Simulation building wind resistance test device and test method
Through the simulation of typhoon model and three-dimensional stereoscopic display, the problem that the existing wind resistance test device cannot truly simulate the wind speed, wind direction and rainfall of the typhoon is solved, which improves the effectiveness of the test results and provides more accurate data support for building design.
Patent Information
- Application Number
- CN202411534800.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-27
AI Technical Summary
The existing wind resistance test device cannot truly simulate the wind speed, wind direction and rainfall during the typhoon, and has low effectiveness for the building test results.
Design a wind resistance test device for simulated buildings. By obtaining the geographical location of the pre-built buildings, the soil hardness and historical typhoon parameters are built, including wind speed, wind direction and rainfall of different levels, the building and substrate are reduced in proportion to simulate Test and monitor the stress, deformation, inclination and displacement in real time to generate a three-dimensional stereoscopic display.
It improves the effectiveness of the test results, can more realistically simulate the impact of typhoons on buildings, and provides intuitive data to support theoretical design.
Smart Images

Figure CN119197988A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building test, and in particular relates to a simulated building wind resistance test device and a test method. Background Art
[0002] A typhoon is a strong tropical cyclone that forms on tropical or subtropical oceans. It generally moves northward to the mainland and then disappears. This process is also called landing. Typhoons pose many hazards to buildings. The first is the direct impact of strong winds. Due to the strong winds of typhoons, huge pressure will be exerted on the structure of the building, especially some old or defective buildings, which may cause wall cracks, collapses, and roof overturns. Secondly, typhoons are often accompanied by heavy rains. The long-term scouring and penetration of rainwater may damage the waterproof layer of the building and cause leakage. If rainwater pours into the wall, it will also affect the stability of the wall structure and pose a serious threat to the structural safety of the building. Therefore, it is necessary to conduct pit wind tests on newly designed buildings before construction. In the prior art, wind tunnels are used to conduct wind resistance tests on buildings that are built in equal proportions. However, during the test, the wind direction and wind speed are often fixed, and the rainfall during the typhoon cannot be simulated, which makes the test conditions very different from the actual typhoon conditions, resulting in low validity of the test results. Summary of the invention
[0003] The present invention provides a simulated building wind resistance test device and test method, which can more realistically simulate typhoons of different grades to test the building, which is beneficial to improving the validity of the test results, and can also generate and display a three-dimensional stereogram, which is helpful to intuitively experience and analyze the force, deformation, inclination and displacement of the building during the test.
[0004] The technical solution adopted by the present invention is:
[0005] A simulated building wind resistance test device and test method, comprising the following steps:
[0006] S1. Obtain soil hardness and soil at the geographical location of the pre-constructed building, and construct a typhoon model, wherein the typhoon model includes multiple groups of typhoon hazard parameters, each group of typhoon hazard parameters corresponds to a single simulated typhoon, and each group of typhoon hazard parameters includes wind speed, wind direction and rainfall loaded in time sequence;
[0007] S2. Compact the collected soil according to the soil hardness to form base soil, build a base on the base soil, and build a building on the base. The base and the building are scaled down in equal proportions, and the materials of the building and the base are the same as the pre-built building construction materials;
[0008] S3, loading the typhoon model and selecting typhoon hazard parameters to conduct a simulation test on the building;
[0009] S4. Monitor the force, deformation, tilt and displacement of the building during the test;
[0010] S5. Generate and display a three-dimensional stereogram based on the real-time detected building stress, deformation, tilt and displacement.
[0011] Furthermore, the step of constructing the typhoon model in step S1 includes:
[0012] S11. Obtain historical hazard parameters corresponding to all historical typhoons, including moving routes and central wind speeds, and select historical hazard parameters with central wind speeds greater than level 12;
[0013] S12. Select the position with the maximum central wind speed on the moving route and mark it. Select the eye route along the moving route in chronological order based on the marked point. When the eye moves along the eye route in chronological order, the wind speed, wind direction and rainfall generated at the marked point in chronological order are obtained and set as typhoon hazard parameters.
[0014] Furthermore, the duration of the time series is 12 hours before and after the eye of the storm is located at the marked point.
