Slagging-off device for submerged arc furnace
The slag removal device in submerged arc furnaces uses a combination of pneumatic and mechanical driving mechanisms to enhance efficiency and reduce costs by allowing flexible slag removal and transport in high-temperature environments.
Patent Information
- Application Number
- CN202411507778.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-12-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing slag removal methods in submerged arc furnaces for silicon-manganese alloy production are inefficient, costly, and lack flexibility due to the use of complex driving equipment, making it difficult to achieve comprehensive and efficient slag removal in high-temperature environments.
A slag removal device utilizing a combination of pneumatic and mechanical driving mechanisms, powered by a double-headed motor, which includes a cylinder barrel, extension and lifting assemblies, and a conveyor system to facilitate precise and comprehensive slag removal and transport.
The device enhances slag removal efficiency and reduces costs by enabling flexible slag removal at different positions and depths, minimizing waste and improving the overall comprehensiveness of the slag removal process.
Smart Images

Figure CN119223012A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of slag removal equipment for submerged arc furnaces, and in particular relates to a slag removal device for submerged arc furnaces. Background Art
[0002] In the process of electrothermal smelting of silicon-manganese alloy, the submerged arc furnace is a main equipment. Its main function is to use electrodes to introduce electric power into the furnace to heat and melt the charge, so that the smelting raw ore, under the mixed action of the reducing agent and the solvent or lime in the furnace, undergoes an oxidation-reduction reaction to generate silicon-manganese alloy. During the production of silicon-manganese alloy, the submerged arc furnace will produce useless slag on the surface of the silicon-manganese alloy melt.
[0003] In the prior art (the patent application for a slag scraper for a submerged arc furnace with a publication number of CN103047866B and a patent name of CN103047866B), the rotation, pitch, lifting, and extension and retraction of the slag scraper arm are controlled by a hydraulic system to complete the slag scraping operation at different positions and angles. In the process of implementing the technical solution, it is found that the prior art has at least the following problems.
[0004] During the slagging operation of the slag in the silicon-manganese alloy melt in the high-temperature environment in the electric arc furnace, it is usually necessary to use multiple and complex driving equipment, which not only increases the slagging cost of the slag in the silicon-manganese alloy melt in the electric arc furnace, but also has low flexibility. It is impossible to adopt a low-cost driving method combining pneumatic and mechanical driving to achieve a comprehensive and efficient flexible slagging effect for the slag in the silicon-manganese alloy melt in the electric arc furnace. Summary of the invention
[0005] The present application aims to solve at least one of the technical problems in the prior art that the slag in the silicon-manganese alloy melt in the submerged arc furnace cannot be fully and efficiently slag-removed by a low-cost driving method combining pneumatic and mechanical means, the slag-removing effect is low in efficiency and high in cost, and the slag-removed cannot be quickly transported in different areas. To this end, the present application proposes a slag-removing device for a submerged arc furnace.
[0006] To achieve the above purpose, the specific technical solutions of the present invention are as follows:
[0007] A slag removal device for an ore-fired furnace comprises a fixed frame, a fixed box is fixedly connected to one side of the top of the fixed frame, a PLC controller is fixedly connected to the top of the fixed box, and a cylinder barrel is fixedly connected to the right side of the fixed box;
[0008] The inner cavity of the fixed box is provided with a supply assembly that cooperates with the cylinder barrel to do work, and the supply assembly includes a double-headed motor fixed to one side of the bottom of the fixed frame, and the right side of the fixed frame is provided with an extension assembly that cooperates with the supply assembly;
[0009] The inner cavity of the fixing frame is provided with a gathering component that is adjusted inside and outside with the extension component, and the outer side of the fixing frame is provided with a lifting component for adjusting the overall height of the supply component, the extension component and the gathering component.
[0010] Preferably: the supply assembly also includes a cam fixed on an output shaft of the double-headed motor, and the other side of the cam is slidably connected to a swing frame through a rotating head, a connecting rod is fixedly connected to the center of the right side of the swing frame, and the side of the connecting rod away from the swing frame is fixedly connected to a piston that slides with the cylinder barrel, the right side of the cylinder barrel is connected to a four-way valve, and the right end of the four-way valve is connected to an intake pipe, an intake valve is provided on the intake pipe, and both ends of the four-way valve are connected to exhaust pipes.
[0011] Preferably: the extension assembly includes a pressure storage tank fixed on both sides of the top of the fixing frame and connected to the two exhaust pipes in one way, and one exhaust port of the pressure storage tank is connected to a telescopic short tube, the end of the telescopic short tube away from the pressure storage tank is connected to a long sealing cylinder, and the inner cavity of the long sealing cylinder is slidably connected to a long T-rod, a long return spring is sleeved on the long T-rod, and a connecting seat is fixedly connected to the right side of the long T-rod, a slag shovel is fixedly connected to the right side of the connecting seat, and the slag shovel is provided with sieve holes all around.
