Training exercise method, device and equipment for power system and medium

By obtaining the power system user ledger information and grid topology model, and generating permission management configuration and fault simulation lesson plans, the problem of low simulation efficiency in traditional power system training exercises is solved, and simultaneous simulation and efficiency improvement of multi-region are achieved.

CN119205447APending Publication Date: 2024-12-27STATE GRID SICHUAN ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411301174.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

Traditional power system training exercise methods cannot conduct simulation exercises in different regions at the same time, resulting in low simulation efficiency and long time.

Method used

By obtaining the power system user ledger information in different regions, generating permission management configuration information under multiple preset training exercise rooms, and creating power system fault simulation lesson plans based on the power grid topology model, and according to the permission management configuration information, multiple preset trainings are carried out in multiple preset trainings based on the power grid topology model. The training exercises of the power system are performed under the exercise room.

Benefits of technology

Simulation exercises for training scenarios in different regions are realized, which significantly improves simulation efficiency and reduces time-consuming.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119205447A_ABST
    Figure CN119205447A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power system automation simulation, and discloses a training exercise method, device and equipment of a power system and a medium. Generating authority management configuration information under a plurality of preset training exercise rooms based on the user ledger information of the power system; making a power system fault simulation teaching plan based on the power grid topology model; and based on the power system fault simulation teaching plan, executing training exercise actions of the power system in the plurality of preset training exercise rooms according to the authority management configuration information. Finally, simulation exercises can be performed on training scenes in different areas at the same time, the simulation efficiency can be remarkably improved, and time consumption can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system automation simulation, and in particular to a training exercise method, device, equipment and medium for a power system. Background Art

[0002] With the rapid construction of the national power grid and the increasingly stringent requirements for power supply safety in modern production, the operation and control of the power system has become more and more complex, and the faults in the power grid have shown more and more new characteristics. Fault handling requires coordination between superiors and subordinates, and the requirements for fault handling response of power grid dispatchers at all levels are getting higher and higher. In order to improve the response speed and handling level of dispatchers to faults, more and more emphasis is placed on training the business capabilities of dispatching teams through the use of training simulation systems. Based on the current status of the power grid, higher requirements are put forward for the training simulation system, which needs to meet the increasingly frequent and intensive fault handling training and assessment of dispatchers.

[0003] The traditional training and exercise method for power systems is to use a small number of people to conduct simulation exercises in a specific training scenario. This method cannot simulate training scenarios in different areas at the same time. If training and exercises for power systems in different areas are to be implemented, each area needs to be simulated separately in sequence, resulting in low simulation efficiency and time-consuming. Summary of the invention

[0004] In view of this, the present invention provides a training exercise method, device, equipment and medium for an electric power system to solve the problem of low simulation efficiency and relatively time-consuming.

[0005] According to a first aspect, an embodiment of the present disclosure provides a training exercise method for a power system, the method comprising:

[0006] Obtain user account information of power systems in different regions;

[0007] Generate permission management configuration information for multiple preset training exercise rooms based on the user account information of the power system;

[0008] Based on the power grid topology model, make a teaching plan for power system fault simulation;

[0009] Based on the power system fault simulation teaching plan, the power system training exercise actions are executed in multiple preset training exercise rooms according to the authority management configuration information.

[0010] In some optional implementations, based on the power system user account information, authority management configuration information under multiple preset training exercise rooms is generated, including:

[0011] All users in the power system user ledger information are grouped according to different areas, exercise roles, and the number of preset training exercise rooms. Exercise roles include administrators, instructors, and trainees.

[0012] Based on the grouping results, the access rights and access time for the corresponding preset training exercise scenarios are set for each group of users according to the exercise role.

[0013] In some optional implementations, a power system fault simulation teaching plan is prepared based on the power grid topology model, including:

[0014] Based on the power grid topology model, the line names, line parameters, and line status of different areas are obtained to make power system fault simulation teaching plans.

[0015] In some optional embodiments, the line parameters include: nominal impedance, maximum current carrying capacity, load parameters, number of transformer windings, bus voltage parameters, generator parameters on lines in different regions; the line status includes switch closed state and switch open state; the power system fault simulation lesson plan includes: short circuit fault simulation lesson plan, open circuit fault simulation lesson plan, bus fault, transformer fault simulation lesson plan, and switch fault simulation lesson plan in different regions.

[0016] In some optional implementations, the training exercise actions of the power system include: simulating protection actions of primary and secondary equipment of the power grid and dynamic power flow distribution actions after a fault.

[0017] In some optional implementations, the training exercise method for the power system of the embodiment of the present disclosure further includes:

[0018] Comprehensively score the training exercises of the power system executed in multiple preset training exercise rooms and generate a scoring report.