[0015] Furthermore, multiple groups of historical flood parameters that have occurred at the geographical location of the pre-constructed building are obtained. The flood parameters include rainfall, flood depth, water flow direction and water flow speed. The rainfall, flood depth, water flow direction and water flow speed in the same group correspond to a single historical flood that has occurred. The corresponding historical flood parameters are screened out according to the maximum flood depth. According to the rainfall when the simulated typhoon is loaded and the rainfall when the maximum flood depth occurs in history, the flood depth parameters when the typhoon is loaded are estimated. The estimated flood depth is loaded into the typhoon model, and the corresponding water flow speed and water flow direction are loaded into the typhoon model. The flood depth estimation formula is:
[0016] A=C / D×B
[0017] In the formula: A is the estimated flood depth; B is the maximum flood depth in history; C is the rainfall when loading the simulated typhoon; D is the rainfall when the maximum flood depth in history occurs.
[0018] Furthermore, when an earthquake has occurred at the geographical location of the pre-construction building, the historical earthquake parameters with the greatest harm to the geographical location of the pre-construction building are obtained; when no earthquake has occurred at the geographical location of the pre-construction building, and the geographical location of the pre-construction building is between the seismic belts of two adjacent plates, and earthquakes have occurred in other areas of the seismic belt, the historical earthquake parameters with the largest magnitude in the seismic belt are obtained, and the earthquake parameters are loaded on the time period with the largest wind speed in the typhoon model. The historical earthquake parameters include shear wave amplitude parameters, shear wave frequency parameters, longitudinal wave amplitude parameters and longitudinal wave frequency parameters distributed in time series.
[0019] Furthermore, in step S4, the sound and sight of each room in the building are monitored, and the sound and sight are displayed and played outwardly.
[0020] A simulated building wind resistance test device, used for executing the above-mentioned simulated building wind resistance test method, comprises a base, an electric swivel second, a control center and a touch screen, the base is provided with a cylinder with an upper end opening through a vibration table, the cylinder is compacted with base soil, the base soil is provided with a base, a building is provided on the base, a plurality of strain gauges are provided at intervals on the outer surface of the building, a water seepage structure is provided at the bottom of the cylinder, a shower device is arranged above the cylinder, an electric swivel first is provided on the outer wall of the cylinder, the upper surface of the electric swivel first is connected with a ring body through an electric push rod, and the ring body is sleeved on On the outer wall of the cylinder, water grooves are provided on opposite sides of the inner wall of the ring body, and the bottoms of the two water grooves are respectively connected to water pump 1 through two water pipes. The electric swivel 2 is provided on the upper surface of the base and is located on the outer periphery of the vibration table. The upper surface of the electric swivel 2 is provided with a fan aligned with the building through a bracket. The control center controls the shower device, electric swivel 1, electric swivel 2, fan, electric push rod and water pump 1 to load the typhoon model on the building according to the typhoon model. The strain gauge transmits electrical signals to the control center, and the control center processes the electrical signals to generate a three-dimensional stereogram and transmits it to the touch screen for display.
[0021] Furthermore, the shower device includes a shower plate installed above the building through a bracket, a diversion chamber is provided in the shower plate, a water pump 2 is connected to the top of the diversion chamber, a plurality of shower nozzles are provided at the bottom of the diversion chamber, and the control center is electrically connected to the water pump 2.
[0022] Furthermore, the water seepage structure includes a drainage cavity arranged in the bottom wall of the cylinder, a plurality of water seepage holes are arranged at the top of the drainage cavity, and a drainage port is arranged at the bottom of the drainage cavity.
[0023] Furthermore, each room in the building is provided with a camera and a microphone, and the microphone and the camera are electrically connected to a control center.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. The collected soil is compacted according to the soil hardness to form base soil, a base is built on the base soil, and a building is built on the base. The base and the building are scaled down in equal proportions, and the materials of the building and the base are the same as the pre-built building construction materials. Then a typhoon model is constructed. The typhoon model includes multiple groups of typhoon hazard parameters of different wind force levels. The typhoon level can be selected for testing according to demand. Each group of typhoon hazard parameters includes wind speed, wind direction and rainfall loaded in time sequence. When the typhoon model is loaded, the building can be tested according to the wind speed, wind direction and rainfall when the real typhoon occurs, which is conducive to improving the validity of the test results.
