0063] Exemplarily, the comprehensive correction model may be calculated based on rated parameters of the water pump.
[0064] The comprehensive correction model can be expressed as the following formula:
[0065] ;
[0066] in, is the comprehensive correction factor, is the voltage correction coefficient, is the weight of the voltage term correction coefficient, is the standard voltage, is the voltage deviation rate, is the correction coefficient of water supply distance term, is the weight of the correction coefficient of the water supply distance term, is the standard distance, The water supply distance.
[0067] B4. Determine the comprehensive correction coefficient based on each correction coefficient and the preset comprehensive correction model.
[0068] B5. Based on the comprehensive correction coefficient, correct the initial electricity-to-water coefficient to obtain the corrected electricity-to-water coefficient for the current period.
[0069] As another possible implementation, the embodiment of the present invention can directly determine the correction coefficient of the comprehensive correction model according to the power supply voltage and the water level of the well, and calculate the corrected electricity-to-water coefficient of the current period based on the power supply voltage and the water level of the well, the comprehensive correction model and the correction coefficient of the comprehensive correction model. The comprehensive correction model and the correction coefficient determination process refer to steps S201-S205, which will not be repeated here.
[0070] S104: Determine the water consumption in the current period based on the electricity consumption and the corrected electricity-to-water conversion coefficient.
[0071] Exemplarily, the embodiment of the present invention may determine the water consumption in the current period by multiplying the power consumption by the corrected electricity-to-water coefficient.
[0072] The present invention provides a water metering method and system based on a hydropower fusion terminal. The initial electricity-to-water coefficient is determined by the irrigation method of the area where the hydropower fusion terminal is located, and the initial electricity-to-water coefficient is corrected based on the power supply voltage and the water level of the well in the current period to obtain the corrected electricity-to-water coefficient. Then, based on the power consumption and the corrected electricity-to-water coefficient, the water consumption in the current period is measured. Since the influence of the irrigation method, the power supply voltage and the water level of the well on the electricity-to-water coefficient is fully considered in the metering process, and the electricity-to-water coefficient is corrected, the irrigation water metering using the electricity-to-water coefficient is more accurate, the metering operation of complex scenes during agricultural irrigation is realized, and the accuracy of agricultural irrigation water metering in complex scenes is improved.
[0073] Optionally, the water metering method based on the hydropower fusion terminal provided in the embodiment of the present invention further includes steps S201-S204 before step S103.
[0074] S201. Obtain flow data of the water supply pipeline in the historical period, and voltage data, water level data and electricity consumption data detected by the water-power integration terminal.
[0075] Exemplarily, the flow data includes water flow in each period of a historical period, wherein the flow data can be measured based on a flow meter disposed on a water supply pipeline.
[0076] S202. Construct a comprehensive correction model based on the rated parameters of the water pump.
[0077] Exemplarily, step S202 may be specifically implemented as steps S2021-S2025.
[0078] S2021. Construct an efficiency model based on the relationship between water pump efficiency and power supply voltage and water well water level.
[0079] Exemplarily, the efficiency model can be expressed as the following formula.
[0080] ;
[0081] in, , , , , , is the coefficient to be fitted; V is the supply voltage, H is the water level of the well, The embodiment of the present invention can perform data fitting according to the water pump efficiency, voltage data and water level data to obtain various coefficients to be fitted and determine the efficiency model.
[0082] S2022. Construct a flow model based on the efficiency model and the relationship between the water pump efficiency and the water pump flow.
[0083] Exemplarily, the traffic model can be expressed as the following formula.
[0084] ;
[0085] Among them, Q is the pump flow rate, k is the flow coefficient, is the pump efficiency, V is the supply voltage, and H is the water level in the well.
[0086] S2023. Construct an electricity consumption model based on the relationship between the water pump power and the power supply voltage, the water level of the well, and the relationship between the electricity consumption and the water pump power.
[0087] Exemplarily, the electricity consumption model can be expressed as the following formula.
[0088] ;
[0089] in, is the real-time power of the water pump under voltage V and water level H, is the average power of the pump under voltage V and water level H, t1 is the start time of the current period, t2 is the end time of the current period, and AE is the power consumption.
[0090] S2024. Construct an electricity-to-water coefficient model based on the flow model and electricity consumption model.
[0091] Exemplarily, the water-dissipation coefficient model can be expressed as the following formula.
[0092] ;
[0093] in, To correct the electricity-to-water coefficient, AW is the water consumption and AE is the electricity consumption.
[0094] S2025. Construct a comprehensive correction model based on the electricity-to-water coefficient model and the initial electricity-to-water coefficient.