[0019] According to a second aspect, an embodiment of the present disclosure further provides a training exercise device for a power system, the device comprising:

[0020] User data acquisition module, used to obtain user account information of power systems in different areas;

[0021] The user authority configuration module generates authority management configuration information for multiple preset training and exercise rooms based on the power system user account information;

[0022] The simulation teaching plan making module is used to make power system fault simulation teaching plans based on the power grid topology model;

[0023] The exercise action execution module is used to execute the training exercise actions of the power system in multiple preset training exercise rooms based on the power system fault simulation teaching plan and according to the authority management configuration information.

[0024] According to a third aspect, an embodiment of the present disclosure further provides a computer device, including:

[0025] The memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the training exercise method for the power system in the first aspect or any embodiment of the first aspect by executing the computer instructions.

[0026] According to a fourth aspect, an embodiment of the present disclosure provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the training exercise method for a power system in the first aspect or any one of the embodiments of the first aspect.

[0027] According to a fifth aspect, an embodiment of the present disclosure provides a computer program product, including computer instructions, which are used to enable a computer to execute the training exercise method for the power system in the first aspect or any embodiment of the first aspect.

[0028] The technical solution of the present invention has the following advantages:

[0029] The present invention relates to the technical field of power system automation simulation, and discloses a training exercise method, device, equipment and medium for a power system. The present invention obtains user account information of the power system in different areas; based on the user account information of the power system, generates authority management configuration information under multiple preset training exercise rooms; based on the power grid topology model, makes a power system fault simulation lesson plan; based on the power system fault simulation lesson plan, performs training exercise actions of the power system in multiple preset training exercise rooms according to the authority management configuration information. Finally, the present invention can realize the simultaneous simulation exercise of training scenarios in different areas, and can also significantly improve the simulation efficiency and reduce the time consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0031] Figure 1 is a flow chart of a training exercise method for a power system according to an embodiment of the present invention;

[0032] Figure 2 is a structural block diagram of a training and exercise device for a power system according to an embodiment of the present invention;

[0033] Figure 3It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0035] According to an embodiment of the present invention, an embodiment of a training exercise method for an electric power system is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0036] In this embodiment, a training exercise method for a power system is provided, which can be used for computer devices such as mobile phones, tablet computers, desktop computers, portable notebooks, servers, etc. Figure 1 is a flow chart of a training exercise method for a power system according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0037] Step S101, obtaining the user account information of the power system in different areas.

[0038] Specifically, different regions may be different provinces and regions across the country, for example, Henan Province, Hebei Province, Shandong Province, Shanxi Province, etc. The power system user ledger information may be user ledger information of different provinces and regions, and the user ledger information mainly includes user name, user type, user station number or user pole number, capacity of each transformer of the user, user commissioning time, user change date and capacity load ratio.

[0039] Step S102, based on the power system user account information, generate the authority management configuration information under multiple preset training exercise rooms.

[0040] Specifically, the authority management configuration information includes authority management configuration information corresponding to different user roles. For example, the embodiment of the present disclosure can restrict access to preset training exercise rooms according to the dispatching organization to which the multi-level power grid users belong, control the access rights of the participants to multiple preset virtual exercise rooms corresponding to different regions, and prohibit the participants from cross-regional access and operation. The multiple preset training exercise rooms in the embodiment of the present disclosure are multiple preset virtual exercise rooms, which can be displayed through the display interface. For example, the first preset training exercise room, the second preset training exercise room, the third preset training exercise room, and the fourth preset training exercise room, the screen of each preset training exercise room is basically the same, the difference is that the logged-in users are different, and each preset training exercise room corresponds to a region. For example, the first preset exercise training scenario corresponds to Henan Province, the second preset exercise training scenario corresponds to Hebei Province, the third preset exercise training scenario corresponds to Shandong Province, and the fourth preset training exercise room corresponds to Shanxi Province.

[0041] In some optional implementations, based on the power system user account information, authority management configuration information under multiple preset training exercise rooms is generated, including:

[0042] Step a1, grouping all users in the power system user ledger information according to different areas, exercise roles, and the number of preset training exercise rooms. The exercise roles include administrators, instructors, and trainees.

[0043] Step a2: Based on the grouping results, the access rights and access time for logging into the corresponding preset training exercise scenario are set for each group of users according to the exercise role.

[0044] Specifically, when configuring permission management information, different users in a multi-level power grid can be divided into groups according to user usage habits, different provinces, exercise roles, and the number of virtual exercise rooms. For example, according to Henan Province, multiple power grid users in Henan Province are assigned to corresponding preset training exercise rooms, or multiple power grid users in Henan Province and Hebei Province are assigned to corresponding preset training exercise rooms. The corresponding user roles in each preset training exercise room can be administrator, instructor, and trainee, respectively, and based on the grouping results, the access rights and access time for logging into the corresponding preset training exercise scene are set for each group of users according to the exercise role.