[0012] Preferably: the lifting assembly includes a boost angle tube connected to another exhaust port of the pressure storage tank, and the end of the boost angle tube away from the pressure storage tank is connected to a telescopic long tube, the bottom end of the telescopic long tube is connected to a four-way joint, and both ends of the four-way joint are connected to a short sealing cylinder, the inner cavity of the short sealing cylinder is slidably connected to a short T-rod, and the short T-rod is sleeved with a short return spring, and the top of the short T-rod is fixedly connected to a bracket fixedly matched with a fixed frame.
[0013] Preferably: the gathering assembly includes a main bevel gear fixed to the side of the double-headed motor output shaft close to the cam, and a secondary bevel gear is arranged on the other side of the main bevel gear, the right side of the secondary bevel gear is fixedly connected to a first electric push rod, and the outer side of the first electric push rod is sleeved with a reciprocating screw that rotates with the fixed frame, the reciprocating screw is threadedly connected to a screw barrel, and the outer side of the screw barrel is sleeved with a double-sided toothed plate, both sides of the double-sided toothed plate are meshed with intermediate gears that rotate with the fixed frame, and the outer side of the intermediate gear is fixedly connected to a slide that is fixedly matched with the long sealing barrel.
[0014] Preferably, first slide rails are provided on both sides of the inner cavity of the fixed box, and the inner cavity of the first slide rail is slidably connected with a first sliding block fixedly matched with the swing frame.
[0015] Preferably, the bottom end of the long sealing tube close to the telescopic short tube is connected to a first pressure relief pipe, and the first pressure relief pipe is provided with a first pressure relief valve.
[0016] Preferably, the inner end of the four-way joint is connected to a second pressure relief pipe, and the first pressure relief pipe is provided with a second pressure relief valve, and the first pressure relief valve and the second pressure relief valve are of the same model and specification.
[0017] Preferably, second slide rails are provided on both sides of the inner cavity of the fixing frame, and second sliding blocks fixedly matched with the double-sided toothed plates are slidably connected to both sides of the inner cavity of the second slide rails.
[0018] Preferably, a conveying frame used in conjunction with a fixing frame is arranged on the inner side of the short sealing cylinder, and a chain plate type conveyor belt is driven on the inner side of the conveying frame.
[0019] The slag removal device for a submerged arc furnace of the present invention has the following advantages:
[0020] 1. The slag scraping device for an electric furnace, during the slag scraping operation of the slag in the silicon-manganese alloy melt in a high-temperature environment in the electric furnace, firstly provides a unified power source of pneumatic and mechanical driving modes by a double-headed motor, saving the power driving cost, and the horizontal reciprocating cooperation of the cam and the swing frame completes the reciprocating work in the cylinder barrel through the piston on the connecting rod, providing an air charging source for the subsequent pneumatic drive, and the suction pipe and the exhaust pipe on the four-way valve provide channel support for the supply and exhaust of the cylinder barrel, at the same time, the pressurized air source generated in the cylinder barrel is supplied to two groups of pressure storage tanks through two exhaust pipes for temporary storage, and supplied to two groups of long sealing cylinders through two telescopic short pipes, under the action of pressure, forcing the two long T-shaped rods to drive the slag scraping shovels on the two groups of connecting seats to extend forward synchronously, so as to meet the slag scraping needs of the slag at different positions on the silicon-manganese alloy melt in the electric furnace, and the silicon-manganese alloy melt scraped up with the slag is screened and discharged by the sieve hole, so as to avoid wasting the silicon-manganese alloy melt.
[0021] 2. The slag removal device for an ore-bearing furnace, then, the pressurized gas source in the two groups of pressure storage tanks is sequentially supplied to the two groups of short sealing cylinders through the two pressurized angle tubes, the telescopic long tube and the four-way joint. Under the action of the pressure force, the brackets on the two short T-bars are forced to drive the fixed frame, the fixed box and the slag removal shovel to perform overall lifting and adjustment, which is beneficial for the slag removal shovel to perform slag removal operations on slag materials of different depths in the silicon-manganese alloy melt in the ore-bearing furnace to avoid omission of slag materials during slag removal, thereby improving the comprehensiveness of slag removal of slag materials in the silicon-manganese alloy melt in the ore-bearing furnace, eliminating the need for rework, and also improving its slag removal efficiency.
