Foundation pit construction operation platform device
Through the electric driving and retractable load-bearing beams of the foundation pit construction platform device, the problem of restricted deep foundation pit construction sites is solved, and the goals of shortening construction period, reducing waste materials and green construction are achieved, and the size and shape of different foundation pits are adapted to .
Patent Information
- Application Number
- CN202411502220.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2025-01-07
AI Technical Summary
The construction site of deep foundation pits is limited. The traditional method of adding side trest bridges has led to an extension of the construction period, a large amount of waste concrete waste is generated, which is not in line with the green construction concept, and affects the subsequent material lifting.
Design a foundation pit construction platform device, including an electric driving device, a retractable load-bearing beam and a steel platform. The electric driving device moves along the enclosure ring beam, and the load-bearing beam can be retracted to adapt to changes in the width of the foundation pit. The steel platform is spliced by multiple sub-components. Occupy the upper space of the foundation pit to avoid the impact on subsequent construction.
Effectively solve the problem of restricted construction sites in deep foundation pits, save construction period, reduce waste materials, reduce construction costs, conform to the green construction concept, expand application scenarios, and can be used repeatedly.
Smart Images

Figure CN119266054A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to a foundation pit construction work platform device. Background Art
[0002] Construction projects in cities are affected by planning and surrounding buildings. The site red line is often close to the edge of the foundation pit. As a result, during the excavation of the foundation pit, the pit edge is available for earthwork vehicles to drive, and the excavator construction area is severely limited. If the project is close to the subway or other important buildings and other facilities that are sensitive to deformation, the routes of heavy-loaded vehicles such as earthwork vehicles must avoid their protection areas during the construction road planning process, and the construction site is further limited.
[0003] In order to solve the problem of limited construction sites for deep foundation pits, most projects often adopt the method of adding side trestles. However, the construction of side trestles requires a long maintenance period. In addition, they need to be demolished during the project backbuilding phase, which will generate a large amount of abandoned concrete construction waste, which is not in line with the concept of green construction and will also lead to a significant increase in construction costs. In terms of side trestle construction, the side trestles will occupy the upper space of the foundation pit, making the subsequent lifting of steel supports and materials such as steel bar formworks difficult, thus affecting the construction period of deep foundation pit excavation.
[0004] In order to shorten the construction period, adhere to the concept of green construction, reduce the generation of construction waste, and solve the problem of limited deep foundation pit construction sites, technical personnel in this field have been looking for solutions. Summary of the invention
[0005] The purpose of the present invention is to provide a foundation pit construction work platform device, which can shorten the construction period, adhere to the concept of green construction, reduce the generation of construction waste, and solve the problem of limited deep foundation pit construction sites.
[0006] In order to solve the above technical problems, the present invention provides a foundation pit construction work platform device, the foundation pit construction work platform device comprising:
[0007] A pair of electric driving devices are respectively arranged on the retaining ring beams on the opposite sides of the foundation pit and can be moved along the retaining ring beams;
[0008] A load-bearing beam, both ends of which are connected to a pair of electric traveling devices;
[0009] Steel platform, laid on the surface of the load-bearing beam, is used to carry construction machinery and equipment.
[0010] Optionally, in the foundation pit construction work platform device, the load-bearing beam includes: a plurality of retractable load-bearing beams overlapped along the length direction.
[0011] Optionally, in the foundation pit construction work platform device, each retractable load-bearing beam includes: two telescopic rods parallel to each other, two supporting rods vertically fixed between the two telescopic rods, and a driving and control module; wherein, a first bolt hole is provided at both ends of each telescopic rod, and the two telescopic rods can be synchronously extended or shortened under the action of the driving and control module to change the length of the retractable load-bearing beam.
[0012] Optionally, in the foundation pit construction work platform device, each telescopic rod includes: a first component, a second component, two gears and a sleeve, the driving tooth mouth of the first component and the driving tooth mouth of the second component are arranged opposite to each other, and both are covered by the sleeve; the gear is arranged in the middle of the driving tooth mouth of both the first component and the second component, and the gear rotates in a predetermined direction under the drive control of the drive and control module, and the first component and the second component are made to move relative to each other under the meshing transmission action of the gears.
[0013] Optionally, in the foundation pit construction work platform device, each electric driving device includes: a vehicle plate frame, two driving limit devices respectively arranged at the front and rear ends of the vehicle plate frame, a driving motor arranged at the bottom of the vehicle plate frame, a first wheel and a second wheel, the output shaft of the driving motor is coaxially connected to the axle of the second wheel, and the first wheel will rotate with the second wheel.