[0045] In the grouping results, groups are required to manage dispatchers in groups, and the same group enters the only designated virtual exercise room; in the exercise role, the administrator has the authority to control the opening and closing of the virtual exercise room, the instructor has the authority to set power grid faults and control the exercise process in the virtual exercise room, and the trainee is the role used to be assessed.

[0046] The following Table 1 is a schematic table of user status information.

[0047] Table 1

[0048] Serial number Property information Property Type Preset training exercise scenarios 1 user_id User ID RTDBKEY No. 1 Pre-set Training and Practice Room 2 usernameUsername STRING No. 2 Pre-set Training and Practice Room 3 scene_id Current scene RTDBKEY No. 3 Pre-set Training and Practice Room 4 scene_name scene name STRING No. 4 Pre-set Training and Practice Room 5 user_role user role INT No. 5 Pre-set Training and Practice Room 6 user_status user status INT No. 6 Pre-set Training and Practice Room

[0049] The following Table 2 is a schematic diagram of a preset training exercise room.

[0050] Table 2

[0051]

[0052]

[0053] Specifically, based on the grouping results, the grouped personnel enter the corresponding preset virtual exercise room to complete training exercises in different provinces and regions, and the same group of users is automatically assigned to the same preset training exercise room.

[0054] Step S103, making a power system fault simulation teaching plan based on the power grid topology model.

[0055] Specifically, the power grid topology model is created based on the power grid nodes and edges and endowed with power grid attribute information, and the power system fault simulation lesson plan is the content used for exercises in a preset virtual exercise room.

[0056] In some optional implementations, a power system fault simulation teaching plan is prepared based on the power grid topology model, including:

[0057] Based on the power grid topology model, the line names, line parameters, and line status of different areas are obtained to make power system fault simulation teaching plans.

[0058] In a specific example, the line name is used to distinguish the lines, and the line parameters include: nominal impedance, maximum current carrying capacity, load parameters, number of transformer windings, bus voltage parameters, and generator parameters on the lines in different areas.

[0059] In another specific example, the line state includes a switch closed state and a switch open state.

[0060] In a specific example, the power system fault simulation lesson plan includes: short circuit fault simulation lesson plans in different areas, open circuit fault simulation lesson plans, busbar faults, transformer fault simulation lesson plans, and switch fault simulation lesson plans.

[0061] Step S104, based on the power system fault simulation teaching plan, execute the power system training exercise actions in a plurality of preset training exercise rooms according to the authority management configuration information.

[0062] Specifically, after completing the collaborative production of training exercise lesson plans in the virtual exercise room, the power system background simulates the data calculation service process of the power grid operation mode, and conducts continuous disturbance simulation on the power system to track the 24-point output and power generation data, and continuously matches the dynamic flow of power generation output in the background, so that the power system can quickly converge and calculate the real-time frequency of the current simulated power grid. In the corresponding power system fault simulation lesson plan, the fault setting and operation mode adjustment operations are performed to execute the training and exercise of the power system training exercise actions.

[0063] Specifically, the operating mode adjustment in the training exercise refers to the operation of electrical equipment on the plant single-line diagram in the virtual exercise room, including: opening and closing operations of switch blades, load active and reactive power adjustment, unit active and reactive power adjustment, and winding gear adjustment.

[0064] In the virtual exercise room, each group of users has access and operation rights to the plants and stations under the jurisdiction of their own dispatching agency, and the power system prohibits access and adjustments across jurisdictions.

[0065] In a specific example, the training exercise method for the power system in the embodiment of the present disclosure further includes:

[0066] Comprehensively score the training exercises of the power system executed in multiple preset training exercise rooms and generate a scoring report.

[0067] Specifically, after the training or exercise, the power system will give a comprehensive score based on the compliance, safety, and economic efficiency of the fault handling process to form a scoring report for this virtual exercise room.

[0068] In a specific example, after the drill is over, the administrator actively applies to close the virtual drill room, and the power system will immediately reclaim the instance scene where the preset virtual drill room is located, or automatically reclaim the instance scene resources after the default duration of creating the preset virtual drill room is reached to avoid overtime occupation of resources.

[0069] In this embodiment, a training and exercise device for a power system is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0070] This embodiment provides a training and exercise device for an electric power system, such as Figure 2 As shown, including:

[0071] The user data acquisition module 21 is used to obtain the user account information of the power system in different areas;

[0072] The user authority configuration module 22 generates authority management configuration information for a plurality of preset training exercise rooms based on the power system user account information;

[0073] A simulation teaching plan making module 23 is used to make a power system fault simulation teaching plan based on a power grid topology model;

[0074] The exercise action execution module 24 is used to execute the training exercise actions of the power system in a plurality of preset training exercise rooms according to the authority management configuration information based on the power system fault simulation teaching plan.

