Integrated road construction method
Through the integrated road construction method, the construction road side molds, curbs and pipelines are integrated, which solves the problems of complicated traditional construction processes and low quality, and achieves efficient and standardized municipal road construction, reduces labor and material use, and Later construction provides boundary control.
Patent Information
- Application Number
- CN202410130467.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-12-27
AI Technical Summary
The construction process of traditional municipal roads is complicated, requiring a lot of manpower and material resources, the construction quality is uneven, the degree of standardization is not high, and the facilities are distributed and cover a large area.
The integrated road construction method is adopted, including digging trenches after the roadbed is completed, pouring the drainage side molding wall, using a lifting device to suspend the curb, and fixing the curb through long screws and adjusting nuts, and installing pipeline limits Pole and inspection well realize integrated construction of road side molds, curbs and pipelines.
Reduced step-by-step construction processes, improved construction efficiency and quality, reduced manual investment and material use, realized integrated management and standardized rapid construction, reduced floor area, and provided elevation for later road grassroots and surface construction and boundary control.
Smart Images

Figure CN119194936A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal roads, and in particular relates to an integrated road construction method. Background Art
[0002] The construction of road side formwork, curbstones, and pipelines of traditional municipal roads is mostly carried out in steps. Generally, the construction is carried out from bottom to top according to the placement of pipelines, casting of road side formwork, construction of curbstone cushion layer, installation of curbstones, and casting of inner and outer backrests. The construction process is complicated and requires a lot of manpower and material resources. The construction quality is uneven due to the influence of construction level, and the degree of standardization is not high. In addition, the construction of these facilities is distributed in multiple different spaces and occupies a large area. Summary of the invention
[0003] The problem to be solved by the present invention is to overcome the shortcomings of the background technology and provide a road integrated construction method.
[0004] The present invention is achieved through the following technical solutions: A road integrated construction method comprises the following steps: Step 1: After the roadbed is completed, a trench is excavated, a template is set up in the trench, and concrete is poured to form a drainage side mold ground-connected wall; the drainage side mold ground-connected wall is rectangular as a whole, hollow inside, and the upper surface of the drainage side mold ground-connected wall is flush with the upper surface of the roadbed; Step 2: evenly place a number of lifting devices below the position where the curbstone is to be placed, use the lifting devices to lift the curbstone to the designed height, and adjust the horizontal and vertical flatness of adjacent curbstones by a leveler; through holes are symmetrically provided on both sides of the bottom of the curbstone, and the through holes penetrate the curbstone along the width direction of the curbstone, and a lateral water inlet is provided on the side of the curbstone facing the road, and a linear drainage groove is provided inside the curbstone, and the linear drainage groove penetrates the curbstone along the length direction of the curbstone, and the linear drainage groove is connected to the lateral water inlet; Step 3: Pass the horizontal long screw through the through hole of the curbstone, thread the two ends of the horizontal long screw with three-way nuts A, drill a hole downward on the drainage side mold ground connection wall directly below the three-way nut A, insert the vertical long screw into the drilled hole, thread the lower part of the vertical long screw with the adjusting nut, connect the upper end of the vertical long screw upward with the three-way nut A, and tighten the adjusting nut to fix the vertical long screw; the middle part of the vertical long screw is provided with a three-way nut B, and the three-way nut B is threaded outwardly to connect the horizontal horizontal jacking rod; remove the jacking device; Step 4: Connect several pipe limit rods from top to bottom between the vertical long screw rods on both sides, place pipelines on the pipe limit rods, and fix the pipelines on the pipe limit rods through pipe clamps. The vertical distance between adjacent pipe limit rods is equal to the outer diameter of the pipeline. Step 5: Support the road side formwork, and use the transverse push rod to press the inner side of the road side formwork tightly; Step 6: After the road side formwork is supported, pour concrete to the designed elevation to form the road side formwork. After the road side formwork strength reaches the requirement, remove the road side formwork; Step 7: Set up a curbstone backrest template on the road side formwork. The curbstone backrest template is divided into an outer backrest template and an inner backrest template. The outer end of the three-way nut A is pressed against the inner side of the curbstone backrest template; Step 8: After the curbstone backrest formwork is set up, pour concrete to form the curbstone cushion layer, the curbstone outer backrest, and the curbstone inner backrest; Step nine: construct an inspection well at regular intervals, with a water inlet extending outward from the upper side of the inspection well. The curbstone at the inspection well has no curbstone backrest. An opening matching the water inlet is provided on the outer surface of the curbstone at the inspection well, and the opening is connected to the linear drainage trough. The water inlet can be inserted into the hole in the curbstone to connect the inspection well and the linear drainage trough together; a water outlet is extended outward from the lower part of the inspection well, and the water outlet is connected to the drainage side mold ground connecting wall.