[0014] Optionally, in the foundation pit construction work platform device, each driving limit device is provided with two second bolt holes whose spacing is adapted to the first bolt holes provided on the two telescopic rods in the telescopic load-bearing beam; after the bolt passes through the first bolt hole and the second bolt hole, it cooperates with the nut to connect the driving limit device to the telescopic load-bearing beam.
[0015] Optionally, in the foundation pit construction work platform device, each electric driving device includes: a load detection device.
[0016] Optionally, in the foundation pit construction work platform device, the steel platform includes: a plurality of sub-steel components spliced along the length direction.
[0017] Optionally, in the foundation pit construction work platform device, each sub-steel component includes: a main body, two slots, two connecting male heads and two connecting female heads adapted to the connecting male heads. All the slots are opened at the bottom of the main body, and their shapes are adapted to the sleeve; the two connecting male heads are respectively arranged on two adjacent sides of one body; and the two connecting female heads are respectively arranged on the other adjacent sides of the body.
[0018] The foundation pit construction work platform device provided by the present invention has the following advantages:
[0019] 1) The platform device of the present invention can be moved along the retaining ring beam, occupying only the space above the foundation pit, and can be adjusted as needed to make room for the space above the foundation pit, thereby avoiding spatial impact on subsequent construction (for example, lifting of steel supports, lifting of materials such as steel bar formwork, etc.), saving construction time, and effectively solving the problem of limited construction sites for deep foundation pits; compared with the traditional method of adding side trestles, it does not generate a large amount of waste concrete garbage, saving construction costs, and is conducive to green construction.
[0020] 2) The load-bearing beams and steel platforms are made of multiple sub-components, which can be increased or decreased according to the span of the foundation pit to be constructed, thus expanding the application scenarios. The construction process is simple and can be reused, reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of using a foundation pit construction work platform device for construction in one embodiment of the present invention. Figure 1 ;
[0022] Figure 2 It is a schematic diagram of using a foundation pit construction work platform device for construction in one embodiment of the present invention. Figure 2 ;
[0023] Figure 3 It is a schematic diagram of using a foundation pit construction work platform device for construction in one embodiment of the present invention. Figure 3 ;
[0024] Figure 4 yes Figure 3 Cross-sectional view along the aa direction;
[0025] Figure 5 Schematic diagram of an electric driving device in one embodiment of the present invention Figure 1 ;
[0026] Figure 6 Schematic diagram of an electric driving device in one embodiment of the present invention Figure 2 ;
[0027] Figure 7 is a top view of a sub-steel member according to an embodiment of the present invention;
[0028] Figure 8 is a side view of a sub-steel member according to an embodiment of the present invention;
[0029] Fig. 9 is a side view of two steel sub-members being spliced together in one embodiment of the present invention;
[0030] Fig.10 is a side view of a retractable load-bearing beam in one embodiment of the present invention;
[0031] Fig.11 yes Fig.10 Cross-sectional view along the bb direction;
[0032] Fig.12 is a top view of a retractable load-bearing beam in one embodiment of the present invention;
[0033] Fig.13 is a top view of two telescopic load-bearing beams overlapped in one embodiment of the present invention;
[0034] Fig.14 is a top view of a plurality of load-bearing beams spanning over a foundation pit in one embodiment of the present invention;
[0035] Fig.15 is a schematic diagram of a telescopic load-bearing beam in an embodiment of the present invention when performing an extension movement;
[0036] Fig.16 is a schematic diagram of a retractable load-bearing beam in one embodiment of the present invention when performing a retracting movement;
[0037] Fig.17 Schematic diagram of the disassembly of the retractable load-bearing beam in one embodiment of the present invention Figure 1 (sleeve not shown);
[0038] Fig.18 Schematic diagram of the disassembly of the retractable load-bearing beam in one embodiment of the present invention Figure 1 (Telescopic rods are not shown);
[0039] Fig.19 is a schematic diagram of a connection between a sub-steel member and a retractable load-bearing beam in one embodiment of the present invention;
[0040] Fig. 20 is a schematic diagram of a telescopic load-bearing beam connected to an electric traveling device in one embodiment of the present invention;
[0041] In the figure:
[0042] 1-enclosing structure; 2-enclosing ring beam;
[0043] 3-electric driving device; 301-driving motor; 302-second wheel; 303-car plate frame; 304-driving limit device; 305-second bolt hole; 306-first wheel;
[0044] 4-steel platform; 40-sub-steel component; 401-body; 402-connecting male head; 403-connecting female head; 404-card slot;
[0045] 5-load-bearing beam; 50-retractable load-bearing beam; 501-retractable rod; 5011-first component; 5012-second component; 5013-gear; 5014-sleeve; 5015_a, 5015_b-first bolt hole; 502-support rod; 503-drive and control module. DETAILED DESCRIPTION
[0046] The foundation pit construction work platform device proposed by the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.