[0075] In some optional implementations, the user authority configuration module 22 includes:

[0076] The grouping submodule is used to group all users in the power system user ledger information according to different areas, exercise roles, and the number of preset training exercise rooms. The exercise roles include administrators, instructors, and trainees.

[0077] The setting submodule is used to set the access rights and access time for the preset training exercise scenarios corresponding to the login for each group of users according to the exercise roles based on the grouping results.

[0078] In some optional implementations, the simulation teaching plan making module 23 includes:

[0079] The simulation lesson plan making submodule is used to obtain the line names, line parameters, and line status of different areas based on the power grid topology model, and make power system fault simulation lesson plans.

[0080] In some optional embodiments, the line parameters include: nominal impedance, maximum current carrying capacity, load parameters, number of transformer windings, bus voltage parameters, generator parameters on lines in different regions; the line status includes switch closed state and switch open state; the power system fault simulation lesson plan includes: short circuit fault simulation lesson plan, open circuit fault simulation lesson plan, bus fault, transformer fault simulation lesson plan, and switch fault simulation lesson plan in different regions.

[0081] In some optional implementations, the training exercise actions of the power system include: simulating protection actions of primary and secondary equipment of the power grid and dynamic power flow distribution actions after a fault.

[0082] In some optional implementations, the method further includes: comprehensively scoring the training exercise actions of the power system executed in multiple preset training exercise rooms, and generating a scoring report.

[0083] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0084] The training and exercise device for the power system in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0085] The embodiment of the present invention also provides a computer device having the above Figure 3 The training drill for the power system shown. Figure 3 , Figure 3 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 3 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 3 A processor 10 is taken as an example.

[0086] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0087] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0088] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0089] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0090] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0091] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0092] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0093] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A training exercise method for a power system, characterized in that: The method comprises: Obtain user account information of power systems in different regions; Based on the power system user account information, generating permission management configuration information under multiple preset training exercise rooms; Based on the power grid topology model, make a teaching plan for power system fault simulation; Based on the power system fault simulation teaching plan, power system training exercise actions are performed in the plurality of preset training exercise rooms according to the authority management configuration information.

2. The method according to claim 1, characterized in that Based on the power system user account information, authority management configuration information under multiple preset training exercise rooms is generated, including: Grouping all users in the power system user ledger information according to different areas, exercise roles, and the number of preset training exercise rooms, wherein the exercise roles include administrators, instructors, and trainees; Based on the grouping results, access rights and access time for logging into the corresponding preset training exercise scenario are set for each group of users according to the exercise role.

3. The method according to claim 1, characterized in that Based on the power grid topology model, a power system fault simulation teaching plan is prepared, including: Based on the power grid topology model, the line names, line parameters, and line status of different areas are obtained to make power system fault simulation teaching plans.

4. The method according to claim 3, characterized in that The line parameters include: nominal impedance, maximum current carrying capacity, load parameters, number of transformer windings, bus voltage parameters, and generator parameters on lines in different areas; the line status includes a switch closed state and a switch open state; the power system fault simulation lesson plan includes: short circuit fault simulation lesson plans, open circuit fault simulation lesson plans, bus faults, transformer fault simulation lesson plans, and switch fault simulation lesson plans in different areas.

5. The method according to claim 1, characterized in that The training exercise actions of the power system include: simulating the protection actions of the primary and secondary equipment of the power grid and the dynamic power flow distribution actions after a fault.

6. The method according to claim 1, characterized in that Also includes: Comprehensively score the training exercise actions of the power system executed in the plurality of preset training exercise rooms, and generate a scoring report.

7. A training exercise device for an electric power system, characterized in that: The device comprises: User data acquisition module, used to obtain user account information of power systems in different areas; A user authority configuration module, based on the power system user account information, generates authority management configuration information under multiple preset training exercise rooms; The simulation teaching plan making module is used to make power system fault simulation teaching plans based on the power grid topology model; The exercise action execution module is used to execute the training exercise actions of the power system in the plurality of preset training exercise rooms based on the power system fault simulation teaching plan and in accordance with the authority management configuration information.

8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the training exercise method for the power system according to any one of claims 1 to 6 by executing the computer instructions.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the training exercise method for the power system according to any one of claims 1 to 6.

10. A computer program product, characterized in that The method comprises computer instructions, wherein the computer instructions are used to cause a computer to execute the training exercise method for a power system according to any one of claims 1 to 6.