[0095] For example, the modified electrohydration coefficient can be expressed by the initial electrohydration coefficient. =TC*F(V,H); where F(V,H) is the comprehensive correction model.
[0096] F(V,H) = ;
[0097] in, To correct the water deduction coefficient, is the initial electric water deduction coefficient.
[0098] S203, split the flow data, voltage data, water level data and electricity consumption data to determine the water supply flow, power supply voltage, well water level and electricity consumption in each time period.
[0099] S204: Classify each time period based on the power supply voltage and the water level of the well to obtain multiple types of time periods.
[0100] Among them, the power supply voltage and well water level are the same in the same time period.
[0101] Exemplarily, the embodiment of the present invention can form different combinations according to the power supply voltage and the water level of the well, that is, multiple types. Each time period corresponds to a different combination, and accordingly, the type of the time period is also different.
[0102] S205. Based on the water consumption, power supply voltage, well water level and power consumption in multiple time periods of each type, and a comprehensive correction model, data fitting is performed to obtain a correction coefficient corresponding to each type.
[0103] Exemplarily, the embodiment of the present invention can perform data fitting by least square method according to each type of data to obtain the correction coefficient of the comprehensive correction model under various combination types.
[0104] Among them, the correction coefficient includes the flow coefficient k and the coefficients to be fitted , , , , , .
[0105] In this way, the embodiment of the present invention can establish a comprehensive correction model for the impact of power supply voltage and well water level on the water supply process of the water pump, provide convenience for the correction of the electricity-to-water coefficient, and improve the accuracy of agricultural irrigation water metering in complex scenarios.
[0106] Optionally, the method for identifying the irrigation mode of the irrigation area where the hydropower fusion terminal is located can be implemented through steps S301-S305.
[0107] S301, obtaining first soil moisture data of each sub-area of the irrigation area before irrigation, and setting an irrigation time for the irrigation area.
[0108] S302: Obtain the second soil moisture of each sub-area after irrigation in the irrigation area, and set the water consumption and electricity consumption within a certain period of time.
[0109] S303: Calculate the soil moisture difference before and after irrigation in each sub-area based on the first soil moisture and the second soil moisture.
[0110] S304: Determine the irrigation type of each sub-region based on the soil moisture difference before and after irrigation, water consumption and electricity consumption, the area of the irrigation region, and a preset identification model.
[0111] In some embodiments, the preset recognition model includes
[0112] Exemplarily, the preset recognition model can be established through the following steps C1-C4.
[0113] C1. Obtain the soil moisture difference, water consumption and electricity consumption of multiple irrigation areas after irrigation for a set time, the area of each irrigation area, and the irrigation method of each irrigation area.
[0114] C2. Based on the water and electricity consumption and the area of each irrigation area, calculate the average water and electricity consumption of each irrigation area.
[0115] C3. Generate training samples using the area, soil moisture difference, water consumption, electricity consumption, average water consumption and average electricity consumption of each irrigation area as multiple input features and the irrigation method of each irrigation area as output features.
[0116] C4. Perform neural network training based on training samples to obtain a preset recognition model.
[0117] S305: Determine the irrigation method of the irrigation area based on the irrigation type of each sub-area and the crop area of each sub-area.
[0118] In this way, the embodiment of the present invention can set the irrigation duration for the irrigation area when the irrigation area is unknown, and comprehensively calculate the irrigation method for the unknown irrigation area, thereby improving the convenience of the hydropower fusion terminal.
[0119] For example, in a hydropower fusion terminal replacement scenario, the parameter setting process in the newly installed hydropower fusion terminal involves the setting of various parameters in the irrigation area. For unknown irrigation methods, the present invention can determine the irrigation method of the unknown irrigation area through the above method.
[0120] In another example, in an agricultural irrigation scenario, the user may adjust the area of each type of crop for drip irrigation, sprinkler irrigation, and flood irrigation according to actual conditions. After the adjustment, the hydropower fusion terminal can re-measure the irrigation method of the irrigation area according to the above method to maintain the accuracy of agricultural irrigation water metering in complex scenarios.
[0121] Optionally, the water metering method based on the hydropower fusion terminal provided in the embodiment of the present invention further includes steps S401-S404.
[0122] S401. Calculate the water consumption corresponding to each irrigation type based on the water consumption of the irrigation area, the crop area of each irrigation type, and the water use efficiency of each irrigation type.
[0123] S402: Generate feedback information based on the water consumption of the irrigation area, the irrigation method, the corrected electricity-to-water coefficient, and the water consumption corresponding to each irrigation type.
[0124] S403: Send feedback information to the hydropower system platform to visualize the irrigation situation in the irrigation area.