[0026] 2. During the simulation test, the real-time detected force, deformation, inclination and displacement of the building will be generated into a three-dimensional stereogram and displayed in real time, which will help to intuitively experience and analyze the force, deformation, inclination and displacement of the building during the test, and provide effective data support for theoretical design. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0028] Figure 2 This is an enlarged structural diagram of the building;
[0029] Figure 3 It is the electric control principle diagram of the present invention;
[0030] In the figure: 1. drainage cavity; 2. seepage hole; 3. base soil; 4. electric swivel 1; 5. electric push rod; 6. water tank; 7. water pipe; 8. water pump 1; 9. ring body; 10. base body; 11. camera; 12. building; 13. base; 14. pickup; 15. diversion cavity; 16. shower nozzle; 17. shower plate; 18. fan; 19. water pump 2; 20. touch screen; 21. bracket; 22. control center; 23. cylinder; 24. drainage outlet; 25. electric swivel 2; 26. vibration table; 27. strain gauge. DETAILED DESCRIPTION
[0031] In order to better understand the technical content of the present invention, specific embodiments are provided below, and the present invention is further described in conjunction with the accompanying drawings.
[0032] See also Figures 1 to 3 The present invention provides a simulated building wind resistance test device and test method, comprising the following steps:
[0033] S1. Obtain soil hardness and soil at the geographical location of the pre-construction building 12, and construct a typhoon model, wherein the typhoon model includes multiple groups of typhoon hazard parameters, each group of typhoon hazard parameters corresponds to a single simulated typhoon, and each group of typhoon hazard parameters includes wind speed, wind direction and rainfall loaded in time sequence;
[0034] S2, compacting the collected soil into base soil 3 according to the soil hardness, constructing a base 10 on the base soil 3, and constructing a building 12 on the base 10, the base 10 and the building 12 are constructed in equal proportions, and the materials of the building 12 and the base 10 are the same as the construction materials of the pre-built building 12;
[0035] S3, loading the typhoon model and selecting typhoon hazard parameters to conduct a simulation test on the building 12;
[0036] S4. monitoring the stress, deformation, tilt and displacement of the building 12 during the test;
[0037] S5. Generate and display a three-dimensional stereogram based on the real-time detected force, deformation, tilt and displacement of the building 12.
[0038] The present invention compacts the collected soil into a base soil 3 according to the soil hardness, so that the base soil 3 can more realistically imitate the soil of the pre-construction geographical location, construct a base 10 on the base soil 3, and construct a building 12 on the base 10. The base 10 and the building 12 are both constructed in equal proportions, and the materials of the building 12 and the base 10 are the same as the construction materials of the pre-constructed building 12. Then, a typhoon model is constructed, and multiple groups of typhoon hazard parameters of different wind force levels are set in the typhoon model. During the test, the typhoon level can be selected according to the needs for the test. Each group of typhoon hazard parameters includes wind speed, wind direction and rainfall loaded in a time sequence, so that when the typhoon model is loaded, the building 12 can be tested according to the wind speed, wind direction and rainfall when the real typhoon occurs, which is conducive to improving the validity of the test results;
[0039] Moreover, during the simulation test, the present invention can generate a three-dimensional stereogram of the real-time detected force, deformation, inclination and displacement of the building 12 and display it in real time, which helps to intuitively experience and analyze the force, deformation, inclination and displacement of the building 12 during the test and provide effective intuitive data support for theoretical design.
[0040] Preferably, the step of constructing the typhoon model in step S1 includes:
[0041] S11. Obtain the historical hazard parameters corresponding to all historical typhoons, including the moving route of the eye and the central wind speed, and select the historical hazard parameters with a central wind speed greater than level 12;
[0042] S12, selecting the position of the maximum central wind speed on the moving route and marking it, selecting the eye route along the moving route in chronological order based on the marked point, obtaining the wind speed, wind direction and rainfall generated at the marked point in chronological order when the eye moves along the eye route in chronological order, and setting them as typhoon hazard parameters;
[0043] By screening and processing, multiple groups of wind speeds, wind directions and rainfalls of typhoons with different wind force equal poles and greater hazards are obtained, which is equivalent to building the building 12 at the maximum wind force on the eye of the storm moving route for testing, so that the building 12 can be in a typhoon environment as if it were real, making the typhoon model more realistic.
[0044] Preferably, the duration of the time series is 12 hours before and after the eye of the storm is located at the marked point. Generally, 12 hours before the eye of the storm moves to the marked point or 12 hours after it moves away from the marked point, the wind force at the marked point will be relatively small and has no experimental significance. Therefore, in order to shorten the test time, the other parts of the moving route are deleted.