[0022] 3. The slag scraping device for an ore-bearing furnace, and then, the first electric push rod adjusts the meshing stroke between the main bevel gear and the auxiliary bevel gear, and the reciprocating screw and the screw tube cooperate in the horizontal reciprocating displacement, and the double-sided toothed plate drives the slides on the two sets of transfer gears and the slag scraping shovels on the two long T-shaped rods to achieve horizontal outward and inward adjustment effects, so as to gather the slag in the silicon-manganese alloy melt in the ore-bearing furnace, so as to avoid slag omission before and after the slag scraping shovel, and further improve the comprehensiveness and efficiency of the slag scraping. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a schematic structural diagram of a slag removal device for a submerged arc furnace of the present invention;
[0025] Figure 2 It is a right view of the structure of a slag removal device for a submerged arc furnace according to the present invention;
[0026] Figure 3 A cross-sectional view of the structure of a slag removal device for a submerged arc furnace according to the present invention;
[0027] Figure 4 This is an internal view of the structure of a slag removal device for a submerged arc furnace according to the present invention;
[0028] Figure 5 It is a front cross-sectional view of the cylinder barrel, supply assembly and extension assembly structure of the present invention;
[0029] Figure 6 It is a right view of the supply assembly, the extension assembly and the gathering assembly structure of the present invention;
[0030] Figure 7 It is a cross-sectional view of the supply component, the extension component and the gathering component structure of the present invention;
[0031] Figure 8 It is a partial cross-sectional view of the gathering component structure of the present invention;
[0032] Fig. 9 It is a side cross-sectional view of the cylinder barrel, supply assembly and pressure storage tank structure of the present invention;
[0033] Fig.10 It is a front cross-sectional view of the cylinder barrel, supply assembly, pressure storage tank and lifting assembly structure of the present invention;
[0034] Fig.11It is a right side cross-sectional view of the cylinder barrel, supply assembly, pressure storage tank and lifting assembly structure of the present invention;
[0035] Fig.12 It is a side view of the supply assembly, slag delivery assembly, conveyor frame and chain plate conveyor belt structure of the present invention;
[0036] Fig.13 It is a right view of the supply assembly, slag delivery assembly, conveyor frame and chain plate conveyor belt structure of the present invention;
[0037] Fig.14 It is a partial cross-sectional view of the fixing frame, fixing box and cylinder barrel structure of the present invention.
[0038] Explanation of the markings in the figure: 1. Fixed frame; 2. Fixed box; 3. Cylinder barrel; 4. Supply assembly; 41. Double-head motor; 42. Cam; 43. Swing frame; 44. Connecting rod; 45. Piston; 46. Four-way valve; 47. Intake pipe; 48. Exhaust pipe; 5. Extension assembly; 51. Pressure storage tank; 52. Telescopic short pipe; 53. Long sealing cylinder; 54. Long T-bar; 55. Long return spring; 56. Connecting seat; 57. Slag shovel; 58. Screen hole; 6. First pressure relief pipe; 7. Lifting assembly; 71. Boost angle pipe; 72. Telescopic long pipe; 73. Four-way joint; 74. Second pressure relief pipe; 75. Short sealing cylinder; 76. Short T rod; 77, short return spring; 78, bracket; 8, gathering assembly; 81, main bevel gear; 82, auxiliary bevel gear; 83, first electric push rod; 84, reciprocating screw rod; 85, screw rod barrel; 86, double-sided gear plate; 87, transfer gear; 88, slide; 9, slag delivery assembly; 91, second electric push rod; 92, driving bevel gear; 93, driven bevel gear; 94, driving roller frame; 95, driven roller frame; 96, push arm; 97, bending rod; 98, combing frame; 10, first slide rail; 11, first slider; 12, second slide rail; 13, second slider; 14, conveying frame; 15, chain plate conveyor belt; 16, receiving frame. DETAILED DESCRIPTION
[0039] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the embodiments of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0040] In the description of the embodiments of the present invention, it should be understood that the terms "length", "vertical", "horizontal", "top", "bottom", etc. indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present invention.
[0041] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0042] In the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.
[0043] The disclosure below provides many different embodiments or examples to implement different structures of the embodiments of the present invention. In order to simplify the disclosure of the embodiments of the present invention, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the embodiments of the present invention. In addition, the embodiments of the present invention can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplification and clarity, which itself does not indicate the relationship between the various embodiments and / or settings discussed.