[0047] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0048] In the description of the invention, it is necessary to understand that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.
[0049] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0050] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to the specific circumstances.
[0051] Please refer to Figures 1 to 20The foundation pit construction work platform device includes: a pair of electric driving devices 3, a load-bearing beam 5 and a steel platform 4. The pair of electric driving devices 3 are respectively arranged on the retaining ring beams 2 on the opposite sides of the foundation pit, and can be moved along the retaining ring beams 2; the two ends of the load-bearing beam 5 are respectively connected to a pair of electric driving devices 3 (at this time: the load-bearing beam is in a state of spanning the foundation pit. That is: it does not occupy the roads around the foundation pit, but only occupies the space above the foundation pit.); the steel platform 4 is laid on the surface of the load-bearing beam 5 to carry construction machinery and equipment (including transportation equipment, lifting equipment, excavation equipment, etc.). In other words, with the working platform device of the present invention, there is no need to provide roads around the foundation pit. Construction machinery and equipment such as excavators and earthmoving vehicles can be parked on this working platform device. They do not need to walk by themselves, but through the position movement of the foundation pit construction work platform device (the platform device is driven by the electric driving device 3 to achieve position movement), the position of each construction machinery and equipment is adjusted relative to the position of the foundation pit, and the problem of limited construction site of deep foundation pits is effectively solved.
[0052] Please refer to Figure 4 and Figure 5 The retaining structure 1 is a bored cast-in-place pile or a ground wall, the retaining ring beam 2 is the upper structure of the retaining structure 1, and the electric driving device 3 is arranged on the retaining ring beam 2.
[0053] It can be understood that multiple foundation pit construction work platform devices can be set on the retaining ring beams on opposite sides of the foundation pit to meet the construction needs of different construction machinery and equipment.
[0054] Example 1: Figure 1 and Figure 2 As shown, two foundation pit construction work platform devices are arranged on the retaining ring beams on opposite sides of the foundation pit, one of which is used to carry the excavator and the other is used to carry the transport vehicle, so as to serve as a dedicated construction road for the transport vehicle. The positions of the two foundation pit construction work platform devices are adjusted according to their respective needs, mainly based on their respective pair of electric driving devices to achieve position movement.
[0055] The platform device of the present invention can be moved along the retaining ring beam, only occupying the space above the foundation pit, and can be adjusted as needed to make room for the space above the foundation pit, thereby avoiding spatial impact on subsequent construction (for example, lifting of steel supports, lifting of materials such as steel bar formwork, etc.), saving construction time, and effectively solving the problem of limited construction sites in deep foundation pits; compared with the traditional method of adding side trestles, it does not generate a large amount of waste concrete garbage, saves construction costs, and is conducive to green construction.
[0056] For further information, please refer to Figures 10 to 14 The load-bearing beam 5 includes: a plurality of telescopic load-bearing beams 50 overlapped along the length direction, and two adjacent telescopic load-bearing beams 50 are connected by bolts (such as Fig.13As shown); wherein each telescopic load-bearing beam 50 comprises: two telescopic rods 501 parallel to each other, two supporting rods 502 vertically fixed between the two telescopic rods 501, and a driving and control module 503; wherein, each telescopic rod has a first bolt hole 5015_a and a first bolt hole 5015_b at both ends, and the two first bolt holes have the same size, but the directions of the bolt holes are different (perpendicular to each other), so as to support the connection of two adjacent telescopic load-bearing beams 50 by bolts, and the two telescopic rods 501 can be extended or shortened synchronously under the action of the driving and control module 503, so as to change the length of the telescopic load-bearing beam 50, so as to meet the needs of extending or shortening the foundation pit. Because the direction of extension is the width direction of the foundation pit, it is also possible to walk on the upper part of an irregular foundation pit by adjusting the width of the load-bearing beams at different parts.