[0005] Preferably, the lifting device in step 2 is a jack.
[0006] Preferably, in step 2, the leveler is a suction cup leveler.
[0007] Preferably, in step three, two nuts are threadedly connected on the transverse long screw, and the two nuts are located between two three-way nuts A. The nuts are tightened toward the side of the curb to stabilize the curb.
[0008] Preferably, in step three, a rubber gasket is provided between the nut and the side of the curb.
[0009] Preferably, in step three, a top plate is provided at the outer end of the transverse push rod.
[0010] Preferably, in step 4, the pipeline limiting rod is a basket bolt.
[0011] Preferably, in step nine, an inspection well is set up every 50-100m.
[0012] Preferably, in step nine, a sedimentation tank is provided at the bottom of the inspection well, the sedimentation tank is located below the water outlet, a filter screen frame is placed in the inspection well, and the filter screen frame is placed above the sedimentation tank.
[0013] Preferably, the filter screen frame comprises a metal frame, and a stainless steel screen is arranged between the metal frames.
[0014] The present invention integrates the construction of road side forms, curbstones, and pipelines, reduces step-by-step construction procedures, greatly improves overall construction efficiency, reduces labor input, thereby eliminating labor in municipal road construction and improving construction quality, while also avoiding cross-construction damage, greatly reducing the use of construction materials, and achieving effective integrated management and standardized rapid construction; the present invention improves the integration of road side forms, curbstones, and pipelines, and reduces the floor space occupied; the present invention pre-constructs road side forms, curbstones, and pipelines, and provides elevation and boundary control points for road base and surface construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of the embodiment after overall assembly; Figure 2 This is a schematic diagram of the top view of the structure of the embodiment after overall assembly; Figure 3 This is a schematic diagram of the structure in which the curbstone is suspended in this embodiment; Figure 4 This is a schematic diagram of the structure at the inspection well location of this embodiment; Figure 5 This is a schematic diagram of the side structure of the suspended curbstone in this embodiment; Figure 6 Schematic diagram of the structure of the transverse long screw and the vertical long screw in this embodiment; Figure 7 This is a schematic diagram of the split structure of the inspection well in this embodiment; Figure 8 This is a schematic diagram of the side structure of the inspection well in this embodiment; Fig. 9 This is a schematic diagram of the side structure of the inspection well in this embodiment; Fig.10 This is a schematic diagram of the structure of the inspection well in this embodiment; Fig.11 This is a schematic diagram of the curb structure of this embodiment; Fig.12 This is a schematic diagram of the structure of the curbstone of this embodiment away from the road surface; Fig.13 This is a schematic diagram of the curb structure connected to the inspection well in this embodiment; Fig.14 This is a schematic diagram of the disassembly structure of lifting the filter frame out of the inspection well in this embodiment.
[0016] In the figure, 1 is the drainage side formwork ground-connected wall, 2 is the curb, 3 is the through hole, 4 is the lateral water inlet, 5 is the linear drainage trough, 6 is the leveler, 7 is the horizontal long screw, 8 is the three-way nut A, 9 is the vertical long screw, 10 is the three-way nut B, 11 is the adjusting nut, 12 is the horizontal top rod, 13 is the rubber gasket, 14 is the nut, 15 is the road side formwork template, 16 is the top plate, 17 is the pipe limit rod, 18 is the pipeline, 19 is the road side formwork, 20 is the outer backrest formwork, 21 is the inner backrest formwork, 22 is the inspection well, 23 is the water inlet, 24 is the opening, 25 is the water outlet, 26 is the sedimentation tank, 27 is the filter screen frame, and 28 is the manhole cover. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.
[0018] The road integration construction method of the present invention comprises the following steps: Step 1: Construction of drainage side formwork ground-connected wall 1 After the roadbed is leveled, a trench is excavated below the curbstone 2 or the road side form 19 using a trenching machine, a formwork is set up in the trench, and concrete is poured to form a drainage side formwork ground-connected wall 1. The drainage side formwork ground-connected wall 1 formed by pouring is rectangular in shape as a whole, hollow inside, and the upper surface of the drainage side formwork ground-connected wall 1 is flush with the upper surface of the roadbed, that is, flush with the road ash soil layer, and the drainage side formwork ground-connected wall 1 is used as a road rainwater drainage ditch.