[0125] In this way, the embodiment of the present invention can perform data processing on the hydropower fusion terminal side, and transmit back various types of processed information, thereby reducing the computing pressure of the hydropower system platform.
[0126] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0127] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.
[0128] Figure 2 The schematic diagram of the structure of a water metering device based on a hydroelectric fusion terminal provided by an embodiment of the present invention is shown. The water metering device 500 includes a communication module 501 and a processing module 502 .
[0129] The communication module 501 is used to obtain the irrigation method of the irrigation area where the hydropower integration terminal is located, and the power supply voltage, well water level and power consumption detected by the hydropower integration terminal in the current period.
[0130] Processing module 502 is used to determine the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process based on the irrigation method of the irrigation area where the hydropower fusion terminal is located; based on the power supply voltage and the water level of the well in the current time period, correct the initial electricity-to-water coefficient to obtain the corrected electricity-to-water coefficient of the current time period; based on the electricity consumption and the corrected electricity-to-water coefficient, determine the water consumption in the current time period.
[0131] Figure 3 Schematic diagram of a hydroelectric fusion terminal provided by an embodiment of the present invention. Figure 3 As shown, the hydroelectric fusion terminal 600 includes: a processor 601, a memory 602, and a computer program 603 stored in the memory 602 and executable on the processor 601. When the processor 601 executes the computer program 603, the steps in the above-mentioned method embodiments are implemented, for example Figure 1 Alternatively, when the processor 601 executes the computer program 603, the functions of each module / unit in the above-mentioned device embodiments are realized, for example, Figure 2 The functions of the data acquisition module 501 and the data processing module 502 are shown.
[0132] Exemplarily, the computer program 603 may be divided into one or more modules / units, which are stored in the memory 602 and executed by the processor 601 to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program 603 in the terminal device 600. For example, the computer program 603 may be divided into Figure 2 A data acquisition module 501 and a data processing module 502 are shown.
[0133] The processor 601 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0134] The memory 602 may be an internal storage unit of the terminal device 600, such as a hard disk or memory of the terminal device 600. The memory 602 may also be an external storage device of the terminal device 600, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the terminal device 600. Further, the memory 602 may also include both an internal storage unit of the terminal device 600 and an external storage device. The memory 602 is used to store the computer program and other programs and data required by the terminal. The memory 602 may also be used to temporarily store data that has been output or is to be output.
[0135] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A water metering method based on a hydropower fusion terminal, characterized in that: include: Obtain the irrigation method of the irrigation area where the hydropower fusion terminal is located, and the power supply voltage, well water level and power consumption detected by the hydropower fusion terminal in the current period; the irrigation method includes the irrigation type and the crop area of each irrigation type; the irrigation type includes drip irrigation, sprinkler irrigation and flood irrigation; Based on the irrigation mode of the irrigation area where the hydropower fusion terminal is located, determine the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process; Based on the power supply voltage and the water level of the well in the current period, the initial electricity-to-water coefficient is corrected to obtain a corrected electricity-to-water coefficient in the current period; Determine the water consumption in the current period based on the power consumption and the corrected electricity-to-water coefficient; The method of determining the initial electricity-to-water coefficient of the hydropower fusion terminal in the water metering process based on the irrigation mode of the irrigation area where the hydropower fusion terminal is located includes: querying a database based on the irrigation type to obtain a standard electricity-to-water coefficient corresponding to each irrigation type; calculating a weight coefficient corresponding to each irrigation type based on the crop area of each irrigation type; and performing weighted summation based on the standard electricity-to-water coefficient and the weight coefficient corresponding to each irrigation type to obtain the initial electricity-to-water coefficient; The method of correcting the initial electricity-to-water coefficient based on the power supply voltage and well water level in the current time period to obtain the corrected electricity-to-water coefficient in the current time period also includes: obtaining the flow data of the water supply pipeline in the historical period, the voltage data, water level data and electricity consumption data detected by the hydropower fusion terminal; constructing a comprehensive correction model based on the rated parameters of the water pump; splitting the flow data, voltage data, water level data and electricity consumption data to determine the water supply flow, power supply voltage, well water level and electricity consumption in each time period; classifying each time period based on the power supply voltage and the well water level to obtain multiple types of time periods; wherein the power supply voltage and well water level in the same type of time period are the same; performing data fitting based on the water consumption, power supply voltage, well water level and electricity consumption in multiple time periods of each type, and the comprehensive correction model to obtain the correction coefficient corresponding to each type; The comprehensive correction model is constructed based on the rated parameters of the water pump, including: constructing an efficiency model based on the relationship between the water pump efficiency and the power supply voltage and the water level of the water well; constructing a flow model based on the efficiency model and the relationship between the water pump efficiency and the water pump flow; constructing an electricity consumption model based on the relationship between the water pump power and the power supply voltage and the water level of the water well, and the relationship between electricity consumption and the water pump power; constructing an electricity-to-water coefficient model based on the flow model and the electricity consumption model; constructing the comprehensive correction model based on the electricity-to-water coefficient model and the initial electricity-to-water coefficient; The method for identifying the irrigation method of the irrigation area where the hydropower fusion terminal is located includes: obtaining first soil moisture data of each sub-area before irrigation of the irrigation area, and setting an irrigation time for the irrigation area; obtaining second soil moisture of each sub-area after irrigation of the irrigation area, and the water consumption and electricity consumption within the set time; calculating the soil moisture difference before and after irrigation of each sub-area based on the first soil moisture and the second soil moisture; determining the irrigation type of each sub-area based on the soil moisture difference before and after irrigation of each sub-area, the water consumption and electricity consumption, the area of the irrigation area, and a preset identification model; determining the irrigation method of the irrigation area based on the irrigation type of each sub-area and the crop area of each sub-area.