[0057] For details, please refer to Figures 15 to 17 Each telescopic rod 501 includes: a first member 5011, a second member 5012, two gears 5013 and a sleeve 5014. The driving teeth of the first member 5011 and the driving teeth of the second member 5012 are arranged opposite to each other, and both are covered by the sleeve 5014; the gear 5013 is arranged in the middle of the driving teeth of the first member 5011 and the second member 5012. The gear rotates in a predetermined direction under the driving control of the driving and control module 503, and the first member 5011 and the second member 5012 move relative to each other under the meshing transmission of the gears. The telescopic bearing beam 50 can realize the free extension and contraction of the telescopic rod 501 under the driving of the driving gear 5013, so as to extend or shorten according to the demand, so that the width of the construction platform device can be extended or shortened according to the demand of the foundation pit, and the width of the bearing beam at different parts can be adjusted to realize walking on the upper part of the irregular foundation pit.
[0058] Please refer to Figure 5 and Figure 6 Each electric driving device 3 includes: a vehicle plate frame 303, two driving limit devices 304 respectively arranged at the front and rear ends of the vehicle plate frame 303, a driving motor 301 arranged at the bottom of the vehicle plate frame 303, a first wheel 306 and a second wheel 302, the output shaft of the driving motor 301 is coaxially connected to the axle of the second wheel 302, and the first wheel 306 will rotate with the second wheel 302.
[0059] For further information, please refer to Fig. 20Each travel limit device 304 is provided with two second bolt holes 305 whose spacing is adapted to the first bolt holes (5015_b) provided on the two telescopic rods 501 in the telescopic load-bearing beam 50; after the bolt passes through the first bolt hole (5015_b) and the second bolt hole 305, it cooperates with the nut to connect the travel limit device 304 with the telescopic load-bearing beam 5, so that the load-bearing beam 5 is connected to the electric travel device 3, so that when the electric travel device 3 moves on the enclosure beam, it drives the load-bearing beam 5 connected thereto to move its position.
[0060] Preferably, each electric driving device 3 includes: a load detection device to monitor the load condition of the device in real time, and immediately alarm once the load exceeds the allowable value to ensure construction safety.
[0061] Please refer to Figures 7 to 9 , Fig.19 The steel platform 4 includes: a plurality of sub-steel components 40 spliced along the length direction; wherein each sub-steel component 40 includes: a main body 401, two card slots 404, two connecting male heads 402 and two connecting female heads 403 adapted to the connecting male heads 402, all the card slots 404 are opened at the bottom of the main body, and their shapes are adapted to the sleeve 5014; the two connecting male heads 402 are respectively arranged on two adjacent sides of one main body; the two connecting female heads 403 are respectively arranged on the other adjacent sides of the main body.
[0062] During use, the multiple sub-steel components 40 in the steel platform 4 can be divided into two parts based on the connecting male head and the connecting female head according to the needs of the site, so as to facilitate the entry and exit of earth-moving vehicles.
[0063] All components (steel platform 4, load-bearing beam 5, electric driving device 3) of the foundation pit construction work platform device of the present invention are assembled in an assembled manner, which is convenient for installation and removal, and can be repeatedly used after removal, thereby reducing construction costs.
[0064] In addition, the load-bearing beam 5 and the steel platform 3 are both made of multiple sub-components. The number of sub-components can be increased or decreased accordingly according to the span of the foundation pit to be constructed (foundation pits of different sizes), thereby expanding the application scenarios, simplifying the construction process, and being reusable, thereby reducing construction costs.
[0065] It can be understood that the above examples are merely examples listed for a better understanding of the technical solutions of the embodiments of the present application, and are not intended to be the sole limitation to the embodiments.