[0019] Step 2: Suspending the curb 2 The curbstone 2 used in the present invention is different from the traditional curbstone 2. The curbstone 2 of the present invention is symmetrically provided with through holes 3 on both sides of the bottom. The through holes 3 penetrate the curbstone 2 along the width direction of the curbstone 2. A lateral water inlet 4 is provided on the side of the curbstone 2 facing the road. A linear drainage groove 5 is provided inside the curbstone 2. The linear drainage groove 5 penetrates the curbstone 2 along the length direction of the curbstone 2. In this embodiment, the linear drainage groove 5 is a rectangular hollow space inside the curbstone 2. The linear drainage groove 5 is connected to the lateral water inlet 4. Rainwater enters the linear drainage groove 5 in the curbstone 2 through the lateral water inlet 4, and then is discharged to the inspection well 22 through the curbstone 2, and finally is discharged to the drainage side mold ground connecting wall 1 through the inspection well 22.
[0020] First, place several lifting devices evenly below the position where the curbstone 2 is to be placed. The lifting devices are placed on the upper surface of the drainage side mold ground-connected wall 1. The lifting devices are used to lift the curbstone 2 to the designed height. The lifting device in this embodiment uses a jack, and other lifting devices can also be used. Any existing device that can lift the curbstone 2 can be used. Unload the curbstone 2 onto the lifting device, and use the lifting device to lift the curbstone 2 to the designed height, so that the curbstone 2 is suspended in the air. At the same time, the horizontal and vertical flatness of adjacent curbstones 2 are adjusted by the leveler 6, that is, the upper surfaces of adjacent curbstones 2 are on the same horizontal plane and the sides are on the same vertical plane. The leveler 6 can be a commonly used stone leveler. The leveler 6 in this embodiment uses a suction cup leveler.
[0021] Step 3: Fix the curb 2 A transverse long screw rod 7 is passed through the through hole 3 of the curb 2, and three-way nuts A8 are threadedly connected at both ends of the transverse long screw rod 7. The horizontal distance between the two three-way nuts A8 is equal to the horizontal distance between the inner backrest and the outer backrest of the curb 2. A hole is drilled downward on the drainage side mold ground connecting wall 1 just below the three-way nut A8, and then the vertical long screw rod 9 is inserted into the drilled hole. A three-way nut B10 is provided in the middle of the vertical long screw rod 9, and the lower part of the vertical long screw rod 9 is threadedly connected to the adjusting nut 11, and the adjusting nut 11 can move up and down on the vertical long screw rod 9. The upper end of the vertical long screw rod 9 is screwed upward into the three-way nut A8, and then the adjusting nut 11 is tightened downward to fix the vertical long screw rod 9. A horizontal transverse push rod 12 is threaded outwardly on the three-way nut B10. The transverse push rod 12 is used to support the inner side of the road side mold template 15, and the direction of the transverse push rod 12 is consistent with the width direction of the curb 2. The curbstone 2 has been supported in the air by the vertical long screw rod 9, and the lifting device under the curbstone 2 is removed at this time.
[0022] In order to make the curb 2 more stable, two nuts 14 are threadedly connected on the transverse long screw rod 7, the two nuts 14 are located between the two three-way nuts A8, and the two nuts 14 are respectively located on both sides of the curb 2. The curb 2 is further stabilized by tightening the nuts 14 to the curb 2. More preferably, a gasket is provided between the nut 14 and the side of the curb 2, and the gasket is a rubber gasket 13, which can prevent the surface of the curb 2 from being damaged and further increase the friction.
[0023] In this embodiment, a top plate 16 is preferably provided at the outer end of the transverse top rod 12. In this embodiment, the top plate 16 is a circular plate, and the top plate 16 increases the area where the force on the road side mold template 15 acts.
[0024] Step 4: Install pipeline 18 A pipeline limiting rod 17 is installed between the vertical long screws 9 on both sides, and several pipeline limiting rods 17 are connected from top to bottom. A pipeline 18 is placed on the pipeline limiting rod 17, and the pipeline 18 is further fixed to the pipeline limiting rod 17 by a pipe clamp. The pipe clamp is not drawn in the attached figure. The pipe clamp is a fixing component commonly used when laying the pipeline 18, and it will not be repeated here. The vertical distance between the upper and lower adjacent pipeline limiting rods 17 is equal to the outer diameter of the pipeline 18. The pipeline 18 is limited by the pipeline limiting rod 17 to prevent the pipeline 18 from drifting up and down during the later concrete pouring. The pipeline limiting rod 17 can be made of various types of components. For example, the pipeline limiting rod 17 can be a steel bar, and the two ends of the steel bar are directly welded to the vertical long screws 9 on both sides. The present invention does not impose special restrictions on this. In this embodiment, the pipeline limiting rod 17 is preferably a basket bolt. By adjusting the length of the basket bolt, the tensioning force on the vertical long screws 9 on both sides can be conveniently adjusted.