[0045] Preferably, multiple groups of historical flood parameters that have occurred at the geographical location of the pre-construction building 12 are obtained, and the flood parameters include rainfall, flood depth, water flow direction and water flow speed. The rainfall, flood depth, water flow direction and water flow speed in the same group correspond to a single historical flood that has occurred. The corresponding historical flood parameters are screened out according to the maximum value of the flood depth. According to the rainfall when the simulated typhoon is loaded and the rainfall when the maximum flood depth occurs in history, the flood depth parameter when the typhoon is loaded is estimated. The estimated flood depth is loaded on the time period with the maximum wind speed in the typhoon model, and the corresponding water flow speed and water flow direction are loaded in the typhoon model. The flood depth estimation formula is:
[0046] A=C / D×B
[0047] In the formula: A is the estimated flood depth; B is the maximum flood depth in history; C is the rainfall when the simulated typhoon is loaded; D is the rainfall when the maximum flood depth in history occurs;
[0048] By using the flood parameters that have occurred in the geographical location of the pre-constructed building 12, the flood depth caused by the rainfall during the typhoon simulation test with different wind force levels can be estimated. Since the water flow speed and water flow direction generally have little effect on the flood depth, the estimated flood depth, water flow direction and water flow direction are loaded into the typhoon model for testing, making the simulation test more realistic and more referenceable.
[0049] Preferably, when an earthquake has occurred at the geographical location of the pre-construction building 12, the historical earthquake parameters with the greatest hazard to the geographical location of the pre-construction building 12 are obtained; when no earthquake has occurred at the geographical location of the pre-construction building 12, but the geographical location of the pre-construction building 12 is between the seismic zones of two adjacent plates, and earthquakes have occurred in other areas of the seismic zone, the historical earthquake parameters with the largest magnitude in the seismic zone are obtained, and the earthquake parameters are loaded on the time period with the largest wind speed in the typhoon model, and the historical earthquake parameters include shear wave amplitude parameters, shear wave frequency parameters, longitudinal wave amplitude parameters, and longitudinal wave frequency parameters distributed in time sequence;
[0050] Since the probability of earthquakes occurring in the seismic zone between the two believed plates is relatively high, the probability of earthquakes occurring in the geographical location of the pre-construction building 12 is relatively high. The highest earthquake that has occurred in the seismic zone is loaded into the time period with the largest wind force for fitting. Optionally, when the earthquake occurring in the corresponding seismic zone is lower than magnitude 7.5, the shear wave amplitude parameters, shear wave frequency parameters, longitudinal wave amplitude parameters and longitudinal wave frequency parameters of the 7.5-magnitude earthquake distributed in time series are loaded into the typhoon model. This can strengthen the test conditions for the building 12 and is suitable for the building 12 with higher construction requirements.
[0051] Preferably, in step S4, the sound and sight of each room in the building 12 are also monitored, and the sound and sight are displayed and played externally, so that the sound and scene in the building 12 during the typhoon test can be transmitted to the outside for external playback and display, so that the situation in the building 12 during the typhoon process can be experienced more intuitively, which can effectively provide a design input reference for designing the living environment comfort of the building 12 when a typhoon occurs.
[0052] A simulated building wind resistance test device is used to perform the above-mentioned simulated building wind resistance test method, including a base 13, an electric swivel 25, a control center 22 and a touch screen 20. A vibration table 26 is provided on the upper surface of the base 13. A cylinder 23 with an upper end opening is connected to the top of the vibration table 26. Soil is compacted into a base soil 3 in the cylinder 23. A base 10 is provided on the base soil 3. A building 12 is provided on the base 10. A plurality of strain gauges 27 are provided at intervals on the outer surface of the building 12. A water seepage structure is provided at the bottom of the cylinder 23. A shower device is fixedly provided on the upper part of the cylinder 23. An electric swivel 4 is provided on the outer wall of the cylinder 23. A plurality of electric push rods 5 are fixedly provided on the upper surface of the electric swivel 4. The telescopic end of the electric push rod 5 is connected to a ring body 9. The sealing sleeve of the ring body 9 is provided on the outer wall of the cylinder 23 so that the ring body 9 can be moved in the cylinder 2 3, water tanks 6 are arranged on opposite sides of the inner wall of the ring body 9, the bottoms of the two water tanks 6 are respectively connected to a water pump 8 through two water pipes 7, the two water pipes 7 are respectively connected to the water inlet and the outlet 24 of the water pump 8, the electric swivel 25 is arranged on the upper surface of the base 13 and is located on the periphery of the vibration table 26, the upper surface of the electric swivel 25 is fixed with a fan 18 aligned with the building 12 through a bracket 21, the typhoon model is stored in the control center 22, the control center 22 controls the shower device, the electric swivel 4, the electric swivel 25, the fan 18, the electric push rod 5 and the water pump 8 to load the typhoon model to the building 12 according to the typhoon model, the strain gauge 27 transmits the electric signal to the control center 22, the control center 22 processes the electric signal to generate a three-dimensional stereogram and transmits it to the touch screen 20 for display;
[0053] The control center 22 controls the vibration table 26 to drive the cylinder 23 to vibrate horizontally or vertically at different frequencies and amplitudes, thereby simulating earthquakes of different levels.