[0044] like Figure 1-Figure 14 As shown, a slag removal device for an electric arc furnace of the present invention comprises a fixed frame 1, a fixed box 2 is fixedly connected to one side of the top of the fixed frame 1, and a PLC controller is fixedly connected to the top of the fixed box 2, a cylinder barrel 3 is fixedly connected to the right side of the fixed box 2, and a supply component 4 cooperating with the cylinder barrel 3 is provided in the inner cavity of the fixed box 2, and the supply component 4 comprises a double-headed motor 41 fixed to one side of the bottom of the fixed frame 1, and the double-headed motor 41 provides a unified power source for both pneumatic and mechanical driving modes, thereby saving power driving costs;
[0045] An extension component 5 cooperating with the supply component 4 is arranged on the right side of the fixed frame 1, a gathering component 8 adjusted inside and outside with the extension component 5 is arranged in the inner cavity of the fixed frame 1, and a lifting component 7 for adjusting the overall height of the supply component 4, the extension component 5 and the gathering component 8 is arranged on the outer side of the fixed frame 1. A low-cost driving method combining pneumatic and mechanical driving is adopted to achieve a comprehensive and efficient flexible slag removal effect on the slag in the silicon-manganese alloy melt in the electric arc furnace, thereby improving the slag removal efficiency and reducing the slag removal cost.
[0046] like Figure 5-Figure 11 As shown, the supply component 4 also includes a cam 42 fixed on an output shaft of the double-headed motor 41, and the other side of the cam 42 is slidably connected to a swing frame 43 through a rotating head, a connecting rod 44 is fixedly connected to the center of the right side of the swing frame 43, and a piston 45 slidably matched with the cylinder barrel 3 is fixedly connected to the side of the connecting rod 44 away from the swing frame 43, and the cam 42 and the swing frame 43 are horizontally reciprocated to complete the reciprocating work in the cylinder barrel 3 through the piston 45 on the connecting rod 44, providing an inflation source for subsequent pneumatic drive, the right side of the cylinder barrel 3 is connected to a four-way valve 46, and the right end of the four-way valve 46 is connected to an intake pipe 47, an intake valve is provided on the intake pipe 47, and both ends of the four-way valve 46 are connected to exhaust pipes 48, and the intake pipe 47 and the exhaust pipe 48 on the four-way valve 46 provide channel support for the supply and exhaust of the cylinder barrel 3;
[0047] A first slide rail 10 is provided on both sides of the inner cavity of the fixed box 2, and the inner cavity of the first slide rail 10 is slidably connected with a first slider 11 fixedly matched with the swing frame 43, which plays a role of sliding support for both sides of the swing frame 43, thereby improving the stability of the horizontal reciprocating movement of the swing frame 43 to prevent the swing frame 43 from tilting and shaking during displacement.
[0048] The extension assembly 5 includes a pressure storage tank 51 fixed on both sides of the top of the fixing frame 1 and connected to the two exhaust pipes 48 in one direction. The pressurized gas source generated in the cylinder barrel 3 is then supplied to the two groups of pressure storage tanks 51 through the two exhaust pipes 48 for temporary storage, and one exhaust port of the pressure storage tank 51 is connected to a telescopic short tube 52, and one end of the telescopic short tube 52 away from the pressure storage tank 51 is connected to a long sealing tube 53, and the pressurized gas source in the two groups of pressure storage tanks 51 is supplied to the two groups of long sealing tubes 53 through the two telescopic short tubes 52;
[0049] The inner cavity of the long sealing cylinder 53 is slidably connected with a long T-shaped rod 54, on which a long return spring 55 is sleeved, and the right side of the long T-shaped rod 54 is fixedly connected with a connecting seat 56, and the right side of the connecting seat 56 is fixedly connected with a slag shovel 57. Under the action of pressure, the two long T-shaped rods 54 are forced to drive the slag shovels 57 on the two groups of connecting seats 56 to extend forward synchronously, so as to meet the slag removal requirements of slag materials at different positions on the silicon-manganese alloy melt in the ore-fired furnace, and the slag shovel 57 is provided with sieve holes 58 around it, and the silicon-manganese alloy melt picked up with the slag materials is sieved and discharged by the sieve holes 58, so as to avoid wasting the silicon-manganese alloy melt;
[0050] The bottom end of the long sealing tube 53 near the telescopic short tube 52 is connected to a first pressure relief pipe 6, and a first pressure relief valve is provided on the first pressure relief pipe 6. The pressurized air source supplied into the long sealing tube 53 is released and discharged through the first pressure relief pipe 6, which is beneficial for the long T-rod 54 in the long sealing tube 53 to be reset with the help of a long reset spring 55.