[0025] Step 5: Install the road side formwork 15 After the pre-buried pipeline 18 is installed, the road side formwork 15 is supported. The road side formwork 15 is placed according to the designed width of the road side formwork 19, and the road side formwork 15 is supported. The outer side of the road side formwork 15 is supported and fixed according to the conventional method, and the inner side of the road side formwork 15 is tightened by the transverse push rod 12. The transverse push rod 12 is rotated to make it tightly press against the inner side of the road side formwork 15.
[0026] Step 6: Casting road side formwork 19 After the road side formwork 15 is installed, concrete is poured to the designed elevation to form the road side formwork 19, which is formed integrally with the pipeline 18. After the road side formwork 19 reaches the required strength, the road side formwork 15 is removed.
[0027] Step 7: Install the curb back template The curbstone backrest template is installed on the road side form 19. The curbstone backrest template is divided into an outer backrest template 20 and an inner backrest template 21. Here, the outer side refers to the side away from the road, and the inner side refers to the side close to the road. The curbstone backrest template is placed on the road side form 19, and the outer side is supported and fixed according to the conventional method, and the inner side is tightened by the three-way nut A8. The distance between the lower surface of the curbstone 2 and the upper surface of the road side form 19 is the thickness of the curbstone cushion layer.
[0028] Step 8: Cast the curb back After the curbstone backrest formwork is set up, concrete is poured to form the curbstone cushion layer, the curbstone outer backrest and the curbstone inner backrest in one piece.
[0029] Step 9: Curbstone 2, inspection well 22, drainage side mold ground wall 1 connected An inspection well 22 is constructed at intervals, and generally an inspection well 22 is set every 50-100m. The upper side of the inspection well 22 of the present invention is provided with an outwardly extending water inlet 23. The curbstone 2 corresponding to the inspection well 22 is no longer constructed as a curbstone outer backrest, but an opening 24 matching the water inlet 23 of the inspection well 22 is opened on the outer side of the curbstone 2. The opening 24 is connected to the linear drainage groove 5. The water inlet 23 of the inspection well 22 can be inserted into the opening 24 of the curbstone 2 to connect the inspection well 22 with the linear drainage groove 5. The lower part of the inspection well 22 is provided with an outwardly extending water outlet 25, and the water outlet 25 is connected to the drainage side mold ground connecting wall 1. The rainwater in the curbstone 2 is discharged into the drainage side mold ground connecting wall 1 through the inspection well 22, eliminating the construction of traditional road drainage pipes and rainwater grates, and ensuring the integrity of the road surface.
[0030] Preferably, a sedimentation tank 26 is provided at the bottom of the inspection well 22, and the sedimentation tank 26 is located below the water outlet 25. A filter screen frame 27 is provided in the inspection well 22. The shape of the filter screen frame 27 is consistent with the shape of the inspection well 22, and is surrounded by frames. The filter screen is connected between the frames. The filter screen is used to filter out large solids such as leaves to avoid blockage at the connection between the water outlet 25 and the drainage side mold ground connecting wall 1. In this embodiment, the filter screen frame 27 is preferably a metal frame, and stainless steel mesh is provided between the metal frames. The filter screen frame 27 is placed above the sedimentation tank 26. When it needs to be cleaned, the manhole cover 28 of the inspection well 22 above is opened, and the filter screen frame 27 can be lifted out of the inspection well 22.
[0031] The present invention integrates the construction and installation of the drainage side formwork ground-connected wall 1, the road side formwork 19, the curb 2, the curb backrest and the curb cushion layer, without the need to cut grooves to damage other structures, avoiding the back-excavation process and saving the use of backfill materials. It can realize integrated and standardized rapid construction, greatly improving construction efficiency and quality.
[0032] The road side formwork 19 and curbstone 2 constructed in advance of the present invention provide construction boundaries and control points for paving height for the later paving of the road water-stabilizing layer and asphalt surface layer. Later, lines can be drawn on the road side formwork 19, curbstone backrest, and curbstone 2 to control the paving height of each layer of the road without the need to set up other elevation control devices.