2. The water metering method based on the hydropower fusion terminal according to claim 1 is characterized in that: The method of correcting the initial electricity-to-water coefficient based on the power supply voltage and the water level of the well in the current period to obtain the corrected electricity-to-water coefficient in the current period includes: Based on the power supply voltage and the rated voltage of the water pump, calculating the voltage deviation rate of the current period; Determine the voltage correction factor for the current period based on the voltage deviation rate and the mapping relationship between the voltage deviation rate and the voltage correction factor; Determine the water level correction factor for the current period based on the water level of the well and the mapping relationship between the water level interval and the water level correction factor; Based on the voltage correction factor and the water level correction factor of the current period, the initial electricity-to-water coefficient is corrected to obtain a corrected electricity-to-water coefficient of the current period.
3. The water metering method based on the hydropower fusion terminal according to claim 1 is characterized in that: The method of correcting the initial electricity-to-water coefficient based on the power supply voltage and the water level of the well in the current period to obtain the corrected electricity-to-water coefficient in the current period includes: Based on the power supply voltage and the rated voltage of the water pump, calculating the voltage deviation rate of the current period; Based on the water level of the water well, the water supply distance between the water well water level point and the water supply point is calculated; the water supply point is the highest point in the water supply pipeline of the water pump; Based on the voltage deviation rate in the current period and the water supply distance, the correction coefficients of the comprehensive correction model are determined; Determine a comprehensive correction coefficient based on the correction coefficients and a preset comprehensive correction model; Based on the comprehensive correction coefficient, the initial electricity-to-water coefficient is corrected to obtain a corrected electricity-to-water coefficient for the current period.
4. The water metering method based on the hydropower fusion terminal according to claim 1 is characterized in that: Before determining the irrigation type of each sub-region based on the soil moisture difference before and after irrigation of each sub-region, the water consumption and electricity consumption, the area of the irrigation region, and the preset identification model, the method further includes: Obtain the soil moisture difference, water consumption and electricity consumption of multiple irrigation areas after irrigation for a set time, the area of each irrigation area, and the irrigation method of each irrigation area; Based on the water consumption and electricity consumption, and the area of each irrigation area, calculate the average water consumption and average electricity consumption of each irrigation area; Generate training samples by taking the area, soil moisture difference, water consumption, electricity consumption, average water consumption and average electricity consumption of each irrigation area as multiple input features and the irrigation method of each irrigation area as output features; A neural network training is performed based on the training samples to obtain the preset recognition model.
5. The water metering method based on the hydropower fusion terminal according to claim 1 is characterized in that: The method further comprises: Calculate the water consumption corresponding to each irrigation type based on the water consumption of the irrigation area, the crop area of each irrigation type, and the water use efficiency of each irrigation type; Generate feedback information based on the water consumption of the irrigation area, the irrigation method, the corrected electricity-to-water coefficient, and the water consumption corresponding to each irrigation type; The feedback information is sent to the hydropower system platform to visually display the irrigation situation of the irrigation area.
6. A water metering system based on a hydroelectric fusion terminal, characterized in that: The water metering system includes a hydroelectric fusion terminal; the hydroelectric fusion terminal includes a memory and a processor, the memory stores a computer program, and the processor is used to call and run the computer program stored in the memory to perform the steps of the method as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Agricultural irrigation water-conversion-with-electricity algorithm management and control system and water-electricity conversion coefficient correction method
CN106895885A