[0051] The lifting assembly 7 includes a boost angle tube 71 connected to another exhaust port of the pressure storage tank 51, and the end of the boost angle tube 71 away from the pressure storage tank 51 is connected to a telescopic long tube 72, the bottom end of the telescopic long tube 72 is connected to a four-way joint 73, and both ends of the four-way joint 73 are connected to short sealing cylinders 75. The boost air sources in the two groups of pressure storage tanks 51 are sequentially supplied to the two groups of short sealing cylinders 75 by the two boost angle tubes 71, the telescopic long tube 72 and the four-way joint 73;
[0052] The inner cavity of the short sealing cylinder 75 is slidably connected with a short T-shaped rod 76, and a short return spring 77 is sleeved on the short T-shaped rod 76. The top of the short T-shaped rod 76 is fixedly connected with a bracket 78 fixedly matched with the fixed frame 1. Under the action of the pressure force, the bracket 78 on the two short T-shaped rods 76 is forced to drive the fixed frame 1 and the fixed box 2 and the slag shovel 57 to perform overall lifting and adjustment, which is conducive to the slag shovel 57 to perform slag removal operation on slag materials of different depths in the silicon-manganese alloy melt in the ore-fired furnace, so as to avoid omission when removing slag materials, improve the comprehensiveness of slag removal of slag materials in the silicon-manganese alloy melt in the ore-fired furnace, and improve its slag removal efficiency.
[0053] The inner end of the four-way joint 73 is connected to a second pressure relief pipe 74, and a second pressure relief valve is provided on the first pressure relief pipe 6. The pressurized air source supplied into the short sealing cylinder 75 is released and discharged through the second pressure relief pipe 74 on the four-way joint 73, which is conducive to the short T-bar 76 in the short sealing cylinder 75 to be reset with the help of a short reset spring 77. The first pressure relief valve and the second pressure relief valve adopt the same model and specification, which is convenient for unified replacement of the first pressure relief valve and the second pressure relief valve. A conveying frame 14 used in conjunction with the fixed frame 1 is provided on the inner side of the short sealing cylinder 75, and a chain plate conveyor belt 15 is driven on the inner side of the conveying frame 14 to convey and discharge the slag material removed, replacing the manual cleaning method. A material receiving frame 16 cooperating with the chain plate conveyor belt 15 for feeding is fixed obliquely on the side of the conveying frame 14 close to the slag shovel 57, and the slag material removed from the slag shovel 57 is divided into two groups of chain plate conveyor belts 15 to prevent slag material from clogging.
[0054] The gathering component 8 includes a main bevel gear 81 fixed to the output shaft of the double-headed motor 41 on one side close to the cam 42, and a secondary bevel gear 82 is provided on the other side of the main bevel gear 81. The meshing stroke between the main bevel gear 81 and the secondary bevel gear 82 is first adjusted by the first electric push rod 83. The right side of the secondary bevel gear 82 is fixedly connected to the first electric push rod 83, and the outer side of the first electric push rod 83 is sleeved with a reciprocating screw 84 that rotates with the fixed frame 1. The reciprocating screw 84 is threadedly connected with a screw barrel 85, and the outer side of the screw barrel 85 is sleeved with a double-sided toothed plate 86. The double-sided toothed plate 86 Both sides are meshed with a transfer gear 87 that rotates with the fixed frame 1, and the outer side of the transfer gear 87 is fixedly connected with a slide 88 that is fixed with the long sealing tube 53. Under the cooperation of the horizontal reciprocating screw 84 and the screw tube 85, the slides 88 on the two sets of transfer gears 87 and the slag shovels 57 on the two long T-shaped rods 54 are driven by the double-sided toothed plate 86 to achieve horizontal outward and inward adjustment effects, so as to gather the slag in the silicon-manganese alloy melt in the ore-fired furnace to avoid slag leakage before and after the slag shovel 57 slags, and further improve the comprehensiveness and efficiency of slag slag removal;
[0055] Second slide rails 12 are provided on both sides of the inner cavity of the fixed frame 1, and second sliders 13 are slidably connected to both sides of the inner cavity of the second slide rails 12 and fixedly matched with the double-sided toothed plate 86, which play a role of sliding limit for the double-sided toothed plate 86, improve the back-and-forth displacement stability of the double-sided toothed plate 86, and facilitate the double-sided toothed plate 86 to smoothly turn and adjust the two sets of transfer gears 87.