[0033] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A road integrated construction method, characterized in that: The following steps are involved: Step 1: After the roadbed is completed, a trench is excavated, a formwork is set up in the trench, and concrete is poured to form a drainage side mold ground-connecting wall (1); the drainage side mold ground-connecting wall (1) is rectangular in shape as a whole, hollow inside, and the upper surface of the drainage side mold ground-connecting wall (1) is flush with the upper surface of the roadbed; Step 2: evenly placing a number of lifting devices below the position where the curb (2) is to be placed, using the lifting devices to lift the curb (2) to a designed height, and adjusting the horizontal and vertical flatness of adjacent curbs (2) by means of a leveler (6); through holes (3) are symmetrically provided on both sides of the bottom of the curb (2), the through holes (3) penetrate the curb (2) along the width direction of the curb (2), a lateral water inlet (4) is provided on the side of the curb (2) facing the road, a linear drainage groove (5) is provided inside the curb (2), the linear drainage groove (5) penetrates the curb (2) along the length direction of the curb (2), and the linear drainage groove (5) is connected to the lateral water inlet (4); Step 3: Pass the transverse long screw rod (7) through the through hole (3) of the curbstone (2), thread the two ends of the transverse long screw rod (7) with three-way nuts A (8), drill a hole downward on the drainage side mold ground connection wall (1) directly below the three-way nut A (8), insert the vertical long screw rod (9) into the drilled hole, thread the lower part of the vertical long screw rod (9) with an adjusting nut (11), connect the upper end of the vertical long screw rod (9) upward with the three-way nut A (8), and tighten the adjusting nut (11) to fix the vertical long screw rod (9); a three-way nut B (10) is provided in the middle part of the vertical long screw rod (9), and the three-way nut B (10) is threaded outwardly with a horizontal transverse jack rod (12); remove the jacking device; Step 4: Connect a plurality of pipeline limiting rods (17) from top to bottom between the vertical long screw rods (9) on both sides, place pipelines (18) on the pipeline limiting rods (17), and fix the pipelines (18) on the pipeline limiting rods (17) by pipe clamps. The vertical distance between adjacent pipeline limiting rods (17) is equal to the outer diameter of the pipeline (18); Step 5: supporting the road side formwork template (15), and the transverse push rod (12) is pressed against the inner side surface of the road side formwork template (15); Step 6: After the road side formwork (15) is supported and installed, concrete is poured to the designed elevation to form the road side formwork (19). After the road side formwork (19) reaches the required strength, the road side formwork (15) is removed; Step 7: A curbstone backrest template is supported on the road side template (19), the curbstone backrest template is divided into an outer backrest template (20) and an inner backrest template (21), and the outer end of the three-way nut A (8) is pressed against the inner side of the curbstone backrest template; Step 8: After the curbstone backrest formwork is set up, pour concrete to form the curbstone cushion layer, the curbstone outer backrest, and the curbstone inner backrest; Step nine: construct an inspection well (22) at intervals, wherein the upper side of the inspection well (22) is provided with a water inlet (23) extending outward, the curb (2) at the inspection well (22) has no curb back, and an opening (24) matching the water inlet (23) is provided on the outer surface of the curb (2) at the inspection well (22), the opening (24) is connected to the linear drainage groove (5), and the water inlet (23) can be inserted into the opening (24) of the curb (2) to connect the inspection well (22) and the linear drainage groove (5) together; the lower part of the inspection well (22) is provided with a water outlet (25) extending outward, and the water outlet (25) is connected to the drainage side mold ground connecting wall (1).
2. The road integrated construction method according to claim 1, characterized in that: The lifting device in step 2 is a jack.
3. The road integrated construction method according to claim 1, characterized in that: In the step 2, the leveler (6) is a suction cup leveler.
4. The road integrated construction method according to claim 1, characterized in that: In the step 3, two nuts (14) are threadedly connected on the transverse long screw rod (7), and the two nuts (14) are located between the two three-way nuts A (8). The nuts (14) are tightened toward the side of the curbstone (2) to stabilize the curbstone (2).
5. The road integrated construction method according to claim 4, characterized in that: In step three, a rubber gasket (13) is provided between the nut (14) and the side of the curb (2).
6. The road integrated construction method according to claim 1, characterized in that: In the step three, a top plate (16) is provided at the outer end of the transverse push rod (12).
7. The road integration construction method according to claim 1, characterized in that: In step 4, the pipeline limiting rod (17) is a turnbuckle bolt.
8. The road integrated construction method according to claim 1, characterized in that: In the step nine, an inspection well (22) is set up every 50-100 m.
9. The road integration construction method according to claim 1, characterized in that: In the step nine, a sedimentation tank (26) is provided at the bottom of the inspection well (22), the sedimentation tank (26) is located below the water outlet (25), a filter screen frame (27) is placed in the inspection well (22), and the filter screen frame (27) is placed above the sedimentation tank (26).
10. The road integrated construction method according to claim 8, characterized in that: The filter screen frame (27) comprises a metal frame, and a stainless steel screen is arranged between the metal frames.