[0066] Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0067] On the other hand, in order to better understand the working process of the foundation pit construction work platform device of the present invention, the following is combined with Figures 1 to 20 The construction process is described in detail as follows:
[0068] S1: After the retaining ring beam of the foundation pit reaches the designed strength, clean the surface of the retaining ring beam to ensure that the platform walking area is flat and free of protruding obstacles;
[0069] S2: Measure the width of the foundation pit, select load-bearing beams and other devices according to the width of the foundation pit, and determine the required width of the steel platform;
[0070] S3: Equipment materials enter the site;
[0071] S4: Assemble the retractable load-bearing beam and install the load-bearing beam on the electric traveling device;
[0072] S5: Use a tower crane to hoist the assembled load-bearing beam to the upper part of the retaining ring beam;
[0073] S6: Lift the steel platform to the top of the load-bearing beam and fix it;
[0074] S7: Inspection and acceptance, after the test run, start excavation of the foundation pit;
[0075] S8: The platform device is parked at the end of the foundation pit, and the excavator and earthmoving vehicle drive to the upper part of the platform and start to take soil downwards;
[0076] S9: After the earthmoving vehicle is loaded, the steel platform connection lock is opened, the earthmoving vehicle platform device moves to the end of the foundation pit, and the earthmoving vehicle exits the pit;
[0077] S9: Repeat steps 8 and 9 until the excavation is completed.
[0078] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0079] Obviously, those skilled in the art can make various changes and modifications to the invention without departing from the spirit and scope of the invention. Thus, if these modifications and variations of the invention fall within the scope of the claims of the invention and their equivalents, the invention is also intended to include these modifications and variations.
Claims
1. A foundation pit construction work platform device, characterized in that: include: A pair of electric driving devices (3) are respectively arranged on the retaining ring beams (2) at two opposite sides of the foundation pit and can be moved along the retaining ring beams (2); A load-bearing beam (5), both ends of which are respectively connected to a pair of electric driving devices (3); The steel platform (4) is laid on the surface of the load-bearing beam (5) to carry construction machinery and equipment.
2. The foundation pit construction work platform device according to claim 1, characterized in that: The load-bearing beam (5) comprises: a plurality of telescopic load-bearing beams (50) overlapped along the length direction.
3. The foundation pit construction work platform device according to claim 2, characterized in that: Each telescopic load-bearing beam (50) comprises: two telescopic rods (501) parallel to each other, two supporting rods (502) vertically fixed between the two telescopic rods (501), and a driving and control module (503); wherein, first bolt holes (5015_b) are provided at both ends of each telescopic rod, and the two telescopic rods (501) can be synchronously extended or shortened under the action of the driving and control module (503) to change the length of the telescopic load-bearing beam (50).
4. The foundation pit construction work platform device according to claim 3, characterized in that: Each telescopic rod (501) comprises: a first component (5011), a second component (5012), two gears (5013) and a sleeve (5014); the driving tooth opening of the first component (5011) and the driving tooth opening of the second component (5012) are arranged opposite to each other, and both are covered by the sleeve (5014); the gear (5013) is arranged in the middle of the driving tooth openings of the first component (5011) and the second component (5012); the gear rotates in a predetermined direction under the driving control of the driving and control module (503), and the first component (5011) and the second component (5012) move relative to each other under the meshing transmission action of the gears.
5. The foundation pit construction work platform device according to claim 3, characterized in that: Each electric driving device (3) comprises: a vehicle frame (303), two driving limit devices (304) respectively arranged at the front and rear ends of the vehicle frame (303), a driving motor (301) arranged at the bottom of the vehicle frame (303), a first wheel (306) and a second wheel (302), wherein the output shaft of the driving motor (301) is coaxially connected to the wheel axle of the second wheel (302), and the first wheel (306) rotates following the second wheel (302).
6. The foundation pit construction work platform device according to claim 5, characterized in that: Each travel limit device (304) is provided with two second bolt holes (305) whose spacing is adapted to the first bolt holes (5015_b) provided on the two telescopic rods (501) in the telescopic load-bearing beam (50); after the bolt passes through the first bolt hole (5015_b) and the second bolt hole (305), it cooperates with the nut to connect the travel limit device (304) to the telescopic load-bearing beam (50).
7. The foundation pit construction work platform device according to claim 5, characterized in that: Each electric driving device (3) comprises a load detection device.
8. The foundation pit construction work platform device according to claim 4, characterized in that: The steel platform (4) comprises: a plurality of sub-steel components (40) spliced along the length direction.
9. The foundation pit construction work platform device according to claim 8, characterized in that: Each sub-steel component (40) comprises: a main body (401), two slots (404), two connecting male heads (402) and two connecting female heads (403) adapted to the connecting male heads (402); all the slots (404) are arranged at the bottom of the main body (401), and their shapes are adapted to the sleeve (5014); the two connecting male heads (402) are respectively arranged on two adjacent sides of the main body (401); and the two connecting female heads (403) are respectively arranged on the other adjacent sides of the main body (401).