[0056] like Figure 12-13As shown, during the slag removal operation of the slag in the silicon-manganese alloy melt in the high-temperature environment in the ore-fired furnace, the removed slag is mostly cleaned manually, and the removed slag cannot be fed in real time, resulting in slag accumulation, which affects the slag removal operation. A slag feeding component 9 used in conjunction with a conveyor frame 14 and a chain plate conveyor belt 15 is provided on the other side of the supply component 4, and the slag feeding component 9 includes a second electric push rod 91 embedded in the other output shaft of the double-headed motor 41, a piston rod of the second electric push rod 91 is fixedly connected to a driving bevel gear 92, and a driven bevel gear 93 is provided on one side of the driving bevel gear 92, and the second electric push rod 91 adjusts the meshing stroke between the driving bevel gear 92 and the driven bevel gear 93;
[0057] The inner cavity of the driven bevel gear 93 is fixedly connected with a driving roller frame 94 that cooperates with the chain plate conveyor belt 15, and the inner cavity of the chain plate conveyor belt 15 is connected with a driven roller frame 95 that rotates synchronously with the driving roller frame 94. The driving roller frame 94 and the driven roller frame 95 are both rotated with the conveyor frame 14. The driving bevel gear 92 and the driven bevel gear 93 that are meshed in place drive the driving roller frame 94 to rotate, and under the synchronous transmission cooperation of several driven roller frames 95, the chain plate conveyor belts 15 in the two groups of conveyor frames 14 are driven to synchronously drive, so as to perform a zoned feeding operation on the shoveled slag. , replacing the manual cleaning method, improving the slag removal efficiency, and a push arm 96 is fixedly connected to the center of the left side of the swing frame 43, and bent rods 97 are fixedly connected on both sides of the push arm 96, and a combing frame 98 used in conjunction with the chain plate conveyor belt 15 is fixedly connected to the bottom of the bent rod 97. The swing frame 43 drives the combing frames 98 on the two groups of bent rods 97 through the push arm 96 to comb the slag transported on the two groups of chain plate conveyor belts 15 back and forth, so that the slag in the conveying state is spread out, which is conducive to the rapid dissipation and cooling of the heat carried inside, and also prevents the slag from clogging on the chain plate conveyor belt 15.
[0058] Working principle of a slag removal device for an electric arc furnace: During the slag removal operation of the slag material in the silicon-manganese alloy melt in a high-temperature environment in the electric arc furnace, the double-headed motor 41 is first controlled to start and drive the cam 42 to rotate, and the first slide rail 10 and the first slider 11 play a sliding support role on the swing frame 43. The cam 42 drives the swing frame 43 to move horizontally back and forth through the rotating head, and the swing frame 43 drives the piston 45 on the connecting rod 44 to work back and forth in the cylinder barrel 3. When the piston 45 is in the return stroke in the cylinder barrel 3, the piston 45 is in the return stroke. In the intake state, the air intake valve on the intake pipe 47 is controlled to open, and the passage from the four-way valve 46 to the two exhaust pipes 48 is controlled to close, so that the outside air is sucked into the cylinder barrel 3 by the piston 45 through the intake pipe 47. When the piston 45 is in the process exhaust state in the cylinder barrel 3, on the contrary, the air sucked into the cylinder barrel 3 is pressurized by the piston 45 and discharged into the opened passage from the four-way valve 46 to the two exhaust pipes 48, and then supplied to the two groups of pressure storage tanks 51 for temporary storage until the pressurized air source in the two groups of pressure storage tanks 51 is full.
[0059] Next, the pressurized air source in the two pressure storage tanks 51 is supplied to the head end space of the two long sealing cylinders 53 through the two telescopic short tubes 52. With the continuous supply of the two-way pressurized air source, the two long T-shaped rods 54 are forced to slide forward in the two long sealing cylinders 53 under the action of the pressure force, and while compressing the two long return springs 55, the two long T-shaped rods 54 drive the two groups of slag shovels 57 to extend forward synchronously through the two groups of connecting seats 56. At the same time, the pressurized air source in the two pressure storage tanks 51 passes through the telescopic long on the two pressurized angle tubes 71. After the tube 72 is fed into the two sets of four-way joints 73, it is fed into the bottom end space of the four sets of short sealing cylinders 75. Similarly, under the action of pressure, the four short T-shaped rods 76 are forced to slide upward in the four sets of short sealing cylinders 75, and while compressing the four short return springs 77, the four short T-shaped rods 76 drive the fixed frame 1, the fixed box 2 and the two sets of slag shovels 57 in the synchronous extension state to move upward as a whole through the two sets of brackets 78, so that the two sets of slag shovels 57 adjusted forward and upward reach the slag area in the silicon-manganese alloy melt in the ore-fired furnace;