[0054] The control center 22 controls the electric swivel 4 to rotate on the cylinder 23, and the electric swivel 4 drives the ring body 9 to rotate on the cylinder 23 through the electric push rod 5, which can adjust the water flow direction when floods occur;
[0055] The control center 22 controls the electric push rod 5 to drive the ring body 9 to slide on the cylinder 23, and the depth of the flood can be adjusted. The depth is the distance between the top of the ring body 9 and the top of the cylinder 23;
[0056] The strain gauge 27 can be used to check the stress, deformation, tilt and displacement of the building 12 in real time during the typhoon test. The strain gauge 27 transmits an electrical signal to the control center 22, and the control center 22 processes the electrical signal to generate a three-dimensional stereogram and transmits it to the touch screen 20 for display;
[0057] The control center 22 can be used to control the water suction speed of the water pump 8, so that the water in the ring body 9 is sucked out from one side and then discharged into the other side, but the water in the ring body 9 can flow at a preset speed;
[0058] The control center 22 can control the electric swivel 25 to drive the fan 18 to rotate around the building 12 through the bracket 21 according to the typhoon model, and can adjust the wind direction during the simulation process. The control center 22 can also control the wind speed of the fan 18 blowing toward the building 12 according to the typhoon model;
[0059] The control center 22 can control the rainfall amount of the shower device on the building 12 according to the typhoon model.
[0060] Preferably, the shower device includes a shower plate 17 fixed on the top of the building 12 by a bracket 21, a diversion chamber 15 is provided in the shower plate 17, a water pump 19 is connected to the top of the diversion chamber 15, a water inlet pipe 7 of the water pump 19 is connected to a water source through a pipe fitting, a plurality of shower nozzles 16 are provided at the bottom of the diversion chamber 15, and a control center 22 is electrically connected to the water pump 19;
[0061] The control center 22 controls the start, stop and speed of the water pump 2 19 according to the loaded typhoon hazard parameters, and transports the water in the water source to the diversion chamber 15 through the water pump 2 19. The water in the diversion chamber 15 is discharged through the shower nozzle 16, thereby controlling the start, stop and amount of rain.
[0062] Preferably, the water seepage structure includes a drainage cavity 1 arranged in the bottom wall of the cylinder 23, a plurality of water seepage holes 2 are arranged on the top of the drainage cavity 1, and a drainage port 24 is arranged on the bottom of the drainage cavity 1; the moisture in the base soil 3 can flow into the drainage cavity 1 through the water seepage holes 2, and then be discharged through the drainage port 24, so as to avoid excessive water accumulation in the base soil 3 resulting in a large difference from the soil of the geographical location of the construction.
[0063] Preferably, each room of the building 12 is provided with a camera 11 and a microphone 14, and the microphone 14 and the camera 11 are electrically connected to the control center 22. The camera 11 and the microphone 14 are respectively used to collect scenes and sounds in the building 12 and transmit them to the controller, and the control center 22 transmits the sounds and images to the touch screen 20 for generation and display.
[0064] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for simulating wind resistance test of a building, characterized in that: The following steps are included: S1. Obtain soil hardness and soil at the geographical location of the pre-constructed building, and construct a typhoon model, wherein the typhoon model includes multiple groups of typhoon hazard parameters, each group of typhoon hazard parameters corresponds to a single simulated typhoon, and each group of typhoon hazard parameters includes wind speed, wind direction and rainfall loaded in time sequence; S2. Compact the collected soil according to the soil hardness to form base soil, build a base on the base soil, and build a building on the base. The base and the building are scaled down in equal proportions, and the materials of the building and the base are the same as the pre-built building construction materials; S3, loading the typhoon model and selecting typhoon hazard parameters to conduct a simulation test on the building; S4. Monitor the force, deformation, tilt and displacement of the building during the test; S5. Generate and display a three-dimensional stereogram based on the real-time detected building stress, deformation, tilt and displacement.