[0060] After the two groups of slag shovels 57 are in place, the double-headed motor 41 is first controlled to pause, and then the first electric push rod 83 is controlled to start and drive the secondary bevel gear 82 to reach the meshing portion of the main bevel gear 81, and then the double-headed motor 41 is controlled to start again and the main bevel gear 81 that is meshed in place drives the secondary bevel gear 82 to rotate, and the secondary bevel gear 82 drives the reciprocating screw rod 84 to rotate forwardly. With the second slide rail 12 and the second slider 13 providing sliding support for the double-sided toothed plate 86, the reciprocating screw rod 84 drives the double-sided toothed plate 86 on the screw rod barrel 85 to move forward, and the double-sided toothed plate 86 that moves forward drives the two groups of transfer gears 87 on The slide 88 expands outward synchronously, and the two sets of slides 88 drive the two sets of slag shovels 57 to expand outward synchronously through the two sets of long sealing cylinders 53 and the long T-shaped rods 54, and after the slag area in the silicon-manganese alloy melt in the submerged arc furnace is fully covered, on the contrary, the two sets of slag shovels 57 are controlled to shrink inward, and the two sets of slag shovels 57 in the contracted and combined state gather all the slag in the silicon-manganese alloy melt in the submerged arc furnace, and the silicon-manganese alloy melt leaks from the sieve leakage holes 58 on the two sets of slag shovels 57 after the merger into the silicon-manganese alloy melt in the submerged arc furnace, and so on, all the slag in the silicon-manganese alloy melt in the submerged arc furnace can be scraped out;
[0061] After all the slag is removed, the first pressure relief valve on the first pressure relief pipe 6 and the second pressure relief valve on the second pressure relief pipe 74 are controlled to open, and the pressurized air source in the two groups of long sealing tubes 53 and the four groups of short sealing tubes 75 is discharged through the first pressure relief pipe 6 and the second pressure relief pipe 74, and the two long reset springs 55 and the four short reset springs 77 in the compressed state drive the two long T-shaped rods 54 and the four short T-shaped rods 76 to perform elastic reset, so that the two groups of slag scrapers 57 still in the contracted and merged state are reset backward and downward to the initial position. , and after the two groups of slag shovels 57 still in the contracted and merged state reach the top of the material receiving frame 16, on the contrary, the two groups of slag shovels 57 in the contracted and merged state are controlled to expand outward, so that the slag materials shoveled out of the two groups of slag shovels 57 fall into the material receiving frame 16 at the loading position of the two groups of conveying frames 14, and then the inclined material receiving frame 16 slides the slag materials onto the two groups of chain plate conveyor belts 15, first control the double-headed motor 41 and the first electric push rod 83 to pause, so that the first electric push rod 83 drives the secondary bevel gear 82 to disengage from the meshing part of the main bevel gear 81 to the initial position;
[0062] After the slag material is divided and slides onto the two sets of chain plate conveyor belts 15, the second electric push rod 91 is first controlled to open and drive the driving bevel gear 92 to move down and get stuck in the meshing part of the driven bevel gear 93, and then the double-headed motor 41 is controlled to open again and drive the driven bevel gear 93 to rotate through the meshing driving bevel gear 92, and the driven bevel gear 93 drives the driving roller frame 94 to rotate accordingly. With the auxiliary transmission cooperation of a number of driven roller frames 95 to the two sets of chain plate conveyor belts 15, the driving roller frame 94 drives the two sets of chain plate conveyor belts 15 to transport the slag material forward. At the same time, the swing frame 43 still drives the piston 45 on the connecting rod 44 to work back and forth in the cylinder barrel 3, and the horizontal reciprocating swing frame 43 also drives the two sets of bent rods 97 on the push arm 96 to move accordingly, and the two sets of bent rods 97 moving horizontally drive the two sets of combing frames 98 to spread and comb the slag transported on the two sets of chain plate conveyor belts 15 back and forth, so that the heat in the slag transported on the two sets of chain plate conveyor belts 15 can be quickly dissipated and cooled, and at the same time, the slag can be prevented from blocking the two sets of chain plate conveyor belts 15, thereby completing the slag removal operation in the silicon-manganese alloy molten liquid in the ore-fired furnace.
[0063] It should be noted that the specific model specifications of the double-headed motor 41 and the electric push rod need to be selected and determined according to the actual specifications of the device, and the specific selection calculation method adopts the existing technology in this field, so it will not be repeated in detail.
[0064] The power supply circuits of the double-headed motor 41, the electric push rod and various valves are clear to those skilled in the art and will not be described in detail here.
[0065] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. A slag removal device for a submerged arc furnace, comprising a fixing frame (1), characterized in that: A fixed box (2) is fixedly connected to one side of the top of the fixed frame (1), a PLC controller is fixedly connected to the top of the fixed box (2), and a cylinder barrel (3) is fixedly connected to the right side of the fixed box (2); The inner cavity of the fixed box (2) is provided with a supply assembly (4) that cooperates with the cylinder barrel (3) to perform work, and the supply assembly (4) includes a double-headed motor (41) fixed to one side of the bottom of the fixed frame (1), and an extension assembly (5) that cooperates with the supply assembly (4) is provided on the right side of the fixed frame (1); The inner cavity of the fixing frame (1) is provided with a gathering assembly (8) that is adjusted inside and outside with the extension assembly (5), and the outer side of the fixing frame (1) is provided with a lifting assembly (7) that is used for adjusting the overall height of the supply assembly (4), the extension assembly (5) and the gathering assembly (8).
2. The slag removal device for a submerged arc furnace according to claim 1, characterized in that: The supply assembly (4) further comprises a cam (42) fixed on an output shaft of the double-headed motor (41), and the other side of the cam (42) is slidably connected to a swing frame (43) via a rotating head, a connecting rod (44) is fixedly connected to the center of the right side of the swing frame (43), and a piston (45) slidably matched with the cylinder barrel (3) is fixedly connected to the side of the connecting rod (44) away from the swing frame (43), the right side of the cylinder barrel (3) is connected to a four-way valve (46), and the right end of the four-way valve (46) is connected to an intake pipe (47), an intake valve is provided on the intake pipe (47), and both ends of the four-way valve (46) are connected to exhaust pipes (48).
3. A slag removal device for a submerged arc furnace according to claim 2, characterized in that: The extension assembly (5) comprises a pressure storage tank (51) fixed on both sides of the top of the fixing frame (1) and connected to two exhaust pipes (48) in one direction, and an exhaust port of the pressure storage tank (51) is connected to a telescopic short tube (52), and one end of the telescopic short tube (52) away from the pressure storage tank (51) is connected to a long sealing tube (53), and the inner cavity of the long sealing tube (53) is slidably connected to a long T-shaped rod (54), a long return spring (55) is sleeved on the long T-shaped rod (54), and the right side of the long T-shaped rod (54) is fixedly connected to a connecting seat (56), and the right side of the connecting seat (56) is fixedly connected to a slag shovel (57), and the slag shovel (57) is provided with sieve holes (58) around it.
4. A slag removal device for a submerged arc furnace according to claim 3, characterized in that: The lifting assembly (7) comprises a boost angle tube (71) connected to another exhaust port of the pressure storage tank (51), and the end of the boost angle tube (71) away from the pressure storage tank (51) is connected to a telescopic long tube (72), the bottom end of the telescopic long tube (72) is connected to a four-way joint (73), and both ends of the four-way joint (73) are connected to a short sealing cylinder (75), the inner cavity of the short sealing cylinder (75) is slidably connected to a short T-shaped rod (76), and a short return spring (77) is sleeved on the short T-shaped rod (76), and the top of the short T-shaped rod (76) is fixedly connected to a bracket (78) fixedly matched with the fixing frame (1).
5. The slag removal device for a submerged arc furnace according to claim 4, characterized in that: The gathering assembly (8) comprises a main bevel gear (81) fixed to the output shaft of the double-headed motor (41) on one side close to the cam (42), and a secondary bevel gear (82) is arranged on the other side of the main bevel gear (81), a first electric push rod (83) is fixedly connected to the right side of the secondary bevel gear (82), and a reciprocating screw (84) which is rotatably matched with the fixed frame (1) is sleeved on the outer side of the first electric push rod (83), a screw rod cylinder (85) is threadedly connected to the reciprocating screw rod (84), and a double-sided toothed plate (86) is sleeved on the outer side of the screw rod cylinder (85), both sides of the double-sided toothed plate (86) are meshed with a transfer gear (87) which is rotatably matched with the fixed frame (1), and the outer side of the transfer gear (87) is fixedly connected to a slide bracket (88) which is fixedly matched with the long sealing cylinder (53).
6. The slag removal device for a submerged arc furnace according to claim 5, characterized in that: First slide rails (10) are provided on both sides of the inner cavity of the fixed box (2), and the inner cavity of the first slide rail (10) is slidably connected to a first sliding block (11) fixedly matched with the swing frame (43).
7. The slag removal device for a submerged arc furnace according to claim 6, characterized in that: The bottom end of the long sealing cylinder (53) close to the telescopic short tube (52) is connected to a first pressure relief pipe (6), and a first pressure relief valve is arranged on the first pressure relief pipe (6).
8. The slag removal device for a submerged arc furnace according to claim 7, characterized in that: The inner end of the four-way joint (73) is connected to a second pressure relief pipe (74), and a second pressure relief valve is arranged on the first pressure relief pipe (6). The first pressure relief valve and the second pressure relief valve are of the same model and specification.
9. The slag removal device for a submerged arc furnace according to claim 8, characterized in that: Second slide rails (12) are provided on both sides of the inner cavity of the fixed frame (1), and second sliding blocks (13) fixedly matched with the double-sided toothed plate (86) are slidably connected on both sides of the inner cavity of the second slide rail (12).
10. The slag removal device for a submerged arc furnace according to claim 9, characterized in that: A conveying frame (14) used in conjunction with the fixing frame (1) is arranged on the inner side of the short sealing cylinder (75), and a chain plate type conveying belt (15) is driven on the inner side of the conveying frame (14).