2. A simulated building wind resistance test method according to claim 1, characterized in that: The steps of constructing the typhoon model in step S1 include: S11. Obtain historical hazard parameters corresponding to all historical typhoons, including moving routes and central wind speeds, and select historical hazard parameters with central wind speeds greater than level 12; S12. Select the position with the maximum central wind speed on the moving route and mark it. Select the eye route along the moving route in chronological order based on the marked point. When the eye moves along the eye route in chronological order, the wind speed, wind direction and rainfall generated at the marked point in chronological order are obtained and set as typhoon hazard parameters.
3. A simulated building wind resistance test method according to claim 2, characterized in that: The duration of the time series is 12 hours before and after the eye of the storm is located at the marked point.
4. A simulated building wind resistance test method according to claim 3, characterized in that: Obtain multiple groups of historical flood parameters that have occurred at the geographical location of the pre-constructed building. The flood parameters include rainfall, flood depth, water flow direction and water flow speed. The rainfall, flood depth, water flow direction and water flow speed in the same group correspond to a single historical flood. The corresponding historical flood parameters are screened out according to the maximum flood depth. According to the rainfall when the simulated typhoon is loaded and the rainfall when the maximum flood depth occurs in history, the flood depth parameters when the typhoon is loaded are estimated. The estimated flood depth is loaded into the typhoon model, and the corresponding water flow speed and water flow direction are loaded into the typhoon model. The flood depth estimation formula is: A=C / D×B In the formula: A is the estimated flood depth; B is the maximum flood depth in history; C is the rainfall when loading the simulated typhoon; D is the rainfall when the maximum flood depth in history occurs.
5. A simulated building wind resistance test method according to claim 4, characterized in that: When an earthquake has occurred in the geographical location of the pre-construction building, the historical earthquake parameters with the greatest harm to the geographical location of the pre-construction building are obtained; when no earthquake has occurred in the geographical location of the pre-construction building, and the geographical location of the pre-construction building is between the seismic belts of two adjacent plates, and earthquakes have occurred in other areas of the seismic belt, the historical earthquake parameters with the largest magnitude in the seismic belt are obtained, and the earthquake parameters are loaded on the time period with the largest wind speed in the typhoon model. The historical earthquake parameters include shear wave amplitude parameters, shear wave frequency parameters, longitudinal wave amplitude parameters and longitudinal wave frequency parameters distributed in time series.
6. A simulated building wind resistance test method according to claim 6, characterized in that: In step S4, the sound and sight of each room in the building are also monitored, and the sound and sight are displayed and played out.
7. A simulated building wind resistance test device, characterized in that: A method for simulating wind resistance test of a building for executing any one of claims 1 to 6, comprising a base, an electric swivel two, a control center and a touch screen, wherein a cylinder with an upper end opening is arranged on the base through a vibration table, base soil is compacted inside the cylinder, a base is arranged on the base soil, a building is arranged on the base, a plurality of strain gauges are arranged at intervals on the outer surface of the building, a water seepage structure is arranged at the bottom of the cylinder, a shower device is arranged above the cylinder, an electric swivel one is arranged on the outer wall of the cylinder, the upper surface of the electric swivel one is connected to a ring body through an electric push rod, and the ring body is sleeved on the cylinder On the outer wall, water grooves are provided on the opposite sides of the inner wall of the ring body, and the bottoms of the two water grooves are respectively connected to water pump 1 through two water pipes. The electric swivel 2 is provided on the upper surface of the base and is located at the outer periphery of the vibration table. The upper surface of the electric swivel 2 is provided with a fan aligned with the building through a bracket. The control center controls the shower device, electric swivel 1, electric swivel 2, fan, electric push rod and water pump 1 to load the typhoon model on the building according to the typhoon model. The strain gauge transmits electrical signals to the control center, and the control center processes the electrical signals to generate a three-dimensional stereogram and transmits it to the touch screen for display.
8. The simulated building wind resistance test device according to claim 7, characterized in that: The shower device comprises a shower plate arranged above the building through a bracket, a diversion cavity is arranged in the shower plate, a water pump 2 is connected to the top of the diversion cavity, a plurality of shower nozzles are arranged at the bottom of the diversion cavity, and the control center is electrically connected to the water pump 2.
9. The simulated building wind resistance test device according to claim 8, characterized in that: The water seepage structure comprises a drainage cavity arranged in the bottom wall of the cylinder, a plurality of water seepage holes are arranged at the top of the drainage cavity, and a drainage port is arranged at the bottom of the drainage cavity.
10. A simulated building wind resistance test device according to claim 9, characterized in that: A camera and a microphone are arranged in each room of the building, and the microphones and cameras are electrically connected